2014, 05-29 Permit App: BLD-2014-1224 Rebuild ResidenceSpokan �
40Valley.
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
Spokane Valley, WA 99206
Tel: (509) 720-2540 PERMIT FEE:
Fax: (509) 688-0037
permitcenter@spokanevallev.orq
NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK OTHER
SITE ADDRESS:4820 S. GILLIS WAY COURT
ASSESSORS PARCEL NO.:44042.1718 LEGAL DESCRIPTION:
BUILDING OWNER NAME:FLATT
NAME:PETE AND RACHELLE FLATT
I't VjCc..t
ADDRESS:4820 S. GILLIS WAY COURT
CITY:CITY OF THE SPOKANE VALLEY
ZIP:99206
CSV PERMIT CENTER
STATE: WA
PHONE:
FAX: � R E I cELL:509-280-4420
CONTACT NAME:DAN OLSON
PHONE:509-928-9209
FAx:509-922-3266
CELL:509-435-1430
CONTRACTOR NAME:DANIEL J. OLSON CONSTRUCTION, INC.
MAILING ADDRESS:P.O. Box 13246
CITY:CITY OF THE SPOKANE VALLEY
ZIP:99213
STATE: WA
PHONE:509-928-9209 FAX:509-922-3266
1430
CELL:509-435-
CONTRACTOR LICENSE No.:DAN IEJO081 RJ
LICENSE NO.:
EXPIRES:11-30-14 CITY BUSINESS
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
RE BUILD BURNED DOWN RESIDENCE - FOUNDATION EXIISTING - SEWER EXISTING - ALL UTILITIES EXISTING
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:18 FEET
Dimensions:71' X 44'
(INCLUDES GARAGE)
No. of Stories:ONE STORY
(PARTIAL DAYLIGHT BASEMENT)
Total Habitable
Space:3616 SQ. FT.
Main Floor SQ FT:2046
Upper Floor SQ FT:N/A
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:1570
Garage SQ FT:539
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:3124
30% Slopes on
Property:No
No. of Bedrooms:FlvE
Construction Type:FRAME
Heat Source:GAs FORCED AIR
Sewer or Septic:SEwER
2002 CONNECTION
TOTAL COST OF PROJECT: $250,000
DISCLAIMER
Updated 1-11-11
C:\Users\Dan\Documents\City of the Spokane Valley permit form.doc
Page 1 of 2
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valle • -rmit is not a •- mit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information ay be required to be bmitted and subsequently approved before this application can be processed.
Signatu
Date: 67Z7(ifz
Updated 1-11-11
C:\Users\Dan\Documents\City of the Spokane Valley permit form.doc
Page 2 of 2
j�l
Target Date sheet
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of I
SPECIALTY INSULATION, INC.
Residence Address LOOSE -FILL 262E East Trent
12U ATION CERTIFICATE S okane, WA 99292
eatherization Division p
FART2
Square Feet
2.
3.
Added R -value
Date installed // / 3- / 1
Ceiling Areas Insulated (Loose Fill)
I Combined Insulation
Hwy los. Bag I Total Depth 1 -{aiue p,TYPr,
6.
HART 3
Square Feet
0 Wail Area Insutated (Loose Fill)
Added R -Value No. Bags i Lbs. Bag Total Depth
2.
Loose Fill Insulation
Manufacture, Address
0 Floor Areas Insulated
Combined Insulation
R -Value Type
PART 4 CERTIFICATION
SPECIALTY INSULATION, INC. certifies that the above residence identified in Part 1 was insulated as specified in Part 2, or 3 and the installation
was conducted in conformance to applicable codes, standards and regulations at the time of installation.
AUTHORIZED SIGNATURE;
Loose Fill Insulation
Manufacture Address!
WHITE COPY TO CUSTOMER • PINK COPY TO CONTRACTOR • HARD COPY TO ATTIC