Loading...
2013, 01-14 Permit: SW-13000010 SewerSPOKANE COUNTI+BUILDING AND PLANNING PERMIT Application Number: SW -13000010 Permit Issued Date: 01/14/2013 Expiration Date: 01/15/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION GRANDVIEW ACRES SEWER Primary Contact Applicant: Address Phone: Email LARRY MILLER EXCAVATING LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area. Zoning 11618 E FREDERICK AVE 45091.0458 MIRABEAU RANCH ADDITION MIRABEAU RANCH L3134 Water District: Irvin Water District #6 Owner: Address Phone: Email: ROMERO, MARYLN A 12809 E 23RD AVE SPOKANE, WA 99216 Fire District: Spokane Valley Fire Land Area- 12600 Square Feet CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7117E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 5125.00 S125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 01/14/2013 12:35 43 Printed by:I15 APPPOOL\SmartGovProdApp SPOKANE COUNTY'BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000010 01/14/2013 Expiration Date: 01/15/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/14/2013 12.35:43 Printed by 113 APPPOOL\SmartGovProdApp