1978, 10-09 Permit App: N1704 DemolitionCourt of Spokane, Washineon
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99260
APPLICATION FOR LAND USE OR STRUCTURE PERMIT °/
GENERAL REQUIREMENTS PERMIT FEE
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building
or structure already erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Con-
struction must have inspections.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders
or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47-235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line is required. See current
Spokane County Zoning Ordinance for all required set -backs.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance
with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must
be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory building (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable
through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner ../81111urt
aci, .o
Architect .
Engineer
Contractor
p i
Address _( , /.27f�. C,
Address
Address
Address 4'
Phone
Phone
Phone
9,R4/47S.2_
Phone
ert ( ive complete Legal D scription of Pro �S y description from deed, tax rec,pipt,etc.) Parcel Nu er- xc� rf s..''/ - if
�r e isztAr_ Qi✓tri' ��F t�t�-6 YI ��+�C lib rfi.c rGd.GQyL.
ON OF WORK: New Addition
3dT
Storie
Rooms y'
Heat. System
Use of Bdg
l
ROADWAY R/W
Basement A/A
(Full, part, none)
Type of Roofing
jr.m..e.L.e,2.
T� l
Remodel
Foundation Const
Moving BI g. Zone 1 Fire Zone
Sewage System onst.
onc., r., jt� 0
Chimney i1/, - . ace_ ALA
(Nurpber
Ext. Finish Ai