Loading...
ZE-0014-02 . q r SPOKANE COUNTY HEARING Ex;AMINER RE Zone Reclassificanon from UR-3 S and) B-2 Zones to B-2 Zone, and Vanance ) FINDINGS OF FACT, from Landscaping Requirements, ) CONCLUSIONS OF LAW, Apphcant Modern Draftmg Service ) AND DECISION File No ZE-14-02/VE-14-02 ) 1 This matter conung on for pubhc heanng on September 25, 2002, the Heanng Examiner, after review of the subject apphcattons and the entire record, and findwg good cause therefore, hereby makes the following findmgs of fact, conclusions of law and decision I FINDINGS OF FACT 1 The rezone applicahon requests a rezone of approxunately 62 acres of land from the Urban Residenhal-3 5(LTR-3 5) and Commuruty Busmess (B-2) zones to the B-2 zone The vanance apphcation requests that a 15-foot wnde stnp of Type I Landscaping stnp be permrtted along the west property line, whereas Section 14 806 040 (1)(d) of the Spokane County Zorung Code requires 20 feet of Type I Landscapmg along such boundary 2 The srte is generally located west of and adjacent to Argonne Road and approxunately 130 feet south of Alki Avenue, m the SE 1/a of Sechon 18, Townslup 25 North, Range 44 EWM, Spokane County, Washington 3 The srte is currently referenced as a porhon of County Assessor's tax parcel no 45184 0803, and has a street address of 511 N Argonne Road 4 The srte is legally descnbed as the North 90 feet of the South 180 feet of Lot 1, Block 23, Hutchinsons Addznon, Less Hwy, the North 90 feet of the South 180 feet of Lot 2, Block 23, Hutchmsons Add.ihon, and the North 90 feet of the South 180 feet of the East %Z of Lot 3, Block 23 of Hutchuisons Addihon, as per plat recorded in Book Q, Page 4 of Plats, records of Spokane County Audrtor, m Spokane County, Washuigton 5 The apphcant is Modem Draftng Service, c% Joe Stoy, 1104 N Pemne Rd, Spokane, WA 99206 The legal owner of the srte is Boulder Creek Inc, 19012 Nevada Rd, Spangle, WA 99031 6 The Heanng Examuier heard the apphcahon pursuant to the County Heanng Examiner Ordmance (County Resoluhon No 96-0171) and the County Heanng Exammer Rules of Procedure (County Resolurion No 96-0294) 7 The Heanng Examiner conducted a srte visit on September 24, 2002, and held a pubhc heanng on the proposed rezone and vanance on September 25, 2002 The requuements for nohce of pubhc hearmg were met HE Findmgs, Conclusions and Decision ZE-14-02/VE-14-02 Page 1 • 8 The following persons tesnfied at the pubhc heanng Tammy Jones Cneg Baldwin Division of Planning Division of Engineenng 1026 West Broadway 1026 West Broadway Spokane, WA 99260 Spokane, WA 99260 Randy Snuth Joe Stoy Northwoods Construchon Modern Drafting Service 11309 N Government Way 1104 N Pemne Rd Hayden, ID 83835 Spokane, WA 99206 9 The County Division of Plaluung issued a Determination of Nonsigruficance for the proposed rezone on September 10, 2002 The vanance is exempt from comphance wnth the State Environmental Pohcy Act and the Coun#y's Local Environmental Ordinance, pursuant to WAC 197-11-800 (6)(b) 10 The Heanng Exanuner takes nohce of the County GMA Comprehensive Plan and Caprtal Facihhes Plan, Phase I Development Regulahons, 2001 County Standards for Road and Sewer Construction, County Zomng Code, County Code, other apphcable development regulahons, and pnor land use decisions in the vicuuty 11 The record includes the documents in the project file at the hme of the pubhc heanng, the documents and teshmony subnutted at the pubhc heanng, and the items taken notice of by the Heanng Exanuner 12 The subject property is approxunately 27,000 square feet m size and is located west of and adj acent to Argonne Road The site is generally flat in topography and is undeveloped 13 The sub~ect rezone and variance apphcations, and srte plan of record, were subrrutted to the County Division of Planiung on July 25, 2002 The site plan illustrates development of 15 641 square feet of the srte, including a 2-story buzlduig vvith a bwlduig footprint of 8,850 square feet and a building height of 25 feet, associated pazking and landscaping The site plan also illustrates the adjacent parcels to the south that are under the same ownerslup as the subject pazcel The site plan states that the proposed use will reqwre a reciprocal parkrng agreement with the parcel to the south, in order to meet the minimum pazking reqturements of Sectton 14 802 040 of the Spokane County Zomng Code 14 Effective January 1, 1991, the zorung of the east half and west half of the srte was reclassified from the zorvng of the site under the now expired County Zomng Ordinance to the B-2 zone and UR-3 5 zone, respechvely, pursuant to the Program to Implement the Spokane County Zomng Code 15 Effechve January 15, 2002, the County unplemented a new comprehensive plan ("GMA Comprehensive Plan'), Capital Facilrties Plan, County Urban Growth Area (UGA) boundanes, and Phase I Development Regulations, all pursuant to the State Growth Management Act (GMA) The County also repealed the intenm development regulations previously adopted by HE Findings, Conclusions and Decision ZE-14-02/VE-14-02 Page 2 the County under the State Growth Management Act See County Resoluhon No 2-0037 Minor revisions were made to the Phase I Development Regularions on May 7, 2002 See County Resolution No 2-0470 16 The Phase I Development Regulations designate the srte, the apphcant's adjoinuig land located to the south, and other land frontYng or near Argonne Road and Mullan Road m the area to the north and south, in the Mixed Use category of the Comprehensive Plan Such regulations retazned the existing zorung of the site and neighboring properties The site and neighborng land are designated in the County UGA The Argonne/Mullan comdor is developed with a mixture of office and other commercial uses, along vvith some remauung residenhal uses 17 The Phase I Development Regulations designate the land 1}nng west of Mullan Road, west of the land designated in the Mixed Use category of the GMA Comprehensive Plan, in the Low Densrty Residential category of the GMA Comprehensive Plan, and retained the UR-3 5 zoiung of such land Such land is dominated by single-family homes This includes the land lymg west of the site 18 In 1996, the land lymg north of the srte was rezoned from the UR 3 5 zone to the Urban Residennal-22 (UR-22) zone See decision in File No ZE-16-96 Professional offices have been developed on such land In 1998, a 17,000 square foot parcel of land located directly north of such land, across Alla Avenue, was rezoned from the UR 3 5 zone to the Urban Residential- 22 (UR 22) zone, for the development of inedicaUprofessional offces See decision in File No ZE-1-98 19 In 1997, the east half of the parcel of land lymg directly south of the site was rezoned from the UR-22 zone to the B-2 zone See decision m Ffle No ZE-12-97 Such parcel is zoned entuely B-2, is under the ownerslup of the current site owner, and is developed for parking 20 The parcel of land lymg two (2) parcels south of the site is also under the ownership of the current site owner The east end of such parcel is zoned UR-22, and the remamder of such parcel is zoned UR 3 5 The east half of such parcel is developed with an office use, wlule the west half is undeveloped The apphcant is currently seeking to rezone such parcel enhrely to the B-2 zone, to develop a pnvate parkuig lot on the east half See File No ZE-13-02 21 The Examiner consoudated the land use apphcations m the current file and Ffle No ZE-13- 02 for public heanng, considerulg the common ownerslup and locahon of the sites, the sunilanty of the land use issues presented, and the lack of pubhc opposition to the proposals 22 A large storage builduig is located immed.iately west of most of the enhre west boundary of the current srte 23 Argonne and Mullan Roads form a one-way couplet, compete with curb and sidewalks, m the area, between Sprague Avenue and Interstate 90, and are designated as Urban Pruicipal Artenals by the GMA Comprehensive Plan HE Findmgs, Conclusions and Decision ZE-14-02/VE-14-02 Page 3 ~ 24 The proposal does not comply with the muumum frontage requirements or the off-street parkmg requirements of the B-2 zone To comply with these requuements, the apphcant w111 be required to aggregate the srte with the adjacent parcel to the south, and to execute a reciprocal parkuig agreement wnth the owner of such adjacent parcel 25 The Staff Report analyzes the consistency of the proposal vnth the GMA Comprehensive Plan and the approval cntena for rezones and vanances The Examiner concurs with such analysis and hereby adopts the same by reference as findings of fact herem 26 Zorung Code 14 810 200 authonzes the County Division of Plannmg to aid.muustratively accept alternate methods of compLance to the development standazds of the County Zonuig Code, incluclmg landscaping, where the alternate is at least equivalent to that prescnbed in the Zoning Code and is not mconsistent wrth conditions of approval unposed through a land use achon 27 The Type I landscapmg required by the Zonuig Code along the east boundary of the srte is mtended to buffer the site from uses developed wnthin the UR-3 5 zone, typically a smgle-family residence The existing storage building, wluch appears to be of recent construction, is located immediately west of the site, faces away from the proposed commercial development on the srte, srte and provides a complete buffer to any single-fanuly home located west of such builduig Under such circumstances, a 15-foot wnde stnp of screen-type landscapmg stnp serves the same purpose as a 20-foot stnp of screen-type landscaping, and should be permitted pursuant to Zoning Code 14 810 200 28 Neighbonrlg property owners did not comment on the proposal As condinoned, the proposal wdl comply with the B-2 zone and other applicable development regulations, will not have any sigruficant adverse unpact on the environment, and will be reasonably compahble wrth neighboring land uses 29 Condihons have changed in the area smce the east half of the srte was zoned UR-3 5 in 1991, to support the proposed rezone T'his includes the approval of three (3) rezones to the UR- 22 zone or B-2 zone on land lying near or adjacent to the srte, increased commercial development along the west side of Argonne Road in the vicuuty, adopnon of the GMA Comprehensive Plan and Phase I Development Regulanons, and extension of pubhc sewer to the area. Based on the above findings of fact, the Heanng Examiner enters the followuig II CONCLUSIONS OF LAW 1 T'he proposed rezone, as cond.inoned, generally conforms to the Comprehensive Plan 2 The proposed rezone, as modified and condinoned, beazs a substannal relationslup, and will not be detnmental, to the public health, safety or welfare 3 A change in econonuc, technologqcal, or land use condinons has occurred to warrant the proposed rezone, as conditioned A substantial change of circumstances has occurred in the area smce the srte was last zoned HE Findings, Conclusions and Decision ZE-14-02/VE-14-02 Page 4 4 Special cucumstances are not appucable to the property, such that stnct apphcahon of the penmeter landscapmg requirements of Section 14 806 040 (1)(d) of the County Zomng Code would create prachcal difficulhes and depnve the property of nghts and pnvlleges enjoyed by other properties in the vlcuuty wrth sunilar zotung 5 An altemate method of compliance, pursuant to Section 14 810 200 of the County Zomng Code, should be accepted regarduig the penmeter landscapmg reqturements of Sechon 14 806 040 (1)(d) of the County Zomng Code, to allow the uista.llahon of 15 feet of Type I landscaping along the west boundary of the subject property, rather than the 20 feet of Type I landscapmg otherwlse reqtured 6 The proposal rezone, as condihoned, comphes wnth the B-2 zone and other apphcable development regulahons 7 The procedural requuements of the State Environmental Policy Act and the County's Loca1 Environmental Ordinance have been met The proposal, as cond.ihoned, will not have a sigruficant, probable adverse unpact on the envuonment 8 The proposed rezone, as condihoned, meets the cntena established by Washuigton case law for approving a rezone, and the cntena estabhshed in paragraphs 14 402 020 (1)(2) of the County Zomng Code for amendmg the County official zonuig map 9 The proposed vanance does not meet the cntena for approving a vanance hsted in Chapter 14 404 of the County Zomng Code 10 Approval of the rezone apphcation, and denial of the vanance applicanon, are appropnate under section 11 of the County Heanng Exammer Ordinance, adopted by County Resoluhon No 96-0171 III DECISION Based on the above Findings of Fact and Conclusions of Law, the subject apphcahon for a rezone to the Commuruty Business (B-2) zone is hereby approved, subject to the conditions of approval of the pubhc agencies stated below The subject apphcahon for a vanance from landscaping reqturements is hereby denied Any condzhons of such agencies that have been added or sigruficantly revised by the Heanng Examiner are ttalicized Fazlure to comply wrth the condihons of this approval may result in revocahon of ttus approval by the Heanrig Examiner This approval does not waive the applicant's obligarion to comply wrth all other reqlurements of other agencies with junsd.ichon HE Fmdulgs, Conclusions and Decision ZE-14-02NE-14-02 Page 5 SPOKAIVE COUNTY DIVISION OF PLANNING 1 All condihons unposed by the Heanng Exanuner shall be bmduig on the "Applicant," wluch term shall mclude the owners and developers of the property, and their heus, assigns and successors 2 The zone reclassificahon apphes to the following descnbed real property "The North 90 feet of the South 180 feet of Lot 1, Block 23, Hutclunsons Addinon, Less Hwy, the North 90 feet of the South 180 feet of Lot 2, Block 23, Hutchinsons Addihon, and the North 90 feet of the South 180 feet of the East %z of Lot 3, Block 23 of Hutchunsons Addition, as per plat recorded m Book Q, Page 4 of Plats, records of Spokane County Auditor, in Spokane County, Washuigton" 3 The proposal shall comply with the Commwuty Business (B-2) zone, the Aquifer Sensitive Overlay zone, and all apphcable provisions of the Spokane County Zonuig Code, as amended 4 The site sha11 be developed m substantial conformance wrth the site plan of record submitted on July 25, 2002, subject to comphance with development regulanons and conditions of approval The County Division of Planning may approve muior alterahons and addrtions to the site plan of record, pursuant to Section 14 504 040 of the County Zorung Code, as amended, subject to comphance vvith all cond.itions of approval and regulanon standards All other changes must be submitted to the Heanrig Exanuner for approval at a public heanrig, through a change of condirions applicanon 5 The appltcant may tnstall l S feet of Type I landscaping along the west boundary of the site in lieu of the 20 feet of Type I landscaping required along such border by the County Zoning Code 6 The site plan of record does not illustrate comphance wath the frontage requtrements or off-street parkcng requarements of the County Zonang Code Prior to the issuance of any butlding permits the applTCant shall aggregate the site with the adjoining property to the south, to meet frontage requtrements and shall enter into ajoint use parking agreement with the ownershtp to the south meeting all the requirements of the County Zoning Code to meet off-street parking requirements 7 Approval is reqwred from the Duector of the Division of Plannmg/designee of a specific illuminahon and signage plan for the descnbed property, pnor to the release of any biulding permit S Duect hght from any extenor area hghtmg fixture shall not extend over the property boundary 9 A specific landscape plan, planting schedule and provisions for the maintenance acceptable to the Duector of the Division of Planrung/designee shall be subnutted with a performance bond or other sultable guarantee for the project, pnor to release of any building pernuts Landscaping shall be installed and ma.mtained so that sight distance at access points is not obscured or unpazred HE Findings, Conclusions and Decision ZE-14-02/VE-14-02 Page 6 10 The Division of Planning shall prepare and record wrth the Spokane County Audrtor a Title Nohce, notuig that the property m queshon is subject to a vanety of special condihons unposed as a result of approval of a land use action The Trtle Notice shall serve as public nonce of the conditions of approval affechng the property m queshon The Title Nohce should be recorded wrthun the same tune frame as allowed for an appeal and shall only be released, in full or in part, by the Division of Plaruung The Title Notice shall generally provide as follows "The parcel of property legally descnbed as "The North 90 feet of the South 180 feet of Lot 1, Block 23, Hutchuisons Addition, Less Hwy, the North 90 feet of the South 180 feet of Lot 2, Block 23, Hutclunsons Addrtion, and the North 90 feet of the South 180 feet of the East %z of Lot 3, Block 23 of Hutchuisons Addirion, as per plat recorded m Book Q, Page 4 of Plats, records of Spokane County Aud.itor, in Spokane County, Washington", is the subject of a land use achon by a Spokane County Heanng Examiner on October 31, 2002, approvuig a rezone applicanon, den}nng a vanance appLcation, and unposing a vanety of special development conditions File No ZE-14-02NE-17-02 is available for uispection and copyuig in the Spokane County Division of Planiung " SPOI:ANE COUNTY BUII.DING AND CODE ENFORCEMENT 1 The apphcant should contact the Division of Builduig and Code Enforcement at the earhest possible stage in order to be uiformed of code requirements admirustered/enforced as authonzed by the state Bullding Code Act Design/development concerns mclude addressmg, fire apparatus access roads, fire hydrant flow, approved water systems, builduig accessibihty, construction type, occupancy classification, existing extenor wall protection and energy code reqiurements SPOKANE