2005, 12-21 Permit: 05004698 ROWSpokane
#Valley
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 600 S FARR @ 6TH AVE
Parcel Number: 99999.9999
Subdivision:
Block:
Zoning: UNK
Lot:
Unknown
Owner: UNKNOWN
Address: UNKNOWN
UNKNOWN
Building Inspector: KEVIN SEVERANCE
Water Dist:
Project Number: 05004698 Inv: 1 Issue Date: 12/21/2005
Permit Use: ROAD OBSTRUCTION FOR INSTALLATION OF
CABLE/CONDUIT/POLE
Applicant: AVISTA UTILITIES
1411 E MISSION MSC -60
SPOKANE WA 99220 Phone: (509) 495-2244
Contact: AVISTA UTILITIES
1411 E MISSION MSC -60
SPOKANE WA 99220 Phone: (509) 495-2244
Setbacks - Front: Left: Right: Rear:
Jurisdiction:: AVISTA UTILITIES
Group Name:
Project Name:
Permits
Right of JVay Contractor: UNKNOWN
License /I: UNKNOWN
OBSTRUCTION/INSPECTION
FOR RIGHT OF WAY INSPECTIONS CALL
(509) 869-5373 ENGINEERING
I 570.00
Total Permit Fee: $70 00
Payment Summary
Total Fees AmountPaid AmountOwing
$70.00 50.00
$70.00
Tran Date Receipt # Payment Anil
12/21/2005
Processed By: JANSSEN, CHRISTINA
Printed By: Main, Jodi L Page 1 of 1
3849 $0.00
PERMIT
al•
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessanly Indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering. metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place. rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails. skirting. etc. installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be Inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eieclncal wiring, Stale Department 01 Labor Permis and Inspections for Sewer Connection. Spokane County Utilities Dtvision
And Industries 324-2640 477-3604
Permis and inspections fir on-site septic systems. Spokane Regional
Health D,stnct 324-1560
Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley
Fire Department 892-4122
State law RCW 19 122 requires that pnor to any excavation the -CALL BEFORE YOU DIG- center must be notified Gat before you dig at least 2 working days in advance. 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
Spokane e�
4 Valley
Call 24 hours before inspection required
Phcc 502+688-0195 Fax 509.688-0037
DEPARTMENT OF PUBLIC WORKS
2-1 Lo9
7-V
Anticipated start date 12-19-05 Permit # Account #
ROW CONSTRUCTION PERMIT
LOCATION OF PROPERTY- Farr Rd & 6th
(Address/Parcel #, if available)
Applicant Name Avista Utilities Fax 534-2463
Address 1411 E. Mission Ave. Spokane, Wa. 99202 — Ann-MSC60 Phone 509-495-2244
Contractor's Name
Address Phone
Contractor's Reg.# Expires
PROJECT DESCRIPTION (Provide site sketch or plan as necessary for clarity)
Sewer Connection Driveway
n Curb & Gutter Gas Installation/Repair
Cable/Conduit/Pole n Sidewalk Repair/Construction
n Other
Dimensions
x
n Water Installation/Repair
nPavement Cut
Bond/insurance certification must be on file with the City. Bond #
SPECIAL INSTRUCTIONS) Replacing pole @ the SW corner of above intersection car hit pole. Job
# 834177369 Locate ticket #5414941
Permittee Signature_AKC Approved
Date
I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card.
Card # Expiration Date
Name of Holder Signature
Fees Paid$ 25.00
(Application) (Inspection)
In addition to the permit application fee of $16.00 (utility) or $25.00 (construction), inspection on
each permit will be billed to the permittee at a rate of $50.00 per hour with a $25.00 (1/2 hour)
minimum. Permittee signature constitutes an agreement to these terms and provisions.
Date
!nit
Work completed satisfactorily (Signed)
Permit not valid until One -Call Notification Ticket # entered here
Date
PERMIT MUST BE KEPT ON SITE