Loading...
ZE-0053C-80 .r ~ lb r SPOKANE CUUNTY HTARING E R Change of Conditions for an exlsting ) FINDINGS OF FACfi, Zone Recla.5sification, in the exi,sting ) CUNCLUSIONS UF LAW, NeighborhQOd Business (B-1) Zone, ) AND► DECISIUN Appt2cant• Cantu Investments, Inc } File No ZE-53C-80 y I. SL;1117MARrY UF PROPUSAL AND DECISIUN Proposai: Application for a change of condrrions to a previous zone reclassification, in the existing Neighborhood Busmess (B-1) zone, for revlew and appraval of a srte plan far the development of of~'ices on 1 14 acres of Iand Decision; .Apgraval, subject to condxtions The Heanng Examiner has reviewed the appliearion for a change of cvndltions, and the evidence of record, and hereby adopts the follawmg findmgs of fact, conclusions of law and decision 11. BACKGROUND/FINDINGS 4F FACT A. Generallnformation: Appficant Cantu Investrnents, LLC, cla Dan Cantu, 15504 North Chromcle Court, Mead, WA 99C?21 Address: 1414 North Mullan Road, Spokane, WA Location: Generally locaxed north of and adjacent to Sinto Avenue, east of and adjacent to Mullan Road., in the NW %4 of the NW i/4 af Section 17, Township 25 Nerth, Range 44 EWM, Spakane County, Washington Legal Description: The South Half (1/2) of Tract 20 of apporturuty, per glat thereof recvrded Yn Volume "K" of Plats, page 20, records of Spukane Caunty Audrtor,lyiag east of Mullan Road and north of Sinto Road, Except the South 5 U feet thereof deeded for road nght of way, Situate in the County of Spokane, State of Washmgton Parcel Number: County Assessor's tax parcel no 45172 0752 Zoning: Neighborhvod Business (B-1) zone, subject to the condihons of approval in Division of Plaruung File No ZE-53-80 The Sate is also located inside the Aqiufer Sensitive (3verlay zone and the Pubhc Transit Benefit Area designated m tie Countjr Zonutg Cade HE Findings, Conclusions and Decision ZE-53C-80 Page 1 ~ a ~ . Comprehensive Plaa: Major Commercial and Urban categones The site is also located inside the Aquifer Sensihve Area, the Pnonty Sewer Service Area and the Urban Impact Area designated in the Comprehensive Plan Environmental Review: A Determinahon of Nonsigruficance (DNS) was issued by the County Division of Building and Code Enforcement on December 29, 2000 Site Description: The site is approximately 1.14 acres m size, is relatively flat in topography, and undeveloped. The site fronts along Mullan Road and Sinto Avenue. The subject parcel is designated as Parcel C on Binding Site Plan No BSP-59-97, wluch was recorded on June 12, 1998 Land Use History of Site: In 1980, a 5 1-acre parcel of land itonhng along Mullan Road and Sinto Avenue, including the land represented by the current site, was rezoned from the Agncultural Suburban (AS) zone to the Local Busmess (LB) zone, under the now expired Spokane County Zoning Ordinance See final decision in File No ZE-53-80 The rezone was condinoned on subnuttal of a srte development plan for review at a future pubhc heanng, and the restnchon of velucular access along Sinto Avenue to the parcel's frontage lyuig wrthui 190 feet east of Mullan Road, except for emergency velucle access points approved by the County Fire Marshall Effechve January 1,1991, the zoning of the 5 1-acre parcel was re-designated to the Neighborhood Busmess (B-1) zone, pursuant to the Program to Implememt the Spokane County Zorung Code. The Program to Implement specifically preserved the condihons of approval attached to the pnor rezone of the site, in re-designating the zoiung of the property under the Zoning Code See County Resolution No. 85-0900, Program to Implement, Zone Classificahon Transihon Guide. On November 12, 1997, the Hearuig Examiner approved a change of cond.ihons apphcation for the easterly 2 75 acres of the 5 1-acre parcel This included approval of a site development plan that proposed deveiopment of a large office bullduig on the westerly 2 26 acres, and a small office structure on the easterly 49 acres The srte plan illustrated a pnvate dnveway extend.ing westerly through the easterly half of the current site, and accessing Sinto Avenue duectly across from its "T" intersection wrth Stout Road. The srte plan also illustrated an emergency fire access dnveway to Sinto Avenue at the southeast comer of the westerly 2 26 acres, closed off by a chaui and padlock The Exanuner's decision specifically limrted development of the change of condihons area to the concept presented m the approved srte plan See Heanrig Exanuner decision in File No ZE-53A-80 On June 12, 1998, a final binding site plan was recorded for the westerly 4 62 acres of the above- referenced 5 1-acre parcel, referenced as Biading Site Plan No BSP-59-97 The binding site plan divided the westerly 4 62 acres of such parcel into 3 parcels, consisting of the current srte of 1 14 acres, a 1 14 acre parcel located directly north of the current srte, and a 2 34-acre parcel that included the 2 26-acre portion of land involved in the change of condinons in File No ZE-53A- 80. The binduig srte plan illustrated a 30-foot wide dnveway easement extending along the entire south boundary of the current site HE Findings, Conclusions and Decision ZE-53C-80 Page 2 ► C}n September 11, 1998, the Hearuig Examwer demed an application to change the conditions unpased for the 2 75 acres involved in Frle No ZE-53A-80, whiah saught to revise the approved site plan to make the emergency access Iocated at the southeast corner of such land a full dnveway access, move the wes#erly dnveway access alang Sinto Avenue to the southwest corner aF sucb land, and delete the dnveway access through the current site See Heanng Examiner decision in File Na. ZE-53B-80 Area Rvad Network: The County Artenal Road Plan designa#es Mullan Road and Argonne Road as Prlncipal Artenals. Such roads fonn a one-way couplet direc#ly west of the s1te, wluch couplet cvmpnses a major traffic and commercial carridor through the Spokane VaIley area +af the county 1Vtssion Avenue to the north is designated as a Muior Artenal Interstate 90 is located a few b1ocks north af thE site, and has an interchange at Argonne Road/Mullan Road Staut Road termsnates alang the south side of Smtv Awenue, at the nudpomt af the site. Smta Avenue and Stout Road are designated as Local Access roads by the County Artenal Road Plan Surroundiag Coaditivns: The Major Commercial category of the Cornprehensive Plan extends along the Argonne/Mullan Road comdor in the area, bzsectmg the current site approxunately in half Such category ws.dens out north of Mission AvenuE, m proxnuty to the I-901Argonne Road interchange. The remauYder of the land in the area is designated in the Urban eategory. The 2.34-acre parcel Iocated east of the site is develope+d with a large office complex, alvng with associated parlang and landscaging Access ta such parcel is provided by a pnvate dnveway, whuch beguis on the site opposrte Stout Road and extends easterly across the frontage of the site to the off ce complex an th+e 2 34-acre parcel to the east An emergency fire department access to Sintfl Avenue is lacated at the southeast corner of the 2 34-acre parcel, which is closed to general vehicular access by a chauz and lock The latid Iymg north of the site Ys zoned Regional Busmess {B-3}, and is developed wnth a large Holiday Iun. The land between Stout Road and Mullan Road, fronting along the sou#h side of Sulto Avenue, is zcyaed B-1 The land 1ymg south of Slnto Avenue, east of Stout Road, as well as the land lying east of the srte, 1S ZDIIed Urball ReS1deIItlal-3 5(CTR-3 5) and umproved wrth srngle-family residences The Argonne/Mu.llan comdor m the area is dominated by commereYal zomng and Iand nses Pruj+ect Descriptian: The applicatxon for a change of condrtions seeks approval of the site plan of record dated November 1, 2000, to satisfy a reqcurement of the 1984 rezone of the site and adjoinsng land that required site pian review at a public heanng The site plan of record fflustrates a 8,431 square faot, 2-story office bml.ding m the nc►rth central pozrtion of the site A new dnveway is illustrated in the northwest cQrner of the site, accessmg Mullan Road The site plan illustra.tes relocation of the exist3ng dnveway that serves the office cornplex on the parcel located to the east, by movtng rt directly narth of rts existing location on the site, remQVing the curbs aiong its north and south borders, arrd moving the cinvEway entrance aiong Sinto Avenue a short distance to the east, to a point lymgjust east of Stout R.oad The relvcated dnveway would allow traffic fram the current site to access such dnveway, along with the property to the east HE Findings, Conclusians and I3ecision ZE-53C-80 Page 3 , w l Approxunately 76 paved off-street parkuig spaces are illustrated on the srte plan of record The building coverage is approximately 16%, and landscaping is proposed for about 28% of the site. A five (5)-foot wide stnp of Type III landscaping is illustrated adjacent to Sinto Avenue and Mullan Road A 14-feet high monument-type sign is proposed at the southwest corner of the site, near the intersection of Sinto Avenue and Mullan Road. On February 23, 2001, the apphcant subnutted a revised srte plan dated February 19, 2001, which illustrates the dnveway easement along the south boundary of the site located m its existing location, subject to certain modifications to allowjoint access See letter dated 2-22-01 from Ron Macicie of Architectural Ventures, and attached revised srte plan B. ProceduralInformation: Applicable Zoning Regulations: County Zomng Code Section 14.504 040 and Chapter 14 624, and Program to Implement the Spokane County Zomng Code, adopted by Spokane County Resoluhon No 85-0900 Hearing Date and Location: February 14, 2001, Spokane County Pubhc Works Building, Lower Level, Commissioners Assembly Room, 1026 West Broadway, Spokane, WA Notices: Mailed• January 26, 2001 by apphcant Posted January 26, 2001 by apphcant Publrshed January 26, 2001 Compliance The legal requirements for pubhc nohce have been met. Hearing Procednre: Pursuant to Spokane County Resolution Nos 96-0171 (Heanrig Exanuner Ordmance) and 96-0294 (Heazing Examiner Rules of Procedure). Testimony: Jim Falk Scott Engelhard Division of Planning Division of Engineering 1026 West Broadway 1026 West Broadway Spokane, WA 99260-0240 Spokane, WA 99260 Don Beres 9317 