Loading...
ZE-004-94MHP/ZE-3-93MHP . . ENGINEER' S REVIEW SHEET BLDG. PERMTT # -or -FILE# AffW-004-94,w Related-File # ( ZE-84-84/MHP3-93) Date to Review Time # tr, ~ Date to AA & DR Time t ; I Datc Rc.~ccivcd 12 -1-94 y Project Name MILHOLAND MOBILE HOME PK(ZE-84-84) No. Lots 24 No.Acres 3.5 Section - Township - Range SITE ADDRESS N BOONE-E BA.RKER PARCEL # 17552-0110+ Applicant's Name ROBERT MILHOLLAND Phone # 891-2415 Address 18717 F BOONE-GREENACRES 99016 Work # 926-6435 Date Conditions mailed Contact person DWIGHT HUNtE Plione # 7474600 FLOOD ZONE V NO W S SCHOOL Engineer / Surveyor's / Architect's Name DWIGHT HUME ADAMS & CLARK INC 1720 W 4TH SPOKA,NE WA 99244-1702 747-4600 FAX 747-8913 Planning Contact Person STACY BJORDAHL Phone # 456-2205 Date Submitted Description Initials / /_j~rAGREEMENT TO PAY FEES COMPLETED & COPY TO ACCOUNTING FINAL PLAT FEES COMPLETED & COPY TO ACGOUNTING NOTICE TO PUBLIC # 1 3 4 6 COMPLETED - OR NEEDS TO BE SIGNED DESIGN DEVIATION SUBMITTED ALTERATION TO PLAT - BLOCKS & LOTS I I BOND RF.LEASED -ROAD & DRAINAGE IMPROVEMENTS ~ l I NF.ARING EXAM _APPROVED DENIEn _APPEALL•D BBC i AROJECT _APPROVEI) _DENTED ~ r r ~ LONE RECLASSIFICATION NO.: ZE-84-84 SPOKANE CUUNTY hEARING EXAMNER COh1MITTEE FINDINGS AND URDkk A. IIJYRUUUCT ION This matter having come before the Zoning Nearing Examiner Committee on February 7, 1985, and the members of the Committee present being Jane E. Myers, Chairperson and Richard L. Skalstad. B. PItOpOSAL The sponsor, Vernon W. Milholland, is requesting approval of a zone reclassification, File No. ZE-84-84, ugricultural to Residential Manufactured Home, for the purpose of developing a 24-Unit Manufactured Home Park with one space to be occupied by the existing residence on site. C. FINDINGS OF FACT l. That the existing land use in the area is residential, railroad right of way, truck stop and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Urban development. 3. That tne existing zoning of the property described in the application is Agricultural. 4. That the provisions of RCW 43.21C (The State Environmental F'olicy Act) have been complied with, and the Committee concurs with the Ueclaration of Non-Significance. 5, That the proper legal requirements for advertisement of the Agenda Item have been ful fi 11 ed. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone is justified. r r ZONE RECLASSIFICATION N0. ZE-84-84 C. t= INU IN6S UF FNCT ( continued ) 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands expressed neither approval nor disapproval of the proposed use. 10. The hearing Examiner Committee finds the proposed use to be in harmony with the general purposeand will not be otherwise detrimental to the public health, safety, and welfare. D. CONDITIUNS OR CONTINGENCIES APPLIED TO THIS APPROVAL (All Conditions imposed by the Zoning Nearing Examiner Committee shall be binding on the "Applicant", which term shall include the owner or owners of the property, heirs, assigns, and successors.) That the road within the proposed manufactured home park may need to be realigned to accommodate the movement of manufactured homes in and out of the park satisfactorily. a) CUUNTY PLANN ING DEPARYMENT l. That the roof shape and composition of the Manufactured Homes be similar to conventional single family residential structures. 2. That a minimum 5-foot dense landscape strip with tall growing trees be provided along Boone Avenue; said landscaping to be installed prior to release of building permits. 3. That a 6-foot sight-obscuring fence be installed prior to issuance of building permits along all property lines, except along Boone Avenue. 4. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumination to the area with full consideration to adjacent properties). 5. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping sfiall be installed and maintained such that sight distance at access points is not obscured or impaired. 2 -J- , ZONE RECLASSIFICATIUN N0. ZE-84-84 a) CUUNTY PLANNING DEPAkTMENT (continued) b. The applicant shall develop subject property generally in accordance within the concept presented to the hearing Examiner Committee. Variations when approved by the zoning Administrator will be permitted, including, but not limited to the followiny changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 7. The specific development plan will be submitted for ('lanning Department review and approval prior to issuance of building permi ts. 8. That prior to release of building permits, the sponsor shall submit a final Manufactured Home Park design plan to the Planning Department which demonstrates compliance with the Residential Nianufactured Home Zone, Development Standards of Section 4.05A.050-(b-1-9), and all Hearing Examiner Committee conditions of approval. 9. All current standards of the Residential P9anufactured Nome Zone, as amended, shall be complied with in the development of this site. lU. That the project is subject to Section 4.16A.050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning Urdinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. 11. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58-17 and the Spokane County Platting Urdinances prior to issuance of building permits. 12. That the provisions of SEPA's NOTICE UF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #17-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements. 3 r , r Z014R RECLASSIFICATION NU. ZE-84-84 a) CUUNTY PLatJN ING DEPARTh1ENT ( conti nued ) 13. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's likely significant adverse impac ts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non-significance is hereby to be issued. b) CUUNTY ENGINEERING DEPARTh1ENT Prior To The Issuance Of A Building Permit Ur Use Of The Property As Nroposed: l. Applicant shall dedicate lU feet on Boone Avenue for ri ght-of-way pri or to any use of the property. 2. Access permits for approaches to the County Road System shall be obtained f rom the Spokane County Engineer. 3. Applicant shall improve Boone Avenue in a manner consistent with Spokane County TYPICAL roadway section No. 2 minimum paving width Access Standard. 4. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 5. The applicant shall submit for approval by the Spokane County Engineer and the Spokane Gounty Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 6. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4 i • 1 i ZUNE RECLASSIFICATION NO. ZE-$4-84 b) COUNTY ENGZNEERING UEPARTMENT (continued) 7. 7he ward "appi icant" sha7 l i nclude the owrier or owrrers of the property, his hei rs, assigns, and successors, S. The canstruction ❑f the raad improvernents stated herein shall be accornplx shed as appro►red by the Spvkane County Engi neer, 9. Aa 1 requi red i mpravements shaZ 1conforrn to the current State of Washi ngton Standard Speci ficatiorrs for Road and Bridge Gonstruction, and other appl icabi+e County standards andlor adopted resoluti ons pertai ning to Road Standards and 5tarmwater Managernent a n effect at the date of constructian, unl ess otherw7 se apprvved b,y the Gourwty Engi neer. 10. Rvadway standards, typi cal roadway secti onS and drai nage pl an r°equi rements are faund inSpakane Board of County Cornmi ssi vners" Resol ution No. 80-1 592 as amended and are applicabl e ta thi s proposal. c } COUNTY UTIL ITIES DEPARTN~EN7 1. Pursuant to Board of County Corrmissioners Resol uti vn No. 80-D41 B, the use of an-si te sewer disposal systems i s her^eb,y authori zed. This authori zati on i sconditi aned on campli ance wi th ai 1 rui es and regu7 ati ons of the Spokane Caunt,y Hearl th aistrict and is further condztivned and subject to specific - ap,plicati on approual and i ssuance of per^mits by the Health dl Str1 ct. 2. The owner(s) or Successar(s) in interest agree to autharize the County to pl ace thei r name(s) on a peti ta on for the formati vn of a UL IU by peti ti on methad pursuant ta RCW 36.94 whi ch the peti tian itacl udes the Owner(s) praperty and further not tv object by the slgni ng of a protest petition agai nst the forrnation of a klLiD hy resaluti on methvd pursuant to RC'W Chapter 36.94 whi ch i nel udes the Owner(s) property. FROV IDED, th~ s conditi vn shall not prohi bi t the Owner(s) or Successor(s) frorn objecti an to an,y assessment(s) on the property as a resul t of improvements cal led for i n conj unction wi tM the formation of a lJL ID by eti ther peti tipn or resol uti on method under RCW Chapter 36.94. 3. Any water service far this praject shall be provided in accordance with the Cnardinated Water System Plan for Spokane Count,y, as amended. ~ , ZONE RECLASSIFICATION N0. ZE-84-4 c) CUUIvTY UT IL IT IES DEPARTI4ENT ( conti nued ) 4. Each dwelling unit shall be double-plumbed for connection to future areawide collection systems. 5. A dry sewer connection to the future area-wide Sewerage System is to be constructed. Plans and specifications for the dry sewer connection are to be reviewed and approved by the Utilities Department prior to issuing a building permit. 6. Sewer easements may be required for future connection to the Yal 1 ey sewer system. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the i ssuance of any bui 1 di ng permi t for thi s project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authori zed. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Uepartment of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BU ILD ING ANU SNFETY UEPARTP9ENT l. The site is located in Fire Uistrict # l. 2. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 6 ! i. ZONE RECLASSIFICATION NO. ZE-84-$4 e) CUU14TY BU ILD ING AND SAFETY DEPARTMENT ( conti nued ) 3. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 4. Each structure shall be accessible to Fire Department apparatus by way of access roadways with all-weather driving surface capable of supporting the imposed loads of fire apparatus. The minimum paved roadway width, inside curb face to inside curb face, shall be 24 feet with no parking. Parallel parking is permitted on one side with road widths of minimum 30 feet. Parallel parking is permitted on both sides with road widths of minimum 36 feet. Signs noting such is required for fire lane. The turning radius of private roadways and drive aisles shall be a minimum of 20 feet inside and a minimum 45 feet outside to curb face. Cul de sacs more than 600 feet from the center line of the nearest cross street shall have a minimum radius of 37 feet, 6 inches (75 feet diameter). 5. Installation of fire hydrants are required to be installed and serviceable in accordance with the Spokane County Department of Building and Safety prior to development. The water plan shall show each fire hydrant and be in compliance with Chapter 10.04 of the 1979 edition of the Uniform Fire Code. The present design requires a minimum fire flow of 500 g.p.m. for 30 minutes. The water plan shall specify the gallons per minute for each fire hydrant at a residual pressure of no less than 20 p.s.i. (minimum pressure). 