2015, 01-20 Permit: SW-15000021 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000021 Permit Issued Date: 01/20/2015
Expiration Date: 01/20/2016
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SO GREENACRES PH 3
COURCHAINE, JAYN P
Applicant:
Address:
Phone:
Email:
COURCHAINE, JAYN P
619 N SARGENT RD
SPOKANE VALLEY, WA 99212-2725
SITE INFORMATION:
Site Address:
Parcel Number:
1625 N FLORA RD
45124.0151
Assessor's Description: (CITY OF SPOKANE VALLEY) GREENACRES
IRRIGATION DISTRICT PLAT A S3 ACRES OF
N2/3 TR 33 EXC N75FT OF E153FT & N81.50FT
OF W94.60FT OF E247.60FT THEREOF & EXC RD
(PARCEL "B" OF RECORDED SURVEY A
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
COURCHAINE, JAYN P
619 N SARGENT RD
SPOKANE VALLEY, WA 99212-2725
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Land Area: 2.56 Acre(s)
CONTRACTOR INFORMATION:
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS SAME, WA 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$27.12
$125.00
$152.12
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 01/20/2015 08:08:54 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000021
Permit Issued Date: 01/20/2015
Expiration Date: 01/20/2016
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/20/2015 08:08:54 Project Coordinator: Kathy Cummings