Loading...
1978, 05-15 Permit App: M6451 ResidenceJob # 203 County of Spokane, Washingtonstoweveutiousimk BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS / I PERMIT FE~ °'' {.v PERMIT WIRED. -A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already- erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land ,which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. I APPLICANT FILL IN BELOW THIS LINE Name of Owner Haase Construction, Inc. Address N. 25 Mullan. Suite 304 Phone 928-1161 • Architect Address Phone i Engineer Address Phone Contractor Haase Construction, Inc. Address N. 25 Mullan. Suite 304 978-1161" one Legal Description of Property (Give complete description from deed, tax receipt, etc.) Parcel Number¢ r, �_ 7.0k, The W 75' of the N. 150' of Block 157 of Orchard Avenue Addition. 347s' RZIADWAY R/W WIDTH .�- DESCRIPTION OF WORK: New • X Addition Remodel Moving 7s Size of Lot 75' x 150' a Bldg. Zone Fire Zone C� Sewage System • Septic onst. frAMP 4{ 7'` r., Conc.. r., etc. : ",e Stories SE Dimensions 32' x 24' Total SqFt full 800 valuation Rooms _Baths 1 Basement Foundation Const concrete ChimneynoneFireplacenone el ec r�%be art' none (Kind) Number Heat. System Type of Roofing comp. Ext Finish wood Int Wall Finish (MP. bd. Use of Bldg. Single Family Dwelling - Unfinished basement No of Units LBedrooms 2 Draw sketch with dimensions showing: (1) Proposed buildings; (4) distance to property tem and water supply lines. NORTH PLOT PLAN property lines; (2) street or road locations; (3) location of existing and lines and streets; (5) dimensions of buildings; (6) location of sewage sys- I hereby cer as r y SOUTH subs t orrect and State License No, Ind. Ins. Acct. No. RESIDENTIAL - COMMERCIAL REQUIRED Plumbing Permit m Heating Permit Sewage Permit mi Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed ere are no o rer structures located .n this property except �/'✓ Ulla. A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS 1S NOT A PERMIT. O4/,l4iaMJ DO NOT WRITE BELOW THIS LINE ner or Agent Date Your street address will be W./ (•j ‘7 I/ The zone is �� ✓�- The t sued Sewage Permit Number Issued Building Permit • Remarks t):- Ce e f� ier / .i jl`�� �v �4 1, -ea 'el) 7 ' Form 523 Bldg. Code ' - ONSTRUCTION. N. 25 MULLAN, SUITE 304 INC' SPOKANE, WASHINGTON 99206 PLOT PLAN FA'Rule w Hyt, Requested Price 3//PICO Lot Cost rodeI prole) Iro raper /n2 /0craa1 thner e (� n,t1r'1� /D /D''a; .2 7' -19'- 41'. walk LZ"ooeth11A' 0 3.2 900-5 FP: &I' d 5' L• `) I ln,• I� tl a`„ 15 1,1 JcLii 60 -43 .I ail ELEVATIONS: Crown of Street fit vl Basic: 'Sq Ft 7S2 Scale: C ' pp /� ' Legal The W 75' of the E 150' of the N �O() "-?__ yo Q_F Block 157 of Orchard Avenue Addi Ffl le- g"- Jo6-713 i Address: � y � 4'� � 7_42 a4:4 Mortgage Co.LOClpl%1Jattb._IJ L+ abaliem. 1, / 6c.c �� Power Co. ; Water �,�„� IS�'2 a( / �Tum6 r 7 % ; Ezc�ia CoCo. �� � t7S`l'1