Loading...
2008, 03-28 Permit App: 08001042 Egress WindowProject Number: 08001042 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/28/2008 Page 1 of 2 Project Information: Permit Use: (1) EGRESS WINDOW Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 000875 Name: FOREST MEADOW ADD Contact: HARDY, JOHN W & DIANE M Address: 4317 S FOREST MEADOW DR C - S - Z: SPOKANE, WA 99206 Phone: (509) 924-5413 Group Name: Project Name: District: Sout Parcel Number: 45333.0409 Block: Lot: SiteAddress: 4317 S FOREST MEADOWS D Owner: Name: HARDY, JOHN W & DIANE M Address: 4317 S FOREST MEADOW DR SPOKANE, WA 99206 Location:: CSV Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 114 Depth: 168 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Permits: Released By: Originally Released: 3/28/2008 By: tmelbourn Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Gr Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB EGRESS 0 $320.00 0 $320.00 'WINDOW Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $320.00 0 $320.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $69.25 $4.50 $27.70 Permit Total Fees: $101.45 Operator: JD Printed By: JD Print Date: 3/28/2008 Project Number: 08001042 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/28/2008 Page 2 of 2 Payment Summary: .. Permit Type Building Permit Fee Amount Invoice Amount $101.45 $101.45 Amount Paid Amount Owing $0.00 $101.45 $101.45 $101.45 $0.00 $101.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 3/28/2008 Spokane jValley� Community Development Residential Construction New Construction Accessory Bldg Permit Application n Addition/Remodel n Deck SZ� Other: Ea 40; w(No.3gt1) Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: / PERMIT FEE: ' SITE ADDRESS: '7 11 S. L, i(t' r;7 (i J (-192L(,. ASSESSORS PARCEL NO: 5'5'3.33 (-A to LEGAL DESCRIPTION: Building Owner: t 9 Name: ..:7:,;.}1 14 flay, Address: It3 i7 5: lrkC'71 Meime-. b.k., City: SPI' l %� it/M� ty State: Q/4_Zip:e1`i �lirf, Phoy,_ Fax: _"-) /71� S��i*q Contact Person Name: �. `-iii i 4,4-kcly CYCL"7t 9 Phone: Describe the scope of work in det. T ,' s4afL Met* g'�1C5- "'a eare, Lir/ Contractor: DIMENSION$ # OF STORIES. Name: -7-t, > /0 2Nu FLOOR SQ. FTG: 4L Address: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: /5-C C_s City: State: Zip: Phone: Fax: HEAT SOURCE: ,it Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project $ ,, L , • s' t-t),4z( AAA ce/ co.) Ree empelare Proposed Use:4e: i3 t. z Y' **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSION$ # OF STORIES. TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: j 5-,c 2Nu FLOOR SQ. FTG: 4L UNFIN BASEMENT/SQ. FTG; _ IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: /5-C C_s GARAGE SQ. FTG: tyt Q'0 DECK/COV. PATIO SQ. FTG: /0/,4 30% SLOPES ON • PROPERTY: /1 # OF BEDROOMS: 4 CONSTRUCTION TYPE: 7 HEAT SOURCE: ,it SEWER OR SEPTIC? _77(2 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. // SIGNATURE: _-._ 4' ---/ r DATE: _ " ay - Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check ❑ Mastercard Expires: ❑ VISA VIN#: Spokane dValley® For City Use Only PLUS Project Number I Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Spokane .00.011\Talley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project 0 Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Monday, March 24, 2008 Site Address: 4317 S FOREST MEADOWS DR Parcel Number: 45333.0409 Zoning: R-2 Fire District: FD 01 Project Number: 08001042 Water District: SPO CO WATER DIST#3B Applicant: HARDY, JOHN W & DIANE M 4317 S FOREST MEADOW DR SPOKANE, WA 99206 (509) 924-5413 e-mail: e-mail: Contact: HARDY, JOHN W & DIANE M Occupant: 4317 S FOREST MEADOW DR e-mail: SPOKANE, WA 99206 (509) 924-5413 e-mail: Owner: HARDY, JOHN W & DIANE M 4317 S FOREST MEADOW DR SPOKANE, WA 99206 Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project Description: (1) EGRESS WINDOW Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N PLAN S !7 Please send all plan review and project comments via e-mail to the highlighted individuals. This transmittal is being circulated along with the indicated documents for your review. Timely review of the information is important. Please notify the Project Coordinator as well as the applicant and/or contact of any major deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such that we may include your sign -off on the permit application. Project Coordinator DAVIS, JENNA Phone: Fax: (509)688-0037 Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane jValley PERMIT CENTER 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 509-688-0036; Fax 509-688-0037 www. spokanevall ey. ore Affidavit in Lieu of General Contractor Registration State of Washington ) County of Spokane ) I, (Print name as signed) , state as follows: 1. I have made application for a building permit from the City of Spokane Valley, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of which is printed on the reverse side of this affidavit. 