2009, 05-01 Permit App: 09001109 GarageProject Number: 09001109 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/1/2009 Page 1 of 2
Project Information:
Permit Use: ATT GAR
Setbacks: Front
Site Information:
Contact: EVANS JR, JOHN M
Address: 1717 N FARR RD
C - S - Z: SPOKANE, WA 99206
Left: Right: Rear: Phone: (509) 926-6830
Group Name:
Project Name:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45083.0455 Block:
SiteAddress: 1717 N FARR RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 17,763 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
7o, Ver
Lot:
Owner: Name: EVANS JR, JOHN M
Address: 1717 N FARR RD
SPOKANE, WA 99206
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 4/30/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 4/29/2009 By: tschmidt
Operator: JD Printed By: jmm
Print Date: 5/1/2009
Project Number: 09001109 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/1/2009 Page 2 of 2
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Gra Type Notes Sq Ft Valuation Su Ft Valuation
GARAGE U-1 VB 1,056 $20,064.00 1,056 $20,064.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 1,056 $20,064.00 1,056 $20,064.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$335.25
$4.50
$134.10
$473.85
Sa *^r. x .�,�,•• „r.: . ••... . ... , . a.� ar<:�.v .`:. .. ' 3. ,_ "&i"u'.'?e . ,. a. .: , ....:< ':r.. Y.E. „ {»a... ...Yv,
New driveway must be paved according to SVMC, before fmal inspection.
HOME PROFESSION PERMIT REQUIRED FOR "DREAMCATCHERS PERSONALS" LETTER
SENT 6/2306
Payment Summary
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$473.85 $473.85 $134.10 $339.75
$473.85 $473.85 $134.10 $339.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 5/1/2009
Spokane
.Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: L -/ it
F
PERMIT FEE:
New Construction n Accessory Bldg
fl Addition/Remodel Deck
Other:
SITE ADDRESS: / 7 / 7 l \l FA R Jp kA ivi V/dl // y /L A 9 51-20
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
`f ,2O 4.11x24
Name:
0 /4V\)
{'v\ L- V'% i\l c -3-A
Address:
i / r7 Ni. %A R R
City: S� o
A ►1% A-Uj j 1 e y State: A Zlp f%® 4
Phone:
State:
// ax:
Contact Person
Name: Sv 4,1 ►�/ dv► Cv'A tN 4 s
Phone: 5 ID q - 9 9 - -25�Y 2
Describe the scope of work in detail:
Contractor:
DIMENSIONS:
`f ,2O 4.11x24
# OF STORIES:/TOTAL
Name:
ov, 01_.
MAIN FLOOR TO SQ.
FTG:
I4 f L
2 FLOOR SQ. FTG:
ti' A
Address:
IMPERVIOUS SURFACE
AREA:
CoNere-rre
FINISHED BASEMENT
SQ. FTG: /Vf
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE:
MiN
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ / % S o
Proposed Use:, .oma
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/3 /U
DIMENSIONS:
`f ,2O 4.11x24
# OF STORIES:/TOTAL
HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
I4 f L
2 FLOOR SQ. FTG:
ti' A
UNFIN BASEMENT SQ. FTG:
/VA
IMPERVIOUS SURFACE
AREA:
CoNere-rre
FINISHED BASEMENT
SQ. FTG: /Vf
GARAGE. FTG: 0/4,
/054
DECK/COV. PATIO SQ. FTG:
/Vh.
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
A.
CO�N TR CTION TYPE:
5/, d( FAN\ C
HEAT SOURCE:
MiN
SEWER OR SEPTIC?
NA
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be prod ssed.
SIGNATURE: ' DATE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
❑ Mastercard
Expires:
0 VISA
VIN#:
Sibliane
Valley®
For City Use Only
PLUS Project Number 1t
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
r
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
CD
m
s�okan��
jValley°
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
1
Site Address: 1717 N FARR RD
Parcel Number: 45083.0455
Subdivision:
Block:
Zoning: R-3
Lot:
SF Res District
Owner: EVANS JR, JOHN M
Address: 1717 N FARR RD
SPOKANE, WA 99206
Building Inspector: NORTH
Water Dist: MODERN
Project Number: 09001109
Permit Use: ATT GAR
Inv: 2 Issue Date: 05/04/2009
Applicant: EVANS JR, JOHN M
1717 N FARR RD
SPOKANE, WA 99206
Contact: EVANS JR, JOHN M
1717 N FARR RD
SPOKANE, WA 99206
Setbacks - Front:
Group Name:
Project Name:
Left: Right:
Phone: (509) 926-6830
Phone: (509) 926-6830
Rear:
1 Permits
Plumbinj Permit Contractor: OWNER
TOILETS/BIDETS
SHOWERS
FLOOR DRAINS
License #: OWNER
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
$6.00 SINKS
$6.00 TUBS
$6.00
Total Permit Fee:
1 $6.00
1 $6.00
$30.00
Payment Summary
1
Total Fees AmountPaid AmountOwing
$30.00 $30.00 $0.00
Tran Date
06/03/2009
Receipt # Payment Amt
18580 $30.00
Notes / Conditions of Approval
1
New driveway must be paved according to SVMC, before final inspection.
