2015, 04-24 Permit: SW-15000367 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000367 Permit Issued Date: 04/24/2015
Expiration Date: 04/24/2016
Project Description: SEWER
Project Name: VIEW RANCH ESTATES
Primary Contact: DERKACHEV, VADIM
Phone:
Applicant: A K CONSTRUCTION & EXCAVATION
LLC
Address: 3320 S MOLTER RD
LIBERTY LAKE, WA 99019
Phone: 509-370-5692
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
2711 N FOX LN
45091.2909
Owner: DERKACHEV, VADIM
Address: 2520 E CASPER DR
SPOKANE, WA 99223
Phone:
Assessor's Description: VIEW RANCH ESTATES (AFN 5478998) LT 9 BLK Email:
2
Inspection Area: : (509)-477-3675
Water District: Irvin Water District #6 Fire District: Spokane Valley Fire
Zoning: Land Area: 6379 Square Feet
CONTRACTOR INFORMATION:
KCONSCE920J4, Exp. 04/24/2016
A K CONSTRUCTION & EXCAVATION LLC
3320 S MOLTER RD LIBERTY LAKE, WA 99019
509-370-5692
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well)
from DOE prior to permit issuance.
Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 04/24/2015 08:57:48 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000367
Permit Issued Date: 04/24/2015
Expiration Date: 04/24/2016
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/24/2015 08:57:48 Project Coordinator: Susan Clark