6. Where it is desired to have access control gates in residential developments, the following shall apply: The minimum width of roadway, inside of access gate, shall be twelve feet (12'). There shall be at least two (2) such drive approaches where the gates are located. One may be used for vehicles exiting. Tire flatting spikes shall not be used unless the entrance is a minimum of twenty feet (20') wide. The gates shall be provided with an approved method of emergency operation in accordance with the fire department standards. Where each drive approach is less than twenty feet (20') in width and controlled by gates, a secondary means of access shall be provided with a clear, twenty foot (2U') unobstructed opening. f ) WATER NURVEYOR 1. Water Purveyor is Consolidated Irrigation District #19, and they will supply the site with adequate water for domestic, fire and irrigation uses. However, satisfactory arrangements have not been made to serve this proposal. 7 e , ZONE RECLASS IF ICAT IOid N0. ZE-84-4 g) COUNTY AIR POLLUTIUN COIJTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. It has been determined that fireplaces and wood stoves are a significant source of suspended particulates. The small particles (C lOmicrons) are respirable and can have an adverse effect upon the health of the public. We strongly urge that if wood stoves/fireplaces are used, that burning be done as efficiently as possible. Al1 wood should be seasoned and stored in a dry place. During periods of poor ventilation or elevated air pollution levels, we request that use of wood stoves and fireplaces be discontinued. 5. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. 6. All air pollution regulations must be met. h) '208' STUDY l. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 8 H a ' r / i ZONE RECLASSIFICAT IDN NO. ZE-84--84 E. ORpER The Hearing Exarniner Cammy ttee, pursuant t❑ the afarernenti aned, fi nds that the appl i cati on af Vernon W. Milholiand, for azane recl a ss ifi cati an as k.6~sc1 1 kJG►1 iJI 1.hG app1 1 ca41 \/n JhV4A 1 tJ 1.~~ ~~PRY1VEDi F"4LJt1 on LMyr SRGIlJ IrSAd SeL.VIIdG1a Z/ys Mye1 s V+0te; Skal stad - A,ye Myers - Aye Unanimous ta APRRQVE to the RESIDENTIAL MANl1FACTURED H014E ZUNE # (2 - 0) HEARr~~ EXPJ41NER c014MYrTEE HEREBY ATTEST T0 TNE ABOVE FINaINGS, ORDER, AND 1fOTE ~ p y / /C '1"perS0n r" r E ~ ATTEST: For WALL IS 0. HUB6ARD jP11a 4nn* g Director B,y STEVE P. h6ROBIUWSKI 2oni ng Adrni ni strator Date ~ 9 I • • r ~ - a . ~ • S P O K A N E 4td ' , C O U N ' I' ~r" OFFlCB OF TI IB COUNTY ENGINEER 0 A UIVLStQN OF T11E ('UBI.IC WORKS nE-VAuiMENT Ronalcl C. f formann, I'.E., County Cngineer Dennis M. Scoit, P.E., Dlrector AGREEMENT TO PAY FCrS ENGlNEER'S AGREEMENT NUMBER Tliis agreement Uetween Srokane County and Bob Millholland , i wtiose interest tn Ilie project is Owner , p.e. owner, agent, , is enterecl into this I S cfay of dC V , 19 T1iis agreemenl is applicahle to the project known as: ( zE 84-84 ) 6,~ ' ffirboct r " i n i numfff) That ilie ineliviciuals anci rarties nameel herein as having an inlerest in tlie above clcsetibecf prorerty or project agree to ilie followinb: l. Reimburse Srokane County foc projeet review anci inspection fees as speeified in Chapter 9.14 of tlie Spokane County Code. The fees will b:, basecf on actual salary costs incurred by Spokane County for project reviews ancl / or inspections plus a ten perc;ent actrninistrative cliarge, ancl will tie hilled montlily as acerued. Any final billing amUUnts, to inclucle any late fecs or any otlier expenses incurreci in tlie collcclion of an overclue account must be paicf prior to the Cuunty's acceptance of the project fur filing. 2. The uncfersigned Agrees that these fees are clue and payable upon reeeipt af the billing as specifiecl above. 3. Any invoices not paicf within 30 days of ilie invoice clate will be subjectecf to a late fee cliarge of l% per montti (12°l0 per year) on the unpaici balance of the account ancf any acertieci Iate fee charges. In aclclition, if any outstanelinb balance on ilie accounl for iIiis project is not paid williin 30 clays of the invoice clate, no further reviews of the project clocuments will be concfucted until tlie entire account balance is paicl. Any balancc on ttie account for tiiis project not paicl witliin 65 clays of Ihe invoice date may result in legal action or the initation of otlier collection prucecltires, ~ inclucling referral to a collec(ion agency. 1lie Sponsor will be liable for any ancl all expenses incurred by ilie Caunty for tlie collection of overciue accoiints. 4. 77ie monllily billing shoulcl be sent to the attention of: . NAMC: Bob Millholland ADDRESS: E. 8712 Mission CITY, STATE: Spokane, Wa. 99216 ZIP CODE: PtIONE l - . - - I uncferstancf that failtire to pay thesc fees may result in dclay in completion or approval of the project or other possiUle sanclions. ❑ If ttiis fee agrcetncnt is completecl by someone otlter tlian Ilie Sponsor (i.e., ilie projec;t owncr or aprincipal in tlie Frm spwnsoring ilie project), sticli as ttle Engineer ciesigning tlic projccl, tlien written autliori2atiUn from ilie Spunsor specificully atitliurizing llie Abent to execute lliis Fee AP eni nt is tlacltecl to h' F -Agreement. , f - SIGNATURE I3y: D ber'f MZM'o (Iczzvol ~ , (PR1NT NAMr) RETURN YEL .OW CnPY TO SI"X)KANE COUI~,TY ENCI]VEERS t1pV\adreenticn fce 8120,193 W. 1026 Qcoadway Ave. Spokane, WA 99260-0170 (509) 956•3600 fAX (509) 456-4715 ~ -Y 0 : ~ j • RECEi~ 9 No "PT Date ~ . 42G379 ; h a • ' ~ Received From y Address -7 a4v 2; 0 Fo r . '7.A ~ ACCOUNT r HOW PAID ~ . ' AMT Of CASH - c ACCOUNT AMT PAlO / C}iECK BA[ANCf MONfY ' B~/ - ~ DUE CRGER ~ - RA~cRT L. MILHOLLAND 1016 , ' TERESA MILHOLLAND ~E 1871T BOONE AVE 891-2415 19'2811250 GREENACRES, WA 99016 19 FPAYTOTHE C A/ Qj a " ORDEROF ~C~C~/Y ~Y O_ r s ♦ r / / ! e% "C~' DOLLARS C~~ Frst Interstate 8ank r of Washtngton. N A L; I/rteIWsle Unwerstry Clry Branch 104 P O 8ox 13117 ~ Bc~l7k spo ane, wa 99213 ~ t F FOR ~ e e Ys q T Et~°i~T ~°if~ ~eS , ~ ~ • ~ . ~-1: L 2 5000 28 61:i1' 30 9 6919139,19 1016 . . . ' ~ ~ - S P O K A N E s ~ C O U~T T Y PLANNING DEPARTMENT WALLIS D HUBBARD, DIRECTOR MEMORANDUM ~ ~ . ` Maw - N ~~II e I N t ~ 1 V Spokane County I?ivision of Build.ings Spokane County Division of Utiliries Spokane County Health District Spokane County Parks Fire District # 1 Central Valley School District L."~, ; J1994 FROM: John Pederson, Senior Plannerp~~ r ~WY~le~ L~ajL3ua~~laJ DATE: December 1, 1994 ` SUBJECT: MHP-494 Millholland Mobile Home Park Enclosed find copies of the above referenced mobile home park plan. Please review and forward any comments by December 15, 1994. If you have any questions you may contact me at 456-2205. Please d.irect your written comments to John Pederson. Thank you. sam Enclosure c: Robert Milholland, 18717 F.ast Boone, Sgokane, WA 99016 Dwight Hume, Adams and Clark, 1720 West 4th Avenue, Spokane, WA 99204 WFST 1026 BROADWAY AVENUE • SPOKANE, WASHINGTON 99260-0240 •(509) 456-2205 ~ . . Awli S ~ PLANNING Dt=1'ARTNtEN7 kk 1\1 I IS I) I Il:llitAltl) I►IIZ! ~ I ()It MEMORANDUM TO: Bill Hernmtngs, Division of Engineering FROM: Stacy Bjordahi, Planning Department DATE: December 2, 1994 RE: MI-IP-4-94; Milholland Manufactured Home Park l.2oad and Drainage Plans Attached are the road and drainage plans for the above referenced nlanufaceLired home paik Plesise revi,.;w these plans for compliance with all applicable state and local regulations, and the .Spokanc Cott nty Zoning Code. Please direct any comments or questions to John Pedei son RECEIVED D E C 13 1994 SPOKANE COUNTY ENGINEER 9K0AUN1'i11' A1'I.NUI • S!'OKAA'I, lV1SIIINc1ON 99200-0241) • ($119) ,15(►-2?I)S , I'\\ O(1'11 15o 2,' ! ~ • I I)I ) 1 --W)) 'I t p~ ,a December 20, 1994 MEMORANDUM TO: John Pederson, Planner III FROM: Scott Engelhard, Project Coordinator SUBJECT: Millholland Manufactured Home Park FILE: MHP-04-94 Applicant shall comply with all County Engineering Conditions found in ZE-84-84. We are currently reviewing the road and drainage plans received from your office. • t ~ ' a MANIJFACTURED HUME PARK APPLICAfiYON A. GE ERAL INFnR UATIC)~ DATE , 8-9-94 APPLICATION NO.: Al i4P-,4-qq NAME OF APPLICANT/REPRESENTATIVE: Bob Mi llhol land C/0 Dwight Hume MAII.ING ADDRES S Adams & Clark Inc. W 1720 4th Ave. CITY• po. STATE• Wa. ZIP CODE. 99204 TELEPHONE 7 4 7- 4 6 0 0 AUTHORIZED AGENTREPRESENTING OWIVER• Dwight J. Hume IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZA'CIOIv NOR APPLICANT TO SERVE AS REPRESEN'I,A'I'IVE EXISTING ZONE CLASSIFICATION UR- 7 DATE ESTABLISHED 1- 91 ( Z E- 8 4- 8 4) PROPOSED ZONE CLASSIFICATION. N/ A EXISTING LAND USE Single Family and vacant COMPREHENSIVE PLAN CATEGORY Urban SCHOOL DISTRICT C. V. S. D. FIRE DISTRICT # 1 LIST PREVIOUS PLANNING DEPART'MENT ACTTONS IIWOLVING THIS PRQPERTY: ZE $4-84 B. LEGAIISFnR1V1ATYnN: LEGAL DESCRTPTION OF PROPERTY The East 41 3. 7' of Lot 10, Except the North 211.55' thereof. And Lots 13 & 14, Block 1 of Corbin Addition to Greenacres per plat of record in Volume "S" of Plats Page 30. Records of Spokane County 4Vashington. , SECTION: 17 TOWNSHIP. Z 5 RANGE• 44 ASSESSOR PARCEL NUMBER TOTAL AMOUNT OF ADJOINING LAND OWiVF-D OR CONTROLLED BY OWNER OR SPONSOR none STREET ADDRESS OF PROPOSAL NAME OF PUBLIC ROAD(S) PROVIDING ACCESS Barker, Boone Ave. DESCRIBE YOUR PROPOSAL 24 lot mobile home park as approved in the above file # 84-84. C. nTHER HnIVIE PARK rNFORMATInN NUMBER OF SPACES. 24 GROSS AREA. 3.53 acres 51 00 sf TYPICAL LOT SIZE ~ M H . . e + ~ PROPOSED SOURCE OF WATER Yndividual wells Public System Private Community System O Other Descnbe PROPOSED MEANS OF SEWAGE DISPOSAL. Public sewer O CommunYty system O Septic tank and drainfield O Double Plumbing Dry S ewer (4 Other s a nd s y s t em UTII,ITY COMPANIES AND/OR DISTRICTS TO PROVIDE SERVICE TO THIS PROPOSAL Electricity: WwP Sewer. Gas: Water Consoliaatephone PNB , IS THIS PROPOSAL AFFECTED BY: Aquifer Sensbtive Area eg PSSA Shorelines Wetlands DO YOU, OR THE OWItiTER IN THE EVENT YOU DO NOT OWN THIS PROPERTY, HAVE AN-Y PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FLJRTHER ACTIVITY RELATED TO THIS PROPOSAL? Yes O No ()o 1F YES, EXPLAIN IS PHASTNG OF THE FINALIZATION OF THE MANUFACTURED HOME PARK PROPOSED Yest~ No IF YES, SHOW PHASING ON THE PRELIMINARY SITE PLf1N D. ACENGY CnNSY„1L7'ATInN THIS SECTION OF THE APPLTCATION WILL PROVTDE THE I'LANNING DEPARTMENT STAFF WTTH WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE TNCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT FIRE MARSHALL/FIRE DISTRICT A. THIS PROPOSAL IS VinTHIIV FIRE PROTECTION I1IS-T8Y T NO. ~ B. ADEQUATE ARRANGEMENTS (HAVE) ~ff-Avr NO~) BEEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQCJATE WATER SYSTEM AND FACILITIES FOR FIRE PROTECTION PURPOSES. C. RECOIvIMENDED FIRE FLOW: 7a 0 ; OR UNABLE TO CALCULATE NOW BECAUSE USE IS NOT DEFIlVITIVE; AND WILL BE DETERMINED AT BUTLDING PERMIT , APPLICATTON TIME. D. REQUIREMENTS INCLUDE: GZ'u2-.-- ~ ~ ' Vi'K.C4 ► lei FIRE DISTRICT ~ SIUrNATURE/I'ITLE DATE , 'VVA'1'ET2 PURVLYOR A. S ATYSFACTORY ARRANGEMENmnoz-'b WATER AND FIRE FLOW REQU]~ZEMENTS (HAVE) BEEN MADE B. REQUIlZEMENTS/COMMENTS : u L1 1 O~ A~ WATER DISTRICT STGN TURE/fI; LE DATE COUNTY UTYr.ITIES A PRELIMINARY DISCUSSION HAS TAKEN PLA ZNF,,RAL REQUIREMENTS FOR SUBNIITTAL OF THIS PROPOSAL (HAVE) AVE N01) ~;''BEEN SATISFIED THE DESIGNATED WATER PURVEYOR FOR THIS S ~ G~•,~` c:i.,.~r 1: AAW A. COM1vLENTS t~ta-ET3 U' , i_ ,I, 17) S TM+VZ• 100W ~c:kn 51~ -n:=~i Aw 5~ -c~- ~t 5 r~~c 5 , , I • 10•ci~ ~ < <~..,~.•.