East Sinto Spokane, WA 99202 Items Noticed: County Generahzed Comprehensive Plan, County Zomng Code, County Code, County Standards for Road and Sewer Construchon, County Guidelines for Stormwater Management, County officlal zoiung maps, and County Artenal Road Plan maps County Resoluhon Nos 99-0261 (revising Road Standards), 97-0874 (revising intenm regulahons for County IUGAs), 96-0294 (Heanng Examiner Rules of Procedure), 96-0171 (Heanng Examiner Ordinance), 85-0987 (revising HEC orduiance), 85-0900 (adopting County Zonuig Code, and Program to Implement Zomng Code), and 81-1078 (revising HEC Ordinance) Spokane County Ordinance No 78-1027 (Heanng Exanuner Committee Ordinance) Final land use decisions referenced in Staff Report and in this decision HE Find.ings, Conclusions and Decision ZE-53C-80 Page 4 l Procedural Matters: At the public heanng held on February 14, 2001, the lessee of the adjacent property to the east, Dakotah Duect II, L.L.C, objected to the revisions to the driveway access to Sinto Avenue located on the site, as illustrated on the srte plan of record Dakota Direct requested additional tune to comment in wnhng on such changes, wluch was granted by the Exammer The apphcant for the project did not appear at the public hearmg held on February 14, 2001, based on a nusunderstanding regarding the tune of the hearing on such date The apphcant showed up at 10 30 a m on the same date, when a separate item was scheduled The Exammer advised the apphcant at such time, off the record, of the issue raised by the adjoirung property owner regarduig access, and gave the applicant an opporturuty to respond m wnhng regarding such issue Between the pubhc heanng and February 26, 2001, Dakotah Duect and the appllcant subnutted correspondence to the Exammer on the dnveway issue On February 28, 2001, a letter was submitted by Donald Beres, on behalf of Dakotah Direct, requestuig addrtional time to respond. The Exanuner had lus secretary advise Donald Beres by telephone that he had until March 1 to subnut any final comments. Nothing was received from Beres by the end of March 1 The Exanuner's secretary contacted Beres on Fnday, March 2, to see if any additional uiformanon was going to be submrtted Mr. Beres advised that the issue of access had become a legal issue, and that he was having trouble gettmg in contact with his attomey. On March 5, the Exammer had his secretary advise Beres' office by telephone that the record was closed. Items in Record: The record includes the electroruc recordmg of the February 14, 2001 pubhc heanng, the documents in File No ZE-53C-80 at the tune of the public hearing, the correspondence received from the parties after the pubhc heanng through February 28, 2001, the respective site plans of record and Examuier's wntten decisions in File Nos ZE-53A-80 and ZE-53B-80, final Binding Site Plan No BSP-59-97, and the rtems taken notice of by the Exanuner M. FINDINGS OF FACT & CONCLUSIONS OF LAW/ LAND USE ANALYSIS A AiDnroval cntena The County Heanng Exammer Ord.uiance authonzes the Heanng Exammer to grant, deny or grant with such condrtions, modificahons and restnctions as the Examiner finds necessary to make a land use apphcarion compatible wrth the Spokane County Generalized Comprehensive Plan and development regulahons. See County Resoluhon No 96-0171, Attachment "A", paragraphs 7(d) and sechon 11 Development regulahons mclude, wnthout hmrta.tion, the County Zomng Code, the State Envuonmental Pohcy Act (SEPA) and the County's Local Environmental Ordinance (chapter 11 10 of Spokane County Code) The County Zomng Code references change of condihons apphcarions, but does not estabhsh specific cntena for approving such applications Zonuig Code 14 504 040 requires that an appucation for any sigruficant change to the site development plan approved for a pnor rezone, or to change the conditions of approval unposed on a pnor rezone, be approved by the Heanrig Body following a pubhc hearing. 2orung Code 14 402 120 references change of condition apphcahons related to a pnor rezone HE Findings, Conclusions and Decision ZE-53C-80 Page 5 . ~ Since a change of conditions application modifies a pnor rezone action, the cntena for approving a rezone is generally applicable Section 14.402 020 of the Zonuig Code authonzes amendments to the Code based on any one of six (6) grounds, without differentiahng between amendments to the zorung text of the code and amendments to the official zoning map Zoning Code 14 402.020(1) authonzes the Code to be amended if it is consistent with the Comprehensive Plan and is not detnmental to the pubhc welfare Zorung Code 14 402 020(2) authonzes a Code amendment where ".[c]hanges in economic, technological, or land use conditions has occurred to warrant modification of this Code These are the most relevant cntena for consideranon of a change of conditions applicarion Zoning Code 14.100 104 states that Code provisions shall be uzterpreted to carty out and unplement the purpose and intent of the Comprehensive Plan, and the general plans for physical development adopted by the Board of County Commissioners Zonuig Code 14 100 106 states that when the Zoiung Code conflicts vcnth the Comprehensive Plan or other adopted plans and regulations of the County or other regulatory agencies, the more restncrive provisions shall govern to the extent legally pernussible and the Zorung Code provisions will be met as a muumum The Comprehensive Plan rtself indicates that rt should be used as a reference source and guide for making land use decisions. See Comprehensive Plan, p 2. The "decision guideluies" set forth in the respechve sections of the Plan are to be used as a guide to determine whether or not a particular proposal should be approved, conditioned or derued In considenrig a rezone apphcation, Washuigton case law generally provides that (1) there is no presumption m favor of the rezone, (2) the applicant for the rezone must prove that condrtions have substanhally changed in the area since the last zoiung of the property, and (3) the rezone proposal must bear a substantial relahonship to the public health, safety or welfare Parkrrdge v Seattle, 98 Wn 2d 454,462 (1978), and Bjarnson v Kitsap County, 78 Wn. App. 840 (1995) General conformance wrth a comprehensive plan is usually requvred before a rezone can be approved Cihzens for Mount Vernon v City of Mount Yernon, 133 Wn 2d 861, 873 (1997), and Cathcart v Snohomish County, 96 Wn 2d 201, 211-12 (1981) Some cases have dispensed vvith the changed circumstances reqturement where the rezone closely unplemented the policies of the comprehensive plan. Bjarnson v Kitsap County, supra ; Save Our Rural Environment v Snohomish County, 99 Wn 2d 363, 370-371 (1983), and Tugwell v Kzttztas County, 90 Wn App 1, 8, 951 P 2d 272 (1999) Waslungton case law indicates that where a comprehensive plan conflicts with zoiung regulations, the provisions of the zoning code will usually prevall See Weyerhaeusep v Pierce County, 124 Wn 2d 26, 43 (1994), Cougar Mt Assocs v Kzng County, 11 I Wn 2d 742, 755-57 (1988), and Nagatani Bros v Commcssioners, 108 Wn 2d 477, 480 (1987) A change of condirions is not a rezone, because rt does not change the actual zone of the property However, a change of condrtions application may sigruficantly affect condihons of approval, as well as the permitted uses, locahon of bwlduigs, landscaping, conditions of approval and other features in a site development plan, approved in conjunction with a pnor rezone A HE Findings, Conclusions and Decision ZE-53C-80 Page 6 ~ changed condition apphcation may logically be jushfied by the same changes that supported the onginal rezone, as modified or supplemented by more recent changes that have occurred in the area B The vroposed change of condihons, as condihoned, bears a substantial relahonslup to and will not be detnmental to the public health, safetv and general welfaze; Qenerallv conforms with the ComDrehensive Plan, and comnlies vcnth the Spokane Countv Zonuig Code and other annlicable development reeulations t Need for chanee of condihons aDnlication The 1980 rezone of the site requued that a site development plan be subnutted for review at a public heanng pnor to any site development The Exanlixier's previous decision in Ffle No ZE-53A-80, mvolving the adjacent property to the east, concluded that a change of condzhons was required pnor to site development, to review the site plan for development on such adjacent property Such findmg was reinforced in the Exammer's decision ui File No ZE-53B-80, whereui the Examiner deiued a request to eluninate access for the adjoining property through the current site, in exchange for access along the south border of such adjacent property The Examiner hereby adopts by reference the analysis contasned in the Examiner's decision in File No ZE-53A-80, regarduig the need for a change of condrtions apphcation Also see County Resoluhon No 85-0900, Program to Implement, p 3"Contractual Conditions", p 9 "Cross-over Schedule II", and p 10 footnote #3, and Donwood, Inc v Spokane County, 90 Wn App 389, 957 P 2d 775 (1998) The apphcant subnutted a site plan for the current project, dated November 1, 2000 The site plan appears to show the driveway access on Sinto from the current srte more than 190 feet east of Mullan Road This is inconsisten# wrth the conditions of the 1980 rezone, and would separately requue approval of a change of conditions in the current matter 2 Aunhcable Comvrehensive Plan vohcies a. "Transition volicv" The west half of the site is designated in the Major Commercial category of the Comprehensive Plan, while the east half is designated in the Urban category Because the srte is m two land use categones, the "transition area." guideluies discussed m the Comprehensive Plan may apply to the proposal The introduchon to the Comprehensive Plan, on page 11, contains the following statement, under the heading "Guidelines for Morutonng and Amending the Plan" Transition Area The area along the boundary between two or more land- use categories cs the "transitlon area " It is the intent that the establtshed boundaries between land use categones aYe aceurate and definable on the ground, but zt zs also recognized that a speclfic proposal may cross or be adjacent to these boundaraes and be sttuated rn a"transition area " In these instances, depending on the impacts to ewtzng land use categorces and the drstance a use intrudes into on adjacent category, an amendment may not be required In those cases where the determanation t.s that the HE Findings, Conclusions and Decision ZE-53C-80 Page 7 ~ proposal rs not in the transztion area, a Comprehensive Plan amendment may be necessary The Comprehensive Plan glossary contains the following related defuutions Transihonal areas-The fringe areas between two or more Comprehensive Plan land use categories Thi.s ts an area which can allow developments complying wath either of the Land-Use map Categones dependent upon the decisron makers'srte spec f c approval Transitional buffering Buffering techniques which mtght be required on !he periphery of two or more Comprehensave Plan land use categoraes to ensure compahbility Such techniques might include increasang the dot sTZes on the pertmeter of a development which abuts another land use category to create open space between two potentially tncompatible uses "Buffenrig" is defined by the Comprehensive Plan glossary as a" technique of separating incompatible land uses by distance, changuig density, landscaping, screerung andlor physical features or structures" "Compatibility" means [when] two different land uses exist adjacent to one anot.her in such proxinuty to one another that adverse impacts are insigruficant". b. Urban cateeorv Dolicies The srte is designated in the Urban category of the Comprehensive Plan. The Urban category is intended to provlde the opportunrty for a"crtylike" envu onment, wluch includes vanous land uses, residential development and a high level of pubhc facihhes and urban services. It is pnmanly a residenhal category of smgle-farruly, two-family, multi-fanuly, and condomuuum buildings along vnth neighborhood commercial, hght mdustnal, and pubhc and recreanona.l facilities. The Urban category recommends a residential net densrty range of 1 to 17 uruts per acre. The more intensive uses in the Urban category, such as hght industnal and neighborhood commercial, are expected to be located near or along the heavily traveled streets. The least intensive single-fanuly residenhal uses should be isolated from the noise and heavy traffic, while mulhfaznily structures will usually be a transitional use located between single-fanuly residenhal and the more intensive areas See Comprehensive Plan, Sechon 1, "Purpose" and "Detailed Defuuhon" The Urban category includes the following relevant objectives and decision guidelines Deci.rion Guitleline 1 1 1 Urban development will be approved in areas havzng adequate power supplies, water, sanitary and storm sewers, streets, and school and fire servtces provtded that such development meets the intent of other Objechves and Decision Guidelines of this section Decision Gurdelane 114 A varcety of densitzes and residential uses should be available to provide a freedom of choice to live in Urban areas with varying densrhes, combtnations, or miac of uses (see detatled Urban definitions) HE Fmdings, Conclusions and Decision ZE-53C-80 Page 8 ~ Decision Guideltne 13 3 All Urban development proposals should require publtc sanitary and storm sewer systems or rntertm sewer systerns to protect water qualtty Goa11.5 Encourage a healthful and pleasing environment in the County's restdenhal areas Decasaon Gurdeltne 15 1 Buffering and/or landscaping will be used to mitigate the dtf~`'erences between proposed developments and exasti»g uses Objechve 1 S c Encourage paved streets and sadewalks in exasting and future developments where they are appropraate to the nature of the development Decision Guzdeline 15 4 Szdewalk facilahes will be required along arterials connectang resadential areas wath corrcmunityfacilaties and/or commercaal areas Objective 1 S e When a neighborhood ezperiences pressure for change in character, such change shall be permttted upon approprzate review 4bjecnve 15 8 When determining whether a proposal wall change the existing land use character of an area, factors to consader may anclude a) the structure hetght of the proposal in relahon to structure height of nearby structures, and b) whether new structures will have a posihve or negahve ampact upon the neighborhood 's architectural character Deei.saon C'ruideltne 1 61 Before land use proposal are approved they should a) conform to plans, poltcies and regulanons of County water, sewer, storm sewer, utilaty and special servace dtstricts, b) conform to County transportation plans and polictes, and c) identify and take steps to resolve sjgnzftcant adverse impacts upon exashng utilities, (a e water, sanztary and storm sewers, utility, available arid future energy resources), and traffic systems "Fill-in development" ls defined m the Comprehensive Plan as development lying between and in close proxunrty to at least 2 existing developed geograpluc areas, havmg densities and land uses wluch conform to the Comprehensive Plan Map categones designated for those areas, and wluch would aid m the econonuc support of public service by increasing the cost- effectiveness of uhlities and public facihties and services Comprehensive Plan, Glossary c Mator Commercial categorv pohcies The Major Commercial category of the Comprehensive Plan is intended to provide the opporturuty for development of commercial uses, " specifically commuiuty and regional shopping centers and commercial uses, duectly related to major throughways" Comprehensive Plan, Major Commercial category, p 99 The Major Commercial category includes the followuig relevant descnpnons, charactenstics and pohcies Residentcal use in Major Commercial areas is not intended to be a high priortty in thts category and may be Itmited to preexisting uses Certain HE Findings, Conclusions and Decision ZE-53C-80 Page 9 ~ residentaal uses, partzcularly multzfamaly developments, may be compatible through the use of proper screening and perf'ormance standards The Major Commercial Category wrll be composed of three different types of commercial development shopping centers, highway and arterial commercial strrps, and freeway commercial The shopping centers are further broken down into three subcategories (neaghborhood, communlty and regaonal) which relate to szze of szte, trade area to be served and type of tenants wrthan the shoppang center ?'he tenants range from supermarkets, drug stores and Laundromats to full- line department stores, highly specaalized shops and professional offices The consumer goods of j`'ered an strip development frequently daffer from those found tn shopping centers Typtcal bustnesses found along a strzp often include new and used car sales, fast food establishments, bars and fruit/produce stands Freeway commercial areas are usually made up of more specialized commercial uses Freeway tnterchange areas are usually orzented to single stops along the freeway for food, gas and lodgrng Major Commerczal areas feature high-intensity uses The heavy automobale traf,~'ic and the related congestaon may create pollunon problems, especially along the commercial strip developments The shopping center a.s a commercial development whzch a.s generally designed, developed, operated and controlled by a single ownership, with off-street parlang facalahes placed on the site to serve all of the establishments rn the center The eenters may range rn siZe from 4 acres with 30, 000 square feet of leasable floor space to over SO acres with 1, 000, 000 square feet of leasable floor space Hzghway and arterial strzp commercial areas will usually be ntade up of businesses on tndivtdual parcels clustered along a heavtly traveled street or haghway, each providang o, fj`=street parlang Shopping is not done by walking from one store to another, but rather ts of a sangle purpose nature Most commercial development wrll be on relatavely flat land and buildings will be of a low profile Paved parking, streets and man-made structures wall dominate the srte, with few natural features to be found Landscapcng, screening, lighting, signage and other archttectural treatment will provide for aesthetacally pleasing development Pleasing aesthetac and archatechcral treatment of new development which elzminates or as generally not characterued by sagnage clutter, provides matntained landscapang, screens exterior storage, provides sujfzcient setbacks and screens parking areas, should foster improved land use compahbalzty with adjacent non-commerctal uses and should support existrng and attract new viable commercial development HE Findings, Conclusions and Decision ZE-53C-80 Page 10 r Major Commercral areas require a full line of servtces and utilzhes These tnclude service by, or commttment to, sanatary and storm sewers, public water systerns and underground utilines such as telephone, gas and electricrty Also avaalable will be paved and lcghted streets, parlang lots, street maintenance, garbage collection and police and fire protection In most cases intensive farming activities, mining and heavy rndustrial uses would be incompatable with Major Commercial uses Ljkewrse, most sangle famlly residenhal areas and schools would not be compatible wathin the Major Commercaal Category unless proper screenang and perfornzance standards are establtshed Goa161 Promote development of commercial land in a manner whzch ts complementary and compahble with adjacent land uses and the surroundang environment Objective 61 a Commercial developments should be buffered to protect adjacent areas Objective 61 b. Provade for aesthetacs of development along County Arterials and State Highways or Freeways. Decasaon Guideline 61 1 The best means of encouraging compatibality between commercial uses and adjacent land use categoraes wzll be accomplished by considering a) orientahon of the structures and/or facilitaes of the proposal to maintaan or improve upon the aesthetics and energy efficiency of all areas a,,~`'ected by the proposal, and b) provr.ston of bufferrng needs, and c) provrsion of landscapang needs Decasron Gutdelane 612 Buffertng or spanal separation between proposed and eaashng uses should be required of a developer if determined that the proposed development's physical characterishcs may be objecttonable to future development on nearby lands Decr..rion Guidelane 6 13 Provide for aesthetzc quality of