Loading...
1984, 02-28 Permit: 84A-1672 Basement FinishrLAN NUMtstH ArrL III.:ArIUN / PERM IT SPOKANE COUNTY — DEPARTMENT OF BUILDING & SAFETY NORTH 811 JEFFERSON / SPOKANE, WASHINGTON 99260 / (509) 456-3675 APPLICANT: COMPLETE NUMBERED SPACES —PRESS HARD TO MAKE 3 COPIES STREET ADDRESS PARCEL NO. . 113 10 P -Al P„ /JVW LOT BLOCK SUBDIVISION LEGAL DESCRIPTION: 2. 1Jwtflcl��lPh3 ,fir k OWNER PHONE PHONE ,7 O MAILING ADDRES§ ZIP Actual Set Backs in Feet to: ® North South East West CONTRACTOR �^A ' LICENSE EXPIRES PHONE Size of Parcel Zone Classification Residential 4. Commercial ❑ ADDRESS ZIP Type Const. Occupancy Sprinklered Dyes ❑No ❑Req'd. DESIGNER PHONE New Const. Valuation Remodeled Valuation Total Bldg. Floor Area 5. ADDRESS ZIP Main Floor Upper Floors Garage/Storage Greenhouse 6. CHANGE OF USE FROM TO Cover Deck Uncv. Deck Fin. Basement Unfin. Basement PE ❑NEW El ALT. El AD'N. 11 RPL. El MVE. No. Baths No. Floors No. Fin. Rooms No. Dwellings !• OF OTHER WORK ElBLD. ElPLMB. 11MECH. ElM.H. ElPOOL Certifi.ofExempt. Required Yes❑ No❑ Number or Variance Received Yes❑ No❑ 8. DESCRIBE WORK �^����iN��j�,-� IN�n pans Required �❑elinesNoloodplazar❑d ❑ 01 9 ZA� ATIONO SOURCE OF GAS ELECTRIC PUBLIC ATE ❑ SEPTIC ❑ Ownership FEES COLLECTED 1 UTILITIES PRIVATE ❑ SEWER ❑ Public ❑Private ❑ certify that I have read and examined this application and have read the "NOTICE" provisions includelof reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this typwork will be complied with whether specified herein or not. The granting of a permit does not presume to give Building thority to violate or cancel the provisions of any other state or local law regulating construction or the performa of construction. SEE REVERSE IDE FOR REQUIRED INSPECTIONS Plumbing SIGNATURE OF APPLICATION , OWNER OR AGENT DATE Mech. SPECIAL APPROVALS SPECIAL CONDITIONS: (SEE ROVERSE SIDE FOR NOTICE) PRELIM. FINAL DATE Plan Check Env. Health Planning Prevent Utilities SEPA Plans PERMIT IS NONTRANSFERABLE Exam. PERMIT IS NULL AND VOID IF WORK HAS NOT COMMENCED Building IN 180 DAYS Tech. SEPA Modular/ MFG. Home Other (Specify) P RMIT NUMBER A — /,y Z=- TOTAL $ WHEN MACHINE VALIDATED IN THIS SPACE, THIS BECOMES A PERMIT. DATEhSt uFi:2 8 .J 4 PERMITiNe. 7, 2 5 *75.0�?a°AL CL O CJ W J_ IJ_