Loading...
2013, 09-26 Permit: SW-13001688 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001688 Permit Issued Date: 09/26/2013 Expiration Date: 09/26/2014 Project Description: SEWER CONNECTION Project Name: WEST FARMS Primary Contact: H & R COMPLETE Phone: 509-218-8336 Applicant: H & R COMPLETE Address: PO BOX 749 NEWMAN LAKE-, WA 99025 Phone: 509-218-8336 Email: SITE INFORMATION: Site Address: Parcel Number: 4809 N EVERGREEN RD 46344.0715 Owner: NOVELLI JR, LEONARD J Address: 4809 N EVERGREEN RD SPOKANE, WA 99216-1433 Phone: Assessor's Description: WEST FARMS IRR 4 LEGGE SUB TR 1 OF SP96- Email: 1061 AUDITOR'S #4063819 BK 13, PG 83 BNG A PTN OF BLK 8 Inspection Area: : (509)-477-3675 Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Zoning: Land Area: 15529 Square Feet CONTRACTOR INFORMATION: HRCOMI*972DD, Exp. 03/04/2015 H & R COMPLETE PO BOX 749 NEWMAN LAKE-, WA 99025 509-218-8336 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Possible FEMA Flood Zone CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 09/26/2013 11:39:15 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001688 Permit Issued Date: 09/26/2013 Expiration Date: 09/26/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/26/2013 11:39:15 Project Coordinator: Dawn Dompier