Loading...
2012, 08-03 Permit App: APR-2012-0047 Driveway ApproachSpokane Valley Cut emunity Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.orq • (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: '\s \ \J . F\( START DATE: cs - ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: MAILING ADDRESS: CITY: S. STATE: ZIP: CONTACT PERSON NAME: C . PHONE: CONTRACTOR NAME: FAX: C-1"\'Z,c CELL: 3 i . \a,tc.z1/4 MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) [] Residential Driveway ❑ Commercial/Industrial Driveway 0 Existing Curb & Gutter U Culvert Installation n Other Conditions: ❑ Rural Road Section ❑ Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: _\ Project #App �L 00g7 RECEIVED AUG 0 3 2012 CSV PER1V11T CENTER SUB #LI REV.#I Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/ 124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLIrION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) O Other (please describe below) z' z' al 0 CL DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) I FT (SEE TABLE) CONCRETE APPROACH CURB1 wl z EtI w� o; ai 1 -4'—i ---THROAT WIDTH OFT ----1-4' [- WING (SEE TABLE) WING STREET NAM E EDGE OF 1 ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH \i IF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) RADIUS RETURN ---THROAT WIDTH nFT -- I (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE \IF CORNER LOT, DISTANCE FROM RADIUS RETURN FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Zz 1 r-_ Z 4 • 7 P, Project #✓4 RECE VEf ._ AUG O. p 2002 CSV PERMIT QEN i E SUB# C_ir REV. C *-