-y_i ~ STGNATURErI'ITLE DATE M 4 1--' *3 ° a • . ~ COUNTY ~:NGINEI;R A PRELINIIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT A COMIvMNTS 4NZSURE/TITLE DATE HEALTH DISTRICT A PRELIMINARY DISCUSSION HAS TAKEN PLA ENERAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE`IV0T)? BEEN SATTSFIED A. C ONIIvIEN TS : ~ S IGNATURE/I'ITLE DATE PART I'V (SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATTON) I, THE UNDERSIGNED, SWEAR UNDER PENALTY OF PERJURY THAT THE ABOVE RESPOVSES ARE MADE TRUTHI-,ULLY AND TO THE BEST OF MY KNOWLEDGE. I FURTBER SWEAR THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE PREVIOUSLY IDENTIFIED LANll USE ACTION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE WNER AUTHOR ZING MY ACTIONS ON HIS/~IER BEHALF , SIGNED ~ . ~ r • ~i~ ~ DATE ADDRES S J ,7 2 PHONE Y/ "3 czG~ ZIl'• . ~ SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss COUNTY OF SPOKANE ) S GrNED AND SWORN TO/AFFIRMED BEFOR NLE ON THIS DAY OF .L`1994, BY ~ ~ JW„6 > I0 ~ l ~ o`'~~ G C• VU'& , j' ~i~ • .•'-J"' d E-,^ti'-~i + • : NC.~T~_~. ~A , . • l - Y S .~o : 0 hO N: r ' U v Notary Public in and for Kao~.Iashington ' ~ PUBLIC O : Residing at• r . . ♦ - - ~ ~ • ~A ~ °o j '•.!•'>,q Y I My appointmcn exptres• • • `J ♦ ~ / ~ ~ . OF wAS\-\•~'~ PART V (TO BE COMPLETED BY TH.E T'LANNING DEPARTMENT) DAT'E SUBMITTED: 6114 Z RECEIPT " ~ DATE ACCEPTED• I. I 1 L G~ Lt .S >BY: (JQYa!n m . • , , . . . .e MANUFA.C'TUREIJ HOIVIT~ PAlZK .A.PPLICATION A. (YENFRAL INrnRMATTnN: 8-9-94 ]7A'IL nPPLICATION NO ' NAME OF APPLICANT/REPRESENTA7'IVE Rob Millholland C/O Dwight Hume MAILING ADDRESS Adams & Clark Inc. W 1 720 4th Ave. CITY S po. STATE Wa. Zin COUE 99204 TFL.E!'HONE 7 4 7- 4 6 0 0 AUTHORIZED AGENT REPRESENTING OWNER Dwight J. Hume IN, APPLICANT IS NOT OjVNFR, INCLUDE `VRI"C'['LN ONVNTR AuI'IIORI7A'CTON FOR APPLICANT TO SLI2VE AS REPI2I;SEN'1'A1IVE EXISTING ZONE CLASSIFICATION UR-7 DATE ESTABLISHED 1- 91 ( Z E- 8 4- 8 4) PROPOSEI7 ZONE CLASSIFICATION N /A EXISTLNG LAND USE Single Family and vacant COMPREHENSIVE PLAN CATEGORY Urban SCHOOL DISTRICT C. V. S. D. FLRE DISTRTCT # 1 LIST FREVIOUS PLANNING DEPARTMENT nCTIONS INVOLVING TH1S PROPLRTY ZE 84-84 B. r L Z1VFORMATZOU: LEGAI. DF-SCRll'TION OF PROPERTX The Fast 41 3. 7' of Lot 10, Except the North 21 1. 55' thereof. , and Lots 13 & 14, 131ock 1 of Corbin Addition to Greenacres pPr plat of record in Volume "S" of Plats Page 30. Records of Spokane County Washington. SECTION 17 TOWNSFLtP 25 R/1_NGE 44 ASSESSOR PARCEL NUNLBER TOTAL AMOUNr OF ADJOINING LANn OtiVNED OR CON-1 ROLLF_I,7 BY OWNER OR SPQNSQR none STREET ADDRESS OF pROPOSAL ' NAME OF PUBLIC ROAD(S) PROVIDING ACCESS Barl;er, Boone Ave. DESCRIBE XOUR PROPOSAL 24 lot mobile home park as approved a.n the above file # 84-84. C. nTHEi2 T1()ME PARK INFnRMATInN NUM:BER OF SPACES 24 G120SS A.REA 3 _ 53 a-Cres 5100 sf TYPICAL LOrT' SI?_,C . . PROPOSED SOURCE OF WATER Indivldual wells O Public System Private Cornniunity SySlr-ill O[her Describe PROPOSED MEANS OF SEWAGE DISPOSAL Public sewer O COnlilltlrllty sysccm O Septic tarik and clrainfield O Double Plumbing O Di y Sewer 0 Other s and s y s tem UTILITY COMPA.NIES AND/OR DISTRTCTS TO PROVIDE SFRVICL TO THIS PROPOSAL Electricity' WWP Sewer Gas' Water LonsoliaatepljonE PNB IS THIS PROPOSAL f1.FF.ECTED BY Aquifer Sensztive Axea (A) PSSA Slloielines ( ) Wetlands DO YOU, OR THE ObVNER IN THE EVENT YOU DO NOT OWN TH1S PROPEFtTY, HAVE ANY PLANS FOR FUTURE ADD1T10NS, EXPANSIONS OR FURTHFR ACTIVITY RELATED TO THIS PROP4SAL? Yes O No (4 IF YES, EXPLAIN IS PHASING OF TfTE FIIVALIZATION OF THE MANUFACTURED HOMF PAZK PROPOSED Yes~A No IF YES, SHOW PI~IASING ON THE PRFLIMINARY SIT.C PLAN D. ArENf Y CnNS[JL'l'ATInN THIS SECTION OF THE A].'PLICATION WILL PROVIDE THE PLANNING DEPAKTM-ENT STAFF VVITH WRI7TEN VERIFICATION THAT TH.E APPLICA.NT HAS H/\D PRELIMLNARY CONSULTATION 1VITH 7'HE AGENCIES IDENTIFIED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED IN THE PROPOSf1.L BEFVRE FTNAL SUDIvtITTAi.. TO THE PLANNING DfiPARTMFNT FIRE MARSNAI.L/FIRE DISTRICT A. THIS PROPOS AL IS WITHiN FIRE PROTECTION DIS-TBICT NO ~ B. ADEQUATE ARRANGEMENTS (HAVE) TffiA-Vr O~) BEEN MADF TO MEET OUR NEEDS IN PROVIDLNG FOR AN ADE ATC WATER SYSTEM AND FACILII"IFS FOR FIRE PROTECTION PURPOSES. C. RECOMMENDED FIRE FLOW• 7_130 ; OR UNABLE TO CALCULATF NOW BECAUSE USE IS NOT DEFWITIVF; AND WI1 L F3F nETERMINED AT BUILDING 1'r--RN4[T APPLICATION TIME " D REQUIREMENTS INCLUDE , U~ue F4~ t-,l FIRE DISTRICT SIdNA7`URE/I'ITLE DATE WATER PURVEYUR A. SATISFACTORY ARRANGEMENTS F IC WATER AND FIRE FLOW REQUIREMENTS (HAVE) (I-IAVL' NO"1') BEEN MADF B REQU1RErTENTS/COMMENTS CL c2- ~ uv\ t 1'~A~ ~ie2 - ~s-I~ t`~ ~'~z~~~ WATER DIS1'RICT SIGN TURE/T' LE llATE covNTY v•rILITIrs A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUJ.REMENTS FOR SUBMITTAL OF THIS PROPOSAL, (HAVE) (HAVE NO"1') BFFN SATISFIED THE DESIGNATEla WATER PURVEYOR FOR THIS SITE IS A COMMENTS S IG NATUR E/T1T1_,L' D/\TE ~ . ~ COUNTY i.NGINI;I,I2 A PRELIMINARY DISCUSSION HAS TAK.EN PLACE AND GF_NERt-1L IZEQUi2EMENTS FOR ROADS AND DRAINAGE HA.VL BEEN pISCUSSED tiV1TIT TRE APPLTCANT A COMMENTS 4 . 4SIGN URE/I'ITLE ~ DA?E HEAL'I'Ii llTSTRICT A PRELIMINARY DISCUSSION HAS TAKEN PLACE A.ND GENERAL, REQUI1.tEMLNTS FOFZ SUBNIITTAL OF THIS PROPOSAL (l-iAVE) (I-IAVE NOT) BEEN SATISFTED A COMMENTS SIGNA'I`URE/TITLE DATE PART IV (STGNATURE OF PROPERTY OWNERS OR I ETTER OF AU'CHOR17AT10N) I, THE UNDERSIGNED, SWEAR UNDER PENALTY OF PERJURY THAT THE A-B0VE RESPONSES ARE MADE TRUTHFULLY AND TO T14.E BEST OF MY KNOWLCDGE I FURTHER S`VEAR THAT 1 Alv1 THE OWNER OF RFCORU OF THE AREA PROPOSF_D FOR "1'f-lE PREVIOUSLY IDENTIFIED LANll USF, ACTION, OR, IF NOT THE OWNER, ATTACHEU NLREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON H1S/HER BEHALF S IGNED• DATE ADDRES S PHONE 7IP SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss• COUNTY OF SPOKANE ) SIGNED AND SWORN TO/AFFIRM.ED BEFORE ME ON THIS DAY OF , , 1994, BY NOTARY SEAL Notary Public in and for lhe Statc of Washington Residing at My appoinlincnl cxpires• PAR'T V (TO IIE COMPI..ETED BY 'I"FlE PLANNING DCPARTN4CN1) DATE SUBMITTED• RECEIPT # _ DATE ACCEP7'ED BY- ~ r► ' - 1VIANUFACTURED HOME PARK APPLICATYON A. GENERLL INFORa~TIC)~;, DATE 8-9-94 AA ly, q-qq APPLICATION NO.: NAME OF APPLICANT/REPRESENTATIVE: Bob Millholland C/O Dwight Hume Mt11LING ADDRESS: Adams & Clark Inc. W 1720 4th Ave. CITY: Po. STATE: Wa. ZLP CODE: 99204 TELEPHONE- 7 4 7- 4 6 0 0 AUTHORIZED AGENT REPRES ENTING OWNER D w i g h t J. H u m e IF APPLICANT TS NOT OWNER, ZNCi,UDE WRZT'I EN OVVNER AUTHORIZA'fION FOR APPLICANT TO SERVE AS REPRESENTA'I'IVE EXISTING ZONE CLASSIFICATION• UR -7 DATE ESTABLTSHED 1- 91 ( Z E- 8 4-$ 4) PROPOSED ZONE CLASSIFICATION: N/ A EXISTING LAND USE Single Family and vacant COMPREHENSIVE PLAN CATEGORY Urban #~1 SCHOOL DISTRICT C. V. S.D. FIRE DISTRICT LIST PREVIOUS PLANNIING DEPARTMENT ACTIONS IlWOLVING THIS PROPL-RTY: ZE 84-84 B. LEGAL TNIFORMAITON: LEGAL DESCRIPTION OF PROPERTY The East 41 3. 7' of Lot 10, Except the North 211.55' thereof. And Lots 13 & 14, Block 1 of Corbin Addition to Greenacres per plat of record in Volume "S" of Plats Page 30. Records of Spokane County Washington. SECTION. 17 TOWNSHIP 25 RANGE• 44 ASSESSOR PARCEL N'U'MBER TOTAL AMOUNT OF ADJOINiNG LAND OWNF-D OR CONTROLLED BY OWNER OR SPONSOR none STREET ADDRESS OF PROPOSAL NAME OF PUBLIC ROAD(S) PROVIDING ACCESS Barker, Boone Ave. DESCRIBE YOUR PROPOSAL 24 lot mobile home park as approved in the above file # 84-84. C. ()THER HnME PARK YNFnRMATInN NUMBER OF SPACES: 24 GROSS AREA 3.53 acres 5100 sf TYPICAL LOT SIZE MNPW~-s ~ -1PROPOSED SOURCE OF WATER Individual wells O Pubhc System Pnvate Communlty Systeni O Other Descnbe PROPOSED MEANS OF SEWAGE DISPOSAL• Public sewer O Community system O Septic tznk and dralnfield O Double Plumbing O Dry Sewer 0 Other sand system UTII.ITY COMPANiES AND/OR DISTRICTS TO PROVIDE SERVICE TO THTS PROPOSAL Electncity: WwP Sewer. Gas: Water Lonsollaatephone. PNB IS THIS PROPOSAL AFFECTED BY. Aquifer Sensinve Area (A) PSSA Shorehnes Wetlands DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN TH7S PROPERTY, HAVE ANl' PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FURTHER ACTIVITY RELATED TO THIS PROPOSAL7 Yes No IF YES, EXPLA.IN IS PHASING OF THE FINALIZATION OF THE NZA.NUFACTURED HOivIE PARK PR4POSED Yest~ No IF YES, SHOW PHASING ON THE PRELIMINARY SITE PLAN D. AGENCY CnNSjJLTATInN THIS SECTION OF THE APPLICATION WILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH WRITTEN VERIFICATION THAT THE APPLTCANT HAS HAD PRELIMTNARY CONSULTATTON WITH THE AGENCIES IDENTIFIED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE TNCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPA.RTMENT FIRE MARSHALY,/FIRE DTSTRICT ~ A. THIS PROPOSAL IS WITHIN FIRE PROTECTION 11IS-T2I.CT NO. + B. ADEQUATE ARRANGEMENTS (HAV~) AVE -'I') BEEN MADE TO MEET OUR NEEDS IN PROVTDING FOR AN ADE ATE WATER SYSTEM AND FACILITIES FOR FIItE PROTECTION PURPOSES. C. RECOMI4ENDED FIRE FLOW: -T13 A ; OR UNABLE TO CALCULATE NOVV BECAUSE USE IS NOT DEFINITTVE; AND WILL BE DETERMINED AT BUTLDING PERMTT APPLICATION TIME. D. REQUIREMENTS INCLUDE• ~ FIRE DISTRICT v SIU'(NATURElTITLE DATE WA1'ER PURVEYOR A. S ATISFACTORY ARRANGEMENTS F IC WATER AND FIRE FLOW REQUIREMENTS (HAVE) < I(HA~VE NOT) BEEN MADE B. REQUIREMENTS/COMMENTS . l, ~2-- ~ u A i l. ~A~ .~ie~ - ~ t~ ~ /~r-~~►~-'~ WATER DISTRICT SIGN TURELE DATE COUNTY UTYLITIES A PRELIMTNARY DYSCUSSION HAS TAKEN PLA ENERAL REQUIREMENTS FOR SUBMIT"TAL OF THIS PROPQSAL (HAVE) AVE NOT ),'BEEN SATISFIED THE DESIGNATED WATER PURVEYOR FOR THIS S T~ ~(?~J`=AM, A. CONIlviENTS ~ u~L:`~ L~ , l., Ii~ STNt rV~• f~J `-N-fi,:; lt>15 t'i:m5 I ' 10 •`,4:-• SIGNATURE/TITLE DATE M 14 i- . . COUN'I'Y ENCINEER A PRELINllNARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS f1ND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT 0 A CONUvIENTS , ~ , ~ c-1 SIGN TURE/TITLE DATE HEALTH DISTRTCT A PRELIMINARY DISCUSSION HAS TAKEN PLA ~,ENERAL REQUII2EMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE'NOT)) BEEN SATISFTED A CONIlvIENTS ~r ~ ~ SIGNATURE/TITLE + DATE , I'ART IV (SIGNATURE OF pROPERTY OWNERS OR LETTER OF AUTHORIZATION) I, THE UNDERSIGNED, SWEAR UNDER PENALTY OF PERNRY THAT THE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE I FURTHER SWEAR THAT I AM THE OWNER OF RECORD OF TH.E AREA AROPOSED FOR THE PREVIOUSLY IDENTIFYED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED HER:EWITH IS WRITTEN PERMISSION FROM THE WNER AUTHOR ZING MY ACTIONS ON HIS/HER BEHALF L/ / j/' SIGNED: DATfi %rf , aDDRES S • 25-17 7 PHOrrE ,ZI5X/ 9 % c'~ /C zrP , SIGNATURE OF APPLICAN'f OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss: COUNTY OF SPOKANE ) S NED AND SWORN TO/AFFIRMED BEFOR ME ON THIS DAY OF 4.7 " LLA994, BY 6 la) I ~ ' ,j,, Cl~e ♦ • ~ ~ ' ~ / . . . ` J t~~ , c ` / ~ l,/J/~ . N40 T y ~ ~ . f• ~ v ; Notary Public iq and ~ ash~n~lo~ . . . ~ ~ ~ PUBUC ;O Residing at: 7t . N . . . . ~ . ~~'•..~>,I y ~ My appointmen expucs• ~d ~ ~ / 0fi PART V (TO BE COMPLETED BY THE PLANNING DEPA.RTMENT) DATE SUBMITTED: ~ I .14 -114 Z RECEIPT #t: VI ~ ~5 DATE ACCEPTED: S~ B Y: U~~~" . . M A y~li~~I'^?lt r ;a--- . FARMERS INSURANCE GROUP U~= , - ~ FEBRUARY 10 1995 I RE: RnBERT MILHOLLAND Elf:: ~l:'I3 I)I~'[41()N i3(_)tiI) MR MILHOLLAND HAS APPLIED FOR A BOND THROUGH THE MARLEN GUELL AGENCY WITH CBIC. WHEN APPROVED BOND WII.L BE ISS UED PROMPT'IJY. I{' YC)[' I-~ 1lrI: .\t~~~~ (Y'rST1ON~ r:-M 1 K.ARI','\i OIZ MIAP'[ ~'N ATr)_'7-49~1. 1 tiAN K~ U U. - KAREN BOO'TH, AGEN I- ._rI . j•~1I~... i - - . , I . . ' I . l . . . . . . J-U-B EIVGINEERS, Inct TRANSMITTAL LETTER ENGINEERS . SURVEYORS . PLANNERS TO: CNR►s (ZG1cM DATE: yy- SPOy-AOje CO Lz \ 02(p 12> Q.OAC~A~ Av~ sPo,~A,~~ ~ P ~ g z c~ o- ~ PROJECT., M~ LN oLLA,Jo WE TRANSMIT: Herewith Under Separate Cover THE FOLLOWING: Design Drawings Shop Drawings Construction Drawings Samples Specifications Product Literature 1) Copy of Letter THESE ARE TRANSMITTED; For Approval For Your Use For Review & Comment (1 For Information & File For Your Distribution As Requested For Record DESCRIPTION/COMMENTS: C2~ ~~Jl~l-.