physical development and land use along nghts-of-way for Arterials, State Highways and Freeways within the Urban Impact Area (UTA) of Spokane County as follows a) The rights-of-way as described above would be intended to have an aesthetically pleasing vtew as seen by the traveling publrc and adjacent property owners when they are developed with commercaal uses b) Standards regarding landscaping, signage, storage and architectural treatment should be developed for uses located along these rights-of-way Objective 61 c Requzre developers to provtde sufficient land for off- street parkcng at commercial srtes HE Fmdings, Conclusions and Decision ZE-53C-80 Page 11 ~ Objective 61 d Encourage adequate circulation patterns and commercial areas and provide planned access to public transat Deccsion Gurdeline 615 Before commercial proposals are approved they must a) conform to plans, policies and regulations of County water, sewer, storm sewer, utality and special servrce dzstrtcts, and b) identify and take steps to resolve adverse impacts upon exastang water, sewer, storm sewer, utilaty, avarlable and future energy resources, and special service district systems Decisron Guidelzne 61 6 Before approvtng proposed commercial developments, it should be determaned that a) the proposal has adequate on sate areas for extshng and potential parking and storm dratnage control and b) the proposal considers the Ympact upon exi.snng or planned transportahon facalzties and conforns to County transportation plarr.s and polacaes, and c) the proposal considers access to existing and planned publzc transat and routes Objective 6 I f Encourage multiple-use centers Objecttve 61 g Encourage the clusterzng of commerctal uses that are ortented toward the urban or regzonal market Deci.sion Guideline 61 1 7. Multiple-use clustering proposals complementary to exrshng and✓or proposed commercial development will be poszhvely considered when such proposals accomplish the intent of establi.shed County poltcies, standards and crateraa Some examples anclude a) shanng physical factlities such as angress and egress, parking facalrtaes, sidewalks, signs, buffertng and landseaping facjlahes, or b) providang cooperatave amenities zn landscaping and/or annovatzve design features Decision Guideline 61 9 Clusterang of uses, when it ancreases cost effectzveness of utilttzes and/or transportatton will be the preferred commercial development pattern Objectave 61 j Consider small-scale convenaence stores and commercial enterpreses adjacent to residential necghborhoods Dectsaon Guzdeline 61 11 Residentaal communaty shoppang centers should be based to serve between S and 10 resrdential nerghborhoods or 25, 000 and 50, 000 people HE Findings, Conclusions and Decision ZE-53C-80 Page 12 ~ Deci.sion Guadeline 61 12 Regconal shoppang centers should be located to serve between 4 and 8 restdentzal communrties, or 100, 000 to 200, 000 people Decision Guideline 61 13 Stores and commerctal services establtshed to serve resadents wzthin a few blocks' radius may be conszdered compatrble, and therefore approprzate, when they are adjacent to resadential land-use categories Decision Gurdeline 61.14 Maantenance of any small-town tax base and economic vatality should be a high przonty when malcang a land use decrsion d Transuortahon Section nohcies The Transportahon section of the Comprehensive Plan contains the Artenal Road Plan (ARP), wluch descnbes county artenals and divides them into the classes of Pnncipal Artenals, Minor Artenals and Collector Artenals All other county roads are considered Loca1 Access roads, under the Artenal Road Plan See Comprehensive Plan, Secrion 21 The ARP charactenzes a Pnncipal Artenal (without controlled access) as a 4 or more lane (mcluding tunung lane), moderately fast facihty designed to pernut relatively urumpeded tra.ffic flow between major traffic generators, such as the central business distnct, major shopping centers, major employment d.istricts, etc Pnncipal Artenals are considered the framework road system for the urbaruzed porhon of the county, and aze to be located on commwuty and neighborhood boundanes The ARP indicates that rt is to be implemented through adopted artenal road plan maps, adopted road standards, and the County's Six-Year Caprtal Improvement Plan. Comprehensive Plan, p. 261 The Transportahon secnon encourages an adequate, efficient, safe, econonucal and energy- conserving arterial system; one wluch provides convement access to homes, employment, shopping, personal busmess and recreahon Decision Guideluie 214 2. Decision Guideluies 21.4.5 and 21.5 7 of the Transportarion sechon recommend that the function of existing and future artenals be preserved by controlling land uses, parlang and direct access along the artenals. Decision Guideluie 21.5.3 encourages land use planrung that mimmizes the need for lugh capacity transportahon comdors, and encourages land uses in azeas that can take advantage of the available capacrty af existYng artenal streets Decision Guideluie 21 5.11 recommends pedestnan facihties that enhance the safety and convemence of pedestnan travel and to provide access to neighborhood facilities Decision Guideline 21 15 states that sidewalks should at a muumum be provided along all artenal roads and all local access roads wluch lead to schools, parks and shoppuig distncts The Artenal Road Plan recommends the early acquisihon of tlie prescnbed nght of width for Pnncipal Artenals, though actual road construcrion within such nght of way may be accomphshed in phases over time. Comprehensive Plan, p. 253 Decision Guidelme 21 13 states that the review of land use proposals should contain provisions for extensions, ahgnments and adequate nght of way acquisihon for designated County Artenals. HE Findings, Conclusions and Decision ZE-53C-80 Page 13 ~ Objective 21 1.6 recommends that long-range widening requirements be considered in developments adj acent to arterials and anticipated artenals, to allow for increased ttaffic volumes caused by future developments Decision Guideluie 21 1 13 states that in selechng long-range artenal improvements, consideration should be given to long-range unprovements at significant locations where such unprovements will delay or e1iminate future lugh cost reconstruction The policies of the Transportahon section further state that proposed development may be reqiured to dedicate needed nght of way, or to wnden, or assist vn undening, existing transportation facilities, all in accordance with estabhshed road design cntena and official maps Decision Guideline 21 17 The pnmary function of Local Access roads is to provide access to adjacent property and dehver traffic to artenals Such roads are to be designed and located to provide converuent access to residential lots, discourage flows of traffic through a neighborhood, and encourage conhnuous or unobstructed flow of traffic from a neighborhood to a neighborhood Collector Artenal Comprehensive Plan, p 247 and 260, and Decision Guzdeline 213 3. Decision Guidelme 215.10 discourages "through" traffic from usin.g residential access streets, and encourages malang residential neighborhoods more ariracrive to fanuly residents The ahgnment and traffic control should encourage a slow, safe speed Tlus may be accomphshed by uhlizing physical and traffic management techiuques such as offset intersections, circle dnves, curviluiear street design and cul-de-sacs 3. Consistencv of nroiect with Comprehensive Plan, Countv Zomng Code and decision cntena The proposal is zoned Neighborhood Business (B-1) The purpose of the B-1 zone is to allow for limited, small-scale neighborhood servuig retail and office uses as a means of unplementing the Urban, Major Commercial and Suburban categones of the Comprehensive Plan. Zomng Code 14 624.100 Within the Urban category, the size, number and locafaon of B-1 zones are luYUted so as to meet neighborhood needs. Zomng Code 14 624.100. Such B-1 zones should be located in a business cluster no larger than five acres in size, must have frontage on a Collector Artenal or higher road classification not exceecimg 600 feet, and must be spaced at least one-half mile from other B-1 zoned azeas. When located wholly within the Major Commerclal category, B-1 zones are not subject to the area, frontage and location restnchons or recommendations that apply to B-1 zones m the Urban category, although frontage on a Collector Arterial is stlll a requirement See Zomng Code Chapter 16.624 The applicant seeks to develop professional offices, which is a pernutted use in the B-1 zone Since the zoning of the srte has already crossed over to B-1, the proposal is not subject to the separation and location requuements for the B- i zone The srte nevertheless has direct access along a Pruicipal Artenal, more than meeting the artenal road requirement of the B-3 zone The transition policy of the Comprehensive Plan also favors approval of the proposed use of the site B-1 zones wrtlun the Major Commercial category are intended to provide transition between the Major Commercial category and less intense land use categones, and are usually located within and on the fnnges of a Major Commercial category The Regional Business (B-3) HE Finduigs, Conclusions and Decision ZE-53C-80 Page 14 / zone and four-story hotel located north of the site penetrates much farther east than the current site, and the proposal provides needed transition between such use and the single-family uses located south of the site The proposal, in conjunction wnth the offlce use to the east, also provides transition between the Argonne Road/Mullan Road commercial comdor and the single-fanuly homes further to the east While the proposed use of the site is not necessanly "neighborhood sernng", its unpacts aze relatively small in scale relative to other uses that could be developed on the site under the B-1 zone, or if the site were rezoned to a more intense commercial zone. The proposal will be served by a high level of public services, includuig modern uhhtles, public sewer and water, and public transit The site meets the cnteria for "fill-in development" These features implement the Urban and Major Commercial categones Area residents did not comment on the project The only concern expressed with regard to the proposal was voiced by Dakotah Direct