2008, 03-28 Permit App: 08001042 Egress WindowProject Number: 08001042 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/28/2008 Page 1 of 2
Project Information:
Permit Use: (1) EGRESS WINDOW
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 000875 Name: FOREST MEADOW ADD
Contact: HARDY, JOHN W & DIANE M
Address: 4317 S FOREST MEADOW DR
C - S - Z: SPOKANE, WA 99206
Phone: (509) 924-5413
Group Name:
Project Name:
District: Sout
Parcel Number: 45333.0409 Block:
Lot:
SiteAddress: 4317 S FOREST MEADOWS D Owner: Name: HARDY, JOHN W & DIANE M
Address: 4317 S FOREST MEADOW DR
SPOKANE, WA 99206
Location:: CSV
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B Hold: ❑
Area: .00 Acres Width: 114 Depth: 168 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 3/28/2008 By: tmelbourn
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Gr Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB EGRESS 0 $320.00 0 $320.00
'WINDOW
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $320.00 0 $320.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$69.25
$4.50
$27.70
Permit Total Fees: $101.45
Operator: JD Printed By: JD Print Date: 3/28/2008
Project Number: 08001042 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/28/2008 Page 2 of 2
Payment Summary: ..
Permit Type
Building Permit
Fee Amount Invoice Amount
$101.45 $101.45
Amount Paid Amount Owing
$0.00 $101.45
$101.45 $101.45 $0.00 $101.45
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 3/28/2008
Spokane
jValley�
Community Development
Residential Construction New Construction Accessory Bldg
Permit Application n Addition/Remodel n Deck
SZ� Other: Ea 40; w(No.3gt1)
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: /
PERMIT FEE: '
SITE ADDRESS:
'7 11 S. L, i(t' r;7 (i J (-192L(,.
ASSESSORS PARCEL NO: 5'5'3.33 (-A to
LEGAL DESCRIPTION:
Building Owner:
t 9
Name: ..:7:,;.}1 14 flay,
Address: It3 i7 5: lrkC'71 Meime-. b.k.,
City: SPI' l %� it/M� ty State: Q/4_Zip:e1`i �lirf,
Phoy,_ Fax:
_"-) /71� S��i*q
Contact Person
Name: �. `-iii i 4,4-kcly
CYCL"7t 9
Phone:
Describe the scope of work in det.
T ,' s4afL
Met* g'�1C5- "'a eare, Lir/
Contractor:
DIMENSION$
# OF STORIES.
Name: -7-t, >
/0
2Nu FLOOR SQ. FTG:
4L
Address:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: /5-C C_s
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE:
,it
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project $ ,,
L
, • s'
t-t),4z( AAA ce/ co.) Ree empelare
Proposed Use:4e: i3 t. z Y'
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSION$
# OF STORIES.
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: j 5-,c
2Nu FLOOR SQ. FTG:
4L
UNFIN BASEMENT/SQ. FTG;
_
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: /5-C C_s
GARAGE SQ. FTG:
tyt Q'0
DECK/COV. PATIO SQ. FTG:
/0/,4
30% SLOPES ON •
PROPERTY: /1
# OF BEDROOMS:
4
CONSTRUCTION TYPE:
7
HEAT SOURCE:
,it
SEWER OR SEPTIC?
_77(2
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed. //
SIGNATURE: _-._ 4' ---/ r DATE: _ " ay -
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
❑ Mastercard
Expires:
❑ VISA
VIN#:
Spokane
dValley®
For City Use Only
PLUS Project Number I
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Spokane
.00.011\Talley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project 0
Previous pre -app meeting 0
Plan revisions 0
Transmittal Date:
Monday, March 24, 2008
Site Address: 4317 S FOREST MEADOWS DR
Parcel Number: 45333.0409
Zoning: R-2
Fire District: FD 01
Project Number: 08001042
Water District: SPO CO WATER DIST#3B
Applicant: HARDY, JOHN W & DIANE M
4317 S FOREST MEADOW DR
SPOKANE, WA 99206
(509) 924-5413
e-mail: e-mail:
Contact: HARDY, JOHN W & DIANE M Occupant:
4317 S FOREST MEADOW DR e-mail:
SPOKANE, WA 99206
(509) 924-5413
e-mail:
Owner: HARDY, JOHN W & DIANE M
4317 S FOREST MEADOW DR
SPOKANE, WA 99206
Contractor: OWNER
( ) - 0
Arch / Engineer:
e-mail:
Project
Description: (1) EGRESS WINDOW
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
N
PLAN
S
!7
Please send all plan review and project comments via e-mail to the
highlighted individuals.
This transmittal is being circulated along with the indicated documents for your review. Timely review of the
information is important. Please notify the Project Coordinator as well as the applicant and/or contact of any major
deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such
that we may include your sign -off on the permit application.
Project Coordinator DAVIS, JENNA
Phone: Fax: (509)688-0037
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jValley
PERMIT CENTER
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
509-688-0036; Fax 509-688-0037
www. spokanevall ey. ore
Affidavit in Lieu of General Contractor Registration
State of Washington )
County of Spokane )
I,
(Print name as signed)
, state as follows:
1. I have made application for a building permit from the City of Spokane Valley, Washington.
2. I understand that state law requires that all building construction contractors be registered with the
State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of
which is printed on the reverse side of this affidavit.
