Loading...
2014, 05-01 Permit: SW-14000546 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000546 Permit Issued Date: 05/01/2014 Expiration Date: 05/01/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION WEST FARMS RYAN CONSTRUCTION & EXCAVATION 509-218-4105 Applicant: RYAN CONSTRUCTION & EXCAVATION Address: Phone: Email: 10404 S SPOTTED RD CHENEY, WA 99004 509-218-4105 SITE INFORMATION: Site Address: 5213 N EVERGREEN RD Parcel Number: 46344.0116 Assessor's Description: TR C OF SP 78-028 BEING A PTN OF BLK 105 & 110 OF W FARMS IRR TR PLAT #4 7808160223 Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: RIEDLINGER, STEVEN J & MARI J 12805 52ND DR SE EVERETT, WA 98208 Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Land Area: 13125 Square Feet CONTRACTOR INFORMATION: RYANC"071BH, Exp. 09/06/2015 RYAN CONSTRUCTION & EXCAVATION 10404 S SPOTTED RD CHENEY, WA 99004 509-218-4105 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Possible FEMA Flood Zone CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/01/2014 09:02:18 Project Coordinator: Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000546 Permit Issued Date: 05/01/2014 Expiration Date: 05/01/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/01/2014 09:02:18 Project Coordinator: Julie Shatto