2012, 08-03 Permit App: APR-2012-0047 Driveway ApproachSpokane
Valley
Cut emunity Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevalley.orq
•
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: '\s \ \J . F\(
START DATE: cs - ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME:
MAILING ADDRESS:
CITY:
S.
STATE:
ZIP:
CONTACT PERSON NAME: C .
PHONE:
CONTRACTOR NAME:
FAX: C-1"\'Z,c
CELL: 3 i . \a,tc.z1/4
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
[] Residential Driveway ❑ Commercial/Industrial Driveway
0 Existing Curb & Gutter
U Culvert Installation
n Other Conditions:
❑ Rural Road Section
❑ Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: _\
Project #App �L 00g7
RECEIVED
AUG 0 3 2012
CSV PER1V11T CENTER
SUB #LI REV.#I
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/ 124/938/210/948/1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLIrION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
O Other (please describe below)
z'
z'
al
0
CL
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
I FT (SEE TABLE)
CONCRETE
APPROACH
CURB1
wl
z
EtI
w�
o;
ai
1 -4'—i ---THROAT WIDTH OFT ----1-4' [-
WING (SEE TABLE) WING
STREET NAM E
EDGE OF 1
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
\i
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
RADIUS
RETURN
---THROAT WIDTH nFT -- I
(SEE TABLE)
STREET NAME
STREET WITH ASPHALT EDGE
\IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
Zz
1
r-_
Z
4
•
7
P,
Project #✓4
RECE VEf
._ AUG O. p 2002
CSV PERMIT QEN i E
SUB#
C_ir REV.
C *-