2009, 04-13 Permit App: 09000850 GarageProject Number: 09000850 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/13/2009 Page 1 of 2
Project Information:
Permit Use: NEW 24 X 32 DETACHED GARAGE
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: Name: Range
Contact: HORSTKETTER, BRIAN J
Address: 7909 E GLASS AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Phone: (509) 990-3501
Group Name:
Project Name:
District: Nort
Parcel Number: 45063.2707 Block:
SiteAddress: 7909 E GLASS AVE
Location:: CSV
Lot:
Owner: Name: HORSTKETTER, BRIAN J
Address: 7909 E GLASS AVE
SPOKANE VALLEY, WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE
Area: 17,625 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Hold: '
Depth: 0 Right Of Way (ft): 0
Released By:
Originally Released: 4/13/2009 By: tmelbourn
Released By:
Landuse/Zoning/HE Conditions
Permits:
Originally Released: 4/8/2009 By: tschmidt
Operator: jmm Printed By: jmm Print Date: 4/13/2009
Project Number: 09000850 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/13/2009 Page 2 of 2
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Sq Ft Valuation
GARAGE U-1 VB 24 X 32 768 $14,592.00 768 $14,592.00
GARAGE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
APPROACH PERMIT REQUIRED
Payment Summary:
Permit Type
Building Permit
Totals: 768 $14,592.00 768 $14,592.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$251.25
$4.50
$100.50
$356.25
Fee Amount Invoice Amount Amount Paid Amount Owing
$356.25 $356.25 $100.50 $255.75
$356.25 $356.25 $100.50 $255.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 4/13/2009
Spokane
jValleya
Community Development
Residential Con
Permit Applicat
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX
www.spokanevalley.or
stfatCtion Nvsk
ti�09
ion
t5V'
SITE ADDRESS: 7 Ct 0 et. G , ((' S5
PERMIT NUMBER: Y -0b) U
PERMIT FEE:
New Construction
Accessory Bldg
Addition/Remodel n Deck
n Other:
i,& ILy w ; ot, 4o..l
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
g
DIMENSIONS:
Name: R ri 1. -or 5 1 -kc li-e-7
Name:
Address: -) `io <, 4 . V lis}
2"" FLOOR SQ. FTG:
N A
Ci State:
�': S'pc✓.;.., tI., Ivy wry
Zip: 40, . i L
Fax:
Phone:(60 50 ri-) t``to 3 Su i
City:
Contact Person
Name: t i a 0t5 J-i(e,
Phone: CS U q ) `t "t u -3 sot
Describe the scope of work in detail;
/illir.J �, fL s 5l.3 40c C.
1-rc.
Proposed Use:
ft% V et 471
6
"
Contractor:
g
DIMENSIONS:
# OF STORIES:
Name:
MAIN FLOOR TO SQ.
FTG: Iv n
2"" FLOOR SQ. FTG:
N A
Address:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE:,, I
l �r �
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ 350
iG " o 61 ir/' (J' (-o r,t,
o•, <i .lir , 3 1-11 o h..J-
**************The followin MUST be complete: (write N/A if not alicable**********************
pp )
HEIGHTO PEAK:
g
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: Iv n
2"" FLOOR SQ. FTG:
N A
UNFIN BASEMENT SQ. FTG:
J P -.
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
i (o --
O
DECK/COVNP�4TIO SQ. FTG:
t'�"
30% SLOPES ON
PROPERTY: NIt
# OF BED OMS:
CONSTRUCTION TYPE:
51-, c* hf,rnc
HEAT SOURCE:,, I
l �r �
SEWER OR SEPTIC?
�V A"
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE: -/--- O
❑ Mastercard 0 VISA
Expires: VIN#:
Spokane
.000Valley
Site Address: 7909 E GLASS AVE
Parcel Number: 45063.2707
Zoning: R-2
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project 0
Previous pre -app meeting 0
Plan revisions 0
Transmittal Date:
Monday, April 06, 2009
Project Number:
Water District: ORCHARD AVENUE
09000850
Applicant: HORSTKETTER, BRIAN J
7909 E GLASS AVE
SPOKANE VALLEY, WA 99212
(509) 990-3501
e-mail:
Contact: HORSTKETTER, BRIAN J
7909 E GLASS AVE
SPOKANE VALLEY, WA 99212
(509) 990-3501
e-mail:
Contractor: OWNER
( ) - 0
Owner: HORSTKETTER, BRIAN J
7909 E GLASS AVE
SPOKANE VALLEY, WA 99212
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project NEW 24 X 32 DETACHED GARAGE
Description:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
N
CONSTRUCTION PLAN
SITE PLA
N
TD
S
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spary.okan��Valley®
For City Use Only
PLUS Project Number `-1_ Cid`>( )
Project Address —ix)
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
ji ��
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
sr-
ckV(�s5
i Dc � ` � Ile. '^',P`
pov-
Elt
1-1
ce—
. j
PLANNING DEPT. APPROVED
DATE:
/10
crz
NT