II, L L C("Dakotah Direct"), the lessee of the property zoned B-1 located directly east of the site The site plan of record dated November 1, 2000 illustrates relocation of tlie existang dnveway that currently serves the office use on the Dakotah Duect parcel located to the east The relocation would move the dnveway directly north of rts exisnng locarion on the site, remove the curbs along the driveway's north and south borders, and move the dnveway's entrance to Smto Avenue a short distance to the east, to a pomt just east of Stout Road The site plan of record illustrates parking spaces on both sides of the relocated access The site plan would allow parked cars and other traffic on the site to access the dnveway, along wrth the property to the east. Dakotah Duect mdicated that the driveway access is already congested, and expressed concern that the site plan proposed by the current apphcant would worsen the problem Dakotah Duect contended tha.t it has a 30-foot vvide driveway easement along the entire length of the south boundary of the current srte, pursuant to the final binding site plan. Such party offered to remove the north curb of the dnveway and share the dnveway with future traffic from the current site, provided the dnveway access was widened to 43 feet at its current locarion opposite Stout Road, a center dzvider was installed, and other related changes made Dakota Direct also agreed to entertain shght vanahon to such modificahon wrth the County's approval. See letter dated 2-22-01 from Donald Beres, and attached revised access plan The applicant offered to revise the site plan of record by leaving the dnveway and easement access in its existmg location, includuig the location of the dnveway entrance to Sinto Avenue duectly opposite Stout Road, eliminating the 9 parking stalls that would occupy the dnveway between the entrance on Sinto Avenue and the east boundary of the site, and only removing a portion of the north curb line to allow traffic from the current site to use the dnveway The appucant subnutted a revised site plan dated 2-19-01, showing such revision. See letter dated February 22, 2001 from Ron Maclae, and attached revised site plan dated 2-19-01 The applicant also offered to accept the shared dnveway proposal offered by Dakota Duect, provided there was no delay to the current project or cost incurred by the applicant The apphcant contended that Dakota Direct had recently mcreased the number of call center HE Findmgs, Conclusions and Decision ZE-53C-80 Page 15 ♦ employees since they first opened, and that Dakota Duect should be responsible for any traffic congestion resulting from such increase The apphcant submitted a copy of a dnveway easement recorded on September 9, 1997, grannng the owner of the adjacent land to the east an easement for velucular and pedestnan traffic, and drauiage, over the east 152 feet of the current srte See letter dated 2-25-01 from Dan Cantu, with attachments The County Engineering conditions of approval for the current project requues the applicant to subnut a parkmg plan and traffic cuculahon plan for the revlew and approval of County Engineenng, obtain an approach pernut for any approaches to the County road system, and submit road and access plans to the County Engineer for approva.l The County Road Standards for Road and Sewer Constructron give the County Enguieer broad discretion over access issues such as are presented, wnthul the scope of legai nghts that the applicant and Dakota Duect have over the disputed dnveway In addition, the policies of the Comprehensive Plan allow the Examiner to impose provnsions to ensure proper access for commercial properkies, both in.temal and external It is clear from the record that Dakota Duect has a dnveway easement for vehicular and pedestnan access over at least the easterly 152 feet of the southerly 30 feet of the site The current site plan would move the exishng dnveway and easement further to the north The applicant has no legai nght to move the dnveway access sernng the Dakota Direct property north of the 30-foot wide easement area, wrthout the approval of Dakota Duect The current site plan would also move the existulg dnveway entrance further to the east, placing most of the dnveway entrance farther than 190 feet east of Mullan Road This violates the condihons of approval of the 1980 rezone, wluch required that access to Sinto Avenue from the onginal rezone srte be hmrted to the frontage within 190 feet of Mullan Road The locahon of the access dlrectly across from Stout Road, as rt currently exists, also reduces conflicts wnth traffic tunung left at the mtersechon of Stout Road and Sinto Avenue Neither the 1997 easement document nor the binding site plan approved m 1998 descnbe the dnveway easement illustrated or discussed m such documents as exclusive At the same tune, such documents do not place any limitations on the intensity of use of the respechve dnveway easements by the property to the east for dnveway access Under Washuigton case law, the applicant would be able to use the easement area as long as rt does not matenally unpalr the function of the driveway as a means of access to serve the property to the east. The dnveway provides the only means of general access for the property to the east to the county road system. Placing parlcing stalls in the dnveway access obviously matenally unpairs the existing easement. The apphcant's project can access the county road system via Mullan Road, although a secondary access via Sinto Avenue may also be desirable Whether the alleged intensificahon of use on the Dakota Direct property results in an increase in traffic using the driveway easement, beyond the scope of the onginal grant of easement, presents a legal issue which the Examiner declines to decide At first blush, this contenhon by the applicant does not appear particularly persuasive to the Exanuner HE Findings, Conclusions and Decision ZE-53C-80 Page 16 Y The Examiner has requued that the site plan provide adequate access to the adjoining parcels to the east through the 30-foot dnveway access located along the south boundary of the current site, unless the parties otherwise agree to a different design The design of such access is subject to the revlew and approval of the County Engineer, and the dnveway entrance must be located entirely vvithin 190 feet of Mullan Road The applicant is prolubited from matenally unpamng the adequacy of the dnveway access to serve the uses developed on the properties located east of the site, subject to any deternunation by a court that the use of the dnveway easement by such properhes exceeds its scope. As condirioned, the proposal wdl not have any sigruficant land use unpacts on surrouncung properhes and provides buffenug of the adjacent single-family uses from more intense uses The proposal unplements the Comprehensive Plan, wluch is evidence of consistency with the pubhc health, safety and welfare The proposal w11I likely provide employment opporturunes in the area As condlboned, the proposal incorporates and implements the condihons of approval from the 1980 rezone, and mEets or exceeds the development standards of the B-I zone No deficiencies with apphcable land use regulattons were identified dunng the public hearuig process The procedural reqiurements of chapter 43 21C RCW and chapter 11 10 of the Spokane County Code have been met The Heanng Examiner concurs with the Detennination of Nonsigruficance (DNS) issuad by the Division of Builchng and Planning No comments were received from pubhc agencies requestuig wnthdrawal of the DNS. The proposal as condihoned will not have more than a moderate effect on the quahty of the environment The Examuner sees no need for the applicahon to demonstrate changed condihons in support of the a.pplication, since the 1980 rezone provided for site plan review at a pubhc hearmg Changed conditions nevertheless support the proposed use of the srte, including the extension of public sewer to the area, the creation of a one-way couplet for Argonne/Mullan Roads, the increase in txaffic and commercial zoning and land uses along such comdor, the approval of the change of condrtions to the east, and the designahon of the srte in the County's intenm urban growth area boundanes IV. DECISION Based on the Findings of Fact and Conclusions of Law above, the above applicahon for a change of condrtions apphcanon is hereby approved, subject to the condihons of the vanous pubhc agencies specified below Any changes to pubic agency condihons added or significantly altered by the Examiner are italzcized Failure to comply with the condihons of this approval may result in revocatton of this approval by the Heanng Exanuner This approval does not waive the apphcant's obligation to comply with all other requirements of other agencies wrthj unsdichon over land development HE Findings, Conclusions and Decision ZE-53C-80 Page 17 ♦ SPOKANE COUNTY DIVISION OF PLANNING 1. All conditions irrtposed by the Hearing Examiner shall be binding on the "Applrcant, " which term shall include the owner(s), developer(s), and user(s) of the property, and thetr heirs, asstgns and successors 2 The proposal shall comply with the Neighborhood Business (B-1) zone, the Aquifer Sensihve Overlay zone, and other applicable provisions of the Spokane County Zoning Code, as amended 3. The apphcant shall develop the subject property in substantial conformance with the revrsed szte development ptarc dated February 19, 2001, sub,Ject to complaance with conditions of approval and development regulattons Muior vanations, consistent with conditions of approval and development standards, may be pernutted admmistratively by the County Division of Planrung in accordance vvith Sechon 14.504 040 of the County Zorung Code All other revlsions must be approved by the Heanxig Examiner, pursuant to a public heanng on a change of conditions apphcation 4. Sate development shall not materaally impair the adequacy of the draveway along the south boundary of the szte to serve the adjacent properttes to the east, provided the use of the driveway by such adjacent properhes is within the scope of the draveway easement possessed by such adjacent properties Such dreveway shall be preserved within the southerly 30 feet of the site, subject to exrsting easement rights, unless