~ Qvov F1v~ `MP1~o•~1GMtr~ Jlil~r(~ W lCH 2.U~j SO ALt../ tsN'~I~R~ CUP-( or- Reotsup (TR40w SNCs:T PrS 4 G2t7a 0 Ta i-j uJ~ PN~wu CvNV1tlSAt~OJ oJ Z~1 I 9~ DISTRIBUTION: Owner (1 Contractor ~ FROM: FFB J-U-B ENGINEERS, Inc. 422 W. Riverside Suite 722, Spokane, WA 99201 f 5091-458-3727 FAX (509)-458-3762 MILHOLLAND MOBILE HOME PARK BOONE AVE IMPROVEMENTS EAST 18717 BOONE AVE $PQKANE WA$H. EDGE OF CENTER CENTER CENTER EXISTING DIST SLOPE EDGE DIST FROM MINIMUM MAXIMUM DESIGN PAVEMENT TOP OF LINE LINE LINE EOP Cll TO CIL TO PAVEMENT EOP TO CURB ELEVATION ELEVATION ELEVATION TO GUTTER CURB STATION ELEVATION GRADE ELEVATION EOP EOP 96 SLOPE AT CURB AT CURB TOC GRADE J • 19898A9 2031.400 2037.30 11.47. •0,81 o ''-.6:42-' 2037.46 2037.59'J 2037.450 •4,78 19900.00 2037.396 •0.26 2037.25 11.37 •1.18 6+t8 2037.41 2037.54 ~ 2037,446 •3.80 •0.26 19926.00 2031.328 •0.27 2031,21 10.27 •1.16 6,'A 2037.37 ~ 2037.49~ 2037.319 •4.27 •0.27 19950.00 2037.261 •0,27 2037,16 9.15 -0.89 Z,70- 2037.29 1031,44 } 1037.311 •4.10 •0.27 19972.48 2037.200 •0.21 2037.18 7.92 -0.25 ,8.80' 1037,24 2037,42 2037,250 •4.32 •0.27 19975.00 2037.189 -0.42 2037,16 20000.00 2037.086 -0.42 2037,08 20025.00 2036.980 •0.42 2037.00 20044.11 2036.900 •0.42 2036.89 8.68 -0.15 W.44 2036.83 2037.08Y2036.950 •3.27 20050.00 2036.882 •0.30 2036.82 7.18 •0.86 ' :.1-Y:JT- 2036.76 ' 2037.01 / 2036.932 •2.78 -0.31 20075.00 1036.807 -0,30 2036.65 7.67 •2.05 `,1.8:96 2036,62 ' 2036.85 / 1036.851 •1.91 -0.30 20100.00 2036.131 •0,30 2036.72 7,75 -0.14 10,32-'- 2036.71 2038.93 ' 1036.781 •3.61 •0.30 ' 20110.24 2036.700 -0.30 2036.71 8.45 0.12 10,22 2036.70 2036.92 2036.750 •3.96 -0.30 ~ ,.f~J L.tu♦ QL1%- 1~1~7 Vr1~• auE Tw-~ ~-~~~-r►►~c~ x-'~.oPE r'11tT yuu ma-t wa, N M . r1. b . i._ MILHOLLAND MOBILE HOME PARK BOONE AVE IMPROVEMENTS EAST 18717 BOONE AVE SPOKANE WASH , EDGE OF CENTER CENTER CENTER EXISTING DIST SLOPE EDGE DIST FROM MINIMUM MAXIMUM dESIGN PAVEMENT TOP OF LINE LINE LINE EOP CIL TO CIL TO PAVEMENT EOP TO CURB ELEVATION ELEVATION ELEVATION TO GUTTER CURB STATION ELEVATION GRADE ELEVATION EOP EOP % SLOPE AT CURB AT CURB TOC GRADE 19898 49 2037 400 2037 30 11 47 -0 87 6 53 2037 46 2037 58 2037 450 -4 67 19900 00 2037 396 -0 26 2037 25 11 37 -1 28 6 63 2037 40 2037 53 2037 446 -3 68 -0 26 19925 00 2037 328 -0 27 2037 21 10 27 -1 15 7 73 2037 31 2037 47 2037 378 -3 48 -0 27 19950 00 2037 261 -0 27 2037 18 915 -0 89 8 85 2037 23 2037 42 2037 311 -3 46 -0 27 19972 48 2037 200 •0 27 2037 18 7 92 -0 25 10 08 2037 18 2037 39 2037 250 -3 67 •0 27 19975 00 2037 189 -0 42 2037 16 20000 00 2037 085 -0 42 2037 08 20025 00 2036 980 -0 42 2037 00 20044 11 2036 900 -0 42 2036 89 6 68 -0 15 11 32 2036 83 2037 08 2036 950 -3 31 20050 00 2036 882 -0 30 2036 82 718 -0 86 10 82 2036 79 2037 02 2036 932 -2 93 -0 31 20075 00 2036807 -0 30 2036 65 7 67 -2 05 10 33 2036 64 2036 86 2036 857 -2 02 -0 30 20100 00 2036 731 -0 30 2036 72 7 75 -0 14 10 25 2036 71 2036 93 2036 781 -3 70 -0 30 ' 20110 24 2036 700 •0 30 2036 71 8 45 012 9 55 2036 73 2036 93 2036 750 -4 29 -0 30 , S P O K A N E Av!' C O U I~T T Y OFFICE OF THE COUMY ENGIN6ER • A DMSION OF THE PUBUC WQ~ Ronald C Hormann, P E, County Enguieer Denrus M, VU&eers REVIEW COMMENTS ~ F EB -1, 1995 TO: Steven J. Chandier, P.E. - J.U.B. Engineers, Inc. ~ ~ FROM: Chris Reich - Engineering Development Services 2 SPOKANE, WA SUBJECT: Milholland MHP DATE: January 31, 1995 A review of the road and drainage plans for the above referenced project has been accomplished. The following items need to be completed prior to finalizing this project. V~ The 10' right-of-way dedication along Boone Avenue needs to be accompiished. Please provide a legal description of the proposed R/V1/ and a copy of the recorded property deed, so that our Right-of-way Department can prepare the /2. necessary documents. Drainage easements are required for the portion of the swales along Boone Avenue that extend onto private property. Please provide a legal description of these areas and our R/W Department will prepare the necessary documents. ~3: The bond for the Boone Avenue improvements is required. 4. Revise the grade sheet as indicated. Once these items are completed, final mylars with developer signature and engineers stamp is required. We will issue a letter to the Planning Department, indicating completion of our review once these remaining items are submitted. If you have any questions, feel free to call. 1026 W Broadwav A-, e. Spol.ane, WA 99260-0170 •(509) 456-3600 FAX (509) 324-3478 TDD (509) 324-3166 ~ . J-U-13 EhIGINEERS, Inc. rJ-U-B-i r EiVGINEERS o S43flYEYl1RS * rLF^51YIVGRr7 W. 422 Riverside Ave,Suite 722 - _ , Spakane,1+VA 99201 5091458-3727 - FAiC, 5091458-3762 .Tanuary 26, 1395 +Chris Reich F-ngineerir~~ Development Services ` Spolcane Caunty - 1 026 W. Broadway Spakane, WA 99260 _ MilhnIIand Mnbile Hnme Park Dear- Mr Reich, Enclased is the rcsubmit of plans for the above referenced prpject. Below I haNFe discussed each item af your coniments dated January 23, 1995. Boone Avenue Immovcments I . En~~~~~d 2 CC]p1e5. 2. Done by J-U-B 3. Done by J-U-B, - 4. Done by J-U-B. _ 5. Done by J-U-B. 6. Done. - - 7. Done. 8. Done. SheetSvfl0 I Doiie. Sheet 9 0f 10 ' 1 Dane. Thank you far your assistance vn this project. Siricerely, i - Steven J C d1er, P.E. Project Engi~~er c Bob Milholland D.IKIbt ~ 5 c;ldave/rnilholil#r1 26 r M1 ~ff~ ~1 jR f 4 ~ f A~ r F ' Sa~6}6~~er . . . , ~ - S P O1< A N E O U N T Y OFFICE OF THE COUMY ENGINEER • A DMSION OF THE PUBLIC WORKS DEPARTivIENT Ronald C Hormann, P E, County Engineer Denrus M Scott, P E, Director REVIEW COMMENTS TO: Steven J. Chandler, P.E. - J.U.B. Engineers, Inc. , FROM: Chris Reich - Engineering Development Services o~/L~ SUBJECT: Milholland MHP DATE: January 31, 1995 A review of the road and drainage plans for the above referenced project has been accomplished. The following items need to be completed prior to finalizing this project. 1. The 10' right-of-way dedication along Boone Avenue needs to be accomplished. Please provide a legal description of the proposed R/VV and a copy of the recorded property deed, so that our Right-of-way Department can prepare the necessary documents. 2. Drainage easements are required for the portion of the swales along Boone Avenue that extend onto private property. Please provide a(egal description of these areas and our R/W Department will prepare the necessary documents. 3. The bond for the Boone Avenue improvements is required. 4. Revise the grade sheet as indicated. . Once these items are completed, final mylars with developer signature and engineers stamp is required. We will issue a letter to the Planning Department, indicating completion of our review once these remaining items are submitted. If you have any questions, feel free to call. 1026 W Broadway Ave • Spokane, WA 99260-0170 •(509) 456-3600 FAX (509) 324-3478 TDD (509) 324-3166 i.-- . . . Sheet 9 of 10 13. Specify sod for the swales. 14. Indicate a 3' pathway on the road cross section. This can be done by providing a painted stripe at that location. DrainaQe Report 15. Provide a copy of the SCS soils map. 16. It is safe to assume the minimum percolation rate if the soil is one of the pre- approved soil types as stated in the Guidelines for Stormwater Management. 17. Inciude the runoff from the improvements to Boone Avenue in your report. Please return the enclosed items marked "Original" with your next submittal. If you have any questions, feel free to call. ~r t~ » 1 w . . S P O K A ~T E C O U N T Y OFFTCE OF THE COUNTY ENGWEER • A DIVISION OF THE PUBLIC WORKS DEPARTMFNT Ronald C Hormann, P E, County Engineer Detuus M Scott, , or . JP~- ~n~~neers REVIEW COMMENTS r0L ~ TO: David Kliewer, P.E. - J.U.B. Engineers JQN 4 1995 ~ FROM: Chris Reich - Engineering Development Service , 14.~~t ~0 UTR , SUBJECT: Milholland MHP SPOKANE, WA DATE: January 23, 1995 A review of the road and drainage plans for the above referenced project has been accompiished. The list below is a summary of the items that need to be addressed. Please refer to the enclosed plans marked "Original" for complete comments. Boone Avenue Imorovements ~ Provide grade sheet for improvements to Boone. Indicate on the typical cross-section where the sawcut will be made ~3. Provide a 2" gutter depression at the curb inlets along Boone Avenue. Please iIlustrate or reference standard Co. drawings. . The curb inlets you are providing are significantly larger than needed. According to my calculations the inlets only need to be 3' at most. Please move the inlet at STA 200 + 60 further downstream to capture more of the runoff from the road. 4/6. Since the road providing access to Boone Avenue is more or less a driveway the right-of-way dedication along Boone will be parailel to the property frontage and no radius dedication at the entrance is required. Please revise all sheets to reflect this revision. The owner needs to sign the Boone Avenue improvement plans directly. The swale detail should indicate that the back of the swale is 0.3' higher than the normal gutter flowline. Sheet 8 of 10 V~/ . Piease revise the drywell cali outs to read as "Type A" since our standards do not include a"Type A1 " and to eliminate any confusion with city standards are not the same. 1026 W 8roadwav Ave • Spokane, WA 99260-0170 •(509) 456-3600 FAX (509) 324-3478 TDD (509) 324-3166 J-U-B Engineers ~I..r - . - F JAN 2 4 1995 ~ Sheet 9 of 10 I L---) I L; a ~ 10. Please specify that the back of swale elevation is 0.3' RF of , pavement. I have prepared a bond estimate amount of $11,000 for the improvements to Boone Avenue. In order to grant finai approval for this project, the road wouid have to be constructed or a form of financial surety will be required. If you have any questions, feel free to cail. y ~ • I . ~ ti S P O K A N E C O U N T Y c OFFICE OF THE COUN'IY ENGINEER • A DMSION OF THE PUBLIC WORKS DEPARTMEM Ronald C. Hormann, P E., County Engineer Detuus M Scott, P E, Director REVIEW COMMENTS TO: David Kliewer, P.E. - J.U.B. Engineers FROM: Chris Reich - Engineering Development Service ~ SUBJECT: MiIholland MHP DATE: January 23, 1995 A review of the road and drainage plans for the above referenced project has been accomplished. The Iist below is a summary of the items that need to be addressed. Please refer to the enclosed plans marked "Original" for complete comments. Boone Avenue Improvements 1. Provide grade sheet for improvements to Boone. 2. Indicate on the typical cross-section where the sawcut will be made 3. Provide a 2" gutter depression at the curb inlets along Boone Avenue. Please iIlustrate or reference standard Co. drawings. 4. The curb inlets you are providing are significantly larger than needed. According to my calculations the inlets only need to be 3' at most. 5. Please move the inlet at STA 200 + 60 further downstream to capture more of the runoff from the road. 6. Since the road providing access to Boone Avenue is more or less a driveway the right-of-way dedication along Boone will be parallel to the property frontage and no radius dedication at the entrance is required. Please revise all sheets to reflect this revision. 7. The owner needs to sign the Boone Avenue improvement plans directly. 