2012, 08-27 Permit: SW-12002072 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002072
Permit Issued Date:
08/27/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: SWANSON'S CONSTRUCTION
Project Name: WEST FARMS Applicant: SWANSON'S CONSTRUCTION
Permit Type: SEWER Address: 11205 E EMPIRE AVE
SPOKANE, WA 99206
Phone: 509-926-1762
Email:
SITE INFORMATION:
Site Address: 5321 N EVERGREEN RD Owner: PIERCE, OLIVER/FRAZIER, MARY
Parcel Number: 46344.0112 Address: 5321 N EVERGREEN RD
SPOKANE, WA 99216-1432
Subdivision: PLAT NO 4 OF WEST Phone:
FARMS IRRIGATED
TRACTS
Assessor's Description: WEST FARMS IRR TR PLAT 4 N8OFT OF Email:
S387.70FT OF E147FT OF TR 105
Inspection Area:
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Zoning: Land Area: 11760 Square Feet
CONTRACTOR INFORMATION:
General Contractor
SWANSC*893D9
SWANSON'S CONSTRUCTION
11205 E EMPIRE AVE
SPOKANE VALLEY, WA 99206
509-981-0852
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible FEMA Flood Zone
Date Printed: 08/27/2012 13:27:46
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002072 08/27/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/27/2012 13:27:46
Printed by: IIS APPPOOLASP.NET v4.0