DIVISION OF ENGINEERING AND ROADS Pnor to release of a builduig permit or use of the property as proposed 1 Access pemuts for approaches to the County Road System shall be obtauied from the County Enguieer 2 The apphcant shall subnut road, drainage and access plans to the County Engineer for approval 3 A Professional Engineer (P E), hcensed in the State of Washington, shall subnut road and stonn dramage construchon plans and a drauiage report that conform to the versions of the Spokane County Standards for Road and Sewer Construchon, the Guidelines for Stormwater Management, and all apphcable federal, state, and local regulations and laws that are in effect at the tune of the plan subnuttal or at the tune of the development permit apphcarion(s) The final road and stonn draznage plans and drainage report shall receive the County Engineer's acceptance, pnor to release of any Gradmg, Builduig or Right-of-Way Pernuts 4 A parkuig plan and traffic cuculation plan shall be subnutted and approved by the Spokane County EngRneer The design, location and arrangement of parkulg stalls shall be m accordance with standard enguieeruig prachces Pavmg or surfacmg, as approved by the County Enguieer, will be reqwred for any portion of the project that is to be occupied or traveled by vehicles HE Findmgs, Conclusions and Decision ZE-14-02/VE-14-02 Page 7 5 The construchon of the roadway unprovements stated herein shall be accomplished as approved by the Spokane County Engmeer 6 No road unprovements are required for Argonne Road, because County Road Project No 2853 constructed all necessary improvements 7 All requued unprovements sha11 confonn to the current State of Washington Standard Specifications for Road and Bndge Construcrion and other apphcable County standards and/or adopted resoluhons pertamung to Road Standards and Stormwater Management in effect at the date of construchon, unless otherwise approved by the County Engmeer S Roadway standards, typical roadway sections and drauiage plan reqiurements aze found in Spokane County Resoluhon No 1-0298, as amended, and are apphcable to tlus pmposal 9 No constsuchon work is to be performed wnthui the exishng or proposed nght of way until the County Engmeer has issued a permrt therefore All work vvitlun the pubhc road nght of way is subject to uispechon and approval by the County Engineer 10 The applicant is advised that there may exist uhhhes either underground or overhead affechng the apphcant's property, mcluchng property to be dedicated or set aside firture acquisihon Spokane County vvill assume no financial obhgahon for adjustments or relocahon regarduig these uhhnes The apphcant should contact the applicable utihhes regarduig responsibihty for adjustment or relocahon costs and to make arrangements for any necessary work 11 The County Engmeer will issue a Concurrency Cerhficate under the County GMA Comprehensive Plan and Phase I Development Regulations for twenty-four (24) PM peak hour tnps, for a 16,000 square foot office bu.dding 12 The proposed rezone has been reviewed accorduig to the site plan of record Any modifications to the srte plan will reqiure add.itional review by the County Engmeer At such tune as a revised srte plan is subnutted for review, the apphcant shall submit detailed traffic uiformation for review by the County Engmeer to determine what traffic unpacts, if any, that the development would have on surrounchng uifrastructure 1Vhtagarion, includuig off-srte improvements, may be reqwred SPOKANE COUNTY DIVISION OF UTILTTIES 1 As required by the Spokane County Zoning Code Phase One Development Regulations, a wet (live) sewer connection to the area-wlde pubhc sewer system shall be constructed Sewer connechon permit is requued Commercial developments shall subnut histoncal andlor estunated water usage pnor to the issuance of the connechon permit in order to estabhsh sewer fees 2 The apphcant sha11 submit expressly to Spokane County Division of Urihhes, "under separate cover", only those plan sheets showing sewer plans and specificahons for the public HE Fmdings, Conclusions and Decision ZE-14-02/VE-14-02 Page 8 sewer connecnons and facilihes for review and approval Commercial developments shall subnut lustoncal and/or eshmated water usage as part of the sewer plan subrYUttal 3 Any water service for this project shall be provided in accordance with the Coorcunated Water System Plan for Spokane County, as amended SPOKANE REGIONAL HEALTH DISTRICT 1 The sewage disposal method sha11 be as authonzed by the Duector of Uhhties, Spokane County 2 Water service sha11 be coorduiated through the Duector of Urihhes, Spokane County 3 Water servrce shall be by an exishng pubhc water supply when approved by the Regional Engu►eer (Spokane), State Department of Health) 4 A pubhc sewer system shall be made available for the project S The use of pnvate wells and water systems is prohibiteci SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORTTY 1 All apphcable a1r pollution control regulahons shall be met See memo dated August 8, 2002, from SCAPCA to the Divlsion of Planrung, in Planning Ffle No ZE-14-02/VE-14-02 DATED this 31S` day of October, 2002 SPOK:ANE COUNTY HEARIlNG Ex:AMINER / l Mich el C Dempsey, WSBA # HE Fmdings, Conclusions and Decision ZE-14-02/VE-14-02 Page 9 NOTICE OF FINAL DECISION AND NOTICE OF RIGHT TO APPEAL Pursuant to Spokane County Resolunon Nos 96-0171 and 96-0632, as modified by County Resolution Nq 1-0700, the decision of the Heanng Examiner on an apphcation for a zone reclassificahon and a related applicahon for a vanance is final and conclusive unless vvithin fourteen (14) days from the Examiner's wntten decision, a party of record aggneved by such decision files an appeal wnth the Board of County Comnussioners of Spokane County, Washington Tlus decision was mailed by cerhfied mail to the Apphcant, and by regular mail to other pazties of record, on October 31, 2002 THE APPEAL CLOSING DATE IS NOVEMBER 14. 2002 ~ The complete record m tlus matter, includulg tlus decision, is on file du.rmg the appeal penod wrth the Office of the Hearuig Exarruner, Thud Floor, Public Works Bmlduig, 1026 West Broadway Avenue, Spokane, Washington, 99260-0245, (509) 477-7490 The file may be inspected du.rmg normal working hours, listed as Monday - Fnday of each week, except holidays, between the hours of 8 30 a m and 5 00 p m Copies of the documents m the record will be made ava.ilable at the cost set by Spokane County Pursuant to RCW 36 70B 130, affected property owners may request a change in valuation for property tax purposes notwithstanduig any program of revaluation HE Findulgs, Conclusions and Decision ZE-14-02/VE-14-02 Page 10 Project Stalus Activc ENGINEER'S REI-%,--f"~:' SHEET As I3uilt Plans Received Rezone File ZE-0014-02 "02 Road Plans Approved Companion Files: VE-0014-02 New Road Standards 5-(5-95 Mylar Reluted Files: Ilearing: 09/25/2002 10:30 Building Dept: Technical Review: 08/15/2002 2:15 I Harvard Rd Plan i_j Eng Special Cees Preliminary Review: TYPe: ❑ Large Lot Bldg. Square Feet 1470 Date Reccived: 08l(}7/2002 a No. Lots: No. Acres: 0.1'1~ Project Name B-2 & UR-3.5 TO B-3 BOULDER CREEK #3 Site Address S. ALKI, W. ARGONNE, E. MARGUERITE, N. VALLEYWAY, ARGONNE N. 511 Applicant Ccrnditions Mailed: Flood Zone No Phone Dist School Dist 363 Fire Dist 01 Range-Towniship-Section: 44 - 25 - 18 PARCEL(S): (lirst 20) BOULDER CREEIC INC Water Source Public 45184.0803 19012 S. Ncvada Rd ticwrr Suurce SPANGLE, WA 99031-9741 Phone (509) 265-3570 (509) 939-0656 Fax (509) 245-3586 Eng Billing I-I Dennis Itauqust BOULUCR CREEK INC 19012 S. Nevada Rd Owner }-i Dcnnis Rauqust SPANGLE, WA 99031-9741 BOULDER CREEK INC Phone (509) 245-3586 (509) 939-0656 19012 S. Nevada Rd Fax (509) 245-3586 SPANGLE, WA 9903 1-974 1 Signed Name: t'hone (509) 245-3586 (509) 939-0656 11 DENNJS RAUGUS"T Fax (509) 245-3586 Buildiq 477-3675 /Planniq 477-7200 /Engineer 477-3600 Contact D/P TAMMY JONES Contact Enp- GREG fiALDVti'IN Date Submittecf Description Initials Eng Necd Technically Camplete Eng Necd Harvard Rd Mitigation Eng Need Drainage Plans Eng Need Traffic Analysis Eng Need Other 08r'0112002 Eng Agree Pay Fees Received Eng Final Plat Fees Completed Copy to Accounting Eng Agree Priority Fees Received 07/25/2002 Eng Arelim Plat Fees Completed Notice to Public / Notice tu Public # 1 3 4 6 Completed - or Nceds to be signed Dcsign Deviatiun Dates (In-0ut) Ban~ quanucs tor f drainage item calculated s 09/25/2002 Hearing Date Decision App ~ Den v Cond Appld BCC Appealed to BCC Decision App Den Cond Appld Court Appealed to Caurt Decision App Den Cond Appld Stamped Mylars to Secretary (Sandy) J / Stamped 208 Lot Plans to Secretary (Sandy) P=o;ect status Active ENGINELAtt~ REVIEW SHEET As Built Plans Received Rezone File ZE-0014-02 '02 Road Plans Approved , I Companion Files: VF-OC►14-0~ New Road Standards 5-15-95 Mylar Related Files: Hearing: Building Dept: Technical Review: 08/15/2002 2:15 I_, Harvard Rd Plan ❑ Eng Special Fees Preliminary Review: Typz: r_I Large Lot Bldg. Square Feet 1470 Uate Received: 08107/2002 No. Lats: No. Acres: 0.17 Project Nanie OOB-2 & UR-3.5 TO B-3 Site Address S. ALKl, W. ARGONNE, E. MARGUERITE, N. VALLEYWAY, ARGONNE N. 511 Applicant Conditions Mailed: Flood Zone No Phone Dist Schual Dist 363 Fire Dist 01 }2angc-Towmship-Scction_ 44 - 25 - 18 PARCEL(S): (first 20) I30ULDER CREEK MC Water Source Public 45184.0803 19012 S. Nevada Rd Sewer Source SI'ANGLE, WA 9903 l -9741 Phone (509) 265-3570 (509) 939-0656 Fax (509;) 245-35$6 Eng Bilfing Ff Dennis Rauqust BUULDEK CREEK INC 19012 S. Nevada Rd Owner I! Dennis Rauqust SPANGLE, WA 9903 l-9741 E30ULDCR CREEK INC Phone (509) 245-3586 (509) 939-0656 19012 S. Ncvada Rd Pax (509) 245-3586 SPANGLE, WA 99031-9741 Signed Name: Phone (509) 245-3$86 (504) 939-0656 11 DENNIS RAUGUST Fax (509) 245-3586 Building 477-3675 /Planning 477-7200/Engineer 477-3600 Contact B/P TAMNIY 10NES Contact Eng GREG BALDWIN Date Submitted Description Initiats Cng Need Technically Complete Cng Need Harvard Rd Mitigation Eng Need Drainage Plans Eng Need Trafiic Analysis Eng Need Other 08/01i2002 Eng Agree Pay Fees Received Eng Final Plat Fees Completed Copy to Accounting Eng Agree Priority Fees Iteceived 07/25/2002 Eng Pretim Plat rees Completed Notice to Public / Notice to Public # 1 3 4 6 Compl4ted - or Needs to be signed Design Deviation Dates ([n-0ut) 1~ l i / i l l ~ Son3 quanties tor drainage item calculated llearing Ua[e Decision App Den Cond Appld E3CC Appealed to BCC Decision App Den Cand Applci Court Appealed to Court Decision App Den Cond Appld ; j Stamped Mylars co Secretary (Sandy) / / Stamped 208 Lot Plans to Secretary (Sandy) r , Spokane County Public Works Division of Engineering & Roads Certificate of Transportation Concurrency Project Name Boulder Creek Iil File Number ZE-0014-02 Parcel Number(s) 34184 0803 Project Address 511 N Argonne Specific Land-Use 16 000 square foot Office Building Number of PM Peak Trips Reserved 24 County Intersections Affected Argonne Road and Valleyway / Argonne and Broadway Expiration Date August 15 2007 The Spokane County Division of Engineering and Roads has reviewed the development described above and has determined that sufficient roadway capacity exists or is programmed to exist with future road improvements on the County road system to accommodate the uses and densities shown This Certificate of Transportation Concurrency reserves the number of PM peak hour tnps indicated above and is issued only for the development as described above It shall run with the land and is not transferable to other development projects or properties The Certificate of Transportation Concurrency is valid upon approval of the development permit/applicaUon through the expiration date indicated The owner or owner s authorized agent shall apply to renew/extend the Certificate of Transportation Concurrency prior to the expiration date Spokane County wiil not notify a property owner/agent of an expired or impending certificate expiration Any quesbons regarding transportation concurrency should be directed to the Transportation Engineermg Section at (509) 477-3600 1 Approval ~ " f_7 Oi on of n ineenng & Roa s Si ZA;ttt ure afe Bouider Creek I n D ennis Raugust 19012 Nevada Road Copies to Spangle, WA 99031-9741 ~ ~ ~ ► ~ ~ ~ STAFF REPORT TO THE HEARING EXAMINER - FILE #ZE-14-02/VE-14-02 I SPOW~ COUNUY DIVISION OF PLANNING HEARING DATE September 25, 2002 @ 10 30 a m FILE # ZE-1402NE-14-02 PROJECT PLANNER Tammy Jones, Associate Planner PROJECT DESCRIPTION Zone Reclassification from Urban Residential-3 5(UR-3 5) and Commurnty Business (B-2) to Commurnty Busmess (B-2) for office uses and those uses allowed in the Community Busmess (B-2) zone with a Vanance request to allow a Type I landscaping stnp 15 feet m v+ndth along the west property line, whereas Section 14 806 040(1) of the Spokane County Zornng Code requires 20 feet of Type I landscapmg Project Data Project Locafion The subject property is generally located west of and adjacent to Argonne Road and approximately 130 feet south of Alki Avenue m the SE %4 of Secbon 18 Township 25 N Range 44 EWM Spokane County Washington Parcel Number(s) 45184 0803 Applicant Joe Stoy Modem Drafbng Sennce 1104 N Pemne Rd Spokane, WA 99206 (509) 535-3668 Comprehensive Ptan Designabon Mixed Use Zonmg Urban Residenbat-3 5(UR-3 5) and Communrty Busmess (B-2) Existng Land Use Vacant and undeveloped land Surroundmg Zoning and Land Uses • North Zoning to the north of the site consists of Urban Residentiat•22 (UR-22) established in 1996 (ZE-16- 96C), previously classifed as Urban Residental-3 5 (UR-3 5) m 1991, and remains unchanged by adoption of the Phase I Development Regulabons Land use north of the site mcludes professionai offices • South Zornng to the south of the site consists of Commurnty Business (B-2) estabiished m 1997 (ZE-12-97C) previously ciassifled as Urban Residential-22 (UR- 22) m 1991 and remams unchanged by adopfion of the Phase I Development Regulabons Land use south of the site includes commercial and office uses ZE 14-02NE 1402 Staff Report September 25 2002 Hearing 1 of 8 ♦ ~ • East ~ s ~-Zornng to the ~ast of the site consists of Regional Business (8-3) established m 1991 previousiy classifled as Commercial (C) m 1984 (ZE-70-84C) and remains unchanged by adoption of the Phase I Development Regulabons Land use east of the site ~ includes commercial and office uses • West Zoning to the west of the site is Urban Residential-3 5 (UR-3 5) established in 1991, previousiy classified as Agncultural (A) m 1947 (ZE-29947), and remams unchanged by adopfion of Phase I Development Regulabons Land use west of the sde is smgle family residential Recent land use acbons m surroundmg Recent land use actions m the vicmity of the subjec# area site include ZE-1-98, Zone Reclassification from UR-3 5 to UR-22 on 17,000 square feet fbr professionaVmedical offices fbr property located north of the subject sde on Alki Avenue and west of Argonne Road, approved by the Heanng Examiner on November 4 1999 ZE-12-97, Zone Reclassificafion from UR-3 5 and B- 2 to B-2 fbr office uses on 12 acres, fbr property located south of and adjacent to the subject sde approved by the Heanng Exammer on November 4 1999 ZE-16-96, Zone Reclassfication from UR-3 5 to UR- 22 fbr professional offices on 1 acre for property north of and adjacent to the sde approved by the Heanng Examiner on October 14, 1996 ZE-6-94, Zone Reclassificabon from UR-3 5 and B-2 to B-2 fbr retad sales and a beauty salon on 36,000 square feet fbr property located at the NW comer of the intersecbon of Argonne Road and Broadway Avenue, approved by the Heanng Exammer Committee on April 21 1994 ZE-51-94 Zone Reclassification from UR-7 to B-3 for a bingo facdity on 12 acres fbr property located east ' of Argonne Road and south of Broadway Avenue approved by the Heanng Exammer Committee on January 1 1995 ZE-39-91, Zone ReclassificaUon from UR-3 5 and B- 2 to B-3 fbr medical offices on 1 acre, for property located south of the subject site and north of Valleyway Avenue approved by the Heanng Examiner Committee on November 21 1991 Land Division Status The subject property consists of a tax parcel of record Water Purveyor Hutchmson Water Dlstnct No 16 ZE 14-02NE 1402 Staff Report September 25 2002 Hearing 2of8 r . Sewage Disposal Yhe suboct sile ls served by a public sewer system 1 Fire Distnct # Spokane County Fire Protecction Distnct #1 Nearest Arterial and Distance ~I tie site is located west of and adjacent to Argonne Road which is designated as an Urban Pnncipal Artedal by the Spokane County Artedal Road Plan ' Neighborhood Associaflon None identified r • This proposal is located withm the Urban Growth Area (UGA) • This proposal is Iocated inside the Public TransportaUon Beneflt Area (PTBA) GMA/Critical Areas Aquifer Recharge Area The subject property is located within the Pnority Sewer Service Area (PSSA) and the Aqurfer SensitNe Area (ASA) Overlay Zone Fish & VYldlife Habrtat Conservabon Areas None diustrated on the Spokane County Crdical Areas Maps Floodplam The site is not located withm a flood plam Geologicaliy Hazardous Areas None dlustrated on the Spokane County Crbcai Areas Maps Wetlands None illustrated on the Spokane County Cribcal Areas Maps SEPA A Determmation of Nonsignfiicance was issued for the proposal on September 10, 2002, with a comment penod ending on September 24 2002 Noticmq Published The proposal was pubiished in the Legal Nobce section of the Spokesman Review on September 10 2002 The deadline for no*ing property ownersitaxpayers within 400 feet of the proposal was November September 9 2002 Site Poshng Deadlme The deadline for posbng public nobce on the site was September 9 2002 1724 Compliance Dates Applicabon Accepted July 25, 2002 Determination of Completeness issued August 5, 2002 Date NoUce of Decision is due December 2, 2002 Reviewma Aqencies 8 agencies were noUfled on August 1 2002 and August 29 2002 Comments were due