Loading...
2005, 10-11 Permit: 05003631 ResidenceSpokane e' ,Valley MirILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1304 N FELTS RD Parcel Number: 45171.0240 Subdivision: Block: Lot: Zoning: UNK Unknown Owner: KIMSEY, JOHN & CAROL Address: 1210 N ARGONNE RD SPOKANE VALLEY. WA 99212-2611 Building Inspector: NIK BEN'T'LEY Water Dist: Project Number: 05003631 Inv: 1 Issue Date: 10/11/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Applicant: NORTHWEST CONSTRUCTION 8611 W WHITE RD CHENEY, WA. 99004 Phone: (509) 838-1861 Contact: NORTHWEST CONS'T'RUCTION 8611 W WHITE RD CHENEY, WA. 99004 Phone: (509) 838-1861 Setbacks - Front: 32 Left: 24 Right: 12 Rear: 73 Group Name: Project Name: Permits Approach Contractor: NORTHWEST CONSTRUCTION & REM License #: NORTI10(96808 APPROACII INSPECTION 1 $25 00 CONST IN ROW -APPROACH 1 $25 00 Total Permit Fee: $50.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Building Permit Contractor: NORTHWEST CONSTRUCTION & REM License #: NORTHCR96808 Total Area 1280 Building Height 12 Stories 1 Dwelling Units 1 DECK R-3 VB 80 RESIDENTIAL PERMIT FEE 51,032.95 GARAGE U -I VB 519 STATE SURCI TARGE $4 50 RESIDENCE R-3 VB 1,280 RESIDENTIAL PLAN REVIEW 5413.18 Total Value: $106,651 40 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Total Permit Fee: $1,450.63 Mechanical Permit Contractor: NORTHWEST CONSTRUCTION & REM License if: NORTHCR96S08 DUCT SYSTEMS 2 $2000 GAS APPLIANCE<=100,000BT 1 $12.00 GAS PIPING 1 $1 00 CLOTHES DRYER 1 $10 00 RANGE 1 $1000 GAS LOG OR GAS INSERT 1 510.00 HOOD -TYPE II 1 $10 00 GAS APPLIANCE - MISC. 2 $20.00 Total Permit Fee: $93 00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054 Processed By: JANSSEN. CHRISTINA Printed By: KUR'I'Z. K,ARI Page 1 of 2 PERMIT 11P NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing. drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Remits and inspections for elec1ncal wrong, State Department of Labor Pemrts and inspections for Sewer Connection, Spokane County Utilises Division And lndustnes 324-2640 477-3604 Rents and inspecions for on-site septic systems. Spokane Regional Fire spnnkler and alarm systems and private access road inspections. Spokane Valley Health Disinct 324.1560 Fire Department 8924122 Stale law RCW 19.122 requires that pnor to any excavation the -CALL BEFORE YOU DO'centermust be notified Call before you dip at least 2 working days in advance. 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date *WaneG� Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1304 N FELTS RD SPOKANE VALLEY, WA 99212 Parcel Number: 45171.0240 Project Number: 05003631 Inv: 1 Issue Date: 10/11/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Permits Plumbinj Permit Contractor: NORTHWEST CONSTRUCTION & REM License 11: NORTHCR96808 TOILETS/BIDETS SHOWERS DISH WASHERS CLOTHES WASHER FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 2 1 $12.00 $6.00 $6.00 $6.00 SINKS TUBS GARBAGE DISPOSAL WATER USING DEVICES Total Permit Fee: 4 $24 00 1 56.00 1 $600 3 $18.00 $84 00 Payment Summary Total Fees AmountPaid AmountOwing $1,677.63 $1,677.63 $0.00 Tran Date Receipt 11 10/11/2005 Processed By: JANSSEN, CHRISTINA Printed By: KURTZ, KARI Page 2 of 2 3079 Payment Amt $1,677.63 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This Inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessanly indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering. metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior t0 concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pennts and inspections for electoral wrong, Slate Department of Labor Permits and inspections for Sewer Connection. Spokane County Ubbees Division And Industries 324-2640 477-3604 Pennts and inspections for on -see sept¢ syslens, Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19,122 requires that pnor to any excavation the -CALL BEFORE YOU DIG'centermust be notified Call before you dig al least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date