8. The swale detail should indicate that the back of the swale is 0.3' higher than the normal gutter flowline. Sheet 8 of 10 9. Please revise the drywell call outs to read as "Type A" since our standards do not include a"Type A1 " and to eliminate any confusion with city standards are not the same. 1026 W Broadway Ave • Spokane, WA 99260-0170 •(509) 456-3600 FAX (509) 324-3478 TDD (509) 324-3166 t Y Sheet 9 of 10 10. Please specify that the back of swale elevation is 0.3' higher than the edge of pavement. I have prepared a bond estimate amount of $11,000 for the improvements to Boone Avenue. In order to grant final approvai for this project, the road would have to be constructed or a form of financial surety wiil be required. If you have any questions, feel free to call. STREET QUANTITIES PROJECT NO.- Z84-84A DESIGNER- C. REICH DATE- 1/23/95 PROJECT DESCRIPTION- Milholland MHP STREET # 1 NAME- BOONE AVENUE LENGTH- 211.75 FT. WIDTH- 9.00 FT. BEGINNING STATION = 19898.49 ENDING STATION = 20110.24 ONE SIDE ONLY PWIDTH= 18.00 EWIDTH= 9.00 QWIDTH= 0.00 INTER # 1 T INCLUDED ISWIDTH = 30.00 SK = 11.12 RAD = 20.00 TERM # 1: TAPER TAPER LENGTH = 75.00 TERM # 2: TAPER TAPER LENGTH = 75.00 ITEM MEASUREMENT QUANTITY SURFACE AREA- 3585.60 S.F. ROADWAY EXCAVATION 0.67 FT. 88.5 C.Y. CRUSHED SURFACING TOP COURSE 0.00 FT. 0.0 C.Y. CRUSHED SURFACING BASE COURSE 0.50 FT. 66.4 C.Y. ASPHALT CONCRETE 0.17 FT. 45.4 TONS CURB TYPE B EXISTING 0.00 FT. PROPOSED 217.0 FT. TOTALS ROADWAY EXCAVATION 88.5 C.Y. CRUSHED SURFACING TOP COURSE 0.0 C.Y. CRUSHED SURFACING BASE COURSE 66.4 C.Y. ASPHALT CONCRETE 45.4 TONS CURB TYPE B 217.0 FT. . , . J-U-B ENGINEERS. Inc. TRANSMITTAL LETTER ENGINEERS . SURVEYORS . PLANNERS I TO: CNR~S ~EIG}~ DATE: SPovca, N~ Go ~.4. W. w, 1~2co 4aoAQt.~~►~ . SPoco~-r l.aa. C1q~_I r - , PROJECT: WE TRANSMIT: Herewith Under Separate Cover THE FOLLOWING: Design Drawings Shop Drawings Consiruction Drawings t1 Samples O Specifications O PfOCjl1CL LItef3tUfC O Copy af Lettcr S) THESE ARE TRANSMITTED; For Approval For Your Use For Review & Comment For Informaticri S1 FiIe For Your Distribution As Requested For Record DESCRIPTION/COMMENTS: 2- SjnS R~~~S~O P1~o~~~T S~►~~'~1 $110 2 5~1~ REV~LC~ Pa o~ cc.t zK~,rT 5 5I iv Z ScZS REVIk & ~ OdMld AJ%d ' M►0.ri ve Mt^.T 1~ I 2 C041 rS O F Cs tiA►D d S r1~T F~~ ~oo~ C f3 DISTRIBUTlON: Owner Contractor ~ FROM: ~ I J-U-B ENGINEERS, Inc. 422 W. Riverside Suite 722, Spokane, WA 99201 (509)-458-3727 FAX (509)-458-3762 MILHOLLAND MOBILE HOME PARK BOONE AVE IMPROVEMENTS EAST 18717 BOONE AVE SPOKANE WASH , EDGE OF CENTER CENTER CENTER EXISTING DIST SLOPE EOGE DIST FROM MINIMUM MAXIMUM DE51GN PAVEMENT TOP OF LINE LINE LINE EOP CIL TO CIL TO PAVEMENT EOP TO CURB ELEVATION ELEVATION ELEVATION TO GUTTER CURB STATION ELEVATION GRADE ELEVATION EOP EOP % SLOPE AT CURB AT CURB TOC GRADE 19898 49 2037 400 2037 30 11 47 •0 81 6 42 2037 46 2037 59 2037 450 -4 78 19900 00 2037 396 -0 26 2031 25 11.37 -1 28 6 48 2037 41 2037 54 2037 446 -3 BO •0 26 19925 00 2037 328 -0 27 2037 21 10 27 •1.15 6 58 2037 37 2037 49 2031 378 -4 27 -0 27 19950 00 2037 261 •0 27 2037 18 915 -0 89 7 70 2037 29 2037 44 2037 311 -4 10 -0 27 19972.48 2037 200 -0 27 2031 18 7 92 •0,25 8,80 2037,24 2037,41 2037 250 •4 32 •0 27 19975 00 2037 189 •0 42 2037 16 20000 00 2037 085 •0 42 2037 08 20025 00 2036 980 -0 42 2037 00 20044 11 2036.900 -0 42 2036 89 6 68 -0 15 11 44 2036 83 2037 08 2036 950 -3 27 20050 00 2036.882 •0 30 2036 82 718 •0 86 11 31 2036 76 2037 01 2036 932 -2 78 •0 31 20075 00 2036 607 -0 30 2036 65 7 67 -2 05 10 60 2036 62 2036 85 2036 857 -1 91 -0 30 20100 00 2036 731 •0.30 2036 72 7 75 •0 14 10 32 2036 71 2036 93 2036 781 -3 67 •0 30 20110 24 2036 100 -0 30 2036 71 8 45 012 10 22 2036 70 2036 92 2036 750 •3 96 •0 30 ~ AAA SPOKANE VALLEY FtRE•DEPARTMENT ~ Spokane County Fire Protection District No, l ~ 10319 EAST SPRAGUE AVE • SPOKANE, WA 99206 •(509) 928-1700 • FAX (509) 927-2227 ~ Karl Bold Fire Chief ~~~ENED ~ p,, ~ January 10, 1995 SPOKAftIE COUNTY EPJGINEER Spokane County Engineers 811 N. Jefferson Sgct:a::e, Wa. 99260 . Attn: Scott Engels Re: Cul-de-sac, Milholland Mobile Home Park Mr. Milholland was in this office on 1109195 and presented a site plan showing the proposed cul-de-sac for his mobile home park. His proposal meets our requirements. Sincerely, - ~ Kevin Miller Inspector KM/bd ~ ~ JAN-27-'00 FRI 21:58 TEL ND: 4024 P01 SPOKANE VAIIEY FfRE 'DEPARTMENT ~ Spokone Gounty Fire Protectian District lVo. 1 ~ 10319 EASY SPRAGUE AVE • SPOKANE. WA 99204 -(509) 928-1700 •fAX (549)927-2227 ~ fcan Sote fire cntet January 10, 1995 Spokane Coutity Enqineers 811 N. Jefferson Spokane, Wa. 99260 . - Attin: Scott Enqelg Re: Cul-de-sac, Milholland Mobile Home Park Mr. Milhalland was in this office on ij09/95 and presented a site plan showi.ng the groposed cul-de-sac for his mobile home park. His proposal meets our requireraentis. ~ A/~'Tr: 7~ Sincerely. C R1 ~W A4-5o M~r's'S o J/L. '51A.10A4&Ps . / • ~ . . Kevin Miller Inspector KM/bd ppg-3t° brand isx transmirial memo 7M Md ~ Q✓G~S IFMM "Xorr co. ~O5 v`1~ ~ ~ \ ~ . , . , ~ , ( S P O K A N E ~ C O U N T'Y OFFTCE OF THE COUNTY ENGIIVEER • A DIVISION OF THE PUBLIC WORKS DEPARTMENT Ronald C Hormann, P E, County Engineer Dennis M. Scott, P E., Director REVIEW COMMENTS TO: David Kliewer, P.E. - J.U.B. Engineers FROM: Chris Reich - Engineering Development Services SUBJECT: Miiholland MHP , DATE: January 6, 1995 ,g A review of the road and drainage plans for the above referenced project has been accomplished. The list below is a summary of the items that need to be addressed. Please refer to the enclosed plans marked "Original" for complete comments. General 1. Please submit road plans for the improvements required a4ong Boone Avenue. 2. All plans need to be signed by the engineer. 3. The owner needs to sign the construction plans as well. Sheet 7 of 10 4. The grade at the end of the road should be 1.43% according to the elevations shown. Please revise. 5. The road should use the "Lane" designation since it will be a private road. 6. The curve in the road does not meet the standards for a private road. Please revise or pursue a design deviation. z ~ Sheet 8 of 10 7. Show the continuous swale on the plan view. . 8. Add the following note or something similar: "See details on Sheet 10 of 10 for driveway construction across the continuous swale." 9. Identify the section as A-A or something that would help provide better clarification. 10. Use and call out Spokane County standard materials. For example, call out Type A drywells, Type 4 Metal frame and grate, etc. 11. Are the offsets from the centerline? If not please specify where the offsets are from? 12. Specify the rim elevations. W 1026 Broadway Ave Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 r a ~ J-U-B EN~INEERS, Inc. rJ-,U-oB-i fENGI~IEERS • SURVEYQF~S - pLANNERS It W 422 Riverside Ave, Suite 722 Spvkane, WA 99201 509]458-3727 - ° _ FAX' 5091458-3762 Deceinber 29, 1994 Chris Reich - Spakane County Engineering Development Services , W. 1026 Bxoadway Ave. Spakane,WA 99260-0170 Milhnlland Mobile HQme Praject Dear IVir. Reich, Enclosed please find a complete set af plans with the drainage repozt on the Mill7olland p roject For your revxew. I am sure you can appreciate niy frustratian upon reading your review coniments letter to m.e wkaen I naw fnd ou# you were affly given d partial set of my design plans by the Caunty Planning Departrnent. I gave the owiier fuaa sets of drawings tor each coLinty department review. Tlae owner tells rne that he gave the planning people fu1l seis for their distributian and review. I d4n't knaw why you anly received sheets l and 8 since drainage and ofiher relative details are an other sheets. ' Please review the complete paclcage and schedule the meeting vvath Pat Harper for us to disr-uss the Boone Ymprovemen ts. In the futtixre, please ask those wha are in charge ofproject routing in #he Caunty to give you c.omplete submittals as they receive thern. It is J-U-B's ' plulosophy to tr-y ta subrnit proaect designs in complete packages. The letter sa.ying the package was I-iot coniplete was saraiewhat offensive though I understalid your concerns. rloak forvvard to our ineeti-ng ta discuss detailed concerns and the Boane Avenue . requirennents. _ Sincerely, .I-C J-Ii E-NGINEERS, Ine. 1 David J. Kliewer, P.E. Prajec! Manager DJK1bt - c:/davelmilhollltr 1 229 - - ~ r~ ~ ~ S P O K A. N E C O'CJ' l-,i T Y OFFICE OF THE COLJNTY ENGINEER • A DIVISIOIV OF THE PUBLIC WORKS DEPARTwfENT Ronald C Hormann, P E, County Enguteer Dennu M. Scott, P E, Duector REVIEW COMMENTS TO: David Kliewer, P.E. - J.U.B. Engineers _ FROM: Chris Reich - Engineering Development Services SUBJECT: Milholland MHP DATE: December 21, 1994 A review of the road and drainage pians for the above referenced project has been accomplished. The Iist below is a summary of the items that need to be addressed. Please refer to the enclosed plans marked "Original" for complete comments. Street Plan and Profile 1. Provide a typical cross-section for the private road. This cross-section should meet the minimum elements as stated in Chapter 14.808, Section 14.808.040 of the Spokane County Zoning Code. 2. The horizontal curve does not meet the minimum standards as stated in the Spokane County Road Standards. The minimum radius for an Urban Private Street is 150. Piease modify this radius or obtain a design deviation for a radius less than the standard. Drainaqe Plan 3. Provide a typical lot layout. 4. Indicate on the plan where you are proposing to put the swales. 5. Provide elevations or profiles to show the swale grades. Indicate the drywell rim elevations. 6. Provide a swale cross-section meeting County standards. . 7. Provide a detail of the driveway. Your drainage report specifies a"V-weir" to allow the water to flow down the swales rather than back out onto the road. Draina4e Report 8. Provide a coy of the SCS soil map for this project. Are the soils pre-approved to support your conclusion of the percolation rate being a minimum 72 in/hr. The Guidelines for Stormwater Management list the pre-approved soil types. W 1026 Broadway Ave Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 ~ . : ~ Page 2 of 2 MiIholland MHP - Review 1 9. Item 3.9 in the report eludes to the fact that Spokane County will construct Boone Avenue. This is not the case. As a condition of approval, the applicant shall improve Boone Avenue to Spokane County typical roadway section No. 2, Access standard. Therefore, the drainage associated with these improvements needs to be addressed. 10. The calculations for each basin needs to include the entire area of the basin, not just the road. It would be safe to assume that there wili be no off-site contribution, but you stiil need to assume that the runoff from the lots themselves will at least flow towards these swale. This would provide a more conservative method. i A(ot of major items are missing from this submittal (i.e. - improvements to Boone Ave., ~ complete drainage analysis, etc.). Therefore it is difficult to perform a complete and thorough review. Please make the necessary revisions regarding these comments and submit a complete package for review. If you have any questions, feel free to call. • • r / ENGINEER'S REVIEW SHEET , BLDG. PERMIT # -or -FILE# MHP=3-93. Related Filc # ( ) Date to Review 9-16-93 Time # I)ate to AA & DR Time Date Received 9-3-93 Project Name MILNOLAND MOBILI: HOME PK(ZE-&=t84) No. Lots 24 No.Acres 3.5 'Section - Township - Range STTE ADDRESS N BOONE/E BARKER PARCEL # 17552- Applicant's Name CLAY ROLLS Phone # 226-0330 Address 11212 E 6TTI-SPnKf1NF WA 99206 Work # 994-0457 Date Conditions mailed Contact person Phone # FLOOD ZONF d NO W S SCHOOL Engineer / Surveyor's / Architect's Name JOHN FRANDSEN 3216 S UNIVERSITY SPOKANE WA 99206 922-8864 Planni.ng Contact Person STACY IIJORDAIIL Phone # 456-2205 Date Subniitted Description Initials AGREENiENT T0 PAY FEFS COMPLEII:D & COPY TO ACCOUNTING / l FIN.