on August 15 2002, and September 11 2002 Agencies Notified Response Date Agencies Notified Response Date Received Received Receixed Received Spokane County Division Yes 9/17/02 Spokane Regional Yes 8/15/02 of Engmeenng Health District Transportation Spokane County Dnnsion I Yes 19/30/02 Spokane County Fire ~ Yes 1 8/15/02 ZE 14-02/VE 14-02 Staff Report September 25 2002 Hearing 3of8 of Utdibes 1 ProtecUon Distnct No 1 ~t I I t Spokane County No Hutchmson Water No Stormwater Utltity District Spokane County Dnnsion Yes 8/15/02 Spokane County Air Yes 8/8/02 of Building & Code Poliution Control Enforcement Authonty - &ency Comments Agency comments received are m the form of recommended condibons of approval Public Comments No public comments have been receNed Descnption of the Site The subject site is approwmately 27 000 square feet in size and is located west of and adjacent to Argonne Road Argonne Road is a fully improvsd one-way road with curbs and sidewalks and is designated as an Urban Pnncipal Artenal by the Spokane County Artenal Road Plan The site is generaily flat and is undeveloped Surroundmg uses inciude office uses to the south and north, office and commercial uses to the east and smgle famdy residenhal uses west of and adJacent to the site An exisbng storage budding located on the parcel west of and adjacent to the site appears to be located up to the rear property Ime of the subject site Project Descnption The proposed land use acfion consists of a Zone Reclassrficafion from Urban Residental-3 5(UR-3 5) and Commurnty Busmess (B-2) to Commurnty Busmess (B-2) for the development of a 2-story office budding approximately 15, 641 square feet in size, with associated parking and landscaping The applicahon also includes a Variance request to allow a Type I landscapmg stnp 15 feet in width along the west property line whereas Secbon 14 806 040(1) requires a Type I landscaping stnp 20 feet in width along the west property line Backqround The applicabon for the proposal was submitted to the Division of Planrnng on July 25 2002 A Determmabon of Completeness was issued on August 5, 2002 and the Nobce of Applicabon was circulated on that same date wrth a comment penod endmg August 19, 2002 A Technical Review Meeting was heid for the subject land use acbon on August 15 2002 The exis4ng zornng of the sfte is Urban Residential-3 5(UR-3 5) established in 1991 and previousiy classfied as Agncultural m 1947 (ZE-299-47) and Commurnty Business (B-2) established m 1991 and previously classfied as Local Busmess (LB) m 1947 (ZE-299-47) The adopbon of the Phase I Development Regulations to Impiement the Comprehensive Plan by the Board of County Commissioners on January 15, 2002, (Resolution #2-0037) did not change the exisbng zoning of the subJect sde Secbon IV, Concurrency, of the Phase I Devetopment Regulations requires applicabons for Zone Reclassifications withm the Urban Growth Area (UGA) to be evaluated for transportabon, water and sewer concurrency The Spokane County Dwision of Engineenng and Roads issued a Certificate of Transportabon Concurrency for the proposal, and the Spokane County Division of Ublifies and Hutchinson Water District No 16 have both signed Certificates of Concurrency statmg that public water is available to serve the site and that the subject parcel is served by the Spokane County public sewer system Staff Analvsis Comprehensive Plan The subject property is located wrthin the Mixed-use Category of the Urban Land Use Chapter, Chapter 2, of the Spokane County Comprehensive Plan Mixed-use areas are mtended to consist of "centers" and ZE 14-02/VE 14-02 Staff Report September 25 2002 Headng 4of8 1 ~ "comdors° distributed throughout the urban area to providertor ratail sales services, govemment and business offices, recreabon facdities, higher-density residences and other high-intensity uses to serve the needs of surroundmg residential areas Mixed-use areas are intended to enhance travel options encourage development of localiy serving commercial uses medium-density apartments and offices aiong transportation comdors idenbfied on the Land Use Ptan Map Mixed-use areas discourage low-intensity auto-dependent uses and focus on a pedestnan onentabon with an emphasis on aestheUcs and design Neighborhood and subarea planrnng programs that involve design professionals govemment service providers business people and commurnty residents will be necessary to design successful mixed-use areas Policies UL 12 2, UL 12 3 and UL 12 4 state that Maed-use areas wiil mclude a vanety of high density housing and empioyment to support transd service a full range of retail goods and services wdh a wdh an emphasis on commurnty-servmg rather than regional serving commercial uses and wdl prohibit commercial uses that require large land areas with low employment densibes such as warehouses, auto dealerships, etc Policy UL 12 5 states that imptementabon of Mixed-use areas should only occur aRer the adopbon of a subarea plan that involves design professionals, government sennce providers, business people and oommurnty residents As stated above, the policies of the Mixed-use Category of the Urban Land Use Chapter generally support the development of the site for office uses Secfion 11 Zone Reclassiflcabon ApplicaUons of the Phase I Development Regulabons states that applicabons for amendments to the Spokane County Zoning Map mibated under Section 14 402100(1) of the Spokane County Zornng Code shall be limded to reclassificabons tlhat are consistent with the Comprehensnre Plan category and associated impiemenbng zone as provided in the table attached to the regulations The table identifies the implemenfing zones for Mixed-use Category to include the proposed Commurnty Busmess (B-2) zone The Maced-use Category of the Urban Land Use Chapter of the ComprehensNe Plan does not specifically address vanance requests as provided for in Chapter 14 404 of the Spokane County Zoning Code Goals CF 3, CF 6 and CF 7 Capital Facilibes, Chapter 7, are to ensure that public facilibes and services support proposed development at estabiished Levels of Service and is consistent vnth public water and sewer system planrnng The application for the proposed Zone Reclassificafion is consistent with transportahon concurnency requirements, has the availability of public water and public sewer Policy CF 81 requires stormwater management systems for new development wrthin the Urban Growth Area (UGA) The Site Plan of Record idenbfles proposed stormwater management areas Zoning The purpose of the proposed Commurnty Busmess (B-2) zone is to provide for the establishment of commercial centers which wdl meet the needs of the a community for a wide range of retad and service uses and to implement the Major Commercial category of the Comprehensive Plan The Commurnty Busmess (B-2) zone is mtended to pnmanly accommodate commUnity shoppmg facdities grouped at one location and senred by artenats where they can serve a trade area of several neighborhoods The proposed Community Business (B-2) zone generaliy implements the exisbng Mixed-use Category of the Comprehensroe Plan, based on Section II of the Phase I Development Regulabons General characterishcs include paved roads and sidewalks, public sewer and water, and a full line of pubiic services The site is currently served by public water and sewer The purpose and mtent statement (Secbon 14 626100) of the proposed Community Business (B-2) zone states that any B-2 zoned area should have frontage on a Mmor Arterial or higher classficabon and Secbon 14 626 310 requires frontage on a street or road of the Mmor Arterial classification or a higher classification as a development standard for the Community Busmess (B-2) zone The site is located west of and adjacent to Argonne Road, which is designated as an Urban Pnncipal Artenal by the Spokane County Arterial Road Plan The proposed land use acbon includes a Vanance from the Landscapmg requirements ZE 14-02/VE 14-02 Staff Report September 25 2002 Hearing 5of8 I a of Secbon 14 806 040(1), and a discussion of-tm proposal's consistency with the Vanance cntena of v Sechon 14 404 081 of the Zontng Code is included below Existing zornng m the area of the site consists of Urban Residenbal-3 5(UR-3 5) to the west of the site, with a mix of Urban Residenbal-22 (UR-22) Commurnty Business (B-2) and Regional Business (B-3) located - along Argonne Road Site Plan The Site Plan of Record dlustrates the subject property and the location of the proposed office building, parking and landscapmg areas The site plan also dlustrates the adjacent parcels to the south that are under the same ownership as the subject parcel The slte plan identfies that the proposed use will require a reciprocai parking agreement wdh the parcel to the south m order to meet the mmimum parking requirements of Sechon 14 802 040 of the Spokane County Zoning Code Site Plan Data Proposed Use 2-story office bwidmg Lot Area Approximately 27, 000 square feet Area of Proposed Structure(s) 15,641 totai square feet w/ a building footpnnt of 8 850 square fieet Prot)osed Re4wred/Ailowed m B-2 zone Mmimum Frontage 90 feet 100 feet Bwlding Coverage 32% 55% Building Height 25 feet 35 feet Budding Setbacks Front yard 152 feet 35 feet Rear yard 15 feet 15 feet Side yard 5 feet 15 feet Landscapmg East property line 5' Type III 5' Type III West property Ime 15 Type I 20' Type I North property line 5 Type III None required Parkmg 29 spaces 45 spaces mmimum (based on professional offices) As proposed, the Site Plan of Record is generally mconsistent with the minimum frontage requirements of Section 14 626 310 of the Spokane County Zonmg Code The exisbng srte has 90 feet of frontage along Argonne Road and Secbon 14 626 310 of the proposed Commurnty Busmess (B-2) zone requires the mmimum frontage for a buddmg site to be °100 feet at the street" Prior to the issuance of permit, the applicant shali be required to either aggregate the subject parcei with the adjacent ownership to the south or perform a Lot Line Adjustment between the two parcel to create the reqwred mirnmum frontage of 100 feet The Site Plan of Record identifies 22 parking spaces for the proposed office budding and Section 14 802 040 of the Zoning Code requires a mmimum of 45 spaces based on the requirements for professional offices Parkmg requirements will vary based on the type of office space developed and the Site Plan or Record identifies that the proposed use wdl require a reciprocal parking agreement with the adjacent ownership to the south of the site The reciprocal parking agreement shall be consistent with Secbon 14 802 140 of the Zoning Code and is required to be submitted pnor to the issuance of permits ZE 14-02NE 14-02 , Staff Report September 25 2002 Heaflng 6 of8 ~ The Sde Plan of Record is moonsistent with the LaPidsoopOg requirements of Secton 14 806 040(1) of the Zoning Code and the applicant has requested a Variance from these neqwrements The requested Vanance is discussed in detail below Changed Conddions Section 14 402 020(2) of the Spokane County Zoning Code states that amendments to the Zoning Map may _ occur when it is found that °Changes m economic, technological, or land use conddions has occurred to warrant modificabon " Changed conditions may inciude the adopbon of the Phase I Development Regulabons to implement the Spokane County Comprehensrve Plan (Resoluton #2-0037) Vanance Analysis The appiicant is requesting a Vanance to allow a Type I landscaping stnp 15 feet m width along the west property Ime of the subject site, whereas SecUon 14 806 040(1) of the Zoning Code requires a Type I landscapmg strip 20 feet in width Section 14 404 081 of the Zoning Code recogn¢es that circumstances may exist such that stnct application of the Zoning Code may cause practical difficulbes regardmg the use of the property Upon demonstrabon to the Heanng Exammer by the property owner of circumstances, which create pracfical diff'iculbes, the Heanng Examiner may grant a vanance from the provisions of the Zoning Code In order for a vanance request to receNe approval, compliance with Section 14 404 082(1-3) of the Spokane County Zoning Code must be demonstrated by the applicant Any vanance from the terms of the Zoning Code shall be subject to those conditions specfically idenbfied m Secbon 14 404 082(1a & b) Analysis of the proposal wdh regards to Secbon 14 404 082 (1 a& b) is as follows Response to 14 404 082(1a) The appiicant argues that the site is too small for the development of an office buildmg without the relaxabon of the landscaping standards of Section 14 806 040(1) of the Spokane County Zoning Code However, the building footpnnt of the proposed office buildmg is approwmately 8,580 square feet and the applicant has not stated why the s¢e of the proposed building cannot be reduced in order to comply with the mirnmum landscapmg requirements Response to 14 404 082(1b) The appiuant has responded to quesbon D on the Vanance Burden of Proof form by stabng that the proposed variance wiil not be harmful to the pubiic welfare nor mjunous to the property or improvements withm the vicinity of the property The following analysis of Section 14.404 082(2 & 3), while not to be considered as soie substantiation, shail be considered in the granting of a variance Response to 14 404 082(2a) Stnct appiication of the Zoning Code standards may not result m an unreasonable burden on the applicant The applicant contends that the Variance is necessary m order to have a reasonable use of the site states thaf the development of the site would not be feasible for any other use than an office use and based upon the size of the site the parlung and landscapmg requirements are prohibitive for office space that is similar to what currently exists south of the site In addrtion, the applicant states that the W'/ of the site that ls currently zoned Urban Residential-3 5(UR-3 5) would not be feasible for residenbal uses Response to 14.404 082(2b) RelaxaUon of the mirnmum landscaping requirements wdl not allow a more environmentally sensibve, energy conserving design or result in the adaptive reuse of a historic property Response to 14 404 082(2c) The applicant has stated that a broader public interest will be served by providing needed office space and jobs Response to 14 404 082(3a) The granting of the variance will not be based upon a precedent established by illegal or non-conformmg circumstances ZE 14-02/VE 14-02 Sbff Report September 25 2002 Hearing 7of8 ~ Response to 14 404 082(36) The appiicant argues that the precedent will not be established which wdl adversely effect the zoning concept for the exisfing neighborhood or the County as a whote Response to 14 404 082(3c) The applicant has stated on the Vanance Burden of Proof form that the vanance is based upon lack of a reasonable economic retum _ Response to 14 404 082(3d) The Goals and Policies of the Mixed-use category of the Comprehensive Plan do not specifically address vanance requests Response io 14 404 082(3e) The applicant states that practical difficulties related to the property did exist when the applicant purchased the property but implementabon of the Spokane County Zoning Code resulted in more restnctive development standards makmg the property more difficult to develop Response to 14 404 082(3fl The proposed Variance to relax the landscaping requirements of Section 14 608 040(1) of the Spokane County Zoning Code wdl not result in a de-facto zone change Response to 14 404 082(3g) The proposal v+nll not impact the density requirements of the Mixed-use category of the Comprehensive Plan Staff Summar~ The proposed Zone Reclassfication is generally consistent with the Goals and Policies of the Mixed-use category and is consistent with Section II of the Phase I Development Regulabons Pnor to the release of any permits, the appiicant wdl be required to demonstrate compliance with the mmimum frontage requirements of the proposed Commurnty Busmess (B-2) zone The proposed Vanance is generally inconsistent with the Variance critena included withm Secbon 14 404 082 of the Spokane County Zonmg Code The requested Vanance from Sechon 14 806 040(1) of the Zoning Code may not be based on a physical hardship applicable to the property other than the limited size of the sde and the s¢e of the proposed structure Attachments A. Maps • Vicinity Map • Site Development Plan • ComprehensNe Plan • Zoning B Condibons of Approval C Agency Comments ZE 14 02NE 1402 Staff Report September 25 2002 Hearing 8 of8 r i ATTACHANENT A MAPS VICINITY IVIAP SITE DEVELOPIIAENT PLAN 'CONAPREHENSIVE PLAN IVIAP ZOIdIPIG nIIAP ~ Z&14-02/VE-14-02 ' V'icinity Map t~ ~ ~ ~ ~ ~ tr ~ - ~ ~ Artlwr n ~ tmfa/ ~ddle ~ s 0 ~ • ~ e„x vw17 ~ . ~ ~ ~ ffik 18 ' • ~ Se►dorH h t~ ~ a 4 s~ od 24 30 ~ ~ E 2~ Scale 1 mch -1b67 R (rotm" 08/02/02 Vinnity MaP 51BECT PROPERTY PARCEL 45184.0810 ~e „~►-P ,3m! "o.~,r.~ -7' ~ 11 04 ooo, ■~ar- 100, / R - ///ei'~~~////// / ~ 6L-ooo'lmwm~ i1 / /1 aouamcmm sounm~~`~cam 9 9 ~ J e,asr~n m~ ~ xo~em~ I ooas a sa ~n ~ F",.~•~ sorow~o~e I « • I a~ooa. ~ ! : , = a~o~~roa~wna ~aoer asoo~ae PQ~Bt~ ~ BIi0N0 oOYdEni~1°~a~oiw~oosrr~p,~a ~ a~ a~ a b ` I ~ p ~ o ~ woer~ae~s .o.a npeawcem~ t40'PRO" LRACl3oE0iR9 naeoaaoao~ O ~ ~~►WIM~~YOIY ~ famRCr GPM eftw~111w~Jmr• mpA Iia 1 eu{m4~. oom fim r O t msnawrs mnw~ru emwwu mna~e ~ r~= -i.:~=- - - - - - - T - - - - - ~ -7 (a) , CF"M e'~''~~f0~ i 1~I91 1 ~ 25 R ~ + .orva~+m~ue~ ~orsawo~+no~ouw ~ ~ BULDM cmmmi ~ 0 . ! ~,°p ma~aoeirs ns~w►~o~w~ ~ JLRD"MqLmM - - - I~ ~ .L~IdQIR~I•~ - ~w - - ~ ~ ~ aPOKANE COUMY JUL 2 5 2002 ~ ~ ' COMPLEX SITE PLAN c~► IRRENTPLANNINIG ~ ~ @~ mm ~ •m _ l j 6 , FIAN i V r=W/ vcf- 1- , ' ORD l ' ZE-14-021ilr-14-02 Cornprehensive Land Use Plan ~ , TLLJ ~ EL- R ~ftld ~ T, I clq ~ ~ ~ ' . , _ - ~ ~ . A_n n- ~ IH m r = . CWY ~ ~r r IFI' r~ t 1C' ' ' . . . i - R° RC11 ~ HClR JA Scale 1 irtch o 800 ft (rounded) 08/02/02 Comprehensive Land Use Plan iiiiiiiii m Neighborhood Assoc Boundary N Subject Property withm UGA Su6ject Properry withm ASA t t t t t t t t Subject Property within PSSA f'++4ft Subject Property outside NRL & Buffer l ZEI-021Vfr14.02 . ~ ~„r,~n►n~ o phase d x 5 8 S ~ g~ ~ ~ 1 ~ 2AS 68 a-a►' to un ~ ~a to ~ ~ 47 1~R 602 ~ ~ ~ ~ 4 6160 ~ ~ ~p 816. ~ ~ 947 UA~ ~ ~ ~ iZ? 8 gt ~ M . ~ 6 85 ss ~ . , ~ .f~ . tlR-3 02is , AV ~ ~i u 6 b$ Ua $ .,~,,..