Loading...
2009, 06-02 Permit App: 09001507 Pole BldgProject Number: 09001507 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/2/2009 Page 1 of 2 Project Information: Permit Use: NEW 30 X 40 POLE BLDG W/12 X 40 LEAN TOO Contact: ZIEGLER LUMBER Address: 620 E HOLLAND C - S - Z: SPOKANE, WA 99218 Setbacks: Front Left: Right: Rear: Phone: (509) 467-4958 Group Name: Project Name: Site Information: ZW-,,. A. r .. ,s rte; 'mar .4. ,... ... .. ::. r ._ `R.rni..,.-.MasM •".•o. >: ;. -_ .`W :Efg& OVn ,gro :....,-N„i Plat Key: Name: Range District: East Parcel Number: 45241.9102 SiteAddress: 222 S FLORA RD Block: Lot: Location:: CSV Zoning: MF -2 MF HDR District Owner: Name: ROYER, ALISSIA Address: 222 S FLORA RD SPOKANE VALLEY, WA 99016 Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: .53 Acres Width: 75 Depth: 3000 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: w ....,. : -. � �,:.. a,, ... , ......,�_-. .,v,, x,,....._ ._�. ...,... Review Building Plan Review Released;, By: Septic Sys Review Originally Released: 5/28/2009 By: tmelbourn Released By: Originally Released: Landuse/Zoning/HE Conditions Permits: 5/28/2009 By: LHALSEY Released By: The site is 23,806 sq.ft. and the detached accessory structures are limite to 2,380 sf. With the proposed shed the site will have 1880 sf of detached accessory structures. Originally Released: 6/2/2009 By: LBARLOW Operator: jmm Printed By: jmm Print Date: 6/2/2009 Project Number: 09001507 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/2/2009 Building Permit Page 2 of 2 Contractor: ZIEGLER LUMBER COMPANY Firm: ZIEGLER LUMBER COMPANY Address: 4220 N MARKET ST Phone: (509) 489-8760 SPOKANE, WA 99207 This Application: Total Project: Description Gra Type Notes Si Ft Valuation Su Ft Valuation POLE BDLG U-1 VB 1,680 $31,920.00 1,680 $31,920.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 1,680 $31,920.00 1,680 $31,920.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $461.95 $115.49 $4.50 $581.94 wwka... If the structure is used as a garage for the storage of daily use vehicles a paved driveway that has access to a public street shall be required. The permit is granted based on the identified use of shop and storage - not a garage for daily use vehicles. A paved driveway is not required for a shop/storage building. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $581.94 $581.94 Amount Paid $115.49 Amount Owing $466.45 $581.94 $581.94 $115.49 $466.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/2/2009 Spokane Valley [FP CITY OF SPOKANE VALLEY Community Development Department Permit Center CIS Y Jr'U 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 t't ttiv'I i Cci'v i eta y • permitcenter@ sookanevalley.orq RESIDENTIAL CONS1RUC f T NUMBER: (Staff Use Only) T FEE: ANE VALLEY 09 ❑ NEW CONSTRUCTION ❑ DECK SITE ADDRESS: Or3Q 111 ADDITIC i I S co R -R ASSESSORS PARCEL NO.: y5241. 02 L: BUILDING OWNER NAME: NAME: ADDRESS: c2Q a. S r-i_0AZA CITY: PHONE: 509_ - 1 S - OLW5 FAX: CONTACT NAME: PHONE: '5t - 891 - 52_8( FAX: N PERMIT APPLICATION EMODEL SLACCESSORY BUILDING ER Sep ellwE_ =AL DESCRIPTION: E: ZIP:9 cf 0 / k3 CELL: CELL: CONTRACTOR NAME: 72_1 t(i-Lye (2- LvrvA(3(L MAILING ADDRESS: (2Z0 a f L 7 J Cln': PHONE: 6o9- Z/G27-y9too FAX: CONTRACTOR LICENSE No.: C c.0t ZI tG'i-L 3, gXPIRE DESCRIBE THE SCOPE OF WORK IN DETAIL r.:• E: i ZIP: c/%u 7 CELL: CITY BUSINESS LICENSE NO.: INDICATE USE: A- 33 4-/0 /Z CO(NC 7, q0 PROPOSED USE: Effective October 28, 2007 http://www.spokanevalley.org/uploads/Community_Develol A: Page 1 of 2 )ocuments/Forms/Building/Residential Construction Permit ****YOU MUST COMM_ MARK N/A IF Height to Peak: (1 `1 Dimensions: 301c Main Floo SQ FT: j`)\ A__ Upper FI or SQ FT: iJI (r - Q FT: g4 1(e c— Deck/Cover d Patio SQ FT: N)V A - No. of Bedrooms: N) I Ir Construction Type: 7v L.,(:::, TOTAL COST OF PROJECT: $ T THE i HE FOLLOWING**** o. of Stories: I\ I (-} Total Habit ble Space: ►JI 14 nfinishedasement Q FT: tJ� Finished B sement SQ FT: iJi i-- ►ipervio s Surface rea: (- 30% Slopes on Property: �� 14 eat S urce: �� (A- Sewer or Septic: N 18y)y , 'S DISCLAIMER The permitted verifies, acknowledges and agrees by their signature Cn be served by potable water. 2) Ownership of this City of Spokane vz: owner or has permission to represent the property owner in this tram Spokane Valley Development code. Referenced codes are available Spokane Valley permit is not a permit or approval for any violation information may be required to be submitte! n. :sequently appro,- Signa Method of payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: Effective October 28, 2007 http://www.spokanevalley.org/uploads/CommunityDevelo: A f this permit is for construction or on a dwelling, the dwelling is/will •emit inure to the property owner. 3) The signatory is the property 4) All construction is to be done in full compliance with the City of .view at the City of Spokane Valley Permit Center. 5) The City of state or local laws, codes or ordinances. 6) Plans or additional -ore this application can be processed. Date: - fl - U ❑ Visa ❑ Mastercard EXP: VIN#: A/6 4Ev�S�4-y f9,i0/1-04 coe— r9g2/Ycu7— R42c€,-f) 4 7 Y''ef rAe Page 2 of 2 ocuments/Forms/Building/Residential Construction Permit gITY1/� 1 1, .0/ va For City Use Only r PLUS Project Number 9 - r j Project Address U9 f („eit 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. u.d,/', 7 Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Zo N f' d o rs 3 3L Li -b! { i 40' 10' 20 F -17-'-S N Zy5 30 iz 0 30° \A o,. 51- PLANNING ti f2� 310 222 S . C- LO..A� ySZy i s PLANNING DEPT. APPROVED BY: L;-i,� DATE: te(ziyl