&L PLAT FEL'S COMPLETED & COPY TU ACCOUNTING NOTIGL TO PUBLIC # 1 3 4 6 COMPLE'IED - OR NFFDS TO BE SIGNL-D DESIGN DEVIATION SUBMI'ITED AI.TERATION TU PLAT - BI_OCKS & LOTS HEARING EXAM APPROVED DENIED-_APPEALFD BBC _/U'I'itUVIsU DENILU jw . , . ~'L. • ~ 3 . L~ p .~,n,O ( ! . r , , , ~ ' ~ r ~ r - , . _ • ' . •A,, ' _ *vV ~ v ~ ' 1 ~ • q ~ ~~a..,,..~ l ~ • Z1 ~ ~ L.~► 1 S l ~1 ~ T .l review.tor i ~ ey . ~ a S P O K A N E s~ C O U N T X . PLANNING DEPARTMENT ' WALLIS D HUBBARD, DIRECTOR MEMORANDUM TO. Spokane County Divislon of Engineenng and Roads Spokane County Divlsion of Buildings Spokane County Division of Utilitles Spokane County llealth District Fu-e Distnct # 1 Consohdated Imgation District WA State Department of Ecology WA State Department of Transportation WA State Department of Health FROM: Stacy Bjordahl, Planner DATE• September 2, 1993 SUF3JECT. Nff3P-3-93 Milholland Mobile Home Park (See also ZE-84-84) Enclosed find copies of the above referenced mobile home park plan Please review and forward any comments by September 16, 1993 If you have any questlons you may contact me at 456-2205. Please direct your written comments to SCacy B jordahl. Thank you sam Enclosure c: Clay Rolls, 11212 East 6th Avenue, Spokane, WA 99206 RECE VED S E P 0 3 Igsi SPOKANE t,0i1;:31' EtvGINEE$ WES1 1026 BROADWAY AVENUE • SPOKANE, WASHWGTON 99260-0240 •(509)456-2205 . L' - - r , . SPOKANE C OUNTY PLANNING DEPARTMENT MANUFACTURED HOME PARK APPLICATION A. CrYENERAL INFnRMA,TI()N; NAME OF APPLICANT/REPRESENTATIVE: ~~h'y ~ LLS MAII.ING ADDRES S' //C:. ?.1 CITY: STA'TE'~!i' ZIP CODE yTo2i!Z PHONE:_~~~~--~ AUTHORIZED AGENT REPRESENTING OWNER ~ IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE EXISTTNC 70NE CLASSLFICATION DATE ESTABLISHED PROPOSED ZONE CLASSIFICATION• EXISTING LAND USE COMPREHENSIVE PLAN CATEGORY SCHOOL DISTRICT_ FIRE DISTRICT _ LIST PREVIOUS PLANNING DEP RTMENT ACTIONS INVOLVING THIS PROPERTY 2L ~8 y-~ B. I.FGAL INFnRMATIQN: LEGAL DESCRtP'TTON OF PROPERTY SECTION• TOWNSHIP• RANGE ASSESSOR PARCEL NUMBER TOTAL AMOUNT OF ADJOIMNG LAND OWNED OR CONTROLLED BY OWNER OR SPONSOR STREET ADDRESS OF PROPOSAL NAME OF PUBLIC ROAD(S) PROVIDING ACCESS . DESCRIaE YOUR PROPOSf1I. n C. OTHER HOME PARK INFORMATIQN, NUMBER 4F SPACES_ GROSS AREA TYPICAL LOT SIZE _ r ~ ss ~ir- ~r aL 1711s SeG~"iVr? ~/im ~ co oF' ~ ss p P ~ ~u F v ~ ~ L ~ v MANUFAC"TURED HOME PARK APPLICATION Page 3 COUNTY ENGINEFR A PRELIMfitA.RY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUI2EMENTS FOR ROADS AND DRAINA.GE HAVE BEEN DISCUSSED WITH THE APPLICANT A COMMENTS , Jn S I NA LE DATE HEALTH DISTRICT A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN SATISFIED. A COIvTMENTS • SIGNATURE/I'ITLE DATE SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION T, THE UNDERSIGNED, SWEAR/AFFTRM UNDER PENALTY OF PERJURY THAT THE ABOVE RESPONSES ARE MADE TRUTHFUL.LY AND TO THE BEST OF MY KNOWLEDGE. I FURTHER SWEAR/AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTTON, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERNQSSION FROM THE OWNER AUTHORIZIlVG MY ACTIONS ON HIS/HER BEHALF SIGNED DATE ADDRESS • PHONE ZIP SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss COUNTY OF SPOKANE ) SIGNED AND SWORN TO/AFFIRIvrED BEFORE ME ON THIS DAY OF , 1993 NOTARY SEAL Notary Public in and for Lhe State of Washington Residhng at: -My appointment expires (TO BE COMPLETED BY THE PLANNING DEPARTMENI) APPLICATTON RECEIPT DATE ACC'EPTED. BY• / ~ SPOKANE COUNTY PLA,NNING DEPAR'I'iVIENT t IYIANUFACTURED HOIVIE PARK A.PPLICATION A. CYENEIZAY., rNFnRMATInN; NAIvfC OF APPL.TCANT/REPRESENTATNE Iv1AIL,ING ADDRES S //c;,? /I o~ ~ CITY ~~iqiU~F- STATE ZIP CODE P`"/o2Q6 P H 0 N E , , AUTHORIZEll AGENT REPRESENTING OWNER ~ ZF A.F'PLICA.NT IS NOT OWNER, TNCLUDE WRZTTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESEN'T'ATrVE EXISTZ'NG ZONE CLASSIF'ICATION 7 DATE ESTABLISHED /2578 PROPOSED ZONE CLASSIFICATION , EXISTING LAND USE l ~ COMPREHENSIVE PLAN CATEGORY SCHOOL DTSTKICT_ -.r FIRE DISTRICT_ ~ LIST PREVIOUS PLANNTNG DEP TMENT ACTIONS Li-IVOLVING THIS PROPERTX , B. LFr.AL YNMRMATJQ~i: LEGAL DESCRIP'TION OF PROPCRTY Al/0 y /7 7- . , . r/~;Pox-, A.VO ,91l a,=' 4ors i.3 Gr J~/ .z~ '4f~ o CJAS ' ~ SECTION: TOWNS HIP RANGL 4~C~'-n ASSESSOR PfIRCEL NUMBER , TOTAL AMOUNT OF ADJOINING LAND OW-NrED OR CONTROLLED IlY Ou'NER OR SPONSnR STR:EET A.DDRESS OF PROPOSAL 7 E'. AI F NAME OF PUBLIC ROAD(S) PROVIDING ACCESS DESCRIBE YOUR PROP4SAL /ivrr a Q/e ~ 1.~,4,2fc C. OTHER H01Y1F PARK INF(yRMfk'I'I"nN NUMBER OF SPACES_ c 2y GROSS AREA J~ 5- 3 TYPICAL I..OT SIZE F9 ~ . ~j l,~ t-~ G o~o • y~ c~ Ss~ s.s ar- r~~ v~ ~Ifr ~ s ~chv~~ , S64 y , µ'l. • .1 1 ii4~ ~~^it,{•• s/ r~ .tM~ ~ . i%a~ 1l E rb'f ~ ~ t•-` r iI ^ ~ , ~ ~ ? ' ' '~1~hy' . _ X,-j~'• • . P L ► MANUFACT'URED HOIME PfIRK APPLZCA7'ZUN Page 2 PROPOSED SOURCE OF WAT.ER Individual wells Public Systenz Pnvate Cozxi.munity System Other Descnbe PROPOSED MEANS OF SEWAGE DISPOSAL Pubhc sewer O Commurvity system O Septic tank and drainfield.k jW Double Plumbing O Dry Sewez Otheri LFTILITY COMPA.NIES AND/OR DISTRICTS TO PRONfIDE SERtiICE TO TH7S PROPOSAL Electrlcity 1W, a Gas Phone Sewer. AIrD/vif5" Water (-96~) cx.~~ ,~,~~fas IS THIS PROPOS AL AFFEe'I'ED BY Aquifer Sensznve Area ( ) PSSA ( ) Shorelines ( ) Wetlands ( ) DO Y OU, OR THE OWNER IN THE EVENT YOU DO NOT OWN THIS PROPERTY, HA VE ANY PLANS FOR F2ITURE ADDITIONS, EXPANSIONS OR FURTHF-R ACTIVTTY RELATED TO TIES PROPOSAL? Yes No IF YES, LXPLATN IS PHASING OF Tl-iE FINALIZATION OF TI1E MAN UrACTURfiD HONE PAKK PROpOSCv Yes No Ir YES, SHOW PI-iASING ON THM PRELIivLI.NARY SITE PLAN D. ACtENC'Y CnNSULTATInN T'HIS SECTIOiN OF THE A.PPLICATION WTLL PROVIDE THE PLANNIlNG DEPARTMENT STAFF WITH WRITTEN VERZFICATTON THA.T THE fIPPLICAN`T' HAS H.AD PRELTIvIINARY CONSULTATTON WITLI TI-IE AGENCIES IDEN'I'IFIED RESULTS OF THE PRELIMtNARY CONSULTATION SHALL BE INCORPORATED IN THE PROPOSAL BEFORE FXNA.L SUBMTTTAL TO THE PLANNTNC DEPARTNLENT FI12E MARSHALL/FYRE nISTRICT A. TMS PROPOSAL IS WITBIN FIRE PROTECTIO IS-'FR T NO I3 ADE UATE ARRANGEMENTS (HAVE) HAVE NO- BEEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQUATE W ATER SYSTEM AND FACILITIES FOR FTRE PROTECTION PURPOSES ' C RECOMMENDEll FIRE FLOW lZ)' , OR UNABLE TO CALCULATE NOtiV nECAUSE USE TS NOT DEFiNITIVE, ANI7 WILL BE 17ETERMINED A F BUILDING PERMIT APPLICATION TIME D REQUII2EMEI~''S INCLUDE ~ FIFZE DISTRICT Y S].GNATUR.EfIITLE llATE W A.TER P U R V EY OR Gt A. SATISFACTORY ARRA1~tGEMENTS F _ C WATER AND FIRE FLOW REQUIREMENTS (HAVE) HAVE NO BEEN MADE f o/~~~~-. B. REQUIREMENTS/COMMENTS: ./10 5 ~ v I re~. WATER DISTRICT SIGNATURE/TITLe DATE , COUNTY U"CZLTTIES A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERA.r, REQUgtEMENTS FOR SUBMITTAL Or THIS I'ROPOSAL (HA'VE) (HAVE 'YOT) BEEN SATISFIED THE DESIGNATED WATER PURVEYOR FOR THIS SITE IS A CONIlvLENTS h fS < 4 N ~ .SP r, D ~y LrN s r ~ ~-7 - 11 S1GN~Ul~L/ "ITLf nA'1L ~ ~ ! r y 4 sy , t w iMAiNTJFACT'URED HOYE pARK APpLICArEON~ Page 3 COUNTX FNGTNEER A PRELIIviINARY DISCUSSION HAS TAKEN PLACE AIti'D GENERAL REQUTREMENTS FOR ROADS A.ND DRAZNAGE HAVE BEEN' DISCUSSED WITH THE APPLICANT A CONIlv1:ENTS S Z6NAT6f2.E " LE DATE HEALTki DXaTRTCT A PRELIMINARY DISCUSSION HAS TAKEN PLAC RAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) AVE NOT)- BEEN SATISFIED . A CO~IMENTS rJIL- ~ SIG~IATU~E ITLEO ~ VD&E , ~ SIGN,4TURE OF PROPERTY OWNERS OR LETTEk OF AUTHORIZATION I, THE UNDERSIGNED, SWEAl.2/AFFTRM UNDEIZ PENAI-TY OF PEPJ-URY THAT THE t1BOVE RESPONSES ARE MADE TRUTHFULLY AND TO TIIE BEST OF MY KNOWLEDGE I FURTHER S WEAR/AFFIRM TH.AT IAM THE 0 WI~'JER OF RECURD OF THE AREA PROPOSED FOR T~1F-- PREVIOUSLY IDENTIFIED LAND USE ACr14N, OR, lF NOT TI-IE OWNCR, ATTACHED HEREWITH IS WRI7TEN PERNIIISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER BEH_ALF SIGNED 4!!?L'9v "J~ lo GSDATE ADDRESS ..7 cz-7- /;T'y`PHONE zrp SIGNAT'k~~OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHL'vGTON } ) ss COUNTY OF SPOK:ANE ) SIGNED AND StiVORN TO/AFFTI2MED BEFORE IvrE ON THTS DAY OF , 1993 ~,.~v R r- c , . ssio • ,'S~G : s iVpT ~`~-~.a' N . S ot<u~ Pub1ic in and for the ScaLe of Wa u~910n m ~ Y, . ResidingaL 0~,,~; ~Gli ' ' My appointmcnt cxpires v (TO BE COMPLETEll BY TkIE PLANNNi G DEPARTIv1EN-0 APPLICA'T`ION # RECEIPT # DA'TE ACCEPTED BY. ~ ~ ~ Spokane County Fire District No• 9 W. 14 Graves Road o Spokane, Wasliington 99218 Telephone (509) 466-4602 • FAX (509) 466-4698 October 12, 1994 Stacy Bjordahl, Planner I Spokane County Planning Department 1026 W. Broadway Avenue Spokane WA 99260 RE : Ms. Bjordahl: Fire protection matters regarding this project have been completed. Fire hydrants have been installed, tested and placed in service. They will satisfy our needs for the project. If there are any road access issues, they will need to submit a road construction detail for our review. Yours through fire prevention, Claude Earl Wells `2-- Deputy Chief c. Pat Harper, Spokane County Engineers Tom Davis, Spokane County Department of Buildings Ty Wicks, County Water District 3 Cliff Cameron, 8419 N. Northview Court, Spokane WA 99208 Harley Douglass, 815 E. Rosewood Ave, Spokane WA 99207 Fire Prevention is everyone's business ~ LONE kECLASS IF ICAT ION NO.: ZE-£34-84 SpOKANE CUUtJTY htAR ING EXAIYI INER COMM ITTEE FItJDINGS AND UkUEk A. INTRUUUCI'ION This matter having come before the Zoning Hearing Examiner Committee on February 7, 1985, and the members of the Committee present being Jane E. Niyers, Chairperson and Richard L. Skalstad. B. PKOPOSAL The sponsor, Vernon W. Milholland, is requesting approval of a zone reclassification, File No. ZE-84-84, Ngricultural to Residential Manufactured Home, for the purpose of developing a 24-Unit Manufactured Home Park with one space to be occupied by the existing residence on site. C. FINDINGS OF FACT 1. That the existing land use in the area is residential, railroad right of way, truck stop and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Urban development. 3. That tne existing zoning of the property described in the application i s Agri cul tural . 4. That tne provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Ueclaration of Non-Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses ►vithin the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone is justified. t zONE RECLASSIFICATION N0. ZE-84-84 C. t= INU INGS UF FkCT ( conti nued ) 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands expressed neither approval nor disapproval of the proposed use. 10. The Hearing Examiner Cornmittee finds the proposed use to be in harmony with the general purposeand will not be otherwise detrimental to the public health, safety, and welfare. D. CONDITIUNS OR CONTINGENCIES APPLIED TO TNIS APPkOVAL (Al1 Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant", which term shall include the owner or owners of the property, heirs, assigns, and successors.) That the road within the proposed manufactured home park may need to be realigned to accommodate the movement of manufactured homes in and out of the park satisfactorily. a) Ci1UNTY PLANN ING DEPARTMENT l. That the roof shape and composition of the Manufactured Homes be similar to conventional single family residential structures. 