~.k...F-...,..,..~..~.~... ' ~ b F. b ' g~ 1~► 2 ~c,E 17A~~' + 1 tr~ ° 400 Scate k#`~ 1C i•~o';qi ` T"`3'''i~ i~~ [r~~S~ t r ~ ~ I 1 ATTACHMEPIT B COPIDITIONS OF APPROVAL RECOIVIMENDED CONDIT1flNS OF _ APPR4VAL FOR ZE-14-02NE-14-02 DMStON OF PLANNING SPOKAb-kE COUI*ATY 1 All canditions rmposed by the Heanng Examiner shaA be bindmg on the "Applicant," which term shail mclude the owner or owners of the property, heirs, assigns and successors 2 The Zone Reclassif cation applies to the follawmg reaf property Hutchmsons Adddion Part of Lots 9, 2 and 3, Block 3, North 90 feet of South 180 feet Less Hwy , Lot 1 except the North 90 feet of South 180 feet, Lot 2 except the Nvrth 90 feet of the South 180 fee of E112 3 The proposa( shall comply with the Communtty Busmess (B-2) zone, including the minimum frontage requirements and a11 applicable chapters af the Spokane County Zoning Code, as amended 4 The applTCant shall deVelop the subject property substantially in accordance with the concept presented to the Heanng Exammer Vanations, when approved by the Director of the Division of Pianrnngidesignee, may be permrtted, inc[udmg but not limited to building lacation, landscape plans and general allowab[e uses of the perrnitted zone Ail vanabons must conform to regulations set forth m the Spokane County Zoning Code, and the onginal intent of the development plans shall be mamfamed 5 Approval is required from the Director of the DNision of Planningldesignee of a specific lighting and sigrnng plan for the descnbed property pnor to the release of any buifding permit 6 Direct light frorra any extenor area (ightmg fixture shall not extend over the property boundary 7 A specific landscape plan, plantmg schedule and provisions for the maintenance acceptable to the Director of the Division of Planning/designee shall be submrkted wdh a performance bond or other suitabie guarantee for the project pnor to release af any building permits Landscaping shall be installed and maintained so that sight distance at access pomts is not obscured or impaired 8 The Division of Planning shall prepare and record with the Spokane County Auditor a Title Notice noting that the property in question is subject to a vanety of special conditions imposed as a result of approval of a land use action This Ti#1e Notice shail serve as public ZE 14-02NE 14-02 Septamber 25 2002 Pubtic Mearing Division of Planrnng Recommended Conditions of Approval notice of the conddions of approval affectmg the property in question The Title Notice ` should be recorded vuithin the same time frame as allowed for an appeal and shall only be released, m full or m part, by the Division of Planning The Title Notice shall generally provide as follows " The parcel of property legally described as is the subject of a land use act8on by a SpoBcane Counfiy Hearing Examiner on September 25, 2002, imposing a variety of special clevelopment condiflons Ftle No ZE-14-021VE-14-02 is available for inspection and copying in the Spokane County Division of P1anning ZE 14-02/VE 14-02 September 25 2002 Public Hearing Division of Planning Reoommended Condrtions of Approval ~t ~ a ATTACHMEIdT C AGENCY COMMENTS ` ' OFFICE OF THE SPOK:ANE CnLfNTY ENGINEER PWK 2 1026 W Broadway Ave (Location) 1116 W Broadway (Nisil) _ Spolcane, WA 99260-0170 ~ ~ (5091477-360Q Fax (5091477-224~ ~ ~ "ENGINEER'S CONDITIONS OF APPROVAL" TR ZONE TO Spokane County Division of Pla ing FROM Dnrision of Engineedng & Roads ~ DATE August 15, 2002 PROJECT 6-2 & UR-3 5 TO B-3 BOULDER CREEK #3 FILE # ZE-0014-021VE-0014-02 TechnicaUReview Date (4811512002 @ 215) Planner TAMMY JONES Heanng Date @ Review Date SponsoNApplicant BOULDER CREEK INC Section Township Range 1 &25-44 The Spokane County Division of Engmeenng and Roads has reviewed the above referenced appiu;ation The following "Condihons of Approval" are submdted to the Spokane County Division of Planning for indusion in the "Findings of Fact, Condusions and OrdedDeasion" should the request be approved Prior to relesse of a building permit or use of properly as proposed 1 Access permits for approaches to the County Road System shall be obtamed from the County Engineer 2 Applicant shali submd for approvat by the Spokane County Engineer drainage and access plans 3 A Professional Engineer(P E), licensed in the State of Washmgton, shall submd storm drainage construction plans and a drainage report that confomn to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelines for Stormwater Management, and all applicable federai, state, and local regulations and laws that are in etfect at the time of the plan submittal or at the Ome of the development permit application(s) The final storm drainage plans and drainage report shall receive the County Engineer"s acceptance prior to release of any associated Grading, Buiiding, or Right-of-Way Permk 4 A parking plan and traffic cfrculation plan shall be submdted and approved by the Spokane County Engineer The design, location and arrangement of pariong stalis shall be in accordance with standard engineenng practices Pavmg or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles CC Applicant BOULOE.It CREER INC Enqineer/Surveyor Planner TANIINY JONE3 Paqe 2 Engineers Heasinq / Review / 08/15/2002 TR ZE-0014-02 5 The construction of the roadway improvements stated herein shall be acoomplished as approved by the Spokane County Engineer 6 No road improvements are required for Argonne Road because County Road Project 2853 has constructed these improvements 7 All requirsd improvements shall conform to the current State of Washington Standand Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutons pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless othenNise approved by the County Engineer 8 Roadway standards, typical roadway sections and drainage pian requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicabie to this proposal 9 No constnuction work is to be performed within the exisbng or proposed nght of way until a permit has been issued by the County Engmeer All work wdhm the public road nght of way is subjeCt to inspection and approval by the County Engineer 10 °The applicant is advised that there may exist utrldies either underground or overhead effecting the appiicant's property, including property to be dedicated or set aside future acquisibon Spokane County will assume no financial obligabon for adjustments or relocation reg.anding these utilfties °"The applicant should contact the applicable ublities regarding responsibiidy for adJustment or relocation oosts and to make arrangements for any necessary work " 11 If the requested zone change is approved, the Spokane County Engineer will issue a Concurrency Certificate under the Spokane County Comprehensive Plan for twenty-four (24) PM peak hour tnps for a 16.000 square foot ofifice building 12 This proposed zone change has been reviewed acxording to the site plan of record Any modifications to this sde plan of record which would result in changes to sde dramage and/or traffic impacts, shall require additional review by the County Engmeer At such time a revised site plan is submitted for review, the applicant shall submd detailed drainage and/or traffic infornation for review by the County Engineer to determme what traffic impacts, d any, that the development would have on surrounding infrastructure The applicant is advised that mdigation maybe required for off-sde improvements END ~ . SPOKANE REGIONAL HEALTH DISTRICT CONDITIONS a Sewage disposal method shall be as authonzed by the Director of Utilities, Spokane County b Water service shall be coordinated through the Duector of Utilrties, Spokane County c Water service shall be by an existing public water supply when approved by the Regional Eagineer (Spokane), State Department of Health d A pubhc sewer system will be made available for the project e Use of pnvate wells and water systerns is prolubited l ► . ~ To Tammy Jones (Division~of Pianning) CC Froen Jim Red (Division of Uulitles) Date Monday August 12, 2002 Subject ZE-0014-02 Stage Techntcal Review Phase Boulder Creek SSO! As per the Spokane County Zoning Code Phase One Development Regulatlons, a wet (live) sewer connec4ion to the anea-%inde Public Sewer System is to be constructed Sewer connectlon permit, is required Commerclal developments shall submd historical and or estlmated water usage prior to the issuance of the connection permit in order to establish sewer fees SS12A Appiicant shall submit expressly to Spokane County Division of UOlitles "under separate oover", only those pian sheets showing sewer plans and speciflcatlons for the public sewer oonnectlons and faGlibes for review and approval Commercial developments shail submd histoncal and or estimated water usage as part of the sewer ptan submittal UVSO1 Any water service for`this project shall be provided in accordance with the Coordinated Water Sysfiem Plan for Spokane County, as amended ~ DETERMINATION OF NONSIGNIFICANCE - "DNS" WAC 197-11-970 and Section 11.10.230(3) SPOKANE ENVIRONMENTAL ORDINANCE FILE NUMBER: ZE-14-02 DESCRIPTION OF PROPOSAL: Zone Reclassification from Urban Residential-3.5 (UR-3.5) and - Community Business (B-2) to Community Business (B-2) on approximately .62 acres for those uses allowed in the Community Business (B-2) zone. PARCEL NO.: 45184.0803 HEARING DATE AND TIME: September 25, 2002 at 10:30 a.m. APPLICANT: Joe Stoy, Modern Drafting Service, N. 1104 Perrine Rd., Spokane, WA 99206, 509/535- 3668 LOCATION OF PROPOSAL: Generally located west of and adjacent to Argonne Road and approximately 130 feet south of Alki Avenue, in the SE'/. of Section 18, Township 25 N., Range 44 EWM, Spokane County, Washington. LEAD AGENCY: SPOKANE COUNTY DIVISION OF PLANNING DETERMINATION: The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for at least 14 days from the date issued (below). Comments regarding t6is DNS must be submitted no later t6an 5:00 p.m., September 24, 2002, if they are intended to alter the DNS. All comments should be sent to the contact person listed below. RESPONSIBLE OFFICIAL: By: Tammy Jones, Associate Planner Spokane County Division of Planning - 1116 W. Broadway Ave. PWK-1 Spokane, WA 99260-0220 (5 ) 477-7225 DATE ISSUED: September 10, 2002 SIGNATURE: 0ONffViFNTS R,FGARDING IIVVIROTIlVENTAL UONCERNS ARE !VAT TI-E HEARING. APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the SPOKANE COUNTY DIVISION OF PLANNING, 1 st Floor, 1026 W. Broadway, Spokane, WA 99260. The appeal deadline is ten (10) calendar days after the signing of the decision to approve or disapprove the project. This appeal must be written and the appellant should be prepared to make specific factual objections. Contact the Division of Planning to assist you with the specifics for a SEPA appeal. This DNS was mailed to: 1. WA State Department of Ecology (Olympia) 2. Spokane County Division of Engineering, Transportation Engineering; Scb %ngelhard 3. Spokane County Division of Engineering, Development Services; John Hohm 4. Spokane County Division of Utilities; Jim Red 5. Spokane County Stormwater Utility; Brenda Sims 6. Spokane Regional Health District; Steve Holderby 7. Spokane County Division of Building and Code Enforcement, Ron Hand 8. Spokane County Air Pollution-Control Authority, Chuck Studer 9. Spokane County Fire Protection District No. 1 10. Hutchinson Water District No. 16 i OFFICE OF THE SPOK:ANE COUNTY ENGINEER PWK 2 1026 W Broadway Ave (Locarion) 1116 W Broadway (Mail) ~ Spokane WA 99260 0170 (509) 477 3lS00 Fa~c (509) 477 2243 "ENGINEER'S CONDITIONS OF APPROVAL" TR ZONE TO Spokane County Division of Plan ing FROM Division of Engineenng & Roads ~ August 15, 2002 64t- DATE PROJECT B-2 & UR-3 5 TO B-3 BOULDER CREEK #3 FILE # ZE-0014-02NE-0014-02 Technical/Review Date (08/15/2002 @ 2 15) Planner TAMMY JONES Hearing Date @ Review Date Sponsor/Applicant BOULDER CREEK INC Section Township Range 18-25-44 The Spokane County Division of Engineering and Roads has reviewed the above referenced application The followng "Condrtions of Approval" are submitted to the Spokane County Division of Planning for inclusion m the "Findings of Fact, Conciusions and Order/Decision" should the request be approved Prior to release of a buiiding permit or use of property as proposed 1 Access permits for approaches to the County Road System shall be obtained from the County Engineer 2 Applicant shall submit for approval by the Spokane County Engineer drainage and access plans 3 A Professional Engineer(P E), licensed in the State of Washington, shall submit storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelines for Stormwater Management, and all applicable federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final storm drainage pians and drainage report shall receive the County Engineer's acceptance prior to release of any associated Grading, Building, or Right-of-Way Permit 4 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles CC Applicant BOQLDER CREER INC Engineer/Surveyor Planner TAMMY JONES Page 2 Engineers Bearinq / Review / 08/15/2002 TR ZE-0014-02 5 The construction of the roadway improvements stated herein shali be accomplished as approved by the Spokane County Engineer 6 No road improvements are required for Argonne Road because County Road Project 2853 has constructed these improvements 7 Ail required improvements shall conform to the current State of Washington Standard Specifications for Road and Bndge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 8 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicable to this proposal 9 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 10 "The applicant is advised that there may exist utilities either underground or overhead effecting the applicant s property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities ""The applicant should contact the applicable utilities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary work " 11 If the requested zone change is approved, the Spokane County Engineer will issue a Concurrency Certificate under the Spokane County Comprehensive Plan for twenty-four (24) PM peak hour trips for a 16,000 square foot office building 12 This proposed zone change has been reviewed according to the site plan of record Any modifications to this site plan of record which would result in changes to site drainage and/or traffic impacts, shall require adddional review by the County Engineer At such time a revised site plan is submitted for review, the applicant shall submit detailed drainage and/or traffic information for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding infrastructure The applicant is advised that mitigation maybe required for off-site improvements END t A Spokane County Public Works Division of Engineering & Roads Certificate of Transportation Concurrency , Project Name Boulder Creek I I I File Number ZE-0014-02 Parcel Number(s) 34184 0803 Project Address 511 N Argonne . Specific Land-Use 16,000 square foot Office Building , Number of PM Peak Trips Reserved 24 County Intersections Affected Argonne Road and Valleyway / Argonne and Broadway Expiration Date August 15 2007 The Spokane County Division of Engineenng and Roads has reviewed the development described above and has determined that sufficient roadway capacity exists, or is programmed to exist with future road improvements on the County road system to accommodate the uses and densities shown This Certificate of Transportation Concurrency reserves the number of PM peak hour tnps indicated above and is issued only for the development as descnbed above It shall run with the land and is not transferable to other development projects or properties The Certificate of Transportation Concurrency is valid upon approval of the development permit/application through the expiration date indicated The owner or owner's authonzed agent shall apply to renew/extend the Certificate of Transportabon Concurrency prior to the expiration date Spokane County will not notify a property owner/agent of an expired or impending certificate expiration Any questions regarding transportation concurrency should be directed to the Transportation Engineenng Section at (509) 477-3600 , l Approval a e D i on of n ineenng 8~ Roa s Si ature Boulder Creek I , Attn Dennis Raugust, 19012 Nevada Road, Copies to Spangle, WA 99031-9741 r ' • Kimball, Sllwdy, 1 From Nyberg Gary Sent Wednesday August 07- 2002 9 57 AM To Baidwin Greg Cc Hohman John Kimball Sandy Subject ZE-13-02 & ZE--02NE-14-02 Development Services considers all these associated land actions to be technically complete regarding stormwater Stendard Please include the attached standard condition on the staff report for two zone changes CondiNo&doc 1 STANDAR-,Lo CONDITION OF) PROVAL t FOR ZONE CHANGE NO(S). ZE-13-02 & VE-14-02 Prepared By Gary Nyberg, Dev Srvcs Date 08/07/02 1 A Professional Engineer(P E), licensed in the State of Washington, shall submit road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelmes for Stormwater Management, and all applicable federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final road and storm drainage plans and drainage report shall receive the County Engineer's acceptance prior to release of any associated Grading, Building, or Right-of-Way Permit S P O K A N E C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT DMSION OF PLANNING 11iii i:`.~L V.'`~EE~ i I`•,p1, 1)[;;;I, -f if: NIE1111()1RANDUIN1 TO: Division of Engineering and Roads - Transportation Engineering; Scott Engelhard, c/o Sandy Kimball Division of Engineering and Roads- Development Services; John Hohman Division of Utilities - Information Management; Jim Red Division of Utilities - Stormwater Utility; Brenda Sims Spokane Regional Health District; Steve Holderby Division of Building & Code Enforcement; Jeff Fony, Ron Hand Spokane County Air Pollution Control Authority, Chuck Studer Spokane County Fire Protection District No. 1 Hutchinson Water District No. 16 Office of Historic Preservation; Teresa Brum FROM: Tainmy Jones, Planner ` DATE: August 1, 2002 SUBJECT: ZE-14-02/VE-14-02 IRTAT 00(~u, 2.~15 PMG Public Works Building lst Floor Conference Roo fn Please review the above application and use the attached TECHNICAL REVIEw MEETING FORM for your comments. The Division of Planning encourages you to attend this meeting. The sponsor and representative have also been invited to attend this meeting. If you cannot attend, please forward three (3) copies of your review comments on the attached form to me for the meeting. The attached TECHNICAI, itEVIEW FoRMS will be given to the sponsor at the meeting and included in the Division of Planning file. Thanks for your cooperation. If you have any questions about the application, please contact me at 477-7200. NOTE: The Division of Planning is circulating the SEPA Checklist for comments. T6is will be the only time you will be able to comment regarding the SEPA Checklist for this project. Attachments: Technical Review Form, ProJ'ect APPlication, Site Plan, VicinitY MaP, SEPA Checklist I Copy without enclosures: Boulder Creek, Inc., 19012 Nevada Rd., Spangle, WA 99031 Modern Drafting Service, Joe Stoy, N. 1104 Perrine Rd., Spokane, WA 99206 MAILSTOP PWK-1 • 1116 W. BROADWAY AVENUE • SPOKANE, WASHINGTON 99260-0220 PHONE: (509) 477-7200 • FAX: (509) 477-2243 9 TDD: (509) 477-7133 Spokane County Drmion of Planning Technical Review Meehng Meeting Date and Tune August 15, 2002 @ 2 15 p m Project File No ZE-14-01/VE-14-02 Project Location Generally located west of and adjacent to Argonne Road and approximately 130 feet south of A11a Avenue, ui the SE '/a of Secrion 18, Township 25 N, Range 44 EWM, Spokane County, Washington Comprehensive Plan Mixed Use ProJect Descnption Zone Reclassificanon Urban Residential-3 5(UR-3 5) and Commuruty Business (B-2) to Commwuty Business (B-2) on approxunately 62 acres for those uses allowed in the Commuiuty Business (B-2) zone Parcel No(s) 45184 0803 Apphcant Boulder Creek, Inc 19012 Nevada Rd Spangle, WA 99031 Agent Modern Draftmg Sernce c% Joe Stoy N 1104 Pernne Rd Spokane, WA 99206 (509) 535-3668 Project Planner Tammy Jones ~ 3 ~ O 44 ~ SPOKANE COUNTY ~ DIVISION OF PLANNING 25 ? ZONE RECLASSIFICATION APPLICATION ~ v PART I APPlicant 1?'AL*::Pe12 e-AO-miFsle.. 1 viG Mailing Address tel012 61=-V a.v2 A~. CRj► ~o.►.~t.~~ State J&~p► Zip Code 0iqo3i- q141 Phone (Work) (Home) Fax Legal Owner ~oc.+ l r,~i2 G4~1.f=1~ t~.s e-- MailingAddress,~c~IZ ~,Y~A ~n~•~ Clty -:5~PA QcnLA State J&[4 Zip Code di OL231 •4LI ~ Phone (VUortc) (Home) Fax Agent, if different from applicant,~~p~IL►,.~ 'C,AIZTI M G, Mailing Address J1 o 1104- 94eWEV.1020AhkV City ~1~. aN ~ State ~A Zip Code ~ Phone -42,-4- 424l (VNork) lbc a n P-I (Home) Fax 535-~ Project/proposal site area (acres or sq ft.) .:5 4-11 1c 3m' Adjaoent area owned or controlled (acres or sq ft.) 3~, 111~ Assessor's parcel #(s) of project/proposal ~I 84 ~ Oboo 3 Assessors parcel #(s)of adjacent area owned or controlled 1~ . a►12 r., ~.o~ Street addr+ess of proposal 0 11 Exisdng zone ctassffication(s) and date establlshed _Wor'.rr I95o' E!P- 2W83T 1G&lli 3se2 Existlng use of pcoperty VAc..~~►~- ~-r ~ Proposed zoning *.5 • ~ Comprehensive pian category U :5 a- School distdct kJwffgZ~/~ 3to3 Water purveyor W .0 Isp Fire district ~ 0 Proposed use of property' Stngle famity dwetlings Duplexes Muitifamlly dwellin8s Manufactured homes Business P4 Industrial Mixed use 3 Other ( ) - Descrlbe List prevlous plannin8 division actione lnvoiving thls property _~oQP- TQ 24 t2 L , ! . ZE~ 14..02 . ~ r - ~ ZONE RECLASSIFICATION APPLICATION PnGrz 2 of 6 ~ t Address and Locaton of proposal em Section Township Range Name of pubitclprivate road(s) providing access w um mt-! U--~ ~,t~K.I ✓~'~K~ Width of property frondn9 on public/private road q d" Does the proposal have accessito an artenal or planned arteriai? Yes K No Name(s) of arteriai roads Legal descripdon of propetty for each zone reclassificaton proposed , ~ s o w y .-r _1.i -gn a AYXa r-zir oo ~ • ~'1 T"PJ 0" 2~ ~ u ol 45 Exisbng aon;(s) -25Z u c 3. to proposed zone(s) ~ ~ lor the following described property (Attach legal descriptlon stamped by land su(veyor or provide belaw ) _ . !53~_ A 5 An.aahee. '::-M If you do not hold tltle bo the property, what is your interest tn it? 4v+ e51.3"t' Ico w.. ~.1 ~.1~ • v , . sr VUhst are the chenged conditons of the area which you feel make this proposal watranted? , /au "'i'1-~• C=WKJWL TI.-I rQtUBLa 9210 4 ~ L ~O > ~i e ZONE RECLASSIFICATIAN APPLICATION PAOe 3 ot 6 ,I T What tactors support tlhe zone reclassificabon? Consistency with the Comprehensive Plan Ida -Qfizo Fa►'`~ llb e.- Ai&:m T "t2^S 1- 1 h4 ►XeV • Fe2 ~~A' pt rL~-~l,,~ 7~.~ r~ 1Jo~-rt~ ~~'~1-~ A~ ~.•vt~A IT~ Z mK. pZP• ~y tf2ar,pjfjJ=T' 'r;... 'illrn LcclP--s~ I -s 7a1JEY2 ug2ob.~ ~Zou~ krA,r l AT=992vW Compiiance with purpose and intent of zoning A a c. Butl.viUG, is aN Ald.*awcV usE IQ ,A► ~ ~ ygpi,,jSp Descnpflon of changed conditions of the anea that you feel make this proposai warranbed ~ Zt~''1 UG ~ ~s (15 C.A►•Jr7 Wc..lc. A1u102 4or1tJ0 ~W1~..~{G G1~t f►1.1G~r ~ A~~__ Q,1?.t? w~ t~t22% 2 ~C./1►'~~ ~2r~i► r.~~ r~ a~~. ~ T~! ~ y 4 What impact wili the proposed zone reclassification have on the adjaoent propertles? 4~t p7a i~ o~ -[Q _].~~.1T T F S f ~~o►~s IL-~r vtt~.lr.~ =2 Igtr W G R g t e.AZMM. 1+,M f2ttt:) '9:? 6E..~T.~ "5 u►jr~VEt2. _ ~ ~ -Tt ~ I~I~L ~~o ~ l S ZAtJ I~h t32 ' What measures do you propose to miggate your proposal's impaat on surnounding land use? ~ 1/I~s~•5► . h. ~ ~ 1.c~ ~ I I . 1 , PART II ~ FIRE MARSHALL / F{RE DISTRICT RCW 36 TO B requires earty ooordinaUon end infomnetlon A TH{S PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT NO , O B WHAT IMPROVEMENTS NEED TO 8E MADE TO MEET THE DtSTRICTS FIRE PROTECTION r~ °~'r ~`~-s~►''°`''~~i REQUIREMENTS? fro 0 ri6- &e no-~PA - C O SEE ATTACHED LETTER OATED ` D REQUIRED FiRE FLOW (gallons per mtnute) ! hev vlewed t =and heve advlsed the epplkant o the Flre D18bdct hoqulrerrtentL Ft'vo, tlok, ' 7-46 -0 2-- SIGNATURE TITLE OATE , a Q,~~ ` i 9 J ZONE RECL.ASSIFICATION APPLICATION PAGe 4 of 5 ' - ~ . ~ WAYER PURVEYOR RCW 36 70 B requires early ooordi aUon end informatl A THIS PROPOSAL IS WITHIN WATER DISTRICT ~B SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW HAVE BEEN MADE AS FOLLOWS A WATER SYSTEIIA PLAN MUST BE PREPARED YES NO REQUIREMENTS l. &,t, C SEE ATTACHED LETTER DATED I h ve rev/ wed e proposal and have advjsed the applfcant otthe Dlsblct requlrements e~ 1-ji -oL SYW SIGNATURE TITLE DATE SPOKANE REGIONAL HEALTH DISYitICT RCW 36 70 8 requires early ooor+dinedon and infonnatlon A PRELIMINARY DISCUSSIOfV HAS TAKEN PLACE, A COIVIPLETE APPLICATION IVIUST ~ ~ INCLUDE. ~ B SEE ATTACHED LETTER DATED o Aftr a prellminary revfew of the proposal, I heve advlsed the applicanr of some bf the Spokane Reglona/ Hea/th requlrements A caomplete and detaAed revlew wfil be provided after tha eppllcation ls submftted, whkh wlll rmlt !n a complete llst of requ/rements and vonditfons mgard/ng Hea/tr p s/ons fbr the ulev- -Jl,,f SIGPIATURE TITLE DATE - ~ SEWER PURVEYOR - (City of Spokane or Liberty Lake) RCW 36 70 8 requfres earfy coordination and infonnaUon A PRELI USSION HA `T E. A OMPLETE APPLICA'TION MUST ~ INCLUDE ~ ~ B ( j SEE ATTAC R DATED After e pr~l! lewr ot propos ve edvfs a Ilca some of the Sew+er re qutre A n ed ravlew il p ded eRer the spplJcedon Is 8ubmltted, whlch wlll result !n a ulrements and oond on8 re8►erdlng Sewer provlslons !or dhe propasal is 816NATURE TITLE y ' DATE le ~ ~k~ ~e ~ a ~ f P ZONE RECLASSIFIGATION APPLICATION PAGe 5 of 5 ESiAJ 51 t ~ SURVEYOR VERIFICATION ~ x I, the undersigned, a licensed land surveyor have completed the mfomnation requested for e map and written legal descripb ALu►tlo- . Signed Date EXPitiE3 711710 3 ~ Address s - Phone 97.9 " l 3 Z Z. Ci1y State ~ Zip 992.1 L PART III SIONATURE OF PROPER11f OWNERS OR LETTER OF AUTHORIZATION I, the underslgned, swear or affirm under penalty of perjury that the above responses are mede truthfully and to the best of my knowtedge I turther swear or afiimn that I am the ovmer of record of the area proposed Uor the previously idenbfied land use acUon, or, if not the owner attached her+ewith is written permission from the owner authorizing my acbons on his/her behalf Signed a y a f~ Date o72 _;t 001 Address I 4 a13- ~ e.rado Phone S4 q' a-VS ~-?,r 76 cfty 9'C162 I sWe 1Je.. z,p gQo~/ -14 aoo~ Signature of Appli nt or Representative Date Statie of Washingbon ) ) ss County of Spokane ) ~ Stgned and swom or affirmed betore me on this Q.ar'(Q day of 2009; ~ by N ~ Notary Seal A Notaly-~ublic in an e State of Washington residing i Cl~ ~ 0w~s =rcF y. aty~ ~ N~_~ My appointment expires i " ftBt1C ~ ~N ~ ~p~ w~PART IV ~l►rfiil TO BE COMPLETED BY THE ON1310N OF PLANNINO Date submitted File number Date aoceptied By Tatal fees Reaipt number G ff thfs request is grarrtterl, will the subject property b+a more onvironmentally sensfdve, ene onsenring or wil[ it promote the use of an hjstoric property? ~ r No E Explain z2Ag-, qt&I]p-c.-r ~.]o.j P~, regrjntTi c-. -t ' t..►~"1►~..Jt~ ~ ~ ~c 1J i H If this variance is granted, wdl the braader pubtic need or mterest be served? ~'es No Explain I-r tJov vA2 orua-•A r,-rE, w.., cc•r, 1 ~v'~ ,~.ICx~►',~ i 1MII this vanance be moonsistent wdh the purpose of the zonmg which applies to tfie subject ProPerty? Yes DO Explain J Will approval of this varianoe gra►nt to the subject property the prNileges of a diffenent zone ctassific:abon (1n order words would this be a°de facto° zone change)? Yes No Explain K Will this vanance be mconsistent wrth the general purpose and intent of the Comprehensrve Plan? Yes ( I~ Explain L Is this vanance reqwred far a reasonable economrc retum from tlhe subject praperty or is the existing structure too smait? es No Explain Senv-1 t- F L.►.l~ ~+.J^ a l~ ~✓'"',r-} ~.1 ...Cx.1 r Vytj, ~,73r ) Qr- , ~3+t ~!°:~i~/f'.r ~ !~r. ~ ~.t I ►..a ~+i1 M Did the pracacaf difficuk which caused you to apply far this varianee exist befare you owned the subject property? Jes~ No Explain ~w 't'L~-- c.~t.. te..vr..~:...3'~" Gc~~a,►,~ G, ~►~.r~.. ,r ti:r4nn~ N If approved, would this variance affect tand use density reAulatrons which exist ta protect the RathdrumlSpakane Aquifer? yes O Explain Attach an addifional page(s) if needed You are invited to present photographs, dlagrams, maps, charts video tapes, e#c in suppart of this applicabon No such adddional matenai Is required and in any case it must be BRIEF and descdptnre of issues whlch need to be cansidered in relaton to this requested variance If you have quesbons about the procedure to be followed feel free to oontact the Spokane County Division of Plannmg at 477-7200 Varlance Burden af Proof Rev 2 99 Page 2 of 2 ~ ~ t~ CERTIFICATE OF BEWER AVAILABILI1'1r, Thls 1bm► !s 9&ly to be submltted ss an ettachment ~o a fluNy,c:om2[derl aQp!lr~d tiQ Z` Name ot Sewer Utlltty SPoKAIVF CERTIFICATiON o~ JUL 25 ~ Project Name ~aL*Ve-w- 4L 3 ~~CPl~e Par+cel Numbers 4SP.1 FS4 ~ oP-.)07, ~ General Project Descripffon _gfow K1= The above named Public Sewer System Is capabie of and will supply sewer service to this referenced projed or subdivision 1 Is sewer currentiy available,, with servlce connectlons provided as required, to senre the proposed development (If yes, go to signature block, If no, go to 2a) gYei ❑ No 2a Is the s[te within the Spokane County Sewer sbc-yeac Sewer Capttal Improvernent Program? (If no, go to 3) ~ Yes ❑ No ~ 1 2b Wit{ the devetoper design, fund, construct and provide flnancial surety tbr the necessary systems to provide Dryline Sewer andlor Double Plumbing Dry Side Sewers ss r+equired? ~(If no, go to 3) ❑ Yes ❑ No ~ 3 Wili the developer design, fund, construct and provide financial surety tor the necessery systens to extend sewer service to the site and provlde service connecdons as required? ❑ Yes ❑ No Thts Certificate of Sewer Availability Is non-transierable ta other projects and shall be vatld as lone as the reterenced project rernains active and Is not modifled utT« t'Tt~.5 Vlv %i I0AI CetUfied by V G N,5 tjAST Wnt N 71ae C~ ~ Is~v2 r $IAlleha~ G9t9 CONCURRENCY DETERMINATION V If yes to queslon 1, or questlon 2b, or questlon 3 above, concurrency Is satlsfled for sewer Otherwise, refer applicant to the Divtsion of Utllities ❑ This development Is exempt from ;oncurrency for sewer senrlce O Thts development does ) meet the concurrency requirements for sewer eervice one ? ~Jr' 02 ne ep~sentetnre e ~ , • ~ ZE~14i02 ~ , Cert ot Sewer Avallabqity doc ti 01109/02 . WUUMM4PLP 6 ....-.2TIFICATE OF WATER AVAILAL0,61 .'Y Project DescApfAon r This Section to be Completed by Appllcant # N`~~I Project Neme ~u l.r~ ~ i2 G4~~ 3 Parcel Number(s) General Descriptlon of Project. gk.,l.h u~~,1 "al Water requested Number of Residential Taps O , or Commercial Flow gpm Fire Flow Requirements This 8ectfon by Spokane County Building and Code Entomement Name of Water Purveyor ~ 1,~~~~LtA5vx Sv'✓' of5v Fire Fiow Required gpm, at psi, for minutes Certification By Purveyor c f Water System Name -1 tXQ~kukqK lfv WA DOH ID#_jyj 001' Y No 1 p The water system has a current Washington Department of Health Operafing pennft, al[owing tlhe ~ number of new taps or water requested ~ 2 O The proposed project Is oonsistent with the water purveyor's DOH approved water eystem plan 3~ p The off site source, storage and transmission infrastructure of the water purveyor Is sufflctent to ~ provide the servtce requifei for the proposed project % ~ 4 0 0 IKk if 3 Is no, has flnancial security been provided to insure infrastructureimprovements are oompleted? (Check Not Appllcab/e if 3 is yes ) S 5 O o The water system is willing and able to provide water, in conformance bo minimum levels of service, as requested at thls tlme if water system Is unable, or unwilling to supply water at this dme, please descrlbe why Thts Cerdflcate of Water Availability Js non-usnsferable to other projects, (For ~levant lawe, eee RCW _ y 68 i'', 36 70A and 18 ZT ) Further.~rnew~ertificate ot Wate~'Availabilit~s~'hali bi'required if 1) a project modiflcation 7Pdnt, ul tn g ater ter demand, or 2) a project extenston ot time is requested - Certi~ed by SU&IK e tr~e v~ i~, ~~02 lg ature t4s~ Date CONCURRENCY DETERMINATION O This Section to be Completed by Spokane County v If box 1, 2and 6 are checked yes, and 3 or 4 Is checked yes and all other infomnatlon Is complete and the weter purveyor has signed the above Certificefe of Water Availability, concurrency Is satisfled for water Otherwise, refer applicant to the Division of Udlities s Yes No 0 O ThPs development Is exempt from concurrency for water serv ~ 14'~02 0 O This development meets the concurrency requirements for grvice ~ I SPakene Couno► Reprmntatlire 5/pnatuna Date ~ i Cert ot Weter Avetlabtlity doc 04/03102 4 OAA %w• I ~ _ .N. r.•..~i". ,w,., _~y, i;' ,•Ax ~M1 I ~ , pP~ S 1 •;~rr':y-G~~: PItn:.. , 4 } '1~ •~~C f~ 4' :T~1~~J~ ~ k 5.~~• 1~"~'QI ~y , t'Y 's'Y , fx~.t y,~+ 4 .a t: t f'~ a: rx Yss,~ aa"a t nrj d, ~ ~ 1 y • ;w. ,'j. , r. ..Y. + i..i._4'.i i n -7 'r ) ( 4 .~1.>.iQd~ . :.1. .]M1~. .v~Sf : 1N-..•3?.W'~3.~ . f1~• t Wfl T ^ COUIS T~f~) DIVISION '/~,1G ~ Y y~ w 1 `/Jl~►L >i W 1 1 k~,~i~' S y'~ {~~~3~'~{'~it tt ~~fi(} 7'i. ~ .jJ~ •.E~' lr~~i.~±'l1"S{1.s iF4G1~ f PROPERTY OWNER INFORMATION ~ JUL 25 2W2 ♦ Property Owner(s): 1E!;;-L-.;,u l.►~~ r2 <fA~~ Ie, I U~, ~ CURRENTpLAM Street Address: I ~I o 12 City: L~A 1J 4~ State: klp► Zip Code: 9 • 1 q14.1 • Phone: (Home) (Work) Fax: APPLICANT/AGENT INFO ATION ` ♦ ApplicanUAgent: o -T A Street Address: I O 4 , . City: State: ~ Zip Code: (o Phone: (Home)j24L-412,42 (Work) a Fax: T ~ REQUESTED ACTIONS(S) (Indicate appropriate action): O Conditional Use Permit ❑ Expansion of a Nonconforming Use ~ Variance(s) ~ Other (list): _7otJr~ eJ4A _ PROJECT INFORMATION . • Existing use of property: I cPa' ui, c,; • Describe proposed use of the property, notina chanqe from `existinq use': 4::214AQG~.a U K • '.S , 5, ~'►~e.c'~ p' ` ~ , • If a variance application, state the Code standard and describe the variance souqht in comoarable terms (i.e., 50 feet from centerline verses required 65 feet): O ?-MPOLt c.~a V_~Ia ►+vL LO ' TY " a r., ✓J -ar L o►J W es ~ LS ' T-~ 61 I " • If a conditional use permit application, does proposal meet all standards? Y N If rrot, has one or more variances been requested: Y N • If hom~ndustry, has consultatlon occurred with the Divlsion of Planning r~egarding constr tion of building for intended use? Y N • . ; Eq~ 14--02 ~ . ~ APPLICATIONB FOR PUBUC H'c.. .4G ITEMS PAGE Z Of 3 C_ UP. VarlenceT Non-contorming Uses ' • Size of the subject property qp v -Jgp'- ZI.anoO Parcel No (s) 4Si 84 o030 3 • CuRent zonmg of property Y-W~ & urc. a ~ • Street address of property (if known) 1.n ,wy-r~~ • Legal descnption of property (include easement, d appiicabie) LL~~,: , P. 3},~1 2 ' S 1~o a~ ~ Vz • Source of le,al N 0e-1 mr=u-r ` I • Total amount of adjoining land controlled by this owner, sponsor and/or agent ra2.~.4$3 S~F, • What interest does applicant hold m the property -Ql~ ~ ~""Y NOTARY ~ State of Washmgton) ~ SS County of Spokane ) I swear, under penalty of pegury, that (1) I am the owner of record or authonzed agent for the proposed site, (2) if not the owner, written permission from owner authorizing my actions on his/her behalf is attached, and (3) all of the above responses and those on suppQrttng documen are made truthfully and to the best of my k ledg ~Ai~~rli~ CA4 ~'S`~10> st~'~ Signed ~ Date ,f~~'~ ~ ~0 rq~►y . ~ i ~ . . ' No Public in for the Sate of Washmgton, residing at • PUBmG ,~Q _ ,T t My appointment expires avt 1 k~2~.