2008, 07-18 Permit: 08002701 GarageSpokane
Valley®
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
1
Site Information
Project Information
Site Address: 3005 S FOX RD
Parcel Number: 45284.1705
Subdivision:
Block: 17 Lot: 5
Zoning: R-2 SF Res Suburban District
Owner: LEASE, ADAM D & MICHELLE P
Address: 3005 S FOX RD
SPOKANE. WA 99206
Building Inspector: SOUTH
Water Dist: SPO CO WATER DIST#3B
Project Number: 08002701 Inv: 1 Issue Date: 07/18/2008
Permit Use: 30 X 40 ATT GARAGE
Applicant: DAYCO CONSTRUCTION
PO 130X 14182
SPOKANE VALLEY WA 99206 Phone: (509) 216-7907
Contact: DAYCO CONSTRUCTION
PO BOX 14182
SPOKANE VALLEY WA 99206 Phone: (509) 216-7907
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Building Permit
Contractor: DAYCO CONSTRUCTION License #: DAYCOC'958CD
GARAGE U -I VB 1,200 RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
Total Value: 522,800.00 SF PLNS RVW <7999 SQ FT
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
$363.25
$4.50
$145.30
Total Permit Fee: $513.05
Payment Summary
Total Fees AmountPaid AmountOwing
$513.05 $513.05 $0.00
Tran Date Receipt # Payment Amt
07/18/2008
14931 $513.05
Notes / Conditions of Approval
If a floor is provided in the attic above the garage, a new permit will be required.
Processed By: DAVIS, JENNA
Printed By: PATRICIA PRINCE Page I of I
PERMIT
r
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permlttee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this perrnit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - pnor to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eiectncal winng, Stare Department of Labor Permis and inspections for Sewer Connection, Spokane County Utilities Division
And Industnes 324.2640 477-3604
Permts and inspections for on-site septic systems, Spokane Regional Fire spnkier and alarm systems and pnvate access road inspections. Spokane Valley
Health District 324.1560 Fire Department 892-4122
Slate law RCW 19 122 requires that pnor to any excavation the 'CALL BEFORE YOU Die' center must be notified. Call before you dig at least 2 working days In advance, 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a perrnit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent Date �—(8'0e
Staff Approval Date