3. I understand that prior to issuance of a building permit for work that is to be done by any contractor,
the City of Spokane Valley must verify either that the contractor is registered by the State of
Washington, or that one of the exemptions stated under RCW 18.27.090 applies.
4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I
hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I
consider the work authorized under this building permit to be exempt under No. , and will
therefore, not be performed by a registered contractor.
I understand that I may be waiving certain rights that I might otherwise have under state law in any
decision to engage an unregistered contractor to perform construction work.
A
LICANT' S NATURE
Signed and sworn to before me this
vl `f Day of 3 , 20 O
U n1�1 l r\,- k r L
Notary's Name (Prinj)
's Signature
NOTARY PUBLIC in
Washington, residing
)
d for the State of
at
My Commission expires:
County
October 15, 2007 Page 1 of 2
P:\Community Development\Forms\Building Forms
Spokane.0•00*Valley
EMERGENCY ESCAPE AND RESCUE
EGRESS WINDOW
*Minimum 20" wide clear opening
*Minimum 24" high clear opening
*Minimum 5.7 sq ft openable area
**5.0 sq ft minimum @ grade floor
*Top of sill maximum of 44" above finished floor
20' CLEAR
MIN
i
•
OPENABLE
AREA
S 5.7SQFTMIN
{5.0 SO FT MIN
GRADE
FLOOR)
•
•
MINIMUM SIZE
WINDOW FOR 20 IN.
CLEAR WIDTH
41' CLEAR
SILL HEIGHT
44' MAX
34' CLEAR
OPENABLE AREA
5.7 SQ FT MIN
(5.0 SQ FT MIN
GRADE FLOOR)
•
•
MINIMUM SIZE WINDOW
FOR 24 IN. CLEAR HEIGHT
1
24' CLEAR
MIN
FLOOR
Grade floor opening is a window or other openings located such that the sill height of
the opening is not more than 44" above or below the finished ground level adjacent to
the opening.
WINDOW WELL
*Minimum 36" x 36"
*Minimum 9 sq ft clear floor area
*Top of wall a maximum of 44" above
the floor of the well
*A guardrkil is not required unless an
exit way adjoins the well.
*Provide drainage
DEEP WELLS
*If the top of the window well wall is more
than 44" above the floor of the well, either
a permanently fixed ladder or stair egress
is required.
*The ladder or stair may encroach a maximum
of 6" into the required clear floor space.
NET CLEAR DIMENSIONS WHEN
FULLY OPENED TO PROVIDE
9 SQUARE FEET OF OPENING
LADDER OR STAIR
REQUIRED
LADDER EGRESS
*At least 12" in width
*Rungs not more than 18" on center
*Minimum 3" toe space
*Permanently fixed
*Non-combustible
*Shall extend to top of wall
EMERGENCY ESCAPE
OR RESCUE OPENING
WITH FINISHED SILL
HEIGHT BELOW
ADJACENT GRADE
\\\ \\\'/// \\\"///,.\\\
LADDER OR STAIR PERMITTED
TO ENCROACH MAXIMUM OF
6 INCHES INTO REQUIRED
DIMENSIONS
�.0 /// 7
1
\\\'/7/ \\\'/// \\\"/// \\\'//f
36' MIN
36' MIN
1
*Where bars, grills, covers, screens or similar devices are installed over emergency
escape and rescue openings, they must be openable from the inside without the need
of special knowledge or special tools, and the force to open them may not be greater
than that required of the opening itself.
EMERGENCY fens* Nesew ww..^--
FROM SLEEPING ROOMS
1) NET CLEAR OPENING: 5.7 SQUARE FEET
GRADE FLOOR OPENING (MAX 441 SA SQUARE FEET
2) NET CLEAR OPENING HEIGHT 24 INCHES
3) NET CLEAR OPENING WIDTH 20 INCHES
41 MAX FINISHED SIIl HEIGHT 44' ABOVE FLOOR
`- , I tit. KA NC Y ESCAPE 8 RESCUE OPENING SNS,*
c:PI t:,Al:..sr;Al i ROM THE INSIDE OF THE ROOM WITHOUT
Iv, -YSORTOOLS
S
��p,��►D11tl�u'
Nea. Ewes<.
1.0‘' .3 dotiJ
4 pi
r4
13 ♦,r
µY
war
E
WINDOW WELL:
Min. 9 sq. ft. horizontal area.
Min. 3 ft. horizontal projection and width.
Max. 44 in. vertical depth without a ladder
rv�Rr
.4,
fieirk Acto..14c
gTelt
pA' 9" LA\t
./,0,lit,
WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITION
REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE
SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTIN
DWELLINGS. THE DWELLING UNIT SHALL 8E PROVIDED„
WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEV ,
DWELLINGS.
er
SMOKE ALARMS SHALL BE INTER
NECTED AND HARD WIRED IN SUCH A
MANNER THAT THE ACTIVATION OF ONE
ALARM WILL ACTIVATE ALL ALARMS.
(BEDROOMS, AREAS APPROACHING
BEDROOMS, VAULTED CEILING
WITH RISE OF 24 & ON EACH FLOOR)
PArr..e L oo
1/S.?7jkfnq
AA kr,
93 a , f ePtsT /a&6u)wig- qlme,
t ,
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
oliaree
REVIEWED FOR COD=E COMPLIANCE
SPOKANE VALLEY F' -.LUN DIVISION