Loading...
2012, 10-22 Permit: SW-12002424Application Numbe SPOKANE COUNTY BUILDING AND PLANNING v _ SW -12002424 PERMIT Permit Issued Date: 10/22/2012 Expiration Date: Project Description. Project Name: Permit Type: SEWER CONNECTION ELECTRIC RR SEWER Primary Contact: SWAN'S GROUND WORK Applicant: SWAN'S GROUND WORK Address: 14415 N FORKER RD SPOKANE, WA99217 Phone: 509-465-4751 Email. SITE INFORMATION: Site Address: Parcel Number Subdivision: Assessor's Description Inspection Area: Zoning: 8204 E FREDERICK AVE 45072.2703 ORCHARD AVENUE, REPLAT OF BLKS 151- 154 ORCHARD AVE ADD REPLAT BLK 151 TO 154- 178-179-225 W50.1 6FT OF BLK 237 & E15FT OF BLK 236 Owner: Address: Phone Email: MCINTRYE, SALLY A 8204 E FREDERICK AVE SPOKANE, WA 99212 Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District #6 Land Area: 9635 Square Feet CONTRACTOR INFORMATION: General Contractor SWANSGW951 LT SWAN'S GROUND WORK 14415 N FORKER RD SPOKANE, WA 99217 509-465-4751 DETAILS' Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: 5125.00 $25.94 5125.00 $150.94 CONDITIONS' Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed. 10/22/2012 11.05.01 Printed by: IIS APPPOOL\ASP.NET v4 0 SPOKANE COUNTY.BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002424 10/22/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/22/2012 11.0501 Printed by: IIS APPPOOLWSP.NET v4.0