Loading...
2009, 07-21 Permit: 09002181 ApproachSpokane FValley PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 4331 S FARR RD Parcel Number: 45323.0206 Subdivision: Block: Lot: Zoning: R-1 SF Res Estate District Owner: WILBURN, WILLIAM F & JACKIE R Address: 4331 S FARR RD SPOKANE VALLEY, WA 99206-9675 Building Inspector: SOUTFI • Water Dist: SPO CO WATER DIST#3B Project Number: 09002181 Inv: 1 Issue Date: 07/21/2009 Permit Use: RESIDENTIAL APPROACH Applicant: FIVE STAR CONCRETE INC 6225 N MALVERN RD OTIS ORCHARDS WA 99027 Contact: FIVE STAR CONCRETE INC 6225 N MALVERN RD OTIS ORCHARDS WA 99027 Phone: (509) 226-1189 Phone: (509) 226-1189 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: I Permits 1 Approach Contractor: FIVE STAR CONCRETE INC License ft: FIVESSC943OQ APPROACH -CONST IN ROW 1 S50.00 Total Permit Fee: 850.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 688-0053 ENGINEERING Payment Summary Total Fees AmountPaid AmountOwing 850.00 850.00 $0.00 Tran Date Receipt ft Payment Amt 07/21/2009 19243 $50.00 Notes / Conditions of Approval SAW CUTTING OF EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S JURISDICTION DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR TO CONCRETE PLACEMENT. APPRAOCH TO BE 16' WIDE AND 7.5' FROM PROPERTY LINE AT RIGHT OF WAY. IF CONTRACTOR CALLS IN TO CHECK STATUS OF APPROACH PERMIT 09-2181 PLEASE HAVE THEM CONTACT WAYNE AT 688-0038. Processed 13y: Main, Jodi L Printed By: MORRIS, HEATHER Page I of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing. braung and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and pnor to occupancy and/or use All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this perrnit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing. drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and Inspections for eiecincal wiring, Slate Department of Labor Permis and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324.2640 477.3604 Permis and inspecions for on-site septic systems, Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections. Spokane Valley Health Distnet 324-1560 Fire Department 8924122 State law RCW 19 122 requires that pnor to any excavation the -CALL BEFORE YOU DIG- center must be notified. Call before you dig at least 2 worlung days in advance. 455-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. n All refund requests must be made in writing.by the the origTal,permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be grantedr,for any fee.eironeouly paid or collected. Refunds of not more than 80% of a permit fee may be authonzed when no work has been'dline under the permit issueb. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or'cancelledprior4odheplan review being completed. Owner / Agent Date Staff Approval Date Receipt Number: 19243 Projects Miscellaneous Items City of Spokane Valley Building Dept Receipt Customer Number Full Project Nbr Inv Nbr Fee Amt Inv Aint Owing PAID Pint 09002181 1 $50.00 ', . _ $50.00 $50.00 ' $50.00 ❑� Total: $50.00 ; '_. __$5.0.00_ , $50.00 $50.00 Total PAID: $50.00 Tender 'Type Check. Acct Balance CC Nbr Exp Date TENDERED tVISA . xxxxxxxxxxxx6982 • -10/2009 50.00 iPayer: Notes: Tran Date/ Tiine: 0712112009 4:24:13 PM By: HMORRIS Logon User: BldgCounter Station: CX_WI_ALZNKHOQvJcics Override By: Printed: 07/21/2009 4:24:14 P41 Total TENDERED: 50.00 Over /(Short) $0.00 Change $0.00 Page 1 of 1