~ . :L a ~~i~~'.0~ • BURDEN t3t)oF FoRM(s) (by applicant) It is necessaryffor the applicant or his/tier representative to establish the reasons why the requesttd action should be approved and to literally put forth the basic argument in favor of approving the application Accordingly, you should have been given a form for your requested actron (variance, conditional use, etc ) designed to help you present your case in a way which addresses the cntena which the Hearmg Examiner must consider Please complete the form and retum with your application ~ o , FOR STAFF USE ONLY o Section Township Range Violation/Enforcement Y N Lot, legal & add'I ownership checked by Person doing preapp conf 4th'6r/previous Division of Planning actions involving this property , Certificate of Exemption No Application No HeariroDate Varfoua site plan dlmenslona check by . ~ r APPLlCATIONS FOR PUBUC HEARING ITEMS PAGE 3 of 3 CUPLV+arlanceT Non-contormtnp Uses S1GN-OFF BY AGENCIE3 The appticant must visit each agency whose number is circled below 1 SPOKANE REGIONAL HEALTH DISTRICT a Proposed method of water supply ,,,J~I~►-~c„ & L-3 I..P[,amip = ~ b Proposed method of sewage disposal i5n►jrj-b~~ A preliminary consultation has been held to discuss the proposai The appiicant has been informed of require ts and standa s We request consultabon with the Division of Planning Y N ~ w 10 ~ / . 9- Sfgnature Date 2 WATER PURVEYOR t j 11AM a Proposed method of water suppty b The proposal is/is not located withm the boundary of our future service area c The proposal is/is not located within the boundary of our current district h 3 d We are/are not able to serve s site with adequate water eSatisfac ory a j gemen have ave not been made to serve this proposal Sign,at re Date • a~ - 3 SEWAGE DISPOSAL PURVEYOR o - a Proposed method of water s pply b Proposed method of se is osal A preliminary consul eld to disc ropo e li n een informed of requirements an n a d , SiBnature Dat~ 4 FIRE DISTRICT / FIRE MARSHALL d a Proposecf is within Fire Protection District b Adequate anangement have/fiave not been made to meet our needs in providing for an adequate water system and facititles for flre protecUon purposes c Recommended fire flow c.UI& , or unable to catculate now because use ts nat O deflnitive and will be determined at uildmg permrt applica~o time d Requirements include fI~r , ~ ~.t. . ~ , cra,,~ Fe r~ Fire Dletrict # Date App tcr Pubilc Hearinp Items4g-10-98 ~ / ~ ~ VARIANCE BUROEN OF PROOF FORM Name File Number A variance" is the means by which an adJustment is made in the applicabon of the specific regulations of the zoning classificabon for a particular (the subject) piece of property This property because of special circumstances applicable to it is depnved of pnvdeges commoniy enJoyed by other properbes m the vicinity and in a similar zone classificabon This adJustment remedies the difference in pnvileges A vanance shail not authonze an otherwise prohibded use The following quesbons will help to determine the outcome of your request Your request requires accurate and complete responses First circle erther the yes" or the no° answer(s) following the questions below as they appiy to your situation and then explain as needed (in the space provided) to make your urnque situation ciear Certain phrases from the Zonrng Code of Spokane County sechon on variances are included m these questons and are underlmed for convernence A Will this vanance permit a use which is otherwise prohibited m the zone? Yes No Explam B Are the special circumstances (lot size shape topography location access surroundings etc ) which apply to the subject property and which may not appiy to other properbes in the vicinity? Yes Qo Explain C Is the subject property depnved of pnvdeqes commonlX enLqyed by other QUo erties m the vicinity and m a similar zone classifcabon? es No Explain N~T ~►L.1~ ~'T"'F"e~• ~ . , D Wiil this variance be harmful to the public welfare or to other properties m the vicmitV and a similar zone classification? Yes CE) Explatn E Are there other similar situations in the vicmitY m a similar zone classification? es No Are they permitted uses? (Yes~) No Are they `nonconformmQ uses? es No Expiain F Couid the subject property be put to a reasonabie and permitted use by you or another person without the requested vanance? Yes Explain ~t~l M~2 t~al~ ~ 62p'T' ALL12W } t2 LsQ ~ oV VE~. 14.~ 02 *poem • ~+e ~ ~ pm ENV~N hM--:E~ P -7A ~ ~ Aj ~ SJ°Ofti~N1Y oa JUL 25 ft ~ 9 ~ SPOKANE ENV'IR,O'NNiEN'TAL OR,DIN'ANCE ~ SECTIOIV 11 10 230 ~ am Z E 4 ~ amuk 2 , ~ ei,•. - ` t 1 •t r SEPA ENVIROrTMENTAL GHECKLIST WAC 197-11-960 Spokane Environmental Orduiance Section 11 10 230(1) PURPOSE OF CHECKLIST The State Environmental Policy Act (SEPA), chapter 43 21 C RCW, requires all governmental agencies to consider the environmental irnpaccs of a proposal before making decisions An environmental unpact statement (EIS) must be prepared for all proposals with probable sigruficant adverse unpacts on the quality of the environ,ment The purpose of thls checklist is to provide informauon to help you and the agency identify unpact from your proposal (and to reduce or avoid unpacu from the proposal, if it can be done) and to help the agency decide whether an EIS is required I~YSTR UCTIONS FOR APPLICAaVTS This environmental checkbst asks you to describe some basic information about your proposal Governmental agencies use t}us checkLst to determuie whecher the eavironmental unpact,s or your proposal are significant, requiruig preparation of an EIS Answer the questions bnefly, with the most ' precL.se information k.nown, or give the best description you can You must answer each quesuon accurately and carefully, to the best of your kaowledge In most cases, you should be able to answer the quesuons from your own observauons or pro)ect plans without the need to hu-e eYperrs If you really do not know the answer, or if a question does not apply to your proposal, wnte "do not know" or "does not apply" Complete answers to the quesuons now may avoid unnecessary delays later Some questions ask about governmentau regulations, such as zoning, snoreline, and landmark designations Ans'% er these quesLior if you can If you have probleris, une gove-nmenta": ageacies can assist you The checklist quescions apply to a11 pacLS of your proposal even if you plan to do them ove- a period of ume or on dzfferent parcels of land Attach any addiuonal information that will help describe your proposal or ics environmental effeccs The agency to which you subrrut this checklist may ask you to eYpl3un your answers or provide additional information reasonably related to deternuning if the•e may be significant adverse unpact USE OF CHECKLIST FOR NON-PRD~rECT PROAOSALS ~ Complete this checklist for noxi project proposals, even though questions may be ansae•ed "does not apply IV -kDDITIOv, complete the SUi'PLENiENTAL SHFE'T FOR NO\ PROJECT ACTIO'\S (pan D) For non project acuons, the references in the, clief-klist to the %N ords pro)ect," "applicant,` and 'property or site" should be read as "proposal, proposer and affected geographic area," respectively ~ Spol.ane En% i-onrr+~^ a' Ordinance Checklist Pseza 3 of 31 ~a ~!r i 1 0~ a ► FILE/PROJECT NO A BACKGR4UND 1 Name of proposed pro)ect, if appLcable 2 Name of applicant r~-y~~a~ , 3 Address and phone number of apphcant and contact person 2 J~, kV,ar~ Vlc► 110-.M 1741 t A e~T - , 4 Date checklisc prepared 5 Agency requestizg checl.lis-, , 6 Proposed tirtung or schedule (Lncluding phasing, if applicable) l~oN~'t?~uc.-~ o►,,_, ~~I ~ . ►~4~ °iZ' ~ . i ~ Spokane Envtronmencal Ordir~nce Checklisc Page 3 of 21 41e. • i A BACKGROUND (toncinued) 7 a Do you have any plans for future addiuons, eYpansion, or further acuvity related to or connected with tEus proposal) If yes, explaun ~ s~ . T~ u s!.►~J. ~ . K o. i~ ~u i 1,r~ i i F~ b Do you own or have options on land nearby or adjacenc to chis proposal) If yes, eYplaui ~ ~'LO 8 List any environmental information you know about Lhat has been prepared, or will be prepared, directly related to this proposal ~ ~G ~ 5 ~t~ DI'L~ L2@Yl - ~r IrT ~oK.. ~~►~r Gi~-~ IL < r'5uI l.A-21" G, 1 ~ -2- 9 Do you know,% hether appLcations are pending for governmental approvals of other proposals dueczly affecting the property covered by your proposal) If yes, eYplain ~ 10 List any government approvals or pe-mits that will be needed for your proposal, if known P-..-Pu % l.✓j iV.J~ ~ . Spokane Environmentzl Ord,rz-ice Checkl,sc Page 4 of 31 ~ ~a 41.. r A BACKGROLJND (conunued) 11 Give a bnef, complete descnpuon of your proposal, includtng the proposed uses and the size of the pro)ect and site There are several questions later in this checklist thac ask you to descnbe certun aspects of your proposal You do not need to repeat those ansaen on this page 2 - !T~~ rr r, . i ' ,V?►~ ► 1 Jl tbO ~~~w.~ c . c~r ► `-i~'; l.~ ~,.`r r ~ ~ ~ , ~ rz.1 c.~_~1c _ ~ r, 12 Location of the proposal Give sufficient unformation for a person to understand the precise location of your proposed pro)ecc, including a street address, if any, and section, township and range, if jtnown If a proposal would occur over a range of area, provide the range or boundaries of the site(s) Provide a Iegal descnptioa, sxte plan, vicinity map, and topographic map, if reasonably avadable Wlule you should subnut anp plans ` required by the agency, you are not reqwred to duvlicate maps or decazled plans subnutted v►-nh any permit apphcaaon related to this checklist "C 's' 1 ~ ~~O ~.a.-t ~ r7 A-r ~ t # 1, ~ ~ ~ ~t ~i 1 t~_.e~✓.1 14t c..~ 1 'S ~=1 Pm Ju s-r NoK.T ""M6 ~ !~t 13't" 1100 6-1 1~ ~ l.~ ~ ► J ' +K ~r- = v~y ~ G~ ~ 13 Does the proposed action Le within the Aquifer Sensitive Area (ASA)) The General Sewe- Se-vlce Area3 The Prionty SeNNer Servlce Area) The City oE Spol.ane3 (See Spokane County s ASA Overla.% zone tltlas for boundanes) T~iq: A ~ Y T ~s A1~En► ~r ~ ~ ~ . Spokane Envtronmerail P-di--..%c CliLLklist P..Qe 5 nf I . ~l e Evaluation For Agency Use Only TO BE COMPLETED BY APPLICANT , B ENVIRONMENTAL ELE.tiIENI'S 1 EARTH a General descripcion of the site (circle one flat rolhng hilly, steep slopes, mountainous, other b What is the sceepest slope on che site (approximate percent slope)~ ~1'A . , c Whac general types of soils are found on the site (for eYample, clay, sand, gravel, peat, muckP If you know the classificauon of agriculturaJ solls, specify them and note any prune farmland d Are there surface indicaLions or hiscory of unstable sods in che immediate vicuztry) If so, descnbe ~ e Describe the purpose, tvpe and approwmate quant1Lles of any filling or grac3mc, proposed Indicate source of fill - f Could erosion occur as a result of clearina, construction, or us0 If so, generally ~ describe ~ Spol.ane Env►ronmertzl Ordin,.nce Checktis Pa-e 6 of e,%.. r ~ Evaluation For Agency Use Only B ENVIRONMEN'I'AI, Fi _F,yMiN'j'S (Condaued) g About what percent of the site wlll be covered wlth unpervious surfaces after pro)ect construction (for example, asphalt or builchngs)l . , h Proposed measures to reduce or control erosion or other impaccs to the earth, if any f c . 2 AIR a What rype of emissions to the aur would result from the proposal (i e, dust, automobile, odors, industrial, wood smoke) dunng construction and when the pro)ect is completed) I any, generally descnbe and give appro~umate quantities, if known ~ - b Are there any off-site sources of em.issions or odor chat may affect your propbsaV If so, generally describe c Proposed measures to reduce or control enussions or other impacu to air, if any Q F ~ ~ )pokane Environmentz! Ordina-ce Checklisc ,42, Page 7 oi 31 eq~.. ~ Evaluation For A$ency Use Only B ENVIRONMENTAL ELF.1biF.i'I'S (Continued) 3 WATER a Surface 1) Is there any surface -water body on or in the immediaLe vlcinity of the site (including yenr round and seasonal streams, saltwater, lakes, ponds, wetlands)) If yes, describe type and provide names If appropnate, state what stream or river it flows into 2) WLll the project require any work over, in, or adjacent to (w ithin 200 feet) the descnbed waters) If yes, please descnbe and attach available plans WO-r A r:21Q 1[,a t!, 3) Estunate the amount of fill and dredge matenal that would be placed ui or removed from surface waLer or wetlands and indicate the area of the site that would be affected Indicate the source of fill material 4) VUlll the proposal require surface water withdrawals or diversions) Gi% e a genera] description, purpose, and appro-umate quantiaes if known ~ T 1►~~.-i ~ r~,' , 5) Does the proposal lie wlthin a 100 year floodplmn) If so, note location on the site plan ~ I r ~ ~ Spol.ane En-, ironme-l* ~l Orc -;,nct. Checklisc Page 3 of =i lk Evaluation For Agency Use Only B ENVIRONMENTAL ELE.1r1ENTS (Continued) 6) Does the proposal involve any discharges of waste matenals to surface waters) If so, descnbe the type of waste and anticipated volume of discharge 41~T ~ b Ground 1) Will groundWater be wijhdrawn, or will water be discharged to ground water) Give general description, purpose, and appro-umate quanuties if known 2) Describe waste macznal thac will be discharged into the ground from septic tanks or other sarutary waste treatment facilhry Descnbe the general size of the system, the number of houses to be served (if apphcable), or the number of persons the sysem(s) are eY ected to serve N ~ ~ 3) Describe any systems, other than those designed for the disposal of samtary n aste, installed for the purpose of discharging fluids below the ground surface (including systems such as those for the disposal of scorm wacer or drunage from floor drams) Describe the type of system, the amount of matenal to be disposed of through the system and the types of materials likely to be disposed of (including matenals which may enter the sysrem inadvertently through spills or as a result of fre fighung activities) IAI . C' 11 'Y ~ Spokane Enti ironmenczl O-c -+ancee Checklisi. Page 9 of s; • ~ Evaluatton Foc Agency Use Only B EwIR4NMENTAL ELE.I~[ENTS (Coatinued) 4) W1ll any chenucals (especially orgazuc solvents or petroleum fuels) be stored w above ground or underground storage tanks) If so, what types and quanuues of matenals wlll be stored) A1041~- a{l.e2 MW& Mn ~&1'1 , 'Ir::14 d-&V ~ ~1?~►~-~~-~~ 5) What protective measures will be taken to ensure that leaks or spills of any cheaucals stored or used on siLe wlll not be allowed to percolate co groundwacer (this mcludes measures to keep chenucals out of disposal systems described in 36(2) ar,d 36(3)) c Water Runoff (includhn~ storm water) 1} Descnbe the source of runoff ('including storm water) and method of collection and disposal, if any (include quanuues, if known) Where will this water flow) WM thls water flow into other waten) If so, descnbe ~ ~ir.c,,r•~2. S a~►H~..~-~.~e~..-.~ (~U~u y~ f ~ Will any chemicals be stored, handled or used on the site in a locatzon where a spill or leak wlll drain to surface or groundwater or to a storm water disposal system discharging to surface or groundwater) . ~ 3) Could waste rnaterials enter ground or surface wacers~ If so, generslly descnbe ~Jv ~ Spo;%ane En-.ironmenc-tl 0r~i ~~i,. C'hcLklist ~a Page 10 ot 21 0 ► Evaluation For Agency Use Only B EWYRONMENTAL ELE'b!i ENTS (Coodnued) d Proposed measures to reduce or control surface, ground, and ruaoff water impacts, if any (if the proposed action lies within the Aauifer Sensiti-, e Area, be especially clear on eYplanations relacing to facillties concersung Secuons 3b(4), 3b(5), and 3c(2) of this checklist) ~titt`-) G~~= 4 PL4NTs a Check or circle types of vegetauon found on the sice deciduous tree alder, maple, aspen, other ~~evergreen tree ir cedar, pine, other shrubs ✓ grass pasture crop or grain wet soil plants cattail, buaercup, bullcush, skunk cabbage, other . water plants -water Lly, eelgrass, snilfoil, other other types of,% egetauon NY+ at lund an3~amount of re;etation will bc rcmo-,cd o: a:tcrzed~ eatss- c List threatened or endangered species known to be on or near the site ~ d Proposed 1andscaping, use of native planu, or ocher measures to preservs or enhance vegeLation on the site, if any zo ALtw Yi A_)c'* ~-2 t-~ ~ 74ojeo~ TLI LS ~O ~ (4 71~- ,~l ~ ~ t~►~ ~ l, r l J~ v r r'- '~/t~1~ ) TACa~ ~ Spokane Envtronmentsl Oral-,s-icc ChILc.'{lisc Page l 1 0r? 1 ~a ~ Evaluation For Agencv Use Only B EiVVIRONMENTAL FI.EMEN!'S (Continued) 5 ANIMALS a Circle any birds and azumals which have been obse-ved on or near the site or are known to be on or near the sice birds hawk, heron, ea;le s4ong6irdsother mammals deer, bear, elk, beaver, other , flsh bass, salmon, trout, herrulg, shellhsh, other b List any threatened or endangered species known to be on or near the site 4)c0E T~o -x.Ay- i,....i ,c7 iA1 Lr=-+.. ,ot e 1; Is the site part of a riugration route) If so, explain .Kir-Tr~-►~Qt.~ ~ . d Proposed measures to preserve or enhance wildlsfe, if any 6 ENERGY AND N-%TLRAL RESOURCES a What kinds .of energy (electric, natural gas, oil, wood scove, solar) will be used to meet the completed pro)ect s energy needs) Describe whether it will be used for heaung, manufaccunng, etc -r-.c.x-Y.-"rV"u,- %-f c i.-l,--~ ► , A S ~t~ f-~t°.~~ tJG•~ ~i ~ ~ rl.. c ~r..~ ~ t I c7 ~ ) I ~ ' ~ ~ ~ b Would your projec.t attect the potenEial usc of solar e.lier6y by adjacent pcoperties) If so, generally describe il~. 3pokane Envlronr-iLnc il Ordi-..-Le Che..Ust Page 12 o, 2 1 • ► ~ Evaluatioa For Agency Use Only B EWIRONMENTAL ELE.IENTS (Continned) c What lunds of energy conservaaon features are uicluded sn the plaas of this proposal) List other proposed measures to reduce or conuol energy unpacts, d any AL4-Lp ~-~'`a t~~ ~ '~~v t L.4 &L~T r= 1 `tit `„rM YL~ ~a ~ 7 ENVIRONbiEiN'te1L HEAL?H a Are there any eavuonrnental health hazards~ mclucimg eYposvre to toxic chemicals, risk of fire and explosion, spill, or hazardous wane, thac could occur as a reult of thus proposal) If so, descnbe o v/~►t~,~l,~ ~ 1) Deseribe special emergenry services that aught be required ~ ~~tt,.