2013, 03-29 Permit: SW-13000340 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000340 Permit Issued Date: 03/29/2013
Expiration Date: 03/29/2014
Project Description:
Project Name:
Primary Contact:
Phone:
MAIN/MANHOLE & PRIVATE SEWER EXT
SHP 2012-07
SILVER FOX GROUP, LLC
Applicant: SILVER FOX GROUP, LLC
Address: 3465 S WALKERS BAY RD
COEUR D'ALENE, ID 83815
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
122 N FARR RD
45173.1709
Owner: SILVER FOX GROUP, LLC
Address: 3465 S WALKERS BAY RD
COEUR D'ALENE, ID 83815
Phone:
Assessor's Description: OPPORTUNITY N124FT OF W1/2 TRACT 144 Email:
TOG W/ E155.21FT OF W275FT OF S1/2 OF S1/2
OF TRACT 137 OF OPPORTUNITY
Inspection Area: : (509)-477-3675
Water District: Modern Electric Water Fire District: Spokane Valley Fire
Company
Zoning: Land Area: 39680 Square Feet
CONTRACTOR INFORMATION:
BIGSKSH898BC, Exp. 12/29/2014
BIG SKY HOMES & DEVELOPMENT
PO BOX 147
GREENACRES, WA 99016
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
MAIN/MANHOLE TAP/CUT-IN
PRIVATE SEWER EXTENSION
Total Fee:
$26.32
$250.00
$276.32
1 $125.00 $125.00
1 $125.00 $125.00
$250.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 03/29/2013 11:50:40 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000340 Permit Issued Date: 03/29/2013
Expiration Date: 03/29/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/29/2013 11:50:40 Project Coordinator: Dawn Dompier