Loading...
2015, 01-30 Permit: SW-15000057 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000057 Permit Issued Date: 01/30/2015 Expiration Date: 01/30/2016 Project Description: SEWER Project Name: WEST FARMS Primary Contact: J L HAWKINS EXCAVATING Phone: 509-924-9025 Applicant: J L HAWKINS EXCAVATING Address: 9722 E NORA AVE SPOKANE, WA 99206-0000 Phone: 509-924-9025 Email: SITE INFORMATION: Site Address: Parcel Number: 4812 N EVERGREEN RD 46353.0803 Assessor's Description: W FARM IRR 4 EVERGREEN B3 Inspection Area: : (509)-477-3675 Owner: BUTTERS, J W / KANE, N F / EVANS JR, JM Address: 9310 E GREENLEAF DR MEAD, WA 99021 Phone: Email: Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Zoning: Land Area: 1.03 Acre(s) CONTRACTOR INFORMATION: JLHAWE*222LE, Exp. 05/31/2016 J L HAWKINS EXCAVATING 9722 E NORA AVE SPOKANE, WA 99206-0000 509-924-9025 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $27.12 $125.00 $152.12 $125.00 CONDITIONS: Inside Public Transit Benefit Area Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 01/30/2015 09:54:23 Project Coordinator: Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000057 Permit Issued Date: 01/30/2015 Expiration Date: 01/30/2016 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/30/2015 09:54:23 Project Coordinator: Susan Clark