Loading...
2010, 07-23 Permit App: 10002085 Pole BldgProject Number: 10002085 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/23/2010 Page 1 of 3 Proiect Information: Permit Use: 24 X 30 POLE BLDG Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 000875 Name: FOREST MEADOW ADD Contact: WEST, DAVID D Address: 4007 S FOREST MEADOW DR C - S - Z: SPOKANE, WA 99206-9683 Phone: (509) 922-9957 Group Name: Project Name: District: Sout Parcel Number: 45333.0102 Block: Lot: SiteAddress: 4007 S FOREST MEADOWS D Owner: Name: WEST, DAVID D Address: 4007 S FOREST MEADOW DR SPOKANE, WA 99206-9683 Location:: CSV Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Flood Plain Released By: this is a storage building not a residence. Based on diagram provided building will not be in the floodplain and will be elevated 1 foot above the existing grade. Originally Released: 7/23/2010 By: dgriffith Building Plan Review Released By: Originally Released: 7/15/2010 By: tmelbourn Driveway/Approach Released By: NOT REQUIRED PER T MELBOURNE Originally Released: 7/15/2010 By: TMELBOU Operator: .JD Printed By: jmm Print Date: 7/23/2010 Project Number: 10002085 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/23/2010 Page 2 of 3 Landuse/Zoning/HE Conditions Permits: Released By: This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley. Originally Released: 7/13/2010 By: tschmidt Contractor: ZIEGLER LUMBER COMPANY Address: 4220 N MARKET ST SPOKANE, WA 99207 Building Permit Firm: ZIEGLER LUMBER COMPANY Phone: (509) 489-8760 This Application: Total Project: Description Grp Type Notes Sa Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 720 $13,680.00 720 $13,680.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 720 $13,680.00 720 $13,680.00 Units Unit Desc Fee Amount 1 SELECT $237.25 1 SELECT $59.31 1 SELECT $4.50 Contractor: ZIEGLER LUMBER COMPANY Address: 4220 N MARKET ST SPOKANE, WA 99207 Permit Total Fees: Flood Plain $301.06 Firm: ZIEGLER LUMBER COMPANY Phone: (509) 489-8760 Operator: JD Printed By: jmm Print Date: 7/23/2010 Project Number: 10002085 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/23/2010 Page 3 of 3 This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley. applicant has indicated that storage building only and will be elevated above existing grade. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $301.06 $301.06 $301.06 $301.06 Amount Paid $59.31 $59.31 Amount Owing $241.75 $241.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 7/23/2010 Spokane .Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: /o- Za PERMIT FEE: New Construction Accessory Bldg n Addition/Remodel n Deck n Other: SITE ADDRESS: . YUo ) es/ fl41eac �✓` ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: D A.0 t IJ . ijas r Address ` y00 `1 %week Jodi,'IS-y- City: J�_ J„ p , _ State: 404...Zip: F`i Lb(A "`'`'""'j 1 Fax: Phone: st9.9zz-4q,3,7 Contact Person Name: Phone: Describe the scope of work in detail: Contractor: 44. /13 %3.. Name: /1 pc/ a..44.-a..44.-fet 2 /I Address: g . i?ao z- Spicas u e, City:���� State: �� . Zi�QO37 Phone: .Sb9•9Zz-/800 Fax: sv9-S''LG-QLo9 Contractor Lic No: CC.ct z CLA3i JG Exp Date: City Business Lic. No: :;2.-g- 041 9' 30% SLOPES ON PROPERTY: Cost of Project: $ _- j u (sa.� N'S 719 UL., 'tel x .3. Proposed Use: *Tb f 11 win MUST be complete•(write N/A if not licable********************** app ) e o HEIGHT TO,_QEAK: 14-iq)4.3 o g DIMENSIONS: # OF STORIES: / TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG:$ 2Nu FLOOR SQ. FTG: ce-- UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT . SQ. FTG: .49- GARAGE SQ. FTG: p� 7Z 0 0 DECK/COV. PATIO SQ. FTG: -9- 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER ORS TIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordina s. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be pr; j sed. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check DATE: 7- /3- /b I" Dlit/c y 0 Mastercard 0 VISA 41PitOiitGci Expires: VIN#: /41e1(4 . T g7 J e Spokane 1 Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: PERMIT FEE: New Construction FM Accessory Bldg Addition/Remodel Deck Other: SITE ADDRESS: ye,"") %res/ 1/14eac&& %✓` ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: D Av I ►� LJas r Address y00 '1 %/CS 1- j44& ✓" City: da.at.,7 State: 40),,f_Zip: nue. Fax: Phone: (0? • 4 L Z. -9 4,3"7 Contact Person Name: Phone: Describe the scope of work in detail: Contractor: ' :If g g DIMENSIONS: c944)4- 3-:-, # OF STORIES: Name: j11 e-71, MAIN FLOOR TO SQ. FTG:AREA: 2"D FLOOR SQ. FTG: ces_ Address: £ • 170 o L Sp "as u e. IMPERVIOUS SURFACE FINISHED BASEMENT SQ. FTG: $ City: ti a.otae, State: �� _ Zii 7 0 3 7 Phone: Fax: .5-el9• S'ZZ -/800 sv9- TZ6 - 9z6 9 Contractor 14c No: Exp Date: CC.° 'Li _.(',..t..1_ 3 i J C SEWER ORS TIC? City Business Lic. No: - 3ZR 04,a. 9 (r..,5 Cost of Project: $ 3.7 i u (0-7 ts/S')--)9-&(_ c y x / U` PC's (3(— Proposed Use: **************The followin MUST be complete: (write N/A if not alicable)********************** pp HEIGHT,PEAK: g DIMENSIONS: c944)4- 3-:-, # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG:AREA: 2"D FLOOR SQ. FTG: ces_ UNFIN BASEMENT SQ. FTG: $ IMPERVIOUS SURFACE FINISHED BASEMENT SQ. FTG: $ GARAGE SQ. FTG: �L 7Z 0 r DECK/COV. PATIO SQ. FTG: -E 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER ORS TIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: D Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check ❑ Mastercard Expires: DATE: ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. g i -SITE PLAN IX Property lines and dimensions Direction arrow pointing North and orientation to streets t$ Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) 1 Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes o Window well locations if applicable o Brace wall panel locations ❑ Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑ Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board . o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any ❑ Active system with 6 mil vapor barrier O Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Jodi Main From: Deanna Griffith Sent: Friday, July 23, 2010 2:47 PM To: Permit Center Subject: project 10002085 4007 S Forest Meadow I have signed off the floodplain permit on project #100002085, David West, parcel 45333.0102, for a pole building. Customer has indicated he will elevate the foundation 1 foot above grade. Deawwa Grif fitly Admin Assist, Community Development City of Spokane Valley 11707 E. Sprague Ave. Suite 106 Spokane Valley, WA 99206 509-720-5301, direct (please note the new phone number) 509-921-1008, fax dgriffith©spokanevallev.orq NOTICE: Individuals planning to attend a meeting who require special assistance to accommodate physical, hearing, or other impairments, please contact the City Clerk at (509) 921-1000 as soon as possible so that arrangements may be made. 1 Spokane For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 PLANNING DEPT. APPROVED BY: DATE: 7113/to