relocated wath the agreement of the owners of such adjacent properhes and approved by the County Engineer The drrveway entrance along Sinto Avenue shall remain or be placed enttrely withan 190 feet of Mullan Road 5 A specific landscape plan, planting schedule and provisions for maintenance acceptable to Planning Duector/designee sha11 be submitted with a suitable mstallation guarantee for the project pnor to release of building permits Landscaping shall be installed and maintauied so that sight distance at access pouits is not obscured or unpaired 6. Approval is required by the Division of Planrung Duector/designee of a specific lightuig and sigrung plan for the descnbed property prior to the release of any buildmg pernuts. Lightuig shall comply with Section 14 810 180 (Illummanon) 7 The Division of Planrung shall prepare and record with the Spokane County Audrtor a Title Notice, notmg that the property in question is subject to a vanety of special conditions unposed as a result of approval of a land use achon Tlus Trtle Nohce shall serve as pubhc notice of the conditions of approval affechng the property in question The Title Notice should be recorded wnthin the same time frame as allowed for an appeal and shall only be released, in full or in part, by the Division of PlanYUng The Trtle Nohce shall generally provide as follows "The parcel of property legally descnbed as [legal descnprion] is the subject of a land use acrion by the Spokane County Heanng Examiner on March 6, 2001, imposing a vanety of special development conditions File No ZE-53C-80 is available for inspechon and copying in the Spokane County Division of Planning " HE Findirigs, Conclusions and Decision ZE-53C-80 Page 18 I 8 The Division of Planning shall file with the Spokane County Audrtor, witlun the same time frame as allowed for an appeal &om the final d.isposihon, includmg lapsulg of appeal penod, a Title Notice, wluch shall generally provide as follows "Pnor to the issuance of any builduig permrt for any builduig or any use on the properiy described herein, the apphcant shall be responsible for complying with the provisions of the Zonuig Code for Spokane County, Sechon 14 706 (Aquifer Sensitive Area Overlay Zone). The property which is the subject of this nobce is more particularly descnbed as follows (insert legal descnphon) " 10 A filed avigahon easement satisfactory to the Manager of Felts Field shall be provided pnor to issuance of any bwlding pernuts. SPOKANE COUNTY DIVISION OF ENGINEERING AND ROADS Prior to release of a bnilding permit or use of property as proposed: 1. Access permits for approaches to the County Road System shall be obtauned from the County Engineer. 2 The apphcant shall submit road, drainage and access plans for approval by the Spokane County Engineer 3. A Professlonal Enguieer, hcensed in the State of Washington, shall submlt final drainage plans, a drauiage report and calculations that conform to the 1999 Spokane County Standards for Road and Sewer Construction, the current edition of the Spokane County Guidelules for Stormwater Management, and a11 other standards and laws that are apphcable. Final drainage plans and a dralnage report shall receive the County Enguieer's acceptance, pnor to release of a construction or builduig pernut. 4. A pazki.ng plan and traffic cuculahon plan shall be subnutted and approved by the Spokane County Engineer. The design, location and arrangement of pazking stalls shall be m accordance with standazd engineering practices. Paving or surfacmg as approved by the County Engineer will be reqtured for any porhon of the project wluch is to be occupied or traveled by vehicles 5. The construction of the roadway unprovements stated hereul shall be accomphshed as approved by the Spokane County Engmeer 6 The County Engmeer has designated a Local Access Roadway Section for the unprovement of Sinto Avenue which is adjacent to the proposed development This will require the installation of asphalt equal to 20 feet from the centerhne along the frontage of the development Curbing and sidewalk must also be constructed 7. All reqtured improvements shall conform to the current State of Washuigton Standard Specificahons for Road and Bndge construction and other apphcable county standards andJor adopted resolutions perta.irung to Road Standards and Stormwater Management m effect at the date of constructzon, unless otherwise approved by the County Engmeer HE Finduigs, Conclusions and Decision ZE-53C-80 Page 19 t 8 Roadway standards, typical roadway sechons and drainage plan reqturements are found m Spokane County Resolution No 99-0265, as amended, and are applicable to this proposal 9 No construction work is to be performed witlun the existing or proposed nght of way unhl a permit has been issued by the County Engineer All work wrthin the public road nght of way is subject to uispection and approval by the County Engineer 10 All required construction witlun the exishng or proposed public nght of way is to be completed pnor to the release of a building pernut or a bond in an amount estimated by the County Engineer to cover the cost of construchon or unprovements shail be filed with the County Engineer 11 The applicant is advised that there may exist uhhties either underground or overhead affecting the apphcants property, includuig property to be dedlcated or set aside future acquisition Spokane County will assume no financial obhgation for adjustments or relocation regazding these uhlihes The apphcant should check wrth the applicable utalines and Spokane County Enguieer to determine whether the apphcant or utility is responsible for adjustrnent or relocation costs and to make arrangements for any necessary work 12 The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards SPOKANE REGIONAL HEALTH DISTRICT 1 The sewage disposal method shall be as authonzed by the Duector of Urilihes, Spokane County 2 Water service shall be coordinated through the Duector of Utilihes, Spokane County 3 Water service shall be by an existuig pubhc water supply when approved by the Regional Enguieer (Spokane), State Department of Health 4 A pubhc sewer system shall be made avallable for the project and individual service vcnll be provided to the tract. Use of an individual on-site sewage disposal system shall not be authonzed 5 The use of pnvate wells and water systems is prolubited SPOKANE COUNTY DIVISION OF UTILITIES 1 A wet (hve) sewer connectton to the area-vvide Pubhc Sewer System shall be constructed A sewer connechon pernut is required Commercial developments shall subnut lustoncal and or estunated water usage, pnor to the issuance of the connechon permit in order to estabhsh sewer fees 2 The applicant shall submrt expressly to Spokane County Division of Utilities, "under sepazate cover", only those plan sheets showing sewer plans and specificanons for the public HE Findings, Conclusions and Decision ZE-53C-80 Page 20 sewer connections and facilities for review and approval Commercial developments shall submrt histoncal and or estunated water usage as part of the sewer plan subnuttal 3 Sewer plans acceptable to the Division of Utilities shall be submitted pnor to the issuance of the sewer connechon pernut 4 Arrangements for payment of appucable sewer charges must be made pnor to issuance of sewer connechon pernut. Sewer charges may mclude special connection charges and general facilrties charges Chazges may be substantial dependuig upon the nature of the development 5 Any water sern.ce for this project shall be provided in accordance with the Coord.inated Water System Plan for Spokane County, as amended. DATED tlus 6`" day of March, 2001 SPOKANE COUNTY HEARING EXAMINER xi' r 2,0p~ Mic el C Dempsey, WSBA # NOTICE OF FINAL DECISION AND NOTICE OF RIGHT TO APPEAL Pursuant to Spokane County Resolution No 96-0171, the decision of the Heanng Exarruner on an apphcahon for a change of conditions is final and conclusive unless wrthin twenty-one (21) calendar days from the issuance of the ExarYUner's decision, a party with stancung files a land use pehtion m supenor court pursuant to chapter 36 70C RCW Pursuant to chapter 36 70C RCW, the date of issuance of the Hearing Exanuner's decision is three (3) days after rt is mailed. This Decision was malled by Certified Ma11 to the Apphcant, and to other parties of record by first class mail, on March 6, 2001 The date of issuance of the Heanng Exanuner's decision is therefore March 9, 2001. THE LAST DAY FOR APPEAL OF THIS DECISION TO 5UPERIUR COURT BY LAND USE PETITION IS MARCH 30. 2001. The complete record in this matter, includulg this decision, is on file dunrig the appeal penod with the Office of the Heanng Exanuner, Third Floor, Public Works Building, 1026 West Broadway Avenue, Spokane, Washuigton, 99260-0245, (509) 477-4790 The file may be wspected during normal working hours, hsted as Monday - Fnday of each week, except hqlidays, between the hours of 8 30 a m. and 5•00 p m. Copies of the documents in the record will be made available at the cost set by Spokane County. HE Fmdings, Conclusions and Decision ZE-53C-80 Page 21 T ~ . ProjectStatus Act,vC L1vulNEER'S RE'ViE«' SHEr- . As Built Plans Rcceived Rezone I' Ile ZE-0053 C- 8V Road Plans Approved Companion Files: New Road Standards 5-15-95 Mylar Related Files: ticaring: 02/14/2001 9:04 Building Dept 'Cechnical Review: 01/11/2001 2:15 ~ I Har~ L,i L: i:.! I'I.:. Preliminarv Review: 1'ype: - _i Large Lot Bid :,L{L:J: Datc Received: 12/29/2400 No. i.iits: No. . Project Name B-1 CHG OF COND SITE PLAN APPRON'AI. 2 STORl' nFF1C'E RLI)G Site AdJress W. LOCUST, S. M1SSlON, E. RIULLAN, N. SIN'f( ApplicAnt Dan Cantu Conditians Mailed: 11 • ~2.- ~ -OL CAN'tU (NVESTMLNTS LLC Flood Zonc No 15504 N. Chronicle Ct Water Sourcc: MEAD, WA 99021- Sewer Source Phone (509) 755-7j59 School Dist 3, r) i Fire Dist I Phone Dist Architect Ron Mackic ARCHITECCUR:\L VFN I VIZE:S 9802 E. Mission tiPOK.4NL-. WA 99_00 Phoi1C [iuilJIMs {'h: 477-1671~ I'lanninL I'il: 477_„0 Contact: II\1 f:1[X Date Submitted Descriptiun t►~ic~,~l~ Eng Need Technically Complete Eng Necd I larvard Rd Mitigat, Eng Need Drainage Pians Eng Need TratTic Analysis Eng Agree Pay Cees Received Eng Final Piat Fees Completed Eng Agree Priority Fees Received 12/22/2000 Cng I'relim Plat Fees Completc.' Nutice tu Pul,lic 'Notice to I'uhliC : 1 ? 