2009, 03-17 Permit: 09000636 Demo, AdditionSpokane
Valley
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
1
Site Address: 1101 N FELTS RD
Parcel Number: 45171.0916
Subdivision:
Block: Lot:
Zoning: R-3 SP Res District
Owner: JACOBS, BOBBIE ANN
Address: 1101 N FELTS RD
SPOKANE VALLEY, WA 99206
Building Inspector: NORTH
Water Dist: MODERN
Project Number: 09000636 Inv: 1 Issue Date: 03/17/2009
Permit Use: DEMOLITION 8 X 8 ADDITION
Applicant: JACOBS. BOBBIE ANN
1101 N FELTS RD
SPOKANE VALLEY, WA 99206 Phone: (509) 924-2514
Contact: JACOBS, BOBBIE ANN
I101NFELTS RD
SPOKANE VALLEY, WA 99206 Phone: (509) 924-2514
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name: NOI #09 0103
Permits
Demolition Permit Contractor: OWNER
License #: OWNER
DEMOLITION ACCESSORY I $21.00
Total Permit Fee: $21 00
Payment Summary
Total Fees AmountPaid AmountOwing
$21.00 $21.00 $0 00
Tran Date Receipt # Payment Amt
03/17/2009
Processed By: Main, Jodi L
Printed By: PATRICIA PRINCE Page 1 of I
17564 $21.00
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering. metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and Inspections for electncal wrong, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Uolitres Denson
And Industries 324.2640 477.3604
Permits and rnspectons for on-site septic systems. Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley
Health Dislnct 324-1560 Fre Department 892.4122
State law RCW 19122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance. 456-6000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work 15 not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date 7— /7-'7
Staff Approval Date
--ti
Mar 13 2009 2:00PM
March 13, 2009
SPOKANE#COUNTY#UTILITIES 4777178
SPoKARECOUNIFY
L y•
^ry•} flnl .� Y� ��.
UTILITIES DIVISION
N. BRUCE RAWLS, P.E., DIRECTOR
A DIvISION OF THE PUBLIC WORKS DEPARTMENT
To Whom It May Concern:
Re: Demo Permit for 1101 N. Felts Road
A sewer abandonment / modification permit IS NOT REQUIRED for the demolition of
the 8' x 8' addition on the existing house located at the above address.
Please call me @ 477-7682 if you have any questions.
Rog Rivers
Customer Service Representative, Spokane County Division of Utilities
1026 WEST BROADWAY AVENUE, 4TH FLOOR • SPOKANE, WA 99260-0430
PHONE: (509) 477-3604 • Fax: (509) 477-4715 • TDD: (509) 477-7133
p.1
Iw
PPP
, 8,013\6,eSac kcs
6' QgrsM-hea/fk
��,cn�4co s com
I''= 8-O;�
I
If
Pc, 5 Pc\
L64 H H
Gc\A<eS5 44
!be �a\ern�',nec�
f 65� xlaU! '
To ibe
Deme, Gsle,ec\
N
tl
'
Flou se
ay"x VI',
i
Lo ;E -
Hot Fr,e4s.
,`15'X lao'
yG "
ac)xf.
Shop.
la Yap
'0'3/Mar. 17. 20091.10:30AMax SPOKANE CLEAN AIR
OR D/03
Notice of Intent No. Spokane'
cgloral 1
ARrney (/se Only Clean rAgency
:NOTICE ..OVINTENT:
roll 11101 Et Is/uEmou 110\,•
-
No.8657 P. 1)002/002
MAR 12 2009
,„CLt;AI
Date Stam
Refer to the Agency's Renovation, Demolition, and Asbestos Information Sheet as well as Regulation 1, Articles X"I I
A. Project Type:
❑ Asbestos Removal
❑ Asbestos Removal & Demolition
J Demalition, No Asbestos Removal
Docs this project involve a fire••damaged structure?:
1 Yes o (if yea, refer to Sections 9.03Y.3 and 9.08)
Does this project involve demolition by fire tra ping?: ❑ Yes No (Sec Sections 9.02.8, 9.03.F,4 & 9.04.A.6.f)
How many structures does this protect involve: .ON\- i (If more than 1 structure, refer to Section 9.04.A.3)
