Loading...
2012, 06-01 Permit: SW-12001467 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001467 Permit Issued Date: 06/01/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: ELECTRIC RAILROAD Permit Type: SEWER Primary Contact: ACME EXCAVATING Applicant: ACME EXCAVATING Address: 6808 S LINKE RD GREENACRES, WA 99016 Phone: 509-251-8058 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area. 8116E FAIRVIEW AVE 45072.3403 ORCHARD AVENUE, REPLAT OF BLKS 151- 154 ORCHARD AVE ADD REPLAT BLK 151 TO 154- 178-179&225 W75' OF E 175' OF BLK 244 Owner: Address: Phone: Email: SCHADE, FRANK S & TRICIA P 8116 E FAIRVIEW AVE SPOKANE, WA Water District: Orchard Fire District: Fire District 1 Avenue Irrigation District #6 Zoning: Land Area: 0.2546 acres / 11090 sqft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 5125.00 5125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: 5125.00 525.94 5125.00 5150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 06/01/2012 11:00.45 Printed by: 115 APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001467 06/01/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/01/2012 11'00:45 Printed by IIS APPPOOLWSP.NET v4.0