4 C, ('i;i~iplct.il - nr Ntt:di to~ he [)c;i2n [kviation DatL; (In-Out) Hearing Date Decision App Ucn Cond Ar il~ Appealed ta BCC Decision App Uen Cond App'; Appealed to Court Decisinn Stamped Mylars to Secretary (San. i j ! Stamped 208 Lot Plans to Secretar) ~"k-JINEER'S REVIEW SHELi Project Status Active As Built I'lans Reccived Rezone Fite Zi',-0053C-80 'go ~ Road Plans Approved Companion Files: New Road Standards 5-15-95 Mylar Related Eiles: ZE-0053-80 tiearing: Building Dept: Technical Revicw: 01l11/2401 2:15 - Harvard Rd Plan Preliminary Review: Type: Date Received: 12/29/2000 Large Lot E31dg. Square Feet No. Lots: No. Acres: Project Name B-1 CHG OF COND SITE PLAN APPROVAL 2 STORY OFFICE B1.DG Site Address W. LOC'UST, S. MISSION, E. MULLAN, N. SINTO, applicant Range-To%timship-Section: 44 - 25 - 17 PARCEL(S): (first 20) Dan Cantu Conditions Mailed: 45172.0752 CANT'U INVESTMENTS LLC Flaod Zone Nn 15504 N. Chronicle Ct Water Source MEAD, WA 99021- f'hone (509) 755-7559 Sewer Source Schoal Dist 363 E=ire Dist 1 Phone Dist Architect Ron Mackie ARCH17'ECTURAL VENTURES 9802 E. Mission SYOKANE, 'A'A 99206 Phonc (509) 922-5287 BuilJing Ph: 477-3675 / Planning Ph: 477-2205 Cantact: 11M (=ALK Date Submitted Description Initials Eng Need Technicalty Complete Cng Need Harvard Rd Mitigatian Eng Need Drainage Plans Eng Need Traffic Analysis Lng Need Other Eng Agree Pay Fees Received Eng Final Plat rees Completed Capy to Accounting Eng Agree Priority Fees Received 12/22/2000 Eng Prelim Plat Fees Completed ! j Notice to Public / Notice to Public # 1 3 4 6 Completed - or Needs to be signed Dcsign Deviation Datcs (In-Out) l l - l l i i - l ! ! - ' ! Bon-a quantics f-r- drainage item calculated Hearing Date Decision App Den Cond Appld BCC Appealed to BCC Decision App Den Cand Appld Court Appealed to Court Decision App Den Cond Appld / j Stamped Mylars to Secretary (Sandy) / / Stamped 208 Lot Plans to Secretary (Sandy) j ~ . . • ~ ~ STAFF REP4RT TO THE HEARING EXAMINER i~ ZE-53C-80 DivisioN oF PuAiN NN G SPOKAISM COUNTY HEARING DATE February 14, 2001 at 9 00 a m FILE # ZE-53C-80 PROJECT PLANNER. Jim Falk, AICP Associate Pianner PROJECT DESCRIPTION Sde Pian Review for an office buildmg m the Neighborhood Business (B-1) zone as required by the onginal condilhons of approval for zone reciassification, ZE-53-80 Project Data ProJect Location: The project sde address is 1410 N Mullan Road Generally tocated north of and adjacent _ to Sinto Avenue and east of and adjacent to - - Mullan Road m the NV1/ % of Section 17, _ Township 25 North, Range 44 EWM Parcei Number - - - ; , _ 45172 0752 Owner: Dan Can#u (Cantu Investments, LLC) -y 15504 N Chronicle Ct , Mead, WA 99021 Agent: Ron Mackey 9802 E Mission St, Spokane, WA 99206 Gomprehensive Plan Urban Designation: Extsting Zanina: ' Neighborhood Busmess (B-1) Existing- Land Use:= - Undeveloped Surraunding Zonir~§*rtd-=Land qses: - -t _ ~ - - : _North;, Neighborhood Business (B-1) f • South:,-- _-Neighborhood 6usmess (B-1) and Urban Residential-3 5 (UR-3 5) East: Neighborhood Business (6-1) and Regional Busmess (B-3) • West; Neighborhood Business (B-1) Known Land Use Proposals and The only recent land use action in the area east Recent Project Approvals in the of Mullan Road is ZE-53A-80, a site plan review Area of this Project~, for an office buildmg in the Neighborhood Business (6-1) Zone as required by the ongmal conditions of approval for zone reclassfication The most recent zone reclassification m the area was ZE4-97, a zone reclassification from B-1 and UR-3 5 to Regional Business (B-3) located on the south side of Smto across Mullan Road 1 • ~ ` R ~ . - ~ southwest of the project site, ZE-47-84, a rezone from Agricultural Suburban (AS) to Local Busmess (now classified B-1) located at the southeast corner of Muilan Road and Smto Avenue west of the project site Actions west of Mullan Road mclude ZE-47-97, a zone reclassification from Neighborhood Business (13- 1) to Regional Business (B-3) located west of and adjacent to Mullan Road, ZE-5313-80, a change in conditions request, pertaining to the neighboring eastem parcel was denied in 1997 Land Division Status; The project site is Parcel "C° of BSP-59-57 recorded June 12, 1998 79horeffne Designation: NofApplicable -Wa-ter Purveyor: -Wiaern Electnc ater Company -Sewage Disposai: -Spokane County Sanitary 5ewers --Nre ~listricf#: -~=ire bistnct-91 Schoo( District: West Valiey School Distnct #363 Nearesta Arterial and Distance: Project site fronts on Mullan Road, a Primary Arteria! Neighborhood Association: None • This proposal is located mside the Intenm Urban Growth Area (IUGA) • This proposal is located mside the Public Transportation Benefit Area (PTBA) • This proposal is located outside the 1000' notification boundary of designated Naturai Resource Lands GMA/Cntical Areas Aquifer Recharge Area: --~-Subject property is located mside the Aquifer Sensdive Area (ASA) Overiay _ Zone _Fis1h & Wildlife Habitat Conservation None illustrated on the Spokane County Areas: Cntical Area Maps. Floodplain: _ None illustrated on the Spokane County Crrtical Area Maps Geolaaicaily Wazardous: None illustrated on the Spokane County Cnticai Area Maps Wetlands: None illustrated on the Spokane County Critical Area Maps or Wetland Inventory Maps SEPA • DNS issued on December 29, 2000 • Comment penod ended January 13, 2001 Noticinq Published Spokesman Review legal notice section on January 26, 2001 ZE-53C-80 Staff Report - February 14, 2001 Pubhc Heanng 2 ~ . . ~ l Deadime by which notice must be mailed to property owners withm 400 feet of the project site was January 29, 2001 Deadtine by which notice must be posted on the subJect property was Januarq 29, 2001 1724 Compliance Dates Application Accepted (Counter Compiete) December 27, 2000 Technically Complete / Determmation of Compieteness issued January 11, 2001 Date Notice of Decision is Due May 10, 2000 Reviewing A encies 11 agencies were notified on 12-29-2000 and 9-18-2001 Comments were due on 1-11-2001 and 1-31-2001 Agencies Notified Response Date Agencies Notified Response Date Received Received Spokane County Yes 1-12-01 Modern Electnc Water No Division of Engineenng 1-26-01 Company and Roads, Transportation Spokane County Yes 1-2-01 Fire District No 1 Yes 1-9-01 Division of Engmeenng, Development Services Spokane County Yes 1-25-01 Spokane Regional Yes 1-11-01 Division of Utilities- Health Distnct Sewer Spokane County No Boundary Review No Division of Utildies- 8oard Stormwater West Valley School No Spokane Transit No Distnct #363 Authonty Washington State No Spokane County Air Yes 1-19-01 Dept. of Transportabon Pollution Control Auth Responses from the Public No letters were received from nearby property owners or from other members of the pubiic as of the date of this report Agency Comments: Agency comments are in the form of recommended conditions or specify no comment Description of the Site: The site is approximately 1 14 acres m size, relabvely flat in topography, and undeveloped A large office complex was recent{y constructed on the parcel of land adjacent to and east of the proJect site along wdh associated pariang and landscapmg Access to said neighbonng office complex is provided by a pnvate dnveway, which begins at the project site opposite Stout Road and extends easteriy across the project site frontage with Smto Avenue for approximately 170 feet to said office complex The project sde was created as a resuit of the approval and recordmg of binding sde plan BSP-59-97 and is identified as parcel C Said BSP was approved by the DNision of Plannmg and divided a 4 62 acre parcel mto Parcels A, B and C The westedy 2 parcels B and C are each 1 14 acres and front on Mullan Road The project site is bounded on the west by Mullan Road, which is designated as a Principal Artenal in the County Artenal Road Plan The project srte is bounded on the south by Sinto Avenue Sinto is designated as a Local Access street by the County Artenal Road Plan ze.ssc-so Staff Repcrt - February 14, 2001 Public Hearing 3 . . ~ i ~ Background: A zone reclassification, ZE-53-80, from Agnculturai Suburban (AS) to Local Business (LB) for a retail center on this site was approved by the Board of County Commissioners (BOCC) on December 1, 1980 The BOCC attached the foilowing condition to this approval "The specific development pfan will be submitted for Heanng Examiner Committee review and approval prior to issuance of building permds " The previous zone classification of Local Business (LB) crossed over to Neighborhood Business (B-1) on January 1, 1991, with the implementation of the Spokane County Zonmg Code and Crossover Zonmg Matnx As mentioned above, BSP-59-97 created the project sde as well as the 2 neighboring parcels north and east of the proJect site WAM Enterpnses developed a 2 story, 23,300 square foot office buildmg on the neighbonng eastem Parcel A The project proponent has purchased the western project site and desires to construct an 8,031 square foot ofFice building with associated parking, landscaping and drainage areas Essentiaily, the land use policy issue was settied when the rezone was granted by the Board of Commissioners m 1980 While not stated in the Board's findings it is assumed by the Divisron of Planning that the purpose for requiring Heanng Exammer Committee Review of the site specific development plan is to assure that the project is developed in a manner that minimizes conflicts with vicmity land uses and to ensure applicant compliance with the applicable ordiances The public heanng record on the reclassification (ZE-53-80) shows that the project was opposed by nearby residents The applicant has applied for a buildtng permit for the office building Surrounding Conditions: The site fronts along Sinto Avenue, and Stout Road terminates along the south side of Smto Avenue directly across from the project site The Mullan Road/Argonne Road couplet west of the site compnses a major traffic and commercial corndor through the Spokane Valley Area Interstate 90 is located a few blocks north of the site, and has an mterchange at Argonne Road/Mullan Road The land north of the site is zoned Regional Busmess (B-3), and a large Holiday Inn was recently constructed on such land The land between Stout Road and Mullan Road, fronting along the south side of Sinto Avenue, is zoned