Loading...
2008, 07-18 Permit App: 08002701 GarageProject Number: 08002701 Inv: 1 Application Date: 7/18/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 40 ATT GARAGE Setbacks: Front Site Information: Left: Right: Rear: Contact: DAYCO CONSTRUCTION Address: PO BOX 14182 C - S - Z: SPOKANE VALLEY WA 99206 Phone: (509) 216-7907 Group Name: Project Name: Plat Key: 002392 Name: SKYVIEW ACRES ADD District: Sout Parcel Number: 45284.1705 SiteAddress: 3005 S FOX RD Location:: CSV Block: 17 Lot: 5 Owner: Name: LEASE, ADAM D & MICHELLE P Address: 3005 S FOX RD SPOKANE, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 1,850.00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: , Review Building Plan Review Released By: Originally Released: 7/18/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 7/15/2008 By: Mharnois Operator: JD Printed By: JD Print Date: 7/18/2008 Project Number: 08002701 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/18/2008 Page 2 of 2 Building Permit Contractor: DAYCO CONSTRUCTION Firm: DAYCO CONSTRUCTION Address: 2915 S FOX Phone: (509) 216-7907 SPOKANE WA 99206 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 1,200 $22,800.00 1,200 $22,800.00 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW <7999 SQ FT Notes: Totals: 1,200 $22,800.00 1,200 $22,800.00 Units Unit Desc Fee Amount 1 SELECT $363.25 1 SELECT $4.50 1 SELECT $145.30 Permit Total Fees: $513.05 If a floor is provided in the attic above the garage, a new permit will be required. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $513.05 $513.05 $0.00 $513.05 $513.05 $513.05 $0.00 $513.05 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/18/2008 *Wanes #Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevallev.org PERMIT NUMBER: 9c-2-70/ PERMIT FEE: New Construction ❑ Accessory Bldg _Thcij, Deck Other: SITE ADDRESS: 3605 5 - ASSESSORS PARCEL NO: LEGAL DESCRIPTION: _ ,,r,�; av, , _ :-:Coniractor^ rBuilding Owner:=;,:�`-.- L. .. i. `, ...s �. `". Ke . , + ,, �'a.•'-" - ::'.i.' - =- - - r. �.F,:,,3 )y, a Name: yy)�/y�,c�+f��P !�E�SP. Name: T I�yC� (' /9,Irucr, ?::)n Address: 9.ci 15 5. r_ox. 11...., Address: 3CJ�,- 5, iro X ea. City: ,r' (-1 State: LA Ft �(Zip:p aJtic City: SPL/04D State: � Zip: & Phone: 0)- /ea _�79O ) Fax: f Phone: as t3 – Da Fax: FINISHED BASEMENT SQ. FTG: Contractor L5A qy gOC Cfsa xp Date: ^9 „ W'' 09 Contact�,Person ='- °. i•. - '�<'"„ii4 ; F [f�=`?. 2>`�``. 30% SLOPES ON PROPERTY: City Business Lic. No: arrow HEAT SOURCE: er•OR SEPTIC? SevJe(– Name: S t I 1 i ct rri S Phone: 50 - a1 is - --1 10 7 Describe the scope of work in detail: Cost of Project: $ j001:506°---- IA 0e' Id c. 30' xyo' 4-NacJ&J 9a.rcL t Proposed Use: 50.rC %e_ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK:n3 (4 DIMENSIONS: y� 20sMAIN # OF STORIES: A TOTAL HABITABLE SPACE: FLOOR TO SQ. FTG: 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG:,,DECK/COV. tiµf6 1 ?-00 0' PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: AM (4-t 8 ✓\- HEAT SOURCE: er•OR SEPTIC? SevJe(– The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional inform tion may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 - ❑ Check DATE: 7 —•c•i EN NE�p LEY CITY OF SPOKA (1 ❑ Mastercard ❑ VISA ' stk.1 1 11'1% Expires: VIN#: PERMIT _ TER BY: Spokane 11703 E Sprague Ave Suite B -3t Spokane Valley WA 99206 ♦509.688.0036 t Fax: 509.688.0037 t jValleyT Mx Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. MX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. MX Show the height of any proposed buildings or accessory structures. 13 Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. fX Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. MX Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details Furnace and hot water heater location �X All header locations: type, size and connections ❑X Foundation plan Insulation information Decks and Stairway details 13 All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spokane .0,00Valley® ' For City Use Only PLUS Project Number ()54(7"7C) Project Address Eos 5 VA 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 • permttcenter@spokanevaltey.org' As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for. any reason we cannot meet this date, we will contact you with a revised target date.- • Your application review TARGET DATE is - f htc The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Emit time may he required .for re -submittals as project application reviewers work on multiple' applications and it mem he'several dors he/hre //rev "can look at your new or revised ur/armation.• r Designate a specific contact person to communicate with the City. While the person designated as the applicants contact person with the Citi'.can he changed, one individual .vier the expertise for dealing with reviewer comments would be the best choice for the entire review, process. Call staff regarding the status of your project only after the target date shown at the top of the page.. Although you should be contacted on or by the target date. please feel free' to contact us ,if you haven't heardf'm us by your target date. Staff may contact you helore the target date yule initial review is complete. By following this procedure. you will save time and allow the reviewers to complete the work,more expeditious/v. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This. means all of the required documents, as indicated on your Pre -Application Checklist have been submitted- or have been approved for deferred' submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. ' When this step is complete, your application will be routed to the appropriate staff and remain .in their review -queue' until it comes up for review. • . 3. Technical Compliance. Once an application is administratively complete, it -is routed to technical staff for compliance review. Depending on the type of project, technical staff may. include multiple reviewers. -You should be' contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical, compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any. subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center.' Whemall sections of the application are received, a Permit Specialist will process the application and cohtactthe person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 M J I qlk \l Cr N/ Pro e- 30' u Wooge, 5 hook -ed 09 -!o eketoect PraERA. y rtpc.` r -co CA- c, ) sa-; Noor i ?co •i 3Ccas ItoFc/Q a, eirr ey. Oq7 • V la 41 tAJB it � 1;005 5o. Fo