Loading...
2010, 09-15 Permit App: 10002841 GarageProject Number: 10002841 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/15/2010 Page 1 of 2 Project Information: Permit Use: NEW 26 X 36 DETACHED GARAGE Contact: THE DECEMBER TRUST Address: 8030 FAIRVIEW AVE C - S - Z: LA MESA, CA 91941 Setbacks: Front Left: Right: Rear: Phone: (619) 251-6572 Group Name: Site Information: Project Name: Plat Key: 001835 Name: OPPORTUNITY TR # 01-354 District: Nort Parcel Number: 45173.1731 SiteAddress: 104 N FARR RD Location:: CSV Block: Lot: Zoning: MU Mixed Use Water District: 011 MODERN Area: 24,000 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Owner: Name: THE DECEMBER TRUST Address: 8030 FAIRVIEW AVE LA MESA, CA 91941 Hold: [i Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 9/10/2010 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Paving not required since it is an expansion of an existing structure Originally Released: 9/14/2010 By: lbarlow Operator: jmm Printed By: JD Print Date: 9/15/2010 Project Number: 10002841 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/15/2010 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grn llym Notes Su Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB PLAN 936 $17,784.00 936 $17,784.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 936 $17,784.00 936 $17,784.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $293.25 $73.31 $4.50 Notes: Paving is not required since the garage is an expansion of an existing structure. $371.06 FOR 212 N LOCUST, 214 N LOCUST & 216 N LOCUST (SHP-12-06), A 6- FOOT HIGH SIGHT - OBSCURING FENCE, WALL OR LANDSCAPING MUST BE INSTALLED ON THE NORTH, SOUTH AND EAST PROPERTY LINE PRIOR TO ANY BUILDING PERMITS. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $371.06 $371.06 $371.06 $371.06 $52.31 $318.75 $52.31 $318.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/15/2010 SCr ioso11703 E Sprague Ave, Suite B-3 pkane Spokane Valley, WA 99206 jValley. (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development *, Residential New Construction Addition/Remodel n Other: Permit Application PERMIT NUMBER: PERMIT FEE: ccessory Bldg Deck SITE ADDRESS: ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: Name: :�irE t , p % f.1j C- -5 -II- 4/ n IL Address:/U ! City: State: Zip: Phone: 6/1t ._ z 5/ ` /'S 72_ Fax: Contact Person n Name: %}_ A'1 Name: Phone: sc v/ - 72; - %94 Describe the scope of work in detail: Contractor: Name: Cost of Project: $ /O GOO 57.reic Pry- a.tl cog'D Proposed Use: C / 125 / ,57) **************The following MUST be complete: (write N/A if not HEIGIj,4Q PEAK: DIME ION # OF STORIES: MAIN FLOOR TO SQ. 2" F OOR SQ. FTG: UNFIN BASEMENT FTG: 0 FINISHED BASEMENT SQ. FTG: # OF BEDROOMS: RASFTG: to CONSTRUCTION TYPE: C►c (g✓iLT- DECK/COV. PATIC HEATS/ORCE: fit y 4/4 006W -e e T /� eco12) /T ? rr 7-10.4 /44/ -"S'S P 1 A (// (t (�9L`,QtS? ,t r /3011.14a, t/614/ 'TIC? I ' ******** LE SPACE: The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check ❑ Mastercard ❑ VISA Expires: VIN#: Spokane For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is t ! !i i The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 FENc ) P-o(r( 2'6t 1-1(AisE 13' °1)((---- f�- 29 36' x MEW CA2,6E C)PI-vE wf' 104 1, 167 AT BAR r `s4 APPROVED BY t �-- 1 ,2v►0 1 6'02_ N r capti RO $po\PAev vAtc.. Fg2a6' 36 x l ,2,6 wsvf K 6' 2, nr0(v k ). 3 , WA-ZL 'ERA ^^ ti G of 2x6 , OQAc o v ALL (LAM vG- R 6 o Z. t 10 tl A -NE P Z0 -z. „ i o 4/c_ picri ACT5 a El R 44' r,v6 S'f jT�4L- SSR' g,1L 'G W `J1 /0" F GN �4' Et., 'S 'vO 15 /-t 'G, -f GE__ L 7v1. SANG 3- P T-04 R'0ze ' AsP%T S '6E ,e)o SuAKE 51- YL. ,:170d2t' G /0 r 4'" 7741-Z6K 544 ONV--A-0 f 1 ill Ly 36 XeAll DO Q. 16 60cAcr Dooc �r i6 c - �S P ,3 c9) SEE *' � ALL l6 6A AA 90o R < <.,;,;;r.k Co N5 T 2J G27o'/✓ f(YE _TRC, -r7WF fo‘)Avvo-xow -rA5 vsti2 RKv3At R409rL Ro3.1.6 9 11 -11.V. - T` s3,31:7- au cL7- au GUNTrey osis Foorsiv G R.'o 7 4 Z (r) A te- 2 K D t- /6"0� �. �� Z �,��5 ��oz�SpIC()� R� i 6Rowv $ Ce..) SO Psrr �e � G 'L� v 6 A DiAO Lrp io PS CSOF N bcyZ S ,. Z CO tz" /rr fv�s 1� D /17A -4. -;LC PaR5 z 6 4o cr