Processed By: DAVIS, JENNA
Printed By: PATRICIA PRINCE Page 1 of 1
REV PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical winng, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477.3604
Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections, Spokane Valley
Health Distnct 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or ca s celled prior to the plan review being completed.
Owner / Agent
>✓—/��• Date in
307
Staff Approval Date
3
Permit Center
S` "" 11703 E Sprague Ave, Suite B-3
elt Spokane Valley, WA 99206
VQ (509)688-0036 FAX: (509)688-0037
Community Development www.spokanevalley.ore
Plumbing Permit Application ❑ Commercial
SITE ADDRESS: / 7/ 4.7 lq FAR
PERMIT NUMBER: Olt — I
PERMIT FEE: 4 3C -L6
IfKI Residential
Building Owner
Name: S1,Rj ] 1
E' Y A„ 7 �R
O
1 1" 7 5 S a Fax:
Phone: _ O 4i c'"-'''
Address: N l� V J
iv r���kgrlJ`;
City: State:
��; �z/ w�
Zip: Cr
Contractor SJt,
f!
Name:
Phone:
Fax:
Address:
City:
State:
Zip:
License No:
City Business Lic:
Contact
Names o
iiv.,
.6i
% v . i^L.;`� J
Phone: 5_0 Li
-'7"..‘"---,..<
1
2
3
4
5
DESCRIPTION OF WORK
TOILETS
# OF UNITS
X
COST
TOTAL AMOUNT
WATER CLOSET, BIDETS
X
$6.00
URINALS
TUBS
X
$6.00
X
$6.00
SHOWERS (PER TRAP)
SINKS
BATH, STALL, ON-SITE BUILT
X
$6.00
LAVS/BASINS, BAR, FLOOR, KITCHEN,
LAUNDRY, UTILITY, JANITOR, PHOTO,
X-RAY, FOOD, PREP/CULINARY MEAT
X
$6.00
6
7
8
9
DISHWASHER
X
$6.00
CLOTHES WASHER
X
$6.00
GARBAGE DISPOSAL
WATER SOFTENER
X
$6.00
X
$6.00
10
ELECTRIC WATER HEATER
NOTE: IF GAS, SEE MECHANICAL
x
$6.00
11
FLOOR DRAINS
AREA, CASE, COIL, TRENCH,
CONDENSATE
X
$6.00
12
ROOF DRAINS/OVERFLOW DRAINS
X
$6.00
13
FOUNTAINS, DRINKING
X
$6.00
14
WATER PIPING/DRAIN-IN WASTE,
VENT, PLUMBING, REVERSAL
NSTALLATION, ALTERATION, REPAIR,
REVERSALS
X
$6.00
15
SEWAGE EJECTOR
GRINDER, SUMP PUMP
X
$6.00
16
WATER USING DEVICE
ICE AN/OR COFFEE MAKER, HOSE BIB,
STEAMER
PROOFER, CARBONATOR, SWAMP
COOLER
X
$6.00
17
CROSS CONNECTION DEVICE
VACUUM BREAKER, CHECK VALVE,
AND R.P.B.P.D. FOR: VATS, TANKS,
BOILERS
X
$6.00
18
INTERCEPTORS
GREASE TRAP, SAND TRAP,
CHEMICAL HOLDING TANK
X
$6.00
19
MEDICAL GAS (per outlet)
NITROUS, OXYGEN
X
$6.00
20
MISCELLANEOUS PLUMBING FIXTURE
X
$6.00
21
PRIVATE SEWAGE DISPOSAUSYS
X
$20.00
22
INDUSTRIAL WASTE INTERCEPTOR
X
$15.00
METHOD OF PAYMENT:
❑CASH ❑ CHECK ❑ VISA ❑ MC EXPIRES:
Card# VIN:
AUTHORIZED SIGNATURE:
REVISED 8/26/05
SUBTOTAL
PROCESSING FEE
$35.00
TOTAL PERMIT FEE DUE: