2009, 05-05 Permit App: 09001065 MHProject Numbe
09001065 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/5/2009 Page 1 of 2
Project Information:
Permit Use: 26 X 60 2009 FLEETWOOD
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Contact: NORTHWEST EXCAVATING
Address: 1169 BUTTE AVE
C - S - Z: ATHOL ID 83801
Phone: (208) 691-1578
Group Name:
Project Name:
Name: Range
District: Nort
Parcel Number: 35121.1904
Block: Lot:
SiteAddress: 7217 E FAIRVIEW AVE
Location:: CSV
Owner: Name: HAIRE, PATRICK S & ANNETTE
Address: 7217 E FAIRVIEW AVE
SPOKANE, WA 99212-1526
Zoning: R-2 SF Res Suburban District
Water District' 002 ORCHARD AVENUE
Area: 10,950 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Other Reviews
Released By: - - -.
CITY BUSINESS LICENSE
Originally Released: 4/23/2009 By: jdavis
Landuse/Zoning/HE Conditions
Perm its •
Released'By:x
AOZ Title notice received 5/5/09
Originally Released: 5/5/2009 By. MBASINGE
Contractor: NORTHWEST EXCAVATING
Address: 1169 BUTTE AVE
ATHOL ID 83801
Item Description
INSPECTION FEE
Manufactured Home
Firm: NORTHWEST EXCAVATING
Phone: (208) 691-1578
Units Unit Desc
2 # SECTIONS
Fee Amount
$100.00
Permit Total Fees: $100.00
Operator: JD Printed By: jmm Print Date. 5/5/2009
Project Dumber: 09001065 Inv: 1
Application
Date: 5/5/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes
All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement,
grasscrete, paver blocks, or other equivalent hard surface material.
VCA signed 5/4/09 - Owner must either demolish existing 576 house or convert to accessory structure
w/in 60 days of issuance of COO for new manufactured home.
7222 E UTAH AVE --PROPERTY MUST BE DIVIDED TO ADD TI -IE RESIDENCE IN THE SHOP.
TILE EXISTING SHOP CAN BE EXPANDED TO A MAXIMUM OF 1,029 SF.
Payment Summary: _
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Manufactured Home $100.00 $100.00 $0.00 $100.00
$100.00 $100.00 $0.00 $100.00
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 5/5/2009
Spokane
Valley
' For City Use Only
PLUS Project Number nt0(6S
ProjectAddress
77 If
11703 E Sprague Ave Suite'B-3 t Spokane_Valley WA'99206 - '
509.688.0036 t Fax: 509.688.0037,1 permitcenter@spokanevatley.org
•
As part . of bur, on-going. commitment to `customer ,service during the review process ofyour ;project:_
application, we are providing you with a. TARGET DATE for the initial technical application. review;' If for
any reason'we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is ;the date' we estimate your project application will have had, its initial technical
.review. It is not the date for approval`or permit issuance.
Tips for'a'Smoother Proiect'Application Review
i Submit complefe,_accurate plans and documents.
Evh'a time may be rerplired folie-.ruhtinittals-as-project application reviewers 1i,ork.on multiple applications and it
may be several days before thei- can.look at your nem or revised information. -
i Designate a specific contact person to communicate with the City.
While the person designated as the applicants contact person with the,City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice far the entirereview process. ,
i Call staff regarding the status of your project only. after the target date shown at the' top'of the page. -
Although you should be contacted on or by the target.date; please feel free to contact us if you hai ei't heardjrom-us
by your target date. Staffmay contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
I. Counter Complete. Your application has been accepted ,as. counter complete. This, means ail of the required
documents,'as indicated on your Pre -Application Checklist have been submitted or. have, been approved for `deferred
submittal. This does not prevent'tcchnical staff from requesting additional information as a result of. their.technical review.
2. Quality Check- The next step in the process is a•quality check, to make sure that the application is:reviewable,and free
from substantive (laws that would prevent technical staff from completing the technical review ouce'it i started: When
this step is complete, your application will be routed to the appropriate staff. and remain in their review queue until it
comes up for review.
•
3- Technical Compliance- Once an application is administratively complete,_ it is 'routed to technical staff for; compliance
review. Depending on the type of project, technical staff may include multiple reviewers., You' should be, contacted by
phone, fax or mail by your TARGET DATE once the initial technical compliance review is complete;
4. Permit Issuance. When the technical compliance review of the.application is complete, including'any subsequent re -
submittals, each reviewer will approve their section of the 'application and route it to the Permit Center. When`all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on' your
application for permit pick-up. information regarding fees and pre -construction meetingsXif required) will be provided by
the Permit Specialist at that time. •
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
u
.
APPROVED BY
Properfy line
-ail E.-6(f‘i«w Ajtiu ,vv1/1/wok__19oi)
7217 E Fairview
1 i 1512.12912 ill— - •.
—0
rf
r
351211D1: ' 1'
s
+ R
f�..
r J
•� r ...,7w a 'i
1 R 4
u .1r
',,° 14 a 111"
•
• F
35171 1933
36121.1901 city of spoRane Valley
1
1
35121.1805 ill-
d ■
iPfr
'"Iilliit 1111.e
' 3Q Om
SIM