Loading...
2008, 08-06 Permit App: 08003001 Deck RepairProject Number: 08003001 Inv: I Application Date: 8/6/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Parcel Number: 45333.0604 Block: 6 Lot: 4 SiteAddress: 4216 S FOREST MEADOWS D Owner: Name: SMITH, SUSAN K/EDIE, COLIN F Address: 4216 S FOREST MEADOW DR Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Originally Released Permits: 8/5/2008 By: tmelbourn Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sp Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB REPAIR 0 $596.00 0 $596.00 EXISTING DECK Totals: 0 $596.00 0 $596.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 ACCESSORY PLANS REVIEW 1 SELECT $17.31 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $91.06 Operator: JD Printed By: JD Print Date: 8/6/2008 Project Number: 08003001 Inv: I Application Date: 8/6/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: Payment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $91.06 $91.06 $0.00 $91.06 $91.06 $91.06 $0.00 $91.06 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 8/6/2008 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject Previous pre -app meeting Plan revisions Transmittal Date: Friday, August 01, 2008 Site Address: 4216 S FOREST MEADOWS DR Project Number. 08003001 Parcel Number. 45333.0604 Zoning: R-2 Water District: SPO CO WATER DIST#313 Fire District: FD 01 Applicant: SMITH, SUSAN K/EDIE, COLIN F 4216 S FOREST MEADOW DR SPOKANE VALLEY, WA 99206 (509) 922-7758 e-mail: Contact: SMITH, SUSAN K/EDIE, COLIN F 4216 S FOREST MEADOW DR SPOKANE VALLEY, WA 99206 (509) 922-7758 e-mail: Contractor. OWNER ( ) - 0 Owner. SMITH, SUSAN K/EDIE, COLIN F 4216 S FOREST MEADOW DR SPOKANE VALLEY, WA 99206 e-mail: Occupant: e-mail: Project REPAIR EXISTING RESIDENTIAL DECK PER APPROVED PLANS Description: rl"\ X6,40 Please send all plan review and project comments v highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor CONSTRUCTION DRAWING r 0/1 rl"\ X6,40 Please send all plan review and project comments v highlighted individuals. For City Use Only PLUS Project Number �_ k,"', Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. li ,! A Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heardfrom us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Sheetl lumber estimate for deck repair 4216 S Forest Meadow Drive Original $ Ext $ 1 122 2x2 x4' 1.98 241.56 railing balusters 2 3 2x1012' 21.97 65.91 rim joist and beam 3 2 2x10x10' 17.97 35.94 outer joist 4 7 2x6x12' 12 84 railing and treads 5 3 2x6x10' 9.97 29.91 railing 6 1 MW 9.97 9.97 railing 7 1 2x4x12' 7.97 7.97 railing 8 3 2x4x10' 5.97 17.91 railing 9 1 2x4x8' 3.97 3.97 railing 497 Total with 20 % contingency $596.40 Phone Q& A with Tom Melbourne @688-00441/08/2008 : 1 built up beam vs 4 x 10 x 12 2- 2 by 10's with % spacer okay 2 stair width Currently 35.5' wide (made from 2x12s?) Code is 36' wide 3 joist hangers nailed through siding check for corrosion 4 Steps are 7.25 to 7.5' rise 8' on top step Max 3/8 variation 5 Stairs have 10' run ok 7 no riser boards Max 4 inch riser space Page 1 FULL 30 IN. MIN GUARD HEIGHT PER SECT. 8310.1 AT LANDING 4 -IN. SPHERE CANNOT PAGOTHR000H 0 -IN. SPHERE CANNOT PASSTHROUGH OPEN RISER PERMITWD-41N. SPHERE WILL NOT PASS THROUGH OR WHERE HEIGHT OF STAIR IS LESS THAN 30 INCHES — 34 IN. MIN GVARD HEIGHT PER SECT. 8316. 