2009, 08-05 Permit App: 09002332 DecksProject Number: 09002332 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/5/2009 Page 1 of 2
Project Information:
Permit Use: 2 ATT COVERED DECKS Contact: DURA -SIDE INC
Address: 9514 E MONTGOMERY #27
C - S - Z: SPOKANE VALLEY WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 922-9250
Group Name:
Site Information: Project Name:
Plat Key: 000375 Name: CHESTER TERRACE District: Sout
Parcel Number: 45291.1022 Block:
SiteAddress: 1807 S FAWN DR
Location:: CSV
Zoning: R-2
Water District:
Lot:
Owner: Name: WORTH, JANE E
Address: PO BOX 14168
SPOKANE VALLEY, WA 99214-016
SF Res Suburban District
Hold: ❑
Area: .00 Acres Width: 90 Depth: 110 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
8/4/2009 By: tmelbourn
Released By:
Permits: t.
Originally Released: 7/31/2009 By: LBARLOW
Operator: JD Printed By: JD
Print Date: 8/5/2009
Prbject Number: 09002332 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/5/2009 Page 2 of 2
Building Permit
Contractor DURA -SIDE INC Firm: DURA -SIDE INC
Address: 4808 N STARR RD Phone: (509) 226-0048
OTIS ORCHARDS, WA 99027
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
COV DECK R-3 VB 448 SQFT 448 $6,720.00 448 $6,720.00
COVERED
DECKS
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 448 $6,720.00 448 $6,720.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$139.25
$4.50
$55.70
Permit Total Fees: $199.45
Notes: _
Payment Summary: r
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $199.45 $199.45 $164.58 $34.87
$199.45 $199.45 $164.58 $34.87
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 8/5/2009
PermifCenter
Scm of S% ' 11703 E Sprague Ave, Suite B-3
pokane Spokane Valley, WA 99206
\Talley" (509)688-0036 FAX: (509)688-0037
www.spokanevalley. org.
Community Development
Residential Construction
Permit Application
SITE ADDRESS: ,K‹
PERMIT NUMBER: 9_e3 3 Z
PERMIT FEE:
❑ New Construction n Accessory Bldg
Addition/Remodel s DeckI,
'M Other: ()ev3 ') orlyl _SPCC; /119
'Dr cipicrii Uri 1/e y la 9 i 4,
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
».»'�..-:'tiF.'i':j':K wi I; r"r' {!S t.
,Burldm':Owner?.�. _ :;�_;..:':�: _ ;."'tc'•''' ,.3
..`<-.�M�...•�:.•r'rri
g '�__lot
d',p,Y"':: ": �•.`•. ;"
Contractor': :..3!b "-' }r?.: �_'-'�•_:'.r: y.:kd2._t
-�hou+w e,, x.,.x!'J
_'�G`
Name: '�1e,. \ t t' clas_ titd
Name: •�t^fA_5't
r -
� �v7'—.
Address: /pct s..A_Few.-n pc: 1/e
Address:957t1
Ci 5 \SQlr'ic.
E. mo/l' evFe cy 0(.'142%
[J //el State: LOA Zip%92‘74
0
City: �keine_ Vex fel State:w4 Zip:/e9 .21/0
Phone: scat p.:7^ g1 $-S Fax:
11
Phone:5V1 9 23,9 2 2 Fax: 5C`1 122 -ia030
IMPERVIOUS SURFACE
AREA:
11
Contractor LicNoX Vg
c�4(e:
2_ /-2o/Q
zC&htacPeOn,,;"' g6
^: ;, ., ,4. �t-`%ya-T•W.s,d...'
/ON
City Business Lic. No: 6,0j -2_)5Q r sciti
-13eye
FINISHED BA EIf\1�ENT
SQ. FTG: lei
GARAG SOS FTG:
/�
Name: (---
30% SLOPES j
PROPERTY: %� /1—
Phone: .SO`i 392.-07(03
Phone:
# OF BEDROOMM_
#
Describe the scope of work in detail:
nn
Ae, etr.sf-t'n5 de . 'r1sz(l
seperde. ac`tc s'ictWitter
=t zl( Vinyl .sjY�,'n5
Proposed Use: Qec-("e t+i'cn,n
�dSS
Cost of Project: $
2.6716)1411'57-----17"`" ;n�l�kcf
fle�.o c{c`k w 1+h Q ccoP coUe.(-,
tyle.'.) (onc C.oue[— OJef M eI<t ,:j
Gcncfc-i-e P=4 -fib
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO�PE/a c:
cr
DIMENSIONS ,(
# OF STORIE
:/F
TOTAAHABIfABLE SPACE:
MAIN FLOOR TO SQ.
FTG: y) A_
2 FLOOR SQ. FTG:
Y1
UNFIN BASEMENT
/� �__
SQ. FTG:
IMPERVIOUS SURFACE
AREA:
11
/C.OV)k•/
/ON
FINISHED BA EIf\1�ENT
SQ. FTG: lei
GARAG SOS FTG:
/�
DEC ///���''''{{{ PATI'O'' S//Q. FTG:
�i'a Ot�i�
30% SLOPES j
PROPERTY: %� /1—
# OF BEDROOMM_
#
CONSTR.I,.(CTI(ON TYPE:
HE SOAR E:""
SEWER OnNIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) lans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATUR
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE: 2- 05
❑ Mastercard 0 VISA
Expires: VIN#:
RECEIVED BY
CITY OF SPOKANE VALLEY
UUL 2 9 2009
Sy:
PLRMIT C, -
TER
Spokane
do#Valley®
For City Use Only _
PLUS ProjectNumber (PI f")7 5'z
Projecto�s
t Addres
ld\�\» L\ 11�
11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206
509.688.0036 1 Fax: 509.688.0037 1 permitcenter@spokanevattey.org
As part' of our on-going' commitment to customer service during the review process of your project
application, we are providing'you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we,will contact you with a revised
target date.
Your application review TARGET DATE is 1(11—i ', et ):
The TARGET DATE is the date we estimate your .project application will have had its initial -technical,
review. It is, not the date for approval or permit issuance:
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. - - - .
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at vour new br revised information.
➢ Designate a specific contact person to -communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
•expertise for dealing with reviewer comments would be the best choice for the entire review process.
r Call staff regarding the status of your project only after the target date shown at the -top of the' page.
Although You should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you befrn'e the target date if the initial revieiv is'complete..Bv following .this
procedure, you will save lime and allow the reviewers 10 complete the work more expeditiously..
Steps in the Permit Process •
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required,
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.,
2. Quality Check. The next step in the process is'a quality check to make sure that the application is rediewable and free
from substantive flaws that would prevent technical staff from'completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once. an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include' multiple reviewers. You should be -contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it tq the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time. -
WHITE—APPLICANT PINK—BUILDING FILE
REV 9/07
k
Qccocreed rev.;
L.ovt(Lq
r.;
QF
/So7
S,Ca.t%
L.
A,4
PLANNING DEPT _ll
BY: L_
DATE:_ a't
�1 0�
G .J IlS Gyve(
/
4
1
21+
4 —I•1k
r0 V\ Ji