3. I understand that prior to issuance of a building permit for work that is to be done by any contractor, the City of Spokane Valley must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. , and will therefore, not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. A LICANT' S NATURE Signed and sworn to before me this vl `f Day of 3 , 20 O U n1�1 l r\,- k r L Notary's Name (Prinj) 's Signature NOTARY PUBLIC in Washington, residing ) d for the State of at My Commission expires: County October 15, 2007 Page 1 of 2 P:\Community Development\Forms\Building Forms Spokane.0•00*Valley EMERGENCY ESCAPE AND RESCUE EGRESS WINDOW *Minimum 20" wide clear opening *Minimum 24" high clear opening *Minimum 5.7 sq ft openable area **5.0 sq ft minimum @ grade floor *Top of sill maximum of 44" above finished floor 20' CLEAR MIN i • OPENABLE AREA S 5.7SQFTMIN {5.0 SO FT MIN GRADE FLOOR) • • MINIMUM SIZE WINDOW FOR 20 IN. CLEAR WIDTH 41' CLEAR SILL HEIGHT 44' MAX 34' CLEAR OPENABLE AREA 5.7 SQ FT MIN (5.0 SQ FT MIN GRADE FLOOR) • • MINIMUM SIZE WINDOW FOR 24 IN. CLEAR HEIGHT 1 24' CLEAR MIN FLOOR Grade floor opening is a window or other openings located such that the sill height of the opening is not more than 44" above or below the finished ground level adjacent to the opening. WINDOW WELL *Minimum 36" x 36" *Minimum 9 sq ft clear floor area *Top of wall a maximum of 44" above the floor of the well *A guardrkil is not required unless an exit way adjoins the well. *Provide drainage DEEP WELLS *If the top of the window well wall is more than 44" above the floor of the well, either a permanently fixed ladder or stair egress is required. *The ladder or stair may encroach a maximum of 6" into the required clear floor space. NET CLEAR DIMENSIONS WHEN FULLY OPENED TO PROVIDE 9 SQUARE FEET OF OPENING LADDER OR STAIR REQUIRED LADDER EGRESS *At least 12" in width *Rungs not more than 18" on center *Minimum 3" toe space *Permanently fixed *Non-combustible *Shall extend to top of wall EMERGENCY ESCAPE OR RESCUE OPENING WITH FINISHED SILL HEIGHT BELOW ADJACENT GRADE \\\ \\\'/// \\\"///,.\\\ LADDER OR STAIR PERMITTED TO ENCROACH MAXIMUM OF 6 INCHES INTO REQUIRED DIMENSIONS �.0 /// 7 1 \\\'/7/ \\\'/// \\\"/// \\\'//f 36' MIN 36' MIN 1 *Where bars, grills, covers, screens or similar devices are installed over emergency escape and rescue openings, they must be openable from the inside without the need of special knowledge or special tools, and the force to open them may not be greater than that required of the opening itself. EMERGENCY fens* Nesew ww..^-- FROM SLEEPING ROOMS 1) NET CLEAR OPENING: 5.7 SQUARE FEET GRADE FLOOR OPENING (MAX 441 SA SQUARE FEET 2) NET CLEAR OPENING HEIGHT 24 INCHES 3) NET CLEAR OPENING WIDTH 20 INCHES 41 MAX FINISHED SIIl HEIGHT 44' ABOVE FLOOR `- , I tit. KA NC Y ESCAPE 8 RESCUE OPENING SNS,* c:PI t:,Al:..sr;Al i ROM THE INSIDE OF THE ROOM WITHOUT Iv, -YSORTOOLS S ��p,��►D11tl�u' Nea. Ewes<. 1.0‘' .3 dotiJ 4 pi r4 13 ♦,r µY war E WINDOW WELL: Min. 9 sq. ft. horizontal area. Min. 3 ft. horizontal projection and width. Max. 44 in. vertical depth without a ladder rv�Rr .4, fieirk Acto..14c gTelt pA' 9" LA\t ./,0,lit, WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITION REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTIN DWELLINGS. THE DWELLING UNIT SHALL 8E PROVIDED„ WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEV , DWELLINGS. er SMOKE ALARMS SHALL BE INTER NECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM WILL ACTIVATE ALL ALARMS. (BEDROOMS, AREAS APPROACHING BEDROOMS, VAULTED CEILING WITH RISE OF 24 & ON EACH FLOOR) PArr..e L oo 1/S.?7jkfnq AA kr, 93 a , f ePtsT /a&6u)wig- qlme, t , PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS oliaree REVIEWED FOR COD=E COMPLIANCE SPOKANE VALLEY F' -.LUN DIVISION