B. Property Owner: F'.7CJf75\-r, t'll('()lb<7)
Phone:nal-I98'‘
Fez: 61.22.- 317)j ii,
Mailing Address: \\C` j\,I . FlI,t%City:,
4,1\t„,
State:W Pv
1 ZIpfictiC` c
C. Site Address: 1101 N.
--e (f ry,t •
city, e)cJpk- it
state; \AIA
Zip:citt16Q
Contact Person: ?AC ja(`it4C_ -
Job Site Phone: '10'IV
D.]^Asbestos Survey or
Date survey performed: to - d(^ 6
AIIEBA Bldg. Inspector Name:
jvfl'ML - L yK1,�`y-C•
LI Material Presumed
Wes asbestos found? ❑ Yes•allo _Company:
(''7 ',Ane —
Cert. No.;
0 P `0 f)2-
itE.
E.Asbestos Removal
information:
Start
Da o:
Completion
Date:
Abatement By
(if known):
List individual and
quantity of materials o ho
removed, If >1 structure, list
for
Total Square Feet:
Total Linear Feet:
materials each structure
by address / location.
Will all asbesj• r t+terlal he removed from the structure( s b •ro cat corn letion? • Yes NO
F. Demolition
Information;
Start Aote::.' j (� q
(earliest) 3 lg J
hal
I. emolitiou By
(if known):
G. Asbestos Project and Demolition Notification Waiting Period end Non -Refundable Fee Categories
lu nn 1 1 . c�in (tion 17emn A 1 h.'sro 11fa hat)
(cI arra uul�•un i[`I Incl. I l aluucc.(u till R
�., •.c ... .... .,. .'.-.,
At utrng Pti Inti•
I l•r•....
properly
1, 12 All Demolition all asbestos must be removed and disposed of prior to demolition)
(
nes
Ni„,U\I II ic nlireetipied. Va Il Ialllll\ tesudi`011 •
2. • 10-259 In ft and/or 48-159 IN ft asbestos
J Days
\\ Iliiii Pti little
3 Days
r $ OA
1 et •.
$250
3.0 260-999 In ft and/or 160-4,999 sq ft asbestos
10 Days
5500
4. ■ 21,000 In R and/or z 5,000 sq ft asbestos
10 Days
$1,250
5. • All Demolition
idditil11111 c.itegal'ei 1 .
10 Days
$250`
0 1 have completed and attached the Supplemental Notice of Intent (N01) for emergency. alternate asbestos project work practicos,
demolition with nonftiable asbestos rooting, or exception for hazardous conditions.
"The 1GZS0 demutiliun fee !,•wairad 1Jdemo/Ition is performed in con unaton with asbOSI03 pMet- category 2, 3 or 4, above.
FL.
Optional; List additional panics you would like copies of this NUI and/lir related notices sent to (list mum & Vim number and/or
mailing address):
Completenessness
Na
s�
'
Review
•clent-N01 complete
:shed
I.
1 certify that the information contained In this notification and any supplemental information provided Is, to
the best of my lrnow(cdge, accurate and complete.
Business Name: i�)VI c.. 0--ivi 7e-, Fax: 92_2- i 250 Phone: Q)11-1jt1
Meiling Address:( 01 N•Fel \z -A.
U'--IV—e.
Nrinl Name: lag
V\ 9.iclqLm
UI'Q --ret cd /J
Signature: 6 J•
—
J.
42ueav Mr Only
Spokane Clean Air, 3104 E. Augusta Ave., Spokane. WA 99207-5384 / www.snekttnecleanair.orq / Ph.: (509) 477-4727 Fax: (509) 477-6R2R
Your advance notiflcatlon period will begin when a completed NOT, including required nonrefundable fees, is received by SRCAA.NOT 1//08 A
Received Time Mar. 12 2009 3;128114 No. 8610