130 IN. MAX FOR HANDRAIL PER SECT. 831&1 I To NOfE:bEPfNO�P1gN M. BT BE �POq 1�b11bbP H�EN1.71 WIOEBT 77►ER11NIb1V1R.— OTgll NUPO WR1AlaOT1011K KgmmvLTIfmcml U7AR III RL MVAL SQWAUW EROA ewrAl 1fY MN f1AP C� q flOf EC wIAAfl BP�ECEIPFIEb mr. sEollorw CIFICUf/Uf IIAMMM N011 MULMIMf+UUNI iTrsl IbaICIWL 10 IN. MIN P MAX. RISE 7014 IN. VARIATION OF RISER HEIGHTS OR TREAD DEPTHS SHALL NOT EXCEED %IN. Decking .n on Center. 6om edge of to center or be 1 -Ile .Imam k.-- 3'-0" msxlmum —•—.4 Fall Cul basecap �1" mine above concrete or provide treated wood €j min Minimum 2000 psi rooting (/r minimum if covered 12^ min{ Z-3" minimum Natural Grade_ 7' min to daylight • 2000 psi concrete 3" NO Irgrealerthin provide • m 40 bravo a to -beam soar (Maximum Height shell more ban 11 Post & Beam Connection detail (interior condition) Post Cep Installed per macutholmet's instruction --r -Metal boccep " min. above concrete or r d treated wood 6" minimum 1 g" min. � •1 (4M) I Knee brace I N Ig" mix (4x4) Two 112" diameter leg Krep brace bolts lop and bottom typical Part 24" minimum if covered minimum ledger snachment must be boiled through Post & Beam Connection detail oil top installed per mauutscturces inslrucliun Ia" min. 24" max. (4x4) Orarbang nae brae 1)t'InikLi7ITtIC(riJPli�i2Ctk�H!f i9 U!7iR$9gWde7mE4iA71 i— team 71vv 1/2" diameter lag bolls tup mal bona. 11.14.0 S PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE Figure 8: Post -to -Beam Attachment Requirements (1)3xor4 (2) 2x bea bean must be fully m 6x6 not 6x6 (2) 112" diameter lhru- bolts with washers -h post to accomodate beam RIM JOIST REQUIREMENTS Attach a continuous rim joist to the ends of joists as shown in Figure 11. Attach decking to the rim joist as shown in Figure 11. For more decking attachment requirements, see DECKING REQUIREMENTS. Figure 11: Rim Joist Connection Details joists Figure 9: Prohibited Post -to -Beam Attachment Condition Figure 10: Alternate Approved Post -to -Beam Column Cap Attachment secure decking to top of rim joist with #10 x 3" minimum wood screw @ 6" o.c. NAILS NOT PERMITTED I attach rim joist to end of each joist with (5) #10 x 3" ® minimum wood screws; NAILS NOT PERMITTED (the number of screws may be reduced to 3 if there is no guard ® or, when a guard post is present, its connection is per rim joist the GUARD POST ATTACHMENT details) American Wood Council & 22-141 50 SHEETS AAAPAD 22-142 100 SHEETS 22-144 200 SHEETS 700t. 10 kotptcc w vT LA Sit 3)'iA P.r L.UfAttelq- ovr�k +x17- A LOYL. 5'/2 -PAILS t6" 5TA-(q kAyrD s-Mo.4 t-1 R it x It W 2,- -2 L 4X4- TZu N) I p 42%o 5,t-OAVE kem"-k SCLC M q eS <-r :2 tfk i o, \S� Cvz, F r'x 4,4 22-141 50 SHEETS unnww 22-142 100 SHEETS 22-144 200 SHEETS DECK fi��vrP1� Rpktur�C-7 'R1Nh atST C, W IIJC -� vc 22-141 50 SHEETS AMPPM 22-142 100 SHEETS 22-144 200 SHEETS a � -� ,� cj r3,. Vt� r�^T j P., -gyp ►"t � g���, 1 v 47-4. 5. l -b Acsj Mej�,ze,� ])a I,13 YADF DIAGRAMS AND LAYOUTS FOR TNS "SLS, BEAMS AND 'IS PRIOR TO FRAMING CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FCf? ""—" `- vOMPLIANCE SPr,KANIE!/AI s v�u�LOI , DIVISION