2012, 11-26 Permit App: BLD-2012-2153 RemodelSjWi1t e
. Va11ey,.
RESIDENTIAL
iT NEW CONSTRUCTION
DECK
SITE ADDRESS: \ `3\ Los
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permi tcenter(Tspokaneval ley.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
CONSTRUCTION PERMIT APPLICATION
X ADDITION/REMODEL
0 OTHER
0 ACCESSORY BUILDING
ASSESSORS PARCEL NO.:
LEGAL DESCRIPTION:
CC
BUILDING OWNER NAME:
NAME:
0
LU
O
N
w _
7- 4k
W
U
J
UJ
ADDRESS:
CITY:
STATE:
I
PHONE:
FAX:
CELL:
CONTACT NAME:
w
/w z a
6i
t/)
0 4
i
PHONE:
FAX:
CELL:
tO
0
CONTRACTOR NAME: Corp leA-C , c SJ c1.3
MAILING ADDRESS: \) l `t AvivJ
sz vA
SO/ ?r/ —215\
CITY:
PHONE:
STATE: VA
ZIP:, 99o(,
FAX:
CELL:
CONTRACTOR LICENSE No.: COr% u-isSS7OaXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions:
(o'0 X 6 I
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT:
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
300/0 Slopes on
Property:
No. of Bedrooms:
Construction Type:
Heat Source:
Sewer or Septic:
TOTAL COST OF PROJECT: $ 5000 -a
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in thls transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be .ubmitted and subsequently approved before this application can be processed.
Signature
Date: k \ I rt.
Updated 1-11-11 Page 1 of 1
http: //www. spoka neva) ley.org/filestorage/ 124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc
Sp kane
Valley®
Target Date sheet
For City Use Only
PLUS Project NO. t6\? -. 7. ISS
Project Address
1 t Z1(n 1 'Pro
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is 12_ (Z
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
LL.I
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
.several days before they can look at your new or revised information.
S. Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City ran be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, plea.se,feel free to contact us ifyo. u haven't heard ,from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following tins procedure, you will
save time and allow the reviewers to complete the t'orkmore expeditiously
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff front requesting additional information as a result of their technical review
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will he routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-1 l Page 1 of 1
\ 12-S b E ereJ e -kc K
�dI
301AAIJgM00 3000 F103 03W31V38
140181VI0 ZM410.1108 Y3J1AV 3$40440618
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
REFLECTED CEILING PLAN
IOM 2xla u.ll R-13
s 4r
FLOOR PLAN
ATTACHMENT A 1 of 2
EXHAUST FANS
100.01s4kitchen
50.CFN1 bathrooms
P1utw1ai a ffic-ciAc4cd
Pe>a
TQ3LFJU2 DIA IQJIUU 2!HT
2IAOIT03RRO0 VIOIT0392NI 0J319 OT
CITY COPY
Z%i'» I'dJAI1X�1
ni;k i4IG=I;>I$)1
?rour'uriu rJ fJ!9.:)
v thttuul 32)
kY
REVIEWED FOR CODE COMPLIANCE
E VALLEY BUILDING DIVISION
�.