Loading...
2008, 08-01 Permit App: 08003001 DeckSpokane . Valley Community Development Residential Construction Permit Application Permit Center 11703 E S -10,e Ave, Suite B-3 Spokane, WA 99206 (509)688-00 FAX: (509)688-0037 www.spokanevalley.org x PERMIT NUMBER: (14 - j 0 PERMIT FEE: New Construction n Accessory Bldg Addition/Remodel Deck Other: , --r2t I CZ, SITE ADDRESS: 42 l k S , ' l "'`jl M C.. D& g) 'D a. $ Pc 14f-rNe cit tuC 2..156 ASSESSORS PARCEL NO: LEGAL DESC PTION: Building Owner: Name: C (s0J S V 5/VP. Address:4.2 City: r;` ICpt vpcuivirState: id A Zip: r Phone: .-( 6 Fax: Contact Person, Contr Name: A. • ess Ci Pho Name: L t ,t; e Phone: 9aa —TZ5Q Describe the scope of work in det State: Zip: Fax: actor Lic No: / Exp Date: ity Business Lic. No: t of 'moi •c . 596. DU 1'alck1 ` 1201 LPACe, Aertiovetb �S Proposed Use: t d l IG **************The following MUST be complete ( : write N/A if not applicable)********************** RAs HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? 5 , The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be proces SIGNATURE: Method of Payment: ❑ Cash Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: DATE: 41)6 1)) 9-00 'B Authorized Signature: REVISED 2/15/07 1 • Siiokane j ley PERMIT CENTER 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 509-688-0036; Fax 509-688-0037 www.spokanevallev.org Affidavit in Lieu of General Contractor Registration State of Washington County of Spokane ) ep /i D E' ( e , state as follows: (Print name as signed) 1. I have made application for a building permit from the City of Spokane Valley, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of which is printed on the reverse side of this affidavit. 3. I understand that prior to issuance of a building permit for work that is to be done by any contractor, the City of Spokane Valley must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. f Z_ , and will therefore, not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. tcsQi L. 4/4.1"/ ts N-+ / 9 &BO,- /" 1, 0'' WASN�� Signed and sworn to before me this / Day of As/t7 , 20.129 . L )'1or1 NOTARY PUBLIC in and for the �S,ta�teof, Ov-S°-County Washington, residing My Commission expires: 9 -9- October 15, 2007 Page 1 of 2 P:\Community Development\Forms\Building Forms Project • Sitikane Transmittal City of Spokane Valley 4.0.00Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 4216 S FOREST MEADOWS DR Parcel Number: 45333.0604 Zoning: R-2 Fire District: FD 01 New project Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Friday, August 01, 2008 Project Number: 08003001 Water District: SPO CO WATER DIST#3B Applicant: SMITH, SUSAN K/EDIE, COLIN F Owner: SMITH, SUSAN K/EDIE, COLIN F 4216 S FOREST MEADOW DR 4216 S FOREST MEADOW DR SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206 (509) 922-7758 e-mail: e-mail: Contact: SMITH, SUSAN K/EDIE, COLIN F Occupant: 4216 S FOREST MEADOW DR e-mail: SPOKANE VALLEY, WA 99206 (509) 922-7758 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project Description: REPAIR EXISTING RESIDENTIAL DECK PER APPROVED PLANS Building Landuse Engineer Utilities Health Fire Dist Assessor CONSTRUCTION DRAWING Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane ,00Valley di For City Use Cily� ,:} PLUS sect Number 0(3' 3 00 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. `lf<C\ / Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07