Loading...
2012, 04-30 Permit: APR-2012-0021 Driveway ApproachSpokane Vallee Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter spokanevaIlev.orq • (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: 1v \ \V \mac a START DATE: . 1 - \'Z ANTICIPATED COMPLETION DATE: _ \ BUILDING OWNER NAME: MAILING ADDRESS: \ Z CITY: �( �V.o cw STATE: F - ZIP: `-'\`'\ CONTACT PERSON NAME: CA—. . > ,s- PHONE: r PHONE: c \Z - -j FAX: •`:›N1‘ CONTRACTOR NAME: S MAILING ADDRESS: CELL: -\at Q�r, CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway ❑ Commercial/Industrial Driveway El Existing Curb & Gutter ❑ Rural Road Section ❑ Culvert Installation ❑ Other Conditions: ❑ Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature c5 � Date: /17I; -12-z1 414J C.—ts Updated 1-11-11 Page 1 of 1 http://www.spoka neva) ley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11. doc •PROACH PERMIT APPLICA1N REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) DISTANCE FROM INEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) l_IFT (SEE TABLE) CONCRETE APPROACH CURB' Lu �I 4' -1 ----THROAT WIDTH OFT ---1--4' WING (SEE TABLE) WING STREET NAM E EDGE OF 1 ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) • FT (SEE TABLE) ASPHALT APPROACH CURB RETURN `IF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) I --THROAT WIDTH I FT --I (SEE TABLE) STREET NAME 15' RADIUS RADIUS RETURN STREET WITH ASPHALT EDGE NsIF CORNER LOT, DISTANCE FROM RADIUS RETURN OFT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5'