~S w~ ►I I ~ ~ , t ~ a 2) Proposed measures to reduce or control enviroa^I-e^tal health hazards, if any b Noise 1) N'Vhat rypes of noise exist in the area whlch may affecc your project (for eYample tr3ffic, equipment, operauon, other)) ~ v 2) What types and levels of noise would be created by or associated wlth the pro)ecfr on a shorc term or a long term basis (for example traffic, construction, operatlon, other)) Indicate'v►hat houn noise arould corne from che site ~ TN9,b&, • ~ Spokane Envtronmental Ordinance Checklisc Page 13 of 31 , a%*-. t t Evaiusnon For Agency Use Only B ETiVIRONMENTAL ELF+1RENT5 (Continned) 3) Proposed measure to reduce or coatrol noise unpacts, if any ~~I ►J NOt s~ ~.J i II I~ I_i M i Ta~ ~ . 'pe,~`,(l~~T~ ~s ~ 1.~. , 8 LAND AND SHORELM USE a. What is the current use of the sice and ad)acent properties) `t'~ ~/1 v__ rz E w~-~- ta,,~ ~ 1 S ~//~t.~•fJ'~ ,,b Has the site been used for agriculture' If so, descnbe ~ c Descnbe any structures on the ate _faox-ttrep AK~p LJM_~~L ~ : n.► r[~ ~.~2 ~.1~-~ ~-1~ C~ar~~fi~~~J . , d Vi1al any structures be demoLshed) If so, which) e Vilhat is the current zonuig classification of the sttO _~g^,sr-r G hr-.zv • Z O U W. i w hI ~ 1 Spokzne Environmental Ordinazce Checklist 4 tAIL Page 14 of 21 ~ ! P ~ . Evaluation For Agency Use Only B ENVIRONMENTAI. FLE3ViE-4TS (Contiaued) f What is the current Comprehensive Plan designauon of the sitO S.s.tt~.K.~~•aT GoM ~l ~L/s ~J ~D~ S~ G~wY►"r~ Ea1J - ~ ~---r'---- , xOV-;P LnsG - g If apphcable, what is the current shoreline master program designauon oE the szte) h Has aay part of the site been classified as an "environmencally sensinve" area.) If so, spectfy ~ ~ i Approxunately how many people would reside or work in the completed pro)ect2 Aparwx I;t, QWT-I ~ ~ umi, Lij -t16 Lmw , ga#i l.,r~ I Mqi~ a-r -rlJ Approxunately hoa maay people would the completed pro)ect dtsptace) k Proposed measures to avoid or reduce displacement unpacu, if any _.1.UT a coat~rs ~ • n 1 Proposed measures) to ensure the proposal is compatible with eYisting and proJected land uses and plans, if anv " _tAN1311J-d~ 112OO Jtl NI c, 0 W1,E,1 15L~ 42.tr e..dnMPA'4' I121L t"P --Tr.wp T , Spokane Ea-. ironnca0 l Ordi~snce Checklisc 4 psge o~ :1 l . ~ ~ Evaluation For Agency Use Only B ENVIRONMENTAI. E S (Contiaued) 9 HovsrnrG a Approxunately how many urucs would be provided, Lf any) Indicate whether high, middle, or low-income housing ..L t b Apptoximately how many uniu, if any, would be ehnunated.) Indicate w hether high, auddle, or low i.ncome housmg ~ ~ c Proposed measures to reduce or convol housing unpacts, if any v"° ~►~,~5~ , ~ , 0 10 AES'THF.~7Gs L What is the tallest height of any proposed structute(s), noc incluchng ancennas, what Ls the principal- gxtenor btulcitng matenal(s) proposed) 1- AT T ~ tYlhat vlews in the immediate vicuury aould be altered or obstructed) ~ o . Proposed measures to reduce or control aesthetic impacts, if any ~km Amel~~ P6~ . ~ pokane En-. ironmental Or= -tzrtce Checklist ~Qh% Page 16 oF 21 ti... 1 / 1 Evaluation For Agency Use Only B ENVIRONMEIVTAL ELFsbiENTS (Coatinued) 11 I.IGHT AND GLARE a What rype of hght or glare wi]1 the proposal produce% What tune of day would it mainly occur~ ik,)!e.Lor- a-r b Could hght or glare from the finished project be a safery hazard or incerfere with views) 'DI 12.C~L'T{~n Tc5 -T t~ 012, Vl. ~xm~-~ LtG ~ Wer.~ 0 YL 1?4& l.on" p. uQ ( ~ wou lar ~r &W - ~ °''r? Pwxx~ Lwp- t W at e-usting off site sources of hght or glare may affect your proposal) c.~c,A nal.,Lz- , ~ ! Proposed mea,sures tu J educe. or c.oatcol light and glare unpacts, if a,iy vAO)' LA 2 RECREATioN What designated and uiformal recreational opporcunities are in the unmediate vicuury:) 1i.1ln i r--A :4 IW A N N~ 1 ~ I'S ~A1C1 " 1Li a ~ Would the proposed project displace any existing recreMonal uses) If so, descnbe ~1 ot' ~ t . , pokane Environnnencal Ordinarce Checklist A ob% Page 17 0f ? 1 , 44.. ► • t Evaluation For Agency Use Oniy B E1*TVIRQDIIYIEjv"j"Aj,, FT FbIF1TtS (Coatinued) . Proposed measures to reduce or control umpacu on recreauon, sncluclmg recareauon 7 op orturuties to be provided by the proJect or appl~caat, if aay 1~'~ 13 HIS?QRIC AND CULT'URAL PRESERVATION L Are there any places or ob)ecu listed on, or proposed for, naUOnal, state, or local preservauoa registers, known to be vn or next to the site) If so, generally descnbe A=r r'C31 cm-vg. Ic:~NOW , 4 b Generally descnbe any landmarks or evidence of historic, archaeologtcal, scxenuf'ic or cultural unporcance lcaown to be on or ne-+ct to the site NL7r , ~ ~ r f 0 _ Proposed measures to rcduce or control unpacu, if any J%I L.t c. A..r. t;, C.re 14 TxArtsnoRTAXIoN a Idenufy public streets and highways serving the site and descnbe proposed access to the exusting street syscem Show on site plans, if any chl.l.^~J trr.>wl ~Qm-=P . TrI.1- ~ o b Is sLte currently served by public transit) If not, what is the approramate distaaci to the nearest transit stop) --['m laa&!5? .~'.~a~a ~ ! . 1 Spoknne Environmental ordsnznce CheckIesc Page 13 of 31 '60. • 1 Evaluaqon For Agency Use Only B ENVIRONMENTAL ELEMENTS (Coatiaued) c How many parking spaces would the completed project have) How many would the pro ect eluruaate~ Vg3W d Will the proposal require any new roads or streeu, or unprovemenu to exuung roads or streets, not including dnveways) If so, generally descnbe ('indicate whether pubLc or pnvate) ~ e~~2. //~►►~h ~l~ c~u~Kx~n. 4dek• Ak.e ,r tt ST1 N.~ AT_TI41 ~ Wdl the project use (or occur in the immediate vicuziry oQ water, ra1, or air traasportauon) If so, generally descnbe How m=)r velueulu.tnps. per day would be.generated b.y the comgletPd,prnject) If known, indicace when peak volumes would occur t~~ 1 V'J FN-.-.~ s u T , Proposed measures to reduce or control transpoRation unpacts, if any ~ o 5 PUBLIC SERVICES o Vi/ould the project result in an increased need for publlc servlces (for "ample fire protection, police procection, health care, schools, other)) If so, generally desc7ibe ALJ ''r_J1~ 12 1 L='.~ A IrL_.~= •(v~G ti'~ T I nJC~ , i pokane Envlronmencal Ordinance Checkl,sc Page 19 of 31 •dL_ . ~ ~ t Fvdwdon For Agertry Uu Oaiy B ENMQNMEMAL ELEbEEMS (C011fjOYld) b Proposed measures to reduce or conuol direct impacts on publsc sernces, d aay 16 UTILri'IES a CuTle utlhues currently awailable at the site (eectncit~natur~wate e ~usg -sem e aaitan seweosepuc syscem, ocher b Descnbe the uuhues that are proposed for the project, the utihry providing the semce, aad the general construcuon acuviues on the site or in the immechace vicuuty which nught be needed 0.&G-rYL~c. r~ - r►~G ~ TA'~ pOL& , ~r`'s ~_~...L~'~~...~ ~~..~s~'.~'~~►' N ~ ~ C SIGNATURE r I, the undersigned, swear under the penalty oE per)ury that the above responses are made truth{u11y aad to the best of my knowledge I also uaderstand that, should there be any willful misrepresentauon or willU lack of full disclosure on my part, the asencv may withdraw any determinauon of non-sigsuficance that it migbt issue in reliarice upon tlus checkltst Date Proponent. ~1J Nt :~j Proponent (Please type or pnnt) (SrgAature) Address a I~ ~.1 EV^City, State, Zip ~ I Phone ~ o Person completing the form Date- 2 ? Phone - eiz4 • 4 Z.4j w II / Spokane Environmenta1 Ordinance ChecW,sc Page 20 of 21 ti►.. e ~ y . E4R STAFF USE ONI.Y_ Staff Member(s) Reviewuig Checkltsc . Based on thu staff review of the eavisonmental check[i.sc aad other peruaeat iaformauoQ, the staff A Concludes thac there are no probable sigsuficaat adverse unpacts aad recommeQds a deternunauon of nonsigndicaace (DNS) B Concludes that probable significant adverse envuonmental umpacts do exist for the current proposat and recornraends a auugated deteravnauoa of nonsignificaQCe with coAdiuons WNS) C Concludes that there are probable sigrufscaut advene eavuonmeatal Mpacts and recommends a determuiauon of sigafcance (DS) REFER TO FEE SCHEDULE FOR FII.ING FEE ~ 1 ~ ~ 0 ~ ~ ~ ~ a / ~ Spokane Envtronmental Ordinznce Checklisc 1'age 21 of 21 '%,r,o b @!~$ , ( ~ ( ~ SPOKANE ~ ~ - COUNTY, DIVISION OF ENGINEERING AND ROADS A DNISION OF THE PUBLIC WORKS DEP~*I'MF44T ~ t~o AGREEMENT TO PAY FEE ENGINEER'S AGREEMENT NUMBER ~ - Q ~ This agreement between Spokane County and name o f o~ ~t:,&x6,(A y ' whose interesfin~fi~E.ect iDoI,l►.~e~ p ~ (i.e. owner, ag6nt, ecc.) AUG O 1 2002 is entered into this day of , 24 This agreement is applicable to the project known as: SP proje~t at~h me or .-pi'dt nam-1e & pna~s or rue &4mr)-5 E ~ 1 • That the individuals and parties named herein as having an interest in the above described property or project agree to the following: . l. Reimburse Spokane County for project review and inspection fees as specified in Chapter 9.14 of the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane County for project reviews and / or inspections plus a ten percent administrative charge, and will be billed monthly as accrued. Any billing amounts due, including any expenses, incurred in the collection of an overdue account, must be paid prior to the County's acceptance of the project for filing. If a project is approved and/or filed with a balance still owing, the unpaid balance shall be paid within 30 days of the invoice date. . 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as specified above. 3. Any invoices not paid within 30 days of the invoice date will be considered delinquent. If any outstanding balance on the account for this project is not paid within 30 days of the invoice date, no further reviews of the project documents will be conducted until the entire account balance is paid. Any balance on the account for this project not paid within 65 days of the invoice date may result in legal action or the initiation of other collection procedures, including referral to a collection agency. The Sponsor will be liable for any and all expenses incurred by the County for the collection of overdue accounts. 4. The monthly billing should be sent to: NAME / ATTENTION: *U)i3jt~L-5> COMPANY: ADDRESS: I QO 1•~ ~l~ CITY, STATE: WA • ZIP CODE: aq o 31- cl 74 1 , PHONE (I S- 7PHONE # 2: ( 9 FAX E-Mail I understand that failure to pay these fees may result in delay in compleaon or approvai of the project or other possible sanctions. 0 If this fee agreement is completed by someone other than the Sponsor (i.e., the project owner or a principal in the firm sponsoring the project), such as the Engineer designing the project, then written authorization from the Sponsor specifically authorizing the Agent to execute this Fee Agreement is attached to this F e Agreement. SIGNATURE By: ~1 ' 4.i (PRINT NAME) 1j4 02 , RETURN Y~.LOW COPy TO SPOI~ANE COUNTY ENGINEERS k\Ragreefee.doc 4/Z001 . 1026 W Broadway Ave Spokane WA 99260-0170 (509) 477-3600 FAX: (509) 477-2243 TDD: (509) 324-3166 , . ,o.r .t ` SPOKANE COUNTY VIVISION UF BUILDING > ~ :S AND CODE ENFORCEMENT ~ ~ r ; a . v IOZG WFST BROADVVAI At ENUE SPUKANE,~VA 99260-0050 ~ . . ~ . .rr, A'C•_. . . .....~~~iii~ ' ~i~~ . r.. ~ ......:•.~y t . ......t., . . _ i Site Information Project Information L . Site Address: 511 N ARGONNE RD Project Number. 02004680 Inv: 1 Issuc Date: SPOKANE, WA 00000 pertnit Use: VE-14-02/ZE-14-02 TO B-3 Parcel Number: 45184.0803 Subdivisiun: I-IARR.INGTONS ADD.TO HUTCHINSO Applicant: BOULDER CREEK, INC/D RAUGUSZ' Block: Lot: 19012 NEVADA RD Zoning: AGS SPANGLE WA 99031 Phone: (509) 245-3570 Contact: BOULDER CREEK, INC/D RAUGUST Owner: BOLJLDER CREEK INC 19012 NEVADA RD Address: 19012 NEVADA RD SPANGLE WA 99031 Phone: (509) 245-3570 SPANGLE, WA 9903 l -y741 Setbacks - Front: Left: Right: Rear: Builcling Inspector: DAN HOWARD Water Dist: Group Name: Project NAme: Permits , Vuriance Contractor: License F,NGINEERS REVIEW $50.00 VARIANCE $699.00 PRF:-APP CONFERENCI: $39.00 i_i'I'ILITICS RL'VIEW $100.00 'I'otal Permit Fer: $888.00 ZO)tG ChUl1FL' Cuntractor: _ Licensc ENGINEERS REVIEW $200.00 ENVIRONMENTAL REVIEW $75.00 REZONE TO B-1, B-2. B-3 1 $1,935.00 PRE-APP CONFERENCE $60.00 Total Pernilt Fee: $2,270.00 Payment Summary ~ Total Fces AmountPaid AmountOwing Tran Date Recei vt# Pavment Amt $3,158.00 $3,158.00 $0.00 7/25/02 3595 $3,158.00 Processed By: RameY, Kathleen PAYMENT Printcd By: WENDEL, GLORIA Pagc 1 of 1 ! hiPOTICE ~ It is the responsibiiity a# the applicantlpeemittee to see to it that the use ciescribed on the #rant of this permi# complies wifih app4icabEe codes and requiremen#s and that required inspectians are r+aquested. Failure ta request inspections as listed beiow and ab#ain the necessary approvals be#are pragressing beyond the paint uvhere inspections are required may ne+cessitate remoWal of certain parts of the constructian at the applicant's/permittee`s or property owner's expense. At a minimum, the faltowing inspections ARE REQUlRED by County Code: 1. FO{}TING - when forms and reinforcement are in place and prior to placemen# of concrete-all struc#ures, including manufactured hames. NOTE: This inspection includes reviev+r of the structure's setbacks from property lines. Mfnimum setbac#cs are established by Gaunty zoning regulations. Typicafly, side and rear yard setbacks are measured from property fines, while setbacks for yarrls abutfing streets are measured from the property line or the center line of the roadway right-of-way, +whichever pravides the greater setback from the center line of the raadway right-o#- way. Curb lines and fence lines are nat necessarily indicat'rve of prvperty lines. In strme residentiai areas, the County can own as much as 20 feet of right-of-way between your property and the actual impraved streetlcurb. The responsibility ta comply with applicak3le setback provisians Ires solely with the permittee neither Spflkane Count,r nor its suthorized representatives assume any respansibility far the ver-ification ar Iacatian o# your property lines. Pleaae verify their loca#ivn privr to locatirtg your structure. Failure to properly Iocate #he structure may require i#s relocation at the owner'slpermittee's expense. 2. FOUNDATION - when farms and rein#vrcement are in place and prior to placement of concrete. 3. FRAMIMG - after all framing, bracing and blocking is in place, and prior to concealpng. 4. IFJSULATION - prior to the installatian of drywall. 5. PLUMBiNG - affer rough-in, befare cavering, and final. 6. MECHANICAL - rough-in of piping, taefare covering, metal chimneys before conceaiment, and final, 7. FINAL - when complete and prior to occupancy andlor use. F"lease provide 24 hours notice. All permits require final inspection.. NOTE: In addition to inspectian a# the structure, this inspection includes review of site imprQrrements (fiypically depicted on #he appraved si#e plan) required by ordinance or as a condition of araproval of this permit. Items such as the installatian of fire hydranfs, fire department access, on-site drainage ("208 swales"), road improverrents, parking, and Iandscaping are common rec}uirements of a permitlsfte plan which must be com- pfeted prior to final approWal of a bwilding or issuanae o# a Certdicate of Qccupancy. 8. MANUFACTUAEt} HOMES - Final inspection required vuhen comple4e, staars, handrails, skirting, etc. installed, and priar to occupancy; campleted inspection record card must be available on site. 9. SEWERS - prior to cower 14. RIGH7-C?F-WAYfAPPRQACH - pnar to placement of concrete, or, if gravaG approach, a(ter compietion. !n additivn to the above, any plumbing ar mechanical systems or material which w4uld be cnncealed by firaming, drywall, concret$, etc., rteust be inspec#ed prior tv cover. Check with #he department far "speeial inspections" in conjunction with commeECial prajects. FOR INSPECTIQh1S: TQ INSURE PROMPT SERVlCE, PLEASE GIVE ONE WURKING DAY124 HUUR Nt]TICE . PARTS OF YOUR PROJECT MAY REGZUIRE PERMITS AND INSPEGTIflNS FR+DIIA MORE THAN ONE AGENCIf. ` Building, plumbing, mechartical and fire inspectians, Division ' Road cuts for utilities or driveways, Division of Engineering & of Building and Gode Enfvrcement Fioads - 48-HOUR NQTICE REQUIRED 477-3675 477-3600 or 5tate Department of Transportation •Construc#ion in a flvod plain, aivision of Engineering & Roads 456-3000 477-3600 • Sewer cvnnection, Dovisivn of Utilities • Electrical wiring, State Department of Labor and Industr+es 477-3604 324-2640 or City Public Works Department 625-63f}0 `On-site waste disposal system, Spakane Regionat Health District 324-156a PERMIT EXPIRATI+DN AIVD REFUNDS Unless othen+vise noted, this perrnit wdll be considered null and rrvid by limi#ation if the work authorizec# by the permit is not commenced or is stvpped for aperiod of 180 days, unless a writtan reques# for an extension of the permit is reeeiWed and approved by the Building t7fficial prior to expiration. At a minimum an inspection should be requested a# least once every 180 days tQ assure the validify of the permit. A permit may be rene+wed within ane year of the date of expiratian for one-half the original fee, subject to certain limitations-please cafl us if you haWe any questions. Awl refund requests must be made in writing by the applicandpermittee (shown on #he reveese) no Ister than 180 ~days af#er the date of fec paym+ent. Refunds o# not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized mare than 180 days after fee payment. MISTA,KE? If you think we`ve made an error in processing this permit or in canducting inspections perkaining to it, or find erroneflus information in the permit, please bring it to aur attention immediately by filing a uvritten request far correctian within 10 working days of discavery. All such requests should be direc#ed #o #he DiWision o# Buiiding and Code Enfarcement at the laelow address. Spokane Courety Division of Buildirrg & Code Enforce,ment 1116 West Broadway Avenue S"pokane, W14 99260 Phone: (509) 477-3675 Fax.