2013, 04-16 Permit: SW-13000471 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000471
Permit Issued Date: 04/16/2013
Expiration Date: 04/16/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
WEST FARMS
POUL CONSTRUCTION
509-979-5872
Applicant: POUL CONSTRUCTION
Address:
Phone:
Email:
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
SITE INFORMATION:
Site Address:
Parcel Number:
5010 N EVERGREEN RD
46353.0717
Assessor's Description: WEST FARMS IRR TRS PLAT 4 S 85FT OF N
170FT OF W 281 FT OF BLK 115
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
KESSINGER, STEVEN W & MELISSA D
5010 N EVERGREEN RD
SPOKANE VALLEY, WA 99216
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Land Area: 0.55 Acre(s)
CONTRACTOR INFORMATION:
POULCC`932BQ, Exp. 01/28/2015
POUL CONSTRUCTION
18902 E 2ND AVE SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Possible FEMA Flood Zone
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/16/2013 10:09:28 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000471 Permit Issued Date: 04/16/2013
Expiration Date: 04/16/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/16/2013 10:09:28 Project Coordinator: Dawn Dompier