2. That a minimum 5-foot dense landscape strip with tall growing trees be provided along Boone Avenue; said landscaping to be installed prior to release of building permits. 3. That a b-foot sight-obscuring fence be installed prior to issuance of building permits along all property lines, except along Boone Avenue. 4. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumination to the area with full consideration to adjacent properties). 5. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping sliall be installed and maintained such that sight distance at access points is not obscured or impaired. 2 r ZONE RECLASSIFICATIUN N0. ZE-$4-84 a) CUUNTY PLANNING nEPARTMENT (continued) 6. The applicant shall develop subject property generally in accordance within the concept presented to the hearing Examiner Committee. Variations when approved by the Loning Administrator will be permitted, including, but not limited to the following changes: Quilding location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 7. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permi ts. 8. That prior to release of building permits, the sponsor shall submit a final Manufactured Home Park design plan to the Planning Department which demonstrates compliance with the Residential Manufactured Home Zone, Development Standards of Section 4.05A.050-(b-1-9), and all Nearing Examiner Committee conditions of approval. 9. All current standards of the Residential Manufactured liome Zone, as amended, shall be complied with in the development of this site. 1 U. That the project i s subject to Section 4.16A. U50, the Aqui fer Sensitive Area Overlay Zone of the Spokane County Zoning Urdinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater aisposal, spill protection measures, and stormwater runoff. 11. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58-17 and the Spokane County Platting Urdinances prior to issuance of building permits. 12. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.U80 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements. 3 r ZOtJR RECLASSIFICATION NU. ZE-84-84 a) CUUNTY PLNNNING DEPARTh1ENT (continued) 13. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCE.O), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's likely significant adverse impac ts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non-significance is hereby to be issued. b) CUUNTY ENGINEERING DEPARTh1ENT Prior To The Issuance Of A Building Permit Ur Use Of The Property As Proposed: 1• Applicant shall dedicate lU feet on Boone Avenue for right-of-way prior to any use of the property. 2. Access perrnits for approaches to the County Road System shall be obtained from the Spokane County Engineer. ~ Applicant shall improve Boone Avenue in a manner consistent with Spokane County TYPICAL roadway section No. 2 minimum paving width Access Standard. 4. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 5. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 6. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4 ZONE RECLASSIFICATION N0. ZE-84-$4 b) GOUNTY ENGINtERING UEPARTMENT (continued) 7. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 8. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 9. Al1 required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 10. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80-1592 as amended and are applicable to this proposal. c) COUNTY UTILITIES DEPARTMENT l. Pursuant to Board of County Commissioners Resolution No. 8U-0418, the use of on-site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2, The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULIU by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROYIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane Caunty, as amended. 5 [ ZONE RECLASSIFICATION N0. ZE-84-4 c) COUNTY UT IL IT IES DEPARTI4ENT ( conti nued ) 4. Each dwelling unit shall be double-plumbed for connection to future areawide collection systems. 5. A dry sewer connection to the future area-wide Sewerage System is to be constructed. Plans and specifications for the dry sewer connection are to be reviewed and approved by the Utilities Department prior to issuing a building permit. 6. Sewer easements may be required for future connection to the Val 1 ey sewer system. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Uepartment of Social and Nealth Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILOING ANU SAFETY UEPARTP9ENT 1. The site is located in Fire Uistrict # 1. 2. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background, 6 ZOIJE RECLASS IF ICATION N0. ZE-84-84 e) CUUfJTY BUILDING AND SAFETY DEPARTMENT (continued) 3. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 4. Each structure shall be accessible to Fire Department apparatus by way of access roadways with all-weather driving surface capable of supporting the imposed loads of fire apparatus. The minimum paved roadway width, inside curb face to inside curb face, shall be 24 feet with no parking. Parallel parking is permitted on one side with road widths of minimum 30 feet. Parallel parking is permitted on both sides with road widths of minimum 36 feet. Signs noting such is required for fire lane. The turning radius of private roadways and drive aisles shall be a minimum of 20 feet inside and a minimum 45 feet outside to curb face. Cul de sacs more than 600 feet from the center line of the nearest cross street shall have a minimum radius of 37 feet, 6 inches (75 feet diameter). 5. Installation of fire hydrants are required to be installed and serviceable in accordance with the Spokane County Department of Building and Safety prior to development. The water plan shall show each fire hydrant and be in compliance with Chapter 10.04 of the 1979 edition of the Uniform Fire Code. The present design requires a minimum fire flow of 500 g.p.m, for 30 minutes. The water plan shall specify the gallons per minute for each fire hydrant at a residual pressure of no less than 20 p.s.i. (minimum pressure). 6. Where it is desired to have access control gates in residential developments, the following shall apply: The minimum width of roadway, inside of access gate, shall be twelve feet (12'). There shall be at least two (2) such drive approaches where the gates are located. One may be used for vehicles exiting. Tire flatting spikes shall not be used unless the entrance is a minimum of twenty feet (20') wide. The gates shall be provided with an approved method of emergency operation in accordance with the fire department standards. Where each drive approach is less than twenty feet (20') in width and controlled by gates, a secondary means of access shall be provided with a clear, twenty foot (20') unobstructed opening. f) WATER NURVEYOR 1. Water Purveyor is Consolidated Irrigation District #ly, and they will supply the site with adequate water for domestic, fire and irrigation uses. However, satisfactory arrangements have not been made to serve this proposal. 7 , . ~ ZONE RECLASS IF ICAT ION N0. ZE-84-4 g) COUNTY AIR POLLUT IUN COIJTROL AUTHOFt ITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 3. Al1 travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. It has been determined that fireplaces and wood stoves are a significant source of suspended particulates. The small particles (C lUmicrons) are respirable and can have an adverse effect upon the health of the public. We strongly urge that if wood stoves/fireplaces are used, that burning be done as efficiently as possible. All wood should be seasoned and stored in a dry place. During periods of poor ventilation or elevated air pollution levels, we request that use of wood stoves and fireplaces be discontinued. 5. Some objectionable odors will likely result during the construction phase of the project and f rom motor vehicles using the site following completion of the project and f rom occupants of the proposed project. 6. Al1 air pollution regulations must be met. h ) ' Z(18' STUDY 1. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 8 . 1 ~ ZONE RECLASSIFICATION N0. ZE-84-84 E. UFtDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Vernon W. Milholland, for a zone reclassification as described in the application should be APPROVED. Moti on by : Skal stad Seconded by : Myers Vote: Skalstad - aye Myers - Aye Unanimous to APPROVE to the RESIDENTIAL MANUFACTURED HOIIE ZONE - (2 - 0) NEARING EXANiINER COMMITTEE HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE , , :C ' person ~ , t, ~ ATTEST: For WALLIS D. HUBBARD Plann' g Director By `STEVE P. NOROB IOWSK I Zoning Admi ni strator Date: 9 ~ ~ t , f / \ ` • a ~ i / ~ V ~R l ~ r-5 5 03 EL 9000 , Z ~ N u OC ~ . ~ t] Q' ° " ` 8A LD W~N a u, •Z _ W o~ > 0 ~-o W J W > o o~ I~ } Ig7 198 1°9 200 201~ ~ nUGUSA I87 188 ip-9 190 .52 1)3 I94 ;ac 18 132 183 184 185 186 77 178 w JO IV• ~1 V ~ ' .a- ' ~L.~~~v~ ~7 U W ~ • w IIWGnCKr~s J. + , MAXWEL~- A °ry) rY ~ ► ~ ` AXvit4 " 4 Q ~ ► P ''~'~f'^~ 800 ~ w R ~1 Z ui U cx ~ - SMET ►~1 E'Y F ~ ~ r i • ~fiiYaLDOA-_-~_._ v E F R E E W AY A G H'AY N 2~ 17 I_-•--- 9 G C, ' ft r"i c % ~ ~ 1 ~1 ~ ~ ~ ~ ~ ~ ~ ~ r'~''~3 • G L 2 D55 •W~~ ~ I - ` ~,i h/"- , f ~ ~ . ~ ~ ~«r~ • o ST OFFI ( J ~`r.. a. ~ ►.i1 I. 1 N ~ ; ~ G ~ J i JJJ ~ ~ ~ ~ c S~RAG U ~,,_r?r'rAVE~r P O f/~~ ' Z y T r ~ 5 ~ . O O ~ 4 z { IsT'~ SE~0 ^4D n q 'JE Y' y~ N 6 pC ~ O U R T M p` rE ~ caavcf+nn~ U R -T . ~ ~ ► ~ ~ ^ r ~ , ~ ~ r r ,n b } ! 4 v K . l ~/v • r _ OFFICIAL PL AT E C. I T, T Z5 ~ OFFICE OF ~ CO UN T Y EtVGI NEER SPOKANE COUNTY WASH ~ n Ci0 . i ; e7f J liJ~'e s 7 ' c4 ~Q 7 ~ GJ O ~ r. o~~~ ~ S S ~ ~ 2 Z 0 3 30' 2 , ' z co 1-7 o v 2. -4 , , ~ . stc _ , -~30 V17 O~ ~n~1 ~ ~.`n..r~`r~ ~~3; , v , d ~ n ~ k._? ~ r I ~ _ ~ ~ ' " ~ 2 C~ ~ , N i ~ ' - 5 ~ ! ~ G - ' ~ ~ i ~ > ~ ~ • ' ~ a d J ~V • / ~ • ~ ` f \ ~ ~ ~ ---..---r, v. - . ~ } ~ . ! +-''-Q " ' r + T1 0 ' r r.. ~~sr• • ~ • / t•~Q , ~ ~ ~ , s t ~ ~ : ~~j i -4~1JJ ( rr~< ~ ' _ _ -„1 . , - = t . ~...r' S ti ~ ~ : ~ •t • ~ I 1 ~ l r• -J < ~ t ~ - - • • • ~ '•y~ : : :1,..• : . ~ 1-~ .,o, ~ ' . -al ! • ' , ~ Cr,v.c,h ` ~ g•' •a .y , I~' e # ~ ~ ! I G 1 r ~ ~ ' + 9 ~ 9 • q 10 z$ I » J i_- I ~ o g, ~ V -t ~ ~ / , ` I, ~ ► , i Q 25 Z 27 I~~r'Ev ,ne,Ef~ 22 J 20 ,a" ~ ~~J~ K~ f•;~~ ~ ~ 95~ ~ \ ~ - ~ ~ • ♦ Ov rj =c~~~ r ( 1 G ~ IL 21 3 , 2 ' Y ` O 0 ' tN`' : J~ : ~ • I ~ CIN ~ ~ z ,...f ~ : : : • i : t i ~ o , N C4 ~ . 'a ~ . : . 't O v CO co ~ If ~ 4 z 8., y~ I Fa E3 y-4-J C. ATALD O ► c'n ~ v , ~ _ ~ - ~ - T - - - ~ m - - - - - - , ° O Z ' ~ = 0.. e a+a, d6 &-rnL- 00 AVfr. _(`i° 2280 -40' DUC 319499-8 ~ , - - - - - - - - _ - - - S. H. N o. 2 ~ o o ~ ~ r` ~ o LE ~ ♦ ~ ev N ~ z ~ - t , . ~ \ ~ ^ ,~...i~l' . ~ N ~ FS t2U/~ t'~ W/~Y /SV E 12 -4 4 3~- c~d`•...••~ . , ~ . S°~'t/Ce 'eoad - ` 3 } 5 t . O }'O T - - - rrc~~ cz,~ . ~n lCrz~'~c~~ 30 - - _ ' ' C O 1" ~p I ,4r0 A \ y~ _ ~ ! ~ I Y 1 ~ on ~ Y ~ f - - • ~ • ~ S' ~ ' -t , e , _ .r ~ 1 t a r t u J ~ ~ .9 LO ~ . . 4gi ! A C :,t{ ~s _i ~ L r3l u ~tt~ (71.- i t t U ~ . ♦ - - - - o --M-~-SS%ONq tt - E. 2~~ - ~ y ---i- J~-` ct, .rb-- - /9 7' ~i9, 7' * 5 0 ' ~ , q g$ i- `U q) 2 ~ 9004 ~ URm3*S 03 4- „ 286-57 ~ 3 4 4 1 ~ ~ ~ ~ ~ ~ ~ ~0 ^ ZDO` 91 ~s'0 Q ` > IW (4 6 ~ URw3,eS 1~.7%1 '0Ie9 .'0,!r 9' _ . . 