B- 1 The land lymg south of Sinto Avenue, east of Stout Road is zoned Urban Residential-3 5(UR- 3 5) and improved with smgle family residences Site Plan: The project srte plan proposes the construction of a two (2) story 8,031 square foot office budding Access to the site will be by the existing access to Smto Avenue A new access to Mullan Road will be developed Approximately 76 paved off-street parking spaces vinll be provided and approximateiy 28% of the project sde will be landscaped as required by the County Zornng Code Bwiding coverage wiil be approximately 16% of the proJect site and paving vnll cover approximately 46% of the project site A five (5) feet wide stnp of Type III landscaping wili be provided adjacent to Smto Avenue and Mullan Road A 14 feet high monument type sign is proposed on the southwest comer of the site near the intersection of Smto Avenue and Mullan Road Extenor lightmg vinli be provided maintaming I footcandle lighbng to all areas The project proponent submitted a drainage plan for the project and it has been approved by the County Engineer's Office Staff Analysis: The County Comprehensive Plan: The project site is located in the MaJor Commercial category of the Comprehensive Plan The MaJor Commercial category is intended to provide the opportunity for development of commercial uses, specifically community and regionai shoppmg centers and commercial uses, directly related to major throughways Major Commeraal areas feature high-intensity uses Heavy automobile traffic and related congestion may create pollution problems, especially along commercial stnp devetopment Artenal stnp commercial development wdl usually be made up of busmesses on mdividual parcets clustered along heavily traveled ZE-53C-80 Staff Report - February 14, 2001 Pubtic Hearing 4 • s t 4 s#reets or highways, each providmg off-street parking. Shopping is not done by walking from one store to another but rather is of a singie-purpose nature Most commercial development mnll be on relatively flat land and bwldings will be of a low profile Paved parwng, streets and man-made strurxures wili dominate the site with few natural features to be found Landscaping, screenmg, lighbng, signage and other architectural treatment will provide for aesthetically pleasmg development The proJect site is located adJacent to a heavily traveled Pnmary Artenal and is relatively flat The applicant is proposing off-street parking, landscaping, lighting and signage consistent wrth the requirements of the Spokane County Zoning Code Also, public sewer and water service will be provided. Stormwater improvements will be provided consistent with the County Stormwater Management Gwdelines As stated above, the existing zone and site plan of record is consistent with and implements the Spokane County Comprehensive Pian The property is also Iocated within the Interim Urban Growth Area (IUGA) boundary established by County Resolution 97-0321 The Resolution encourages urban growth and development and higher intensities of land use in the IUGA The proposal is consistent with the requirements of said Resolution Zoning: A zone reclassification, ZE-53-80, ftom Agncultural Suburban (AS) to Local Busmess (LB) for a retail center on this site was approved by the Board of County Commissioners on December 1, 1980. The previous LB designation was changed to Neighborhood Business (B-1) as a result of the implementation of the Spokane County Zonmg Code and Crossover Matrix on January 1, 1991 The purpose of the B-1 zone is to allow for timited, smali-scale neighborhood servmg retail and office uses as a means of implementing the Urban, Major Commercial and Suburban categones of the Comprehensive Plan Section 14 624100 (B-1 Zone) of the Spokane County Zonmg Code specifies that B-1 zones should be m a business cluster no larger than five acres in size, with frontage on a Collector Artenal or higher road classifcation not exceeding 600 feet, and spaced at least one-half mile from other B-1 zoned areas. When located wholly mnthin the Major Commercial category, B-1 zones are not subject to the area, frontage and location restnctions or advisements that apply to B-1 zones in the Urban category, although frontage on a Coliector Artenal or higher road ciassffication is stili a requirement Section 14 624100 specifies that the general charactenstics of ali B-1 Zone areas mciude paved roads and sidewaiks, public sewer and water, and a full Ime of public services mcluding manned fire protection and public transd Public sewer and water services are available to the proJect site as well as mass transit service. Adddionally, fire and police protection services, solid waste pickup, telecommunrcation and power services are also available to the project sde In 1996, Spokane County replaced the hearing exammer committee system with a heanng examiner systern, pursuant to the Spokane County Ordinance (County Resolution No 96-0171). The Hearing Exammer Ordinance vested the County Heanng Examiner with the authonty to hear rezone and change of condition applicabons Smce site plan review by the Heanng Examiner Committee was required in ZE-53-80 as a condition of approval, the Heanng Exammer is the proper body to review the site plan submitted by the appltcant in Planning Division File No ZE- 53C-80 Since the Heanng Examiner Ordinance and Zornng Code 14 504 040 vest the Heanng Examiner with authonty to review a site plan only after conducting a public heanng, the Division of Planrnng propedy processed the cuRent appiication as a change of condition application, subject to a public hearing and neview. A public heanng review of a detailed srte plan on ZE-53C-80 is also appropnate considenng that the 1980 nezone, ZE-53-80, was opposed by neighbonng property owners, and the Board of County Commissioners imposed special conddions to protect neighbonng property owners from the impact of future site development ZE-53C-80 Staff Report - February 14, 2001 Public Heanng 5 ~ . The Board of County Commissioners attached 3 conditions to 1980 approval of the reclassification ZE-53-80 approval The proposed project is consistent with conddions 1 and 3 Condition 2 which is the subject of this report reads as foilows . 2 The specific development plan will be submitted for Heanng Examiner Committee review and approval prror to issuance of buiidmg permits The followng is an analysis of the proposed project's compliance with the B-1 Zone minimum development standards Srte Plan Zoninq Compliance Data Proposed ReQuired Building Coverage 16% 50% maximum Lot Size 1 14 acres 5000 square feet Lot Frontage 159 5 feet 50 feet 6uilding Height 32 feet 35 feet Landscaping West Boundary 5 feet Type ill 5 feet Type III South Boundary 5 feet Type III 5 feet Type I I I North Boundary None None East Boundary None None Budding Setbacks Front yard (Mullan Rd ) 98 from lot line 25' from lot Ime/65' from rd centerlme Flanking yard (Sinto Avenue) 77' from lot line 35' from Iot lme/65° from rd centedine Side yard (north side yard) 12' from lot line 0' from lot Ime Rear Yard (east boundary) 79' from lot line 15' from lot line Parlang 76 spaces 38 spaces The proJect sde is located in the Felts Field Airport Overlay Section 14 702 060 of the Spokane County Zornng Code requires the applicant to grant an avigation eas6ment to Felts Field, and such easement must be recorded in the County Auddor's Office The sde plan of record generally meets and/or exceeds the minimum development standards of the Netghborhood 6usmess (B-1) Zone Subdivision The proJec: sde is Parcel C of Binding Sde Plan BSP-59-97 recorded June 12, 1998 The site plan is m compiiance with the Division of Pianning requirements on the recorded BSP This conclusion assumes that all recommended conditions of approval are met Staff Summary: The change of conditions application proposes the proJect sde plan for the constn.tction of a 2 story 8,031 square foot office buildmg The sde pian is submitted for review to the County Hearing Examiner pursuant to a zone reclassification, ZE-53-80, condition of approval The site pian is consistent with the County Comprehensive Plan and Spokane County Zoning Code provided the applicant demonstrates compliance wdh all recommended conditions of approval ZE-53C-80 Staff Report - February 14. 2001 Public Heanng 6 ♦i 1 <<` ~ Attachments A Maps • Vicinity Map •l • Stte Plan Map _ • ComprehensNe,Plan • Zoning B Recomrnended Conditions of Approval C Agency Comments , ze=ssc=so Staff Report - Februaryrl4. 2001 Pubpca Heanng i 7 ` . fATTACHMENT, A MAPS 'VICINITIf MAP SITE DEVELOPWIENT PLAN COMPREHENSII/E PLAN MArP ZOIVING WIflP . • e Z&53C-80 Vicinity Map 1 y~ ~ ~ ~ larlretm Moacgomen, _ w 3 ~ Montt= a ~ Mancfi Jd ~ Knam 08 KnoX ~ 7-1 w ~ _ - d ~ ~a a~ AM NR=oq ~ ~ vxullv ~ Smw m ~ « ~ s Re~ , ~ ~ ~ ~ ACBWO Jame LDM ~ 1 ,a4u1enrOWe~ ~ e"~aa►e" ~1 S SIM- ~ ~ 7 ~ , Alln Y ~ ~ Vaemm- f~ ~ -rucan j4poftne F/ -tiIIah~ ~tixoe ~ 3 x ~ ~ o ~ Za AX&way , Scale :1 bxh -1250 ft (rourdeO 12119/b0 Vidriity Map r ■ ■ .u , «~mrae wr►7A'to• a a~no ua iur ~v.r.a HOUOAY (NN EXPRE88 ~ - ` • ~ ~ ( i ~ ►~11011% ir M=$oarm. eAu uuiM ~nurm I ~ aw a umNS. iaoae Yr M8TIN0 NOTEL ~ ' • ~ ~ ~ ~ q ~ r h~,t tn+t ro+u~~ ~ • el[ Aa v fOrio~n tolY ~ /~r ~qR~y~ "M ~PfR ~ ~a ' ~ i wMalrfaraoar►man~wa ( T r Wn Fi • •r- amas vryx I ! I FI k~~u nsis ro s mov~fm.m a~ wm ~ ~ 1 ~ ~"0~ non Tw It "0 amaLai mn a a rNN Lm LnK ~ ~ m.~°~o'Wm`0ro'~0rar nw~o rea msn: ar rw~ mraai Gnm a u na ai LoR a r a ar ro ~ ~r, ~r ni 1 aat rao r-s ~ ~ ~i~' ~ sw rAm M-0' 1 a v ma w020 *"urrro.air ~~.~`~iaoeae a w.ao. ~ f nan ntec r' en 29Sr ro Motnr tat At Wua ~ ~ ~mt wa ~~ar narM ro"bvu'► LtW .r mro a~at~ aa as tae I I eM t~ w'-P uu u ~ ~ ~ ru • as~ raaeu~~rM 1 aAn* ani ua a wa Aap ► w~ a► Gnvm a s i.r nao ftrm lmme I r~w oomm ►oo v a ao ~m oAwmortm roiaoM anrocaaM anwwwua. w.u rrr.r. ~ a aon v n raria saatn.rot or~r r~i m~anc.arswr.im~°rru~i°r~ ~ aaiaa so* v u tn uNnU Same ro a uan araa m t ro rmw saMl1 ~ Qr tm v i ~ uew v~a w+m I „.,9 w u4rp 1 urom rtft wio v a nm + u 10i1M4M row+s ro nw o metrc wa ( ~ ~~on alo ama o~u w+~ v mm Nw.ae • ~u oucp } :~n~~''"o`r. ~ ~ a ~,M.~ TRACT'0' s Nwtsanw . mMO qMrr ~.o ~ uoP ~ +str~ua te wnr~ arroM01wauouarr PossOM"M e af4 Em s f Oa OPL vMh101w~P ~Lta I J iwom w wae a Nan a aaa a rn re aomwu GW"MtY 1 1~0'101M~ Mt WM ~m ~ I~~I~' OI tiN[I