• (509) 477-4703 ?'DI3; (509) 477-7133 F4RM 30-050204 BLI]G PERM1'f M ~ S'pakane Co unty Puhlic Works I)epartment ~ Divisivn of Building & Cvde Enforcement Receipt Receipt Niimber: 5595 C'tistnmer Nurrrber Fro i ects Full Proiect Nhr Inu Nbr FeeAntt ljt v A ntt Owirrg PAID Pntt 02004680 7 $3,158.0(} $3,158.00 $3,158.0(} $3,158.00 ~ TatRl: $3, 158.00 $3,158.00 $3,158,00 $3,158.00 Miscellaneous Items Total PAID: $3, 158.Q0 Tencler T ffe Glreck Acct Balarrce CC Nhr E-cp Date TENDERED Check2 3299 3,158.00 Payer: BOULDER CREEEK, INC Totrrl TEN.flER.EI): 3,158. 00 O1rL1` / (SflOl'f} $0_00 Cl1 fl ttge $0. {)0 N(lteS: Trrrn Drrtel Tirrre: 7125102 2;Q0:35 PM By; GIIVendel Logait User: gwerldel Strrtiorr: GWENDEL Override By: Frirtterl.• 71I5102 2: 00:36 PM Pnge 1 nf 1 - _ J - ZE-14-021'l1E-14-02 1 V'icinity Map . ~flis= w ~ 117 ~ 1 ~ ICn . Kms Fj 1 1 ~ ~ A ei a 36 e~. ^ 18~wd1 ~ ~ !k ~ ~i7~et 1ka~ ~ ~ - ~ 9' CaY ~ nnlad' ~hllddle Arthur ~ ~enrer~t~- i ~ AL&I B ~ Nixm f- .y.~ - ~ A. ~AMk*2y AML-way ~ r 1 Ih Qffi < 1$ , ~ ~ _ ~ i I~, l~U~ Sehlnr H,~(qh ~ ivt~ G ~ i ~ ~~g9d¢~ l I 25,"' Scale : 1 inch - 1667 ft (rounded) [38/{12102 ll'tcinity Map 4A 4 Ikh, 5 • 00 Parcel: 45184.0803 ~ Owner: BOl9LDER CREfK INC CoOwner; I~ Owner Address JEL-1 t ~ Q ~ 19012 NEVADA RD SPANGLE INA 9'~Q31-9741 Site Address F-- 511 N ARGONNE RD SPOKANE - Legal Descriptian ~ ~ L HUTCH1NSQNS ADC1 PT 4F Li-2-3 B23 N90FT OF 51$OFT LESS ET MWY ~ I ~ L1<N9QFT OF S18QFT L2<N90FT OF S180FT OF E112 - ~ ` Alk ~ L3 ~ ~ ~ ~ 4 ~ l 1 111e~~-- , 1` ay--_ ni I M)Oin ~ _ ; - i ~ r4 YI` ~ I Nofice: This is not a legal document. Da#a depicted on this map is general & subject to constant revision. It is intended for reference use only. Legal dacuments should be obkained from the appropriate agency. ~ ~ . 0 C- f"4 i/ +'s R r .t ~ ~ ~ ~ ~ ~ ' Sr ~ ~ ~ ee 't ~ +t Q, w s•r i ~ r- O r tfa N p ~ •,F.f r ~ ~ ~ ~ M _i~ 0 IN S y ° ~ ~ ~ ~y ' ~ ~ + fi 0 • ~ N t' + ~ or, , ~ T 1 r ~f • - 47 lo' .y o . Z 0 - M r. ~ r,l ► 1i~ `t ~ ` P 04 t ? r.,. * 4L p° ~ 1p • r.,,+~s ~ ~ r, ~ ~ ~ • ,5 Q t "~4 ~ ~~t . . y'~ ~y a~i ~a p ~ 1 rry ~ ~ 'yQ• ~y1 ,~L s. r . ~ ~ ~ ~ ~ t ' t,; z o, r~.... ~ ~ ► dJ ~ ~ a a» F ~ t ~ VA • 10 1 1 n \1. r- -~~"a+ r1►~ 1~ t ~ 5~' 1'~ A75 :~~+r t t + ~ d '`if'~ " .~y,•~, t ~M t~ ~ ~ ~ r ~ti- ~ ~ ' - ►d~4 'i~ ' ~"v ~ a Z • " p ~ t~ ~ ~ Y` r I ~ t'~ ' t~ , ` T~:-• 0 : G "'d ~ r ~ " , ~ o - ~ ► ~ r ,r• ``~`°~•,P ?1 ~ Y N ~,t 1~ + ..r~ + * y~ 4viS 414 ~i~ ~ • ~ U,] ~ . ~ j ~ - •"#J ~ ' . t•, . F~ i ~ w il~ , ~ iy tk _i ~ ~ • . c0 t ~ • ~ , ' ~ e~ ' ~4 ~K~1'~ ~ i ~j~L•~}~~*/' J,r,~-^-►'Le+ •t ~ ► ~ { _ l ` ~ ~r'- K ■ '4~'~'~'~ t _ f _ 1 ~ q! 7~ . a - ~ ~ i ~~:;~.3~' ~l `6 ~i • . s~ . ~-~4 l~ E . 1+ A fA . . :i N' C . < a a 1 ♦ ~ • ;J 1 _ ~i[~'r,~• . ' +T" ~ iM. ,1 ~ ~'~f'►~ + ' 1 - ~ ~.~r y 'y~1~ ` ~ Y ~ I . ~ ~ 7 ~ ~m~ ~i►►*d'°'~ i .a ~a~M ~ar: > ; t • ~~M 1 ~ . ' ' '~I~e ~ ~ ~ , ' s ~ ~+f 1 ' ° : ` , ~ • 'o :~~F ~ - ~ • ! ~ ~ ~ . APF ' • s ~ ~ ~ ~ • ! .i `a ~ ~ - ~ ~ ~ E ~ 3'$[ j'~' , i+~`+'. ~ - ' ~ " ~ t " ~ ~ . ` k ' ,r~ - ! ' ~ tr . a ! ~ ~ ~ p ~ f tar w. ` ~ • 1C . t ~ ~ ~ i~[ F - . ~ `re~ ,,py_~'' 1'`'- ;r•~'P ~'~,~'~'G:. • I ' l 3 i A t~` ~ ! ~ ~ ~j , : 'r z " _ ~ ~ ' ~ i ~ . A ri f, ~ `1 ~ 9 ~ :l~ • u 1•r/Y . . . ~ ~ - t~,, ~F. ~ _ . , i a.~~~• - t ~ ~ . ~ ydK~ ~ ` . ~ - . - v _ . '~i. ~ ;J ~4. ,y ~ - ~ 4 - 1 f1 . y: . ♦ : ~ , ~ !r(~ ~ < • i Ye.~ ~ .1 . ''r 1 ~ . ~ ` ~ ~ ; _ ~ s. w • _ ~ : , • ~ ~e . : . ~ Y`~ . w• ~ ~~~.c~: ~ , t R Sy~'a``~ `.~`r'~tVs lii ~~f~~'~~' ~ ~lr ' * Y,~-`'~ ~ • ~ p . • ~ ~i 1~ ~a ~1 it..t~~" ~ r • " ~~4~ . . ~ ~ y~ z~ `"l.~ yy 1 + ` ~ ~ " •F►'~``~ ~ s~ 1 y l ~ • ) " ' • ° _ s~"'+t~'~ ~1 ~ . ' - - { • . , ' ~ ' ~ ' . ' r. ~ x; .7'~ "~T~~ i~~~ i, ~ds - lg-• . - ' , , • `~y" r ' ~ .r^; ~ ► ~ Y'.. ~ j . ~ ~ ..e » ~ ~ ~ rn• ~ ~ ~ ~ ~i~ ~ a~1 .'r' • . ~ . , 't;, 4 -3 ~ a $~r ' y - ~ ; : tr. ~ y f f r' wr~• ~ ~•~.~a~... , ~ ` } ~ ~ ti ~ .J . ►-i i'-~ . ` I~ ~ r y ~ ~ _ ' ~-s~aA ~ . j , ~ ri 1~t'~' ~ . R ..'~t i• : A, N.. ~ ~+=~Il ~ j 1 _ . ~a ~ ~ ' R ,,,r ; . ` " k`~ ~ ' '~'~?•"~sa~ ' .~i (t 19; ' r ~ ~ p~~~ e ~,~'y~~•: ' ;4~.~~ R . ~ e ? al _ y ~ ~ • r~`~R ~;i.~' ~ f ' ~ ~ ' ir... • : ~ 6'~'~, ! • - ,I• • ' '~-h a. s' ~ i~n~ + ~ , r ' r 4 . ~~,t •..t ~ ~ ~'w ~ y, ~ ~ .v~ ~ .S ~ •F ~ + ^ t ` y- _1 ~ ~ Y`..:~ ~i..`-1, ( ~ ~-ec A{` i 1~ t• n~' r ~y'"~;-~'f ~ _ ` , ~ • - • . • ~ ' , - • ~.ri ~ . ~ ~ r `~''s~r° . ~ ~~s.l ► ~ . C ~ 1~ -A• a~i ~ , ~ ~ ~ } \ „L i •1~ y s` ~ ~ t i ~ ~ ~ ~ , ~ ~ . ;C • • '~.R~ ~'~p ~ ~ t' .--w-~' _ ~j y, . . T~ < _ ~ ~ . ~~gro . . , K, M~ , `s,~ .r _ ~ ~a . a►~c ~ ~ ~ ' ~ • ~ ~ - . ' t ~ 4 . . , . . ~ . . a r . ~ ~ :1 . ~ ~ . . ..~L. y ~ .a.~ , = 1~ ic ~ •.~rZ - A. . . ~ • ` • - - ~sy: " p ~ L - i"~ r - ~r..: ~ . ~ ~ ♦ i . ~ ~ . K s ~ • ~ p'~ ~ ~ ~ ~ j ~ ~«r ' - - ~ • ~ ' ~ ~ry w r ~ - ' ~ /s A'~ _ - ' . - - • ? ~ ~''yyt / _ r L'~•e~,;a~"~ ` j ~ ~'j~'j''~j~ ~ ~ ~a~. ~ 3~~_ ♦1 . • ~ . . . ~ 7 ~`g ..i►~ :i~7`~', ~5` i.e~ ~ , ; . . w . ~ . ,.r f ~ ; r \ , _ _ r~ ~ ~ + . _ ~ . t.. . ~ . d. ~ y • -r.~;, _ ~--r ; ' t t ~ a.`'~ ~ l ~4 ~~a~1-L•+ ` , • , ~ ~ r ti r " ^i~ t • . , ~ Ty t ~ • , ~ ~ Q ~ , ~ ~ , • K 1 f-j•r ls.i•l < < < -7i01a,s- 1 ~ - ' BESSIE~ • ~ 1 it r • , " . 1 t t ~ ; ` 1 ~ - ~ ~ _ ~ ~ , , ~ ?`i'~-~-f~ ~ a~~ ~ , ~ • ~ , , i ~ ~r ~ ~ ~ a ' • ' • ~ ' i . tl114 4d1• E f{ i R * Tl LZ ~~l'~ Y 1 a . ■ ~ • , , . f + = - ,r > O ~ ~ ' f , j , ~ + ~ : • ' ~ ' N , • ~e l r t t ~ ~ • I ~ ~ t~ ~ ~ 1 ~ ~ ,r ~ ~ ' , ~ • . ~ ' ; ° ' ~ 0 f t \ RI'A 1 CH4J, ~ • ~ ' , ~ - ' = - ~ _ 310. 7z ; ~ • y, , 3/0 7~ , 3/0 7~ ! . ~ s V ` ' . ~ ~ ~ ~ ~ r ~ ~ ' i' ~ e r . i fj~ : 1 L , ~ ` • ~ s~` " " " , - M ~ _ • 7 ~f ~ ~ ` 1 ~ , ' . _ ~ ~l~a ~ ~ - ~ ~ ~ , ' " ~ ~ . _ ` ' ~ ' ' - .p 1 ~ ~ • 7 ~ ~n ~ J S ' ~ ~ / ' ~ ~ ♦ ~1 ~ ~ ~ 1 46 t ` ` I~~ ~ [ ~ ~ ~ d ~ 1 ~ : ~ ' ~ ~ ? i ~ ~ n ~l r ~ ~ 1 ~ r 1 ~ i . ~ ~ r t q i l i ~ " ) ~`I " 1 ~ K ~ ♦ ~ ~ - ; s' r• V~ , , ; . , ► , , . ~ ~ i ~ Y, ~ • ^ ~ ' 1 i -i ~ ~ l , 1 ~ ♦ M , i1♦ ~ ( ~ 1 ~ i ~ i SI 11 1 ~ ~ ~ y r • u 1 s r ~ i /'1~ l• j' f a ) . ~ ~ J i- • ~ ~ ~ ~ i ~ ~ ~ " . ~ ~ ~ - ~ ( N . v ~ ~ ~ N~ ~^fl ~ , ` ,i, ~ a ~ t i~ ~ ~~~aaa ' ~ ^1t ~ \r 1 - ~~.Z'~ ~r ~ ; _ J_ - ~ _ • ~ t ~ 1 ~ ~ v ~ ~ ~ V ~ 1 ~ yl t s• it ~ r .4 .r_ r - . ? 1 ` • ~ J ~ t ~ ` •1 ; ► I ~ ~ # ~ Y ~ ► r F ~V t , ^ ~~i i L~.a. ~ t ^ 2 ~ Vt-.3,~d 60 3ia. 6..~~ ' /~'t A RG t/LRlTF• w O 64.i1IRt 9G ' ' " - f + , _ ~ o' b r , ~ ' ~ . 3~0. 6 a ~ . , o• 6 v o ~ ~ u. ~ ~ ~ , v ~ ~ , q~ _ ,s ~ - , ~ , , • ~ , e ~ ~ ~ • ~ . ~ t „ r ~ ~ ~ r ~ ~ ~ Ql> + O • _ . 1 . r S N ~ tA . ~ Y ~ ~ ` ~ v . _ • s u ' ~ ' - -~w - V • ~ ~ ~ ~ w « 1,~~ ' 4 ~ ~ ~ ~ i' - ..+w ~ ! Y~.1 +i ' r - . sa sos ce . , . , ~ ~ N ~ b~ • ' lb , ; Rt ~ o ti ~ ~ ~ a . ♦ • • so [oo,6 w6 , p . ~ • ~ _ _ .^^re. _ ~*a*-a~.acvatx_ _ . .~aw~.w . • --C~■ I » j ~ ! ~ • , _ ' . ' / SIIB,ECT PROPERTI' PARCEL 45184.0810 xa Ao.m u. m~m yre~ ~ . 7.w~~;' -F ' . ; ; • ,,,,G..,~ : ; ~ ~ ; , ;1 ~ , : , , ; ' ~ ~ / 66 ~ - ~71 m C= ~v v Tm T p • T- ' ~ i , ~ ,j ~ ~~~io~iucl+0 . ~~.'A4] }YR n.irx.araeen.Aac,o nAu i i 3 BOULOER CMMK ~ 5S9SF a/I.EV~ ~a~91 .A.EVB- ~ BUIIDiN6 NE16F{f 25' BU0.DING FEIGTW 2'S' ~ ~ I ~ -LF E%ISTING 20rEfS) ~ PRaPOSED ZOPEtS) I A02E5 OF Sp. FT. 0-9 MO 1R-35 I 0-3 I 27.300 SP. Bua.DKVC rPtRMandv Ia70 sr. 53s wvarace ~ I l - - P82C8dT OF BJILOMJC COVH2AGE DdS7►i 6rtUCfli! t0 odsro m*G rn ~ b b b b euRDus `sHS' QffTA:j}~ HOW LAPODCAP94 n q WNO6CAPH1ARE0.S ~o5r.oc5nCUw5t~vw aeCm T'fPE OF LONQSCAPAV6 TtPE II! dd SIXRH~D ~ PROVIOm Q ~ N0. OF PNMPG SPACES REdJIRM ~ PEStCBNf OF OP'BJ SPACE ceua oAvm AggAy 6.010 SP. Q rMOCEPMIW i~C~~ MY e &ADM ASONNEW ~ aHenn~ ~l 1I BuLDN6 SEfBnCKS Ra~rt ~s' soe es' aeea is' l ' » 4 Q c e~►~ erwe eaeno erw: es" ewws - oosTw wu Q aIzoPOS~ z sToRY a ~ VON~CI O~NS~TRU~C ON M~ E I 15,641 SF. TOTAL Q ~ ~,.~,.1- BUILDING I-EIGNT 25' ~ ~~•ma . . roromura, .o,ma rom~rss --eo"M STOMOSE vulLom ruareo►a neww►mN~entm ~ MI IA~ ~I _Y, I' ~ ~ l{l{l[i~~ 00 POOPEM 11w ISO POOPOW" llO ~ ~~_y II 1 ~ r- _ un{r LIM" ~ I Aorasrt Paawrr m~■ mwcw roaam aam uMf ~ ~ ZE-14-02 1 COMPLEX S I TE PLAN ~ A-2 , SEE ~ SHEET 2 fi 40 ~s STA ~ STA STA ~ I.E. 1993,4 40+ ~ ~ I.E. 1992.5 1.~. Q „ 1990.6 25 L.F. 6 SS " ~ 23 L.F. 6 SS 24 ~.F. 6 SS f . , ; , . 4518~,081 D . , 45184.Q8~ 4 . . . . ~ ~ 45i 84.4943 20' ~ . ~ ~ 1 ~ Oll~N~a~ . , - ~ , _ o- ! ~ . ~ f.. „ . ~ . . ~n #~.r'+ . ~ r.,~- ~ i~..~...~.~ ' I~'l c~, ~ . I cn a,pk~,cii f t • ,f ~ ~ . ~ ~ I ~ ~ ~ ~ '-Y~ . . . . . . . . . . . ~ 1 ~ , . , ~.~i _ ~ ~ - I f . . . . . . . . . . . ~ . . , , 521 A ~ . . .~o .I.~.~.I- ~ I, ~ ~ ' ~r' i" ~B I ~ Y C~ ~ . . ~ ~ 5a I ~ ~ ~ VACANT u? . , N.I.C. , ~ ~ N ~,Y; ~ ~ ~ B r~ ~ i , , ..t~ r ~ ~ i ~ I EXIST MN ~ c 1 3. N ~ ~ . , . . . ~ ~ . LJ . 409 ~ 45184 . . ~ a .~817 RIM ELEV. = ~ ~99 .9 . t a . , ~ . . ~ ~ ~ . D817 1 . . B ~ _ ~ NO STUB . ~ ~ ~ ~ NAVD 8 ~ ~ 8 DATUM . ~ u~ _ 417 / a , )8 ~ : , I. . . . . . . ~ . ~ ~ I ~ ~ e E ~ i B < ~'~att ~ :.i~. ~ ~ _ : + G 1 { ~ U~, i .4~~ • _ i I ~ ~I ~ , I t ~ ~ ~ ~ ; t . . . . , . . . / ~ ~ . ~ ~ .j.. ~ ~ c~ _ ~ ! , , ~ ~ a .,S,r:~, f ~ • . • . . . I 5 ss . . ~ ~ `p ~~~~f,~ ~ . ~ ~ . . ~ ~ z ~ ~ ~ m f, i d . I . . . . :E : ~ ~ , ~...J ~ ~ ..r',, I r"r . . ~ ~Spt~a~t 1 L.; ~ I r . . ~ ~ . ~ I°'s i 1 ~ S . . . . . , , ~`3•~ _ ..r. - ~ r-. ~ ,ql~ H - „ - - ~ r , i . r ~ ~ . _ ~ ~ ~ -~S~ , . . . . . - - . I~f ~ i _ w . ~ , . . . . . ~ _ . . . ~ ~ ~ - .,.,,j,........:. , • .....0.1............ 1 _ ~ o ~ . I~'.'. , , . . , . . . ~ . , . .'~',".~r'`.`.'.''`.`+'. . . . y. _ . . . . . . . . .A , . , . . . . . . . . . . . . . . .':1:: . ' ~ . . . . . . . . . . . , . . . . . . . . . ' . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : M=9.- -NMI$ i/]•♦~•`•••~.•. .4.~.•• . . . •-W. . . _ • _.~.5 . - _ . « . , . . . , . . . , . ~ . . . . ..,~.~~..~..~f.....,................,,,...,...........,.,....,, ,_...,,...~,'i'.'~. ~ ..f~.. . . . • •,f~~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . , ' . . . , , . . , . . . . , ~ . , . . , ~ . W ~r►~ ~ . . . . ~ . . , . . . . . . . . . . . - • . . ~~5 ^ ~ . . . . . . . . . . . . . . . ~ I~.~ . ~ . . . . . ~ ~ ~=~wrr~T . ~ ~I ~ . . . . . . . , , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..~e~ ' ' ' ' . _ ' - . . . . - _ - ._~.a•.._...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . - - - ~ . . . . . . . . . . . . . . . . . . . , . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , .•.~.~.~.~.~.~.~.~.a.~.~.~.~.~.~. . . . . . . . . . . . . . . . . . . , . . . ~ r-- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t~. . . . . . . . . . . . . , . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . , . . . . . . . - . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . ~i-- - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BF},~!-; 2„-~-~. ~ ri . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . ~ , ~ . . . "n',4 , ~ , . .i, jy . . . . l . . . . . , . ~ . . . . . . . . . . . , . . . , . . . . ~ g ~ ~ ~ . . ~ , . ~ ~ . ~'s,"`~ . ~ .~'1'.~ . . . . . . . . . . . . . . . . . . . . . . . . ~ . . ~ ..-r.~~r.~..~.rr=.'.-~-.~. . . ~ . ~ , . . . . . , ..T~ f. , - , 'fl,~ . . . . ,s,.y.S. ,~.~.V . 'L ..,'~1.. . l - . . T - ~ ~ U' - 1~ . . ~ .A l ~ i,r. . . . '1. .,i~~.. , r J nn , ~ ~ . ~ ~ i ~ ~ ~ ~ _ m ~J • . ~ . , . > ~ . . . . . . . . y ! ~ ~ ~ a~ . ~ ~ ~ ~ ~ r ~ ~ : . A13 5 ~ - ~ _ 1 _ i ~ ~ , . ~ ~ - ~ . ~ o , _ . . , ~rme J~ _ i a4t ~ ~ , asp~ a . , . . . . . . I~i~4 qlt 4 ~v~~ asp~ J . , ~ I ~r~~~el -~i~2aC m ~ ~ It ~ ~ : '~~r ' I MH 9 . ~ Na S tic V'0 r ~ f D ~ ~ 1 ) ~ ~ - ~ ~ i r ~ Vlf QF . . , ~ . . . a: .I: ~ ~ or ir~e ~ , ` i CL Ci ~ - ~ N ARG ~ ONNE R = 40$ ~ E I . ~ ~ ► ~ 1 ~ ~ ~ ! mfar ati~n j ~ ` : . . FB ,r , ~ ~ rr ~F E CL 502 ~ ~ ~ ~ • d ~ ON VA l i LLEY WAY - . . 4~4 fa nd , E ~ . . . . ~ FB ~ 524 aF w , , CL O~I ~ ~ VALLEY W AY , - ! ,~,~1 ~ ~ FB ~ ~ • - . ~ ~ ► 507 MUl~LAN ' i ~ fi Se tie .W ~ ~ ; ,D ~ I~ ~ . ~ , NB E t ; , in~armati n ~ ~ ; t ~ ~o . { ll ~ r ~ .....~i ur~clear . , . . . . . . . . , . ~ , ~ ~ f d ~ ~ ~ " ~ . ~~t I I " . . . . . . . . . . . . } 3 . ~ I ~ . ~ , ~ i I ~ 1 r ~ ~ 1 ~ . . . . . , , , , . . : ,r'i , . _ . . . i ~ ~ . ~ ~ STA ~ r ~ ~ .I : 25 STA SEE N OTE 3 ~ ~ I.E.1992.22 MH L8 I STA „ .E. ~ssa.~ STA 36 ~.F. fi SS ~ M ~ 38 LF. fi I.E. 1992.~ 11 W SS QF CL ~ 50 ~ I.E. 1987.9 .,HART 45113.0623 ~ 45173.0624 33 L.F. fi SS r n~~ ~ .3 8 L.F. fi" SS.' F np~ 45173.18Q3 LEVA~ION B ~ 1 ~ SEE 45173.0526 2002.5 _ , _ g SHEET ~5 MANHOLE SCHE~lJL~ TYPE B 20 NORTHII~~ EASTING 01.44 . . MH, I~~, TYP~ T~P RlM. EI~~V, pEPTH ('4'IKICTP1 1(`T!nN I _ - - I ' ~ ~ ~ ~ . . ~ - , R ~ ~ • ~ • ~ ~ ~ • • . . ~ . ~ • ~ ~ ~ • AIR AMP ETAIL ~ ~ . ~ ~ ~ ~ MARILY~ • OSG~l~F BY~AN & 21 A . . C ► AKER MICHA~L , , , 8 ~ ~ • • ~ ~ 4 N LLA RD . FIR~GR~VE lNUESTM~NT 303 E ~J ARGONNE RD , . ~ . 449 , . • ~ • s - . POKANE WA 99212 RR 1, P,O.BOx 225 12 ' $ ~ , . P(}~tANE WA 992 , . S , • . . SPANGL~, WA 99031 . . ~ 1. ' 4 184,~8 0 ~ . M1 ..r ~ ~ ~ : . 4. Q816 , 4 18 ~ • ~ ~ a ~ ~t: . . . . 45184.0814 , . w . r:~ :`f . . . . • ~ ~ • ~ a'~ . . . . . . ' ' . . ~ ~ ~+~a~5 ~T, & RT, , REMOVE AND REPI.ACE A.P. 2 . , - SECTION l.~N~ . . • . . ~ ~ ~ U L. F. CURg tINE ' ' N N . _ ~ WN TRANSITIQN~ • TYP~ A~ CUR~ & . , END CRa ~ + , , , ' S L~~T 5 PCC SIDEWALK _ , , , - - . . ~ - . . ~ . . J. ~ ~ . . . . • • . . • • s . r ~ , . . ~ • . • . . • ~ r • . . « . • • . • . " ~ . • ~ s . ~ . • . • . . . . . . • . , ~fr;~' a . . . . ^'"'a~ ~ ~ ' _ ~f _ _ - - = - ~ ~ _ . , . • ..~r....~ ~ ~ 's` ~ ~ ~ Y" - ^r' - " w ~ , _ - - ~ ~ ~ ~ _-..._.-.~.._~.._----i- ~ - 1 1 _ ~ - d'd ~ ~ ~ 1 - - . . . , . , , _ ~ _ ~ ~ 0 _ ~ . , . , . ~ ~ , . . r. . ~ , ~ , , , ; y,.,' . . f _ , , . , . , , `r k . ; „ , . . , ~ : ~ ~ . . . ; . , . . , . . : , jy . . - : . . . , , . . . . . _ t~. ~ . _ , . . _ . . . . ry4 ~ . . . ~ . i e . , . . , t.. . y 7- ! ~ ~ . . . . . . - . , . . ~ ~ • . ~ 1 . . . . , , . ~r , . . . . ~ ~ r ..;r.~., . . . . : . . ~ . , . . ~-..~.~i . . . . . . -i'r Ii , .r~. ....:3~ . :~r-+.., ~ ~ . 1 ' 4 f{ . . . ~ . . ; ~ .M^ a.. : . . . . . r . g ~ . . i . . . . , , ~ , . . . . ~ . ~t; ~ . . . , . , , . . . . . . . ~s , . . , , . I~.: . > . 9 ~ ~ . , . r, . _ ~ .,.a . . _ , . _ . , ~ ~ ( . . . . , r ; r: I~ , _ : . , ~ , „ : . , . . re~.~ . , . , f- . . , - . ~.j . . . t i~. ~ ryYn ".r~~`-'..~.- t~~. ' , . ' ~ ~l, r " _ , ~ i , , . ~ ~ . . . ~ f~~ ~ R r , . . . . . !f. . . . . . ~ ~ . , ~ 4. . ~ r ~ . . . ~ . . , . . . ~ . ~ . . . • ..i, , -r . . ~ . „ , . . . . . . - . . ~ ..;~.r . ' • ~ „ , . . ; i~ ~'t . . . ~ ~ , . . ; , . . ^j~% .f:i 7,,.....f; . . . L. ! . . ~ : , . a ~ ,r . . , . , . . . . : . . ~ . ~ J . . . . . . y ~ : r r ~ 1 ;s . . . . . ~ . . .i. . t~ ..,.f-~': - :.i . . . . ' ~ . ~ . . ' ~ ~ . Jrf'.. v ♦1. j~ ,.y ~ , v._ ~ .~t.~...~ . . . . . . . :.u.... . 1 a ~ . . . .l- . . - • ' r . , . :u ~ . . a ~ , < ~.i.~,. , . . . nw.. , . , ,~i . . . i . i . r., , . , . - . . . . , . ' . . • • .r . - ~ . f, r. : . . . . ' ~ l. . ~ ...1 . I~ f`" ~ f . „ , ~ . i.~ + .I . , , . . . . x ~ - . . . , , . : . . , ~ r: _ _ , . . , . . , { ~r~-...=~ : . : 4;5 , .t_.. . . . . . . . . _ . rV.' r,~ l~~. .r~~~ ~ . ~ . . . . . . . p : ~ , . . . . . . . ~ - ~ , „ ~ ~ ~:s, l.. 9 + •~'4 ' ,i.'~~ ^ ~'.i;., . 1 ~r., ~ ~a _:r, . , . . y . ~ , . . ..1 . _ ~ ' i4 ' ~ f~~ ~ io i~ . 4 ' R ~ ~ .I.~' . ~ . 1' ,.A.A ( . - _ . . , i _ . . ~ i ~ ~ - "ii . r ~ . . ! ' • ~ 1 P .t., i . l~~ . . ' . ~ . . . , . . ~ . ~ . l ~ . r . ~ . . . . . ~ ~ ~ ~ . ~ . f .4 .l'.~ C:.1 4...1 Y .'.r; A. ~ , r + ~ . . . . . . . . . . . . ~ .'r : j . ~_.r:~. . . . , . . . . ; • . r ` . . ' ~ 1 ' .i1 ~I't~r ! . ` ~ a ~.y~.i .r.'~r t s~ . : . A. i . . . . , . ~ ~ , ' , , . , . . . . ~ . . ~ ~ . . ~ . . . . _ 'r . _ . 6 ' . i ~ . ' ~ ' _Hi _ : ~ y . . : . : . . , i.~ r ~<-~'r" ~ . ~ - n, J f . t- ~7~~ . . . ~ ~ , , „ { „ : ~ . . . ~,1 .,e~ 'e . i ..~.r ' ~ r ~t.i . . . . i . . . ~ ) ..r ~ : , . l. , .I. ~ - - . ~ . . -~i.;~ < a . . , ~ , , . ra ~ f . , . , , . . . . . . . , ~ . , . . . . , , , : : , , . ~ . . . , . . ~ , 7 . . . . . . , , . , . . , . . . ; . , . . . _ , . , m . : . . . . . . , + r . ~ - - , w'^ ~ . . . . ~ . . . , . , ( ~ . . , . . . , , . : . , ~ , _ . . . . ~ . , ~ . ~ . i . . , z.,. , . , . , . u c' - , ;7r. 1., ` 1 a 't 'i a;~:. .~.t~,-?.a~. . . , ~ . .i... ~ >r :i~ n, ~ ~ . . y. ~ . ~ , ..t~. w,~, ' '[i 1,'7 II ; i. . • , . ~ , . . , ~ . . ~ , ~ . - r ^ , ~,...~+~.-....,h -w~i~. , . a i i:~! ~ . . .~.i . . :~;'w. ~ +r: , ~ ...~,.~.,-..r... ~ ~ . ~ . ~ ~i . . 11 . . ~ . ~ . ~ . , ~ .~.,r, . 7..~+-.~.. ~ , , . . ~ , . , . . . . n ~ y i . r . ~ ~ . , ~ ~ , ~r , ~ . . , ~ .A . . . C . , i' . . . , . , . . , . . . . . „ ~ - . . . . ~ . . . V . . ~ ~ . , . . . . . , , ~ . . ~...i~ ....~..,.i~ i~ ~ j . ~ . . . . . , ~ r , . ; , . , . , . . 11 . f r • i.; . . `I _ . , Y . . . . . ~ . ~ 1 . r, . ~ . , , . . . , 94;.~r 1l. . . : . ~ ~ . ~ i..:~. : . y ` ~ - ~ _ - ~ . ~ ..r~ . L, 1 ~ ~ ~'.,T w..~;~ d ~ 1 ~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . ~ ~ _ - ~ ~ ~ ~ I~ ,~~p'{ _ ~ _ - ^ _...,,.r~..~._~~~..__ ....~_~r_~-__~..._._~~ r._. , 't _~_.~w~..e_ ~ ~ ~~~.._~~~r~~..~ ~ _ ~ . . ~ . . - AND R~PLAGE ~ ~ R~MOVE ,ro ~ , , . . APP~QX, 10 L.F. . . "u R~& TYP'E A CU . . . ~ ~ . ~ . 5 PCC SID~WALK , , : v 1 1f . ~ ~~rA, z~+~s.~o : ~ ~ IN GR~WN TRANSITION ~ . ' B~G . . . . . , ~ . . WASS4N, LINDA 4 LEFT • , . ~ WASSON, '~INDA , 404 N. ARGQNNE RD ~ I~ ARGONN~ RD SPQKAN~ WA 99212 ~8 , . ~ SPOKANE, WA 99212 . . . . ~~.o~~~ L( ) 45173.~623 ' . , . . . ~ . . S,I. P,Q,S,L, STA; 23+26.40 ; ; , VALLEYWAY AVENUE EAST ' ' : . , SEE WHEELCHAIR RAMP DETAiL SHEE~ i 3 0~ 21 . . . . . , . , . Q . . F ARGaNNE ' ' N CQRNER 0 F ~`.H. E BQLT 4 , W FLANGE A13 5 ~ F,H. W. SIDE OF ARG~NNE ~ ► W~Y AVE, AND UALLEY U) ~NAY AVE. = 2D44,fiZ E~EV. W R 2: ~ TBM S RNER OF MULLAN AN BO T 1N F.H. NE. CO ~ 1 SW. FL GE L , 3 oF ~u~~.a~ P.P, W. SIOE . M 12 RR SPIKE !N , ~ ~ ~ AND VA~LEY WAY AVE. ' WAY AVE, N 4F VALLEY ~~a . . V. - 2005.11 ~ ~ , ELE . . ~ V, = 2003.29 , . ~ . EI.E • • i ;FAGlNG ~ • ; ; . . ~ . . 353 ' ; , ~ ~ { i s a .u_.._ ~ { ~ M. 3 i. r ~ i 9~ y ~K ~ a r^ 6 _ w r o . 1 } - - . a W s ~ f ~ $ F t ' ~ 4. i 4 n . b ~ J k  i 4 3 ID Y ~ i E i - - } , z~ d ~ ~ i a - v ~ 1 z ?g. i p. a t~ I 3