1286-57 1.17~ 18-84C ~ • - 5 ` c ~ ~~~~L i~ • I ~ µ 9oos fi75? 8~ V URw7 3~ @ ~ ° 18-84C (D 9 c ~ Q , . ~ . ► ~ QD 2 7 ~ . .u,,.. 23 URw7 • n , 0/10 Q C .~1 7 i 22 i2 ~°64-84e 'v 0~~• C39 gA ~ 6 ~86- y7 ~ ~ fJ 04 o' e94' ~ ~ • ; Z O ~ ~06 B~ t/ ~ . O / \ ! C'' ' ~ ti ~ ~ 35 ~v,~~~p 10,4 / r41 Jl ~ + ' ' , I ~ ~ ~ ' ~ ~ ~ ~ ~ - - - - - - - - - 2 ~ - - - - - - - - - - - - - - - o- - - - - - - - - - - ~3~~`~- - - - - r3 yc -12A,, 1=2 ~ ~ ~ ►94-71C ~O ►a 40-71 n i o J-U-8 ENGINEERS* Inc;. TRANSMITTAL L~TTER ENGINEERS . SURVEYORS . PLANNERS TO : rnris Feich DATE: JarYUary 17, 1995 -axiom OantY W. 1026 Bmadway Ave. Spdom, IVA 99260-0170 PROJECT: Milhnlland mbi-ie How paL'iC WE TRANSMIT: Herewith Under Separate Cover THE FOLLOWING: Design Drawings Shop Drawings Construction Drawings Sampies Specifications Product Literature Copy of Letter THESE ARE TRANSMITTED; For Approval For Your Use For Review & Comment For Information & File For Your Distribution As Requested For Record (1 DESCRIPTION/COMMENTS: ~ 2 ~e-A 01C ~5~r~rr,e. ~ C~~•C°~''~' DISTRIBUTION: [,~"tA,4 Owner Contractor 1) FROM: , ~ J-U-B ENGINEERS, Inc. 422 W. Riverside Suite 722, Spokane, WA 99201 (509)-458-3727 FAX (509)-458-3762 J-U-B ENGINEERS, Inc. fJ,U,B,i ENGINEERS • SURVEYORS • PIANNERS , W 422 Riverside Ave., Suite 722 Spokane, WA 99201 509/458-3727 FAX 509/458-3762 , - - January 17, -1995 Chris Reich - ~ - Engineering Development Services ~ - - ~ Spokane County 1026 W Broadway Spokane, WA 99260_ Milholland Mobile Home Park Dear Mr. Reich, ~Enclosed is the resubmit of plans for the above referenced project. Below I have _ discussed each item of your-comments dated January 6, 1995. General - 1. Done by J-U-B. ~ - 2.- Done by J-U-B. - ~ 3.- Done by J-U-B., . ' - . - Sheet 7 of 10 ~ ' - - , 4. I~show additional clarifying T.O.A. elevations. I believe the 1.5% is correct. 5. ~ Done by J-U-B. ~ - 6. ~ Done through owner request. ~ . ~ Sheet 8 of 10 - - " , - - 7. ` Done: - - ° 8. Done. ~ . ~ 9. Done. 10. Done. ~ - - . , ~ 11. Drywell offsets are from edge of pavement, note has been added. - - 12. My details show the drywell elevations are based on edge of ' _ pavement. I have used this method with the county before. My = philosophy is that it better insures the proper relationship to the ~ roadway and edge of pavement. ' - ~ 13. Done. ~ . , . _ . , ~ 14. Done. ~ - ~ . , _ ~ ~ ~ f-J,-UIB 1Engineers Surveyors Planners - _ Drainage Report 15. Included with Boone Improvements Drainage. 16. Yes, Garrison Soils. 17. Done. Thank you for your assistance on this project. - Sinc rely, . David . Kliewer, P.E. Proj ect Manager c: Bob Milholland DJK/bt c:/dave/milhol/1tr117 - r A 1 , • «x~~tr r••i ' S P O k ~1 N F. C C~ L_7 N T Y OFFICE OF T}IG COII'V'(-Y ENGWEER • A DIViSlO1VOFTHE PUBLfC WORKS DEPARTMGNT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director REVIEW COMMENTS TO: David Kliewer, P.E. - J.U.B. Engineers FROM: Chris Reich - Engineering Development Services` - ' SUBJECT: Milholland MHP ' DATE: January 6, 1995 A review of the road and drainage plans for the above referenced project has been accomplished. The list below is a summary of the items that need to be addressed. Please refer to the enclosed plans marked "Original" for complete comments. 1 General 1. Please submit road plans for the improvements required a4ong Boone Avenue. 2. All plans need to be signed by the engineer. U Y-- . 3. The owner needs to sign the construction plans as well. &,L Sheet 7 of 10 4. The grade at the end of the road should be 1.43% according to the elevations shown. Please revise. 64,utctc 0.S o~": 5Q¢.. g- 54rL 5. The road should use the "Lane" designation since it will be a private roaddlc_ Co +-Sl,,$A ' - 6. The curve in the road does not meet the standards for a private road. Please revise or pursue a design deviation. Sheet 8 of 10 7. Show the continuous swale on the plan view. vK- 8. Add the following note or something similar: "See details on Sheet 10 of 10 ' for driveway construction across the continuous swale." 67u. 9. Identify the section as A-A or something that would help provide better clarification. o4(- 10. Use and call out Spokane County standard materials. For example, call out Type A drywells, Type 4 Metal frame and grate, etc. Ok. 11. Are the offsets from the centerline? If not please specify where the offsets are from? ~ 12. Specify the rim elevations. Bv 1L.p of*F Qt~,l ~ , W/ ~ l tN~'t~ewl tba4td eu zotr . 5-Q-4, V&xj a fn " ,t aQ'It_ lf vx P'ar' tti. 1026I3rcad~vawAvc. Srok.3ne, t'%'A 1)1?2i)()-c'170 (509) •1:~t~-:~t;f?(1 FAX (5(19) 45G--~i'1" ~ Sfieet 9 of 10 ' 13. Specify sod for the swales. a 14-- 14. Indicate a 3' pathway on the road cross section. This can be done by providing a painted stripe at that location. 1 Drainaae Re or ' 15. Provide a copy of the SCS soils map. 16. It is safe to assume the minimum percolation rate if the soil is one of the pre- ' approved soil types as stated in the Guidelines for Stormwater Management. 17. lnclude the runoff from the improvements to Boone Avenue in your report. Please return the enclosed items marked "Original" with your next submittal. If you have any ' questions, feel free to call. ' ' 1 1 ' 1 ' 1 ' 1 BOB MILliOLLAND MO►I3ILE HOME PARK 1 130UNE AVENUE IMPROVENIENTS STORMWATER DRAINAGF DESIGN REP4RT ' , PREPAREU FQR: SPOKANE COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ' JANUARY 1995 ' , , ' PREPARED BY: J-U-B ENGINEERS, Inc. W. 422 Riverside Ave., Sui#e 722 Spokane, WA 99201 (509) 458-3727 PROJECT !'~JOB NQ. SHEET ' DESIGNED DATE ITEM CHECKED DATE , . . . _ . . . . _ . . • - - - - • : r~~►c~v . ! 8 t q8. ~fs. ' v . Z~a r~ . d C~ : . ~O ~C,~,t . . - . . _ . , , . . . . . . . - - ~ - t /~1r ~G • ~ ~~ET'. ~ f _ zZ. VG ~ ~ - - ~ - ' - - • • i~ . - - , - 1 ~ ► . ~ ---I-, 6Z7 . ~ ; - - , ,~"~9', ~rSI , ~ ~ . . . . ' - - - . - . - - - - - . . { . . . . i . . _i I ' I w!D c lgo// • • I , ~3~ ' - D - ~ ~ . . . . . . . . . , . . ~ r!l ~ . - I I ' ~ 1 ► ~ ' i ! ~ ~ . . ! --1 i - ~ - - -1- . - - ; - ~ , ; - . - - - i - , ` . • - - i- - ~ - - I - - - ~ - - • ~ - - - ' - ~ - • , ~ ~ i~ ; - ~ ~ 1 , : - - - ~ - -~---1- v - : iz , I ' ' • ' ' ' ' ' I _ Y . - - - - - - - I ~ i . I ~ I I ~ ~ _ ~ ' I ~ ` - - - J-U-B 460 - Rev. 4194 J m m m r r m m r m m r m m r m m r m m BOWSTRING METHOD (TEN YEAR STORM DESIGN) boone1 PROJECT milholl mhp TIME OF CONCENTRATION (minutes) DETENTION BASIN DESIGN BASIN boone 1 REVIEWER Tc (overland) Tc (gutter) Areas "C" A"C NUMBER OF DRYWELLS PROPOSED DATE 16-Jan-95 1 Single (type A) 0 Double (type B) Ct = 015 L2 = 102 imp 008 0 90 007002 Total Area (calc )(see 1-11) 008 Z1 = 12 5 nat 0 00 0 30 0 Time of Conc (calc )(see H1) 5 00 L1(A) = 0 Z2 = 1 landscape 0 00 015 0 Camposite "C" (calc )(see H1) 0 90 N(A) = 0 4 B= 0 5 0 00 0 00 0 Time af Conc (min) 5 00 S(A) = 0 025 n= 0 016 0 00 0 00 0 Area (Acres) 00778 s= 00027 0 00 0 00 0 C' Factor 0 90 Tc (A) = 0 00 d= 0125 0 00 0 00 0 Impervious Area (sq ft) 3388 Total A Comp "C" Volume Provided 208 142 STORM 142 Lt(B) = 0 Tc (gu) = 199 008 0 90 OuMow (cfs) 0 3 N(B) = 0 Tc(A+B) = 0 00 Area " C" Factor 0 07 S(B) = 0 Q=C'I'A= 0 22 Tc(tot ) = 5 00 Q(est ) = 014 #1 #2 #3 #4 #5 #6 #7 Tc (6) = 0 0 Intensity = 318 Time Time Intensity Q dev V in V out Storage A= 0167969 Inc Inc WP = 22443 (min ) (sec ) (in !hr ) (cfs) (cu ft ) (cu it ) (cu ft ) R = 00748 (#1'60) (A'C'0) (Outf'#2) (#5-#6) V = 0 66 Tc (total) = Tc (ovedand) + Tc (gutter) Tc(gu) = 199 5 00 300 00 318 0 22 90 90 00 -0 Tc (ovedand) = Ct'(L1'N!S^0 5)"0 6) Q(est) = 014 Ct=015 5 300 318 0 22 90 90 -0 L1 = Length of Overland Flow Holding = 2 55 10 600 2 24 016 110 180 -70 N= fnclion factor of overland flow ( 4 for average grass cover) 15 900 177 012 124 210 -146 S= average slope of ovedand flow 20 1200 145 010 132 360 -228 Tc (gutter) = Length (ft )NeloGty (ft Isec )!60 25 1500 121 0 08 136 450 •314 B= Bottom width of gutter or ditch 30 1800 104 007 139 540 -401 Z1= inverse af cross slope one af diich 35 2100 0 91 006 140 630 -490 Z2 = inverse of cross slope two of ditch 40 2400 0 82 006 144 720 -576 d= depth of flow in gutter (estimate, check estimate with Flow) 45 2700 0 74 0 65 145 810 -665 Area = d'B+d"2/2'(Z1+Z2) 50 3000 0 68 0 05 148 900 -752 Wetted penmeter = B"d+(1lsm(atn(121))+11sin(ain(11Z2))) 55 3300 0 64 004 152 990 -838 Hydraulic Radius = R= ArealWetted Penmeter 60 3600 0 61 0 04 158 1080 -922 Velocity =14861n'R" 667's^ 5 65 3900 0 60 0 04 168 1170 -1002 Flow = Velocity'Area 70 4200 0 58 0 04 175 1264 -1085 n= 0 016 for asphait 75 4500 0 56 0 04 180 1350 -1170 s= longiludinal slope of gutter 80 4800 0 53 0 04 182 1444 -1258 85 5100 0 52 0 04 189 1530 -1341 90 5400 0 50 0 04 193 1620 -1427 95 5700 0 49 0 03 199 1710 -1511 100 6000 0 46 0 03 205 1800 -1595 DRAINAGE POND CALCULATIONS Required grassy swale pond storage volume = Impernous Area x 5 in 112 in !ft = 141 cu ft provided 142 cu ft OKI DRYWELL REQUIREMENTS -10 YEAR DESIGN S70RM Maximum slorage reqwred by Bowstnng = 0 cu ft provided 142 cu ft OK! Number and type of Drywells Required = 1 Single 0 Double o r~'e Post-It'" Ljidlld fax trdriSmMttal memo 76T1 N of peQoa►~ • (Jo1ns sheel 58) uw 67 - ~ ~ - - . - - - - - - - _ Co. ~~i~~ f _ 1-~ ~ . ~ _ _ CO 4on• A P6A N • `y ~ ~ 1 • _.►.~►•_r~~~ fir1H PA~IrfC u x ' . AaA , - r i 6 5 t~ h ~-'fixA . . . ~ GPA Cng r ~ 1 1 1 1~~ ~ • : i~•~ r'~ I . ~ JVf ~ ~ ♦ , f , `1'7 .I"'1~~r.~ ' ' ' ~ ~~~Ii1 ~ i' ♦ r^ ~ ~f~ f L ~ r ~ • l~~ ~ / . Y~oN . . ~ . ~mtj . tEAN~ .,~,I3 ~ ~ r ° . G»A • . -.ca ` - ' eF• ^ c ~ ii c~. T GnB GmB Gg8 . ' . GQA GgA 0 ~ ~ c n Cif18 I ri ~ LeA R ki~ I~ • / ~ j~ Rn CigA ^ 8 N - 7 t \ V~ ~ h ail u ~ 11 ~ ~ 7 l3►{A ..i- raier r - • .s u• <<- 0 I1 „ D „ ' ~T~:~-...4~"" • . ~ ' ~ ~T!« '7' : ~ • L~~ C~~ • ~ ~ ' / • ~4 ♦ ~ _..A32~~ ~ r ~ `SA . . f NORTNERIY ji • _ . ~~►-r ~ ~ _C II~a=~~ • _s=~ _ ~r r f ~ •'1~ ' !D 10 ~ . ~ CrZ'Z14nRI`I'et~3 s _4 a--f....♦ 4 S - - 17 ~ (;gq j~a= ~ : . ' _ _ _ ~ ' • C/1NAL • ~ ~r~G Ci R U~ ii ~*j~'asT ^NV ~ I~ • U L a t pI~ Y ~ ~ K - -J'•pP ' MIV ~ GN~G~4o ~ • ~ --:~('P'• ' 1+W.►~iru c ~ _ _.~rr• •.~a~~ a I ~ " ~ , t • I (Jorn, shee, 76) ~OUV t e~ ~ L--• ~ SCe1e 1 1U OOU ~ _ . ~ _ • ~ vFFicE oF couNfiv ENGINEERs BOND ESTIMATE PRC)JECT Millholland MHP NAME CJR DATE 23-Jan-95 DRAlNAGE ITEMS UNITS QUANITY PRICE GOST 7} Drywell - Type A €A 2 1250.00 2500.40 2} Dryweli - Type 13 EA 1650 oa 0.00 3) Grate - Type 1 EA 315.00 0.00 4) Grate Type 2 EA 340.00 0.40 5) Grate - Type 3 EA 2 30000 600.00 6) Backfill For QW CY 60 16.00 960.00 T) Concrete lnlet EA 750.00 0.00 8) C M. PIpG* 1 QFF ❑121. LF 2300 0.00 9) C M. Pipe 12" Qia. LF 27.00 0.00 10) C.M. Pipe 15" Dia. LF 27 80 0.00 11) C.M. Pipe 18" Dia. LF 31.50 0.00 12) Precas# fVlanhole EA 1500.00 0.00 13) SolEd lid EA 310.00 0.00 14) akchf'208' Swale Excavafion CY 111 i0 00 11000 15) Sod SF 568 0.70 397,60 NON STANDARQ QRAINAGE ITEEiAS 1) Curb 4nlet Type 1 EA 2 200o00 400.40 2) 0.00 3) 0,00 4) 0.00 5) 0.00 fi) 0.00 DRAENAGE SUBTOTAL 4967.60 16) Monuments EA 185,00 0.00 17) Bamcade LF 33.00 0.00 18) Street Signs EA 1 85.00 85.00 OTHER SUBTOfiAL 8500 GRADING, SURFACING, CURB, AND SIDEV1lALK 19) Rnugh Grade CY 90 10.00 900.00 20} Top Cvurse CY 16.00 0.00 21) Base Course CY 65 16.04 1040.00 22) Asphalt Concrete fivns 45 44,40 1998.00 23) Curb fiype A LF 7.00 0.00 24) curb Type B LF 217 8,00 7736.00 25] Curb 7"ype R LF 8.00 0.00 26) Sidewalk SQ YD 16.70 4,00 NDN-STANDARD ROAD ITEMS 1) 0.00 2) 0.00 3) 0.00 4) 0.00 GRADIIVG 14A1D SIJRFACIfVG 5674.00 GRAND TOTAL 10,726.60 CtSe 111,C00