2013, 01-14 Permit: SW-13000010 SewerSPOKANE COUNTI+BUILDING AND PLANNING
PERMIT
Application Number: SW -13000010
Permit Issued Date:
01/14/2013
Expiration Date: 01/15/2013
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GRANDVIEW ACRES
SEWER
Primary Contact
Applicant:
Address
Phone:
Email
LARRY MILLER EXCAVATING
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area.
Zoning
11618 E FREDERICK AVE
45091.0458
MIRABEAU RANCH
ADDITION
MIRABEAU RANCH L3134
Water District: Irvin
Water District #6
Owner:
Address
Phone:
Email:
ROMERO, MARYLN A
12809 E 23RD AVE
SPOKANE, WA 99216
Fire District: Spokane Valley Fire
Land Area- 12600 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LARRYME918DR
LARRY MILLER EXCAVATING
7117E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
5125.00 S125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 01/14/2013 12:35 43
Printed by:I15 APPPOOL\SmartGovProdApp
SPOKANE COUNTY'BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000010 01/14/2013
Expiration Date: 01/15/2013
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/14/2013 12.35:43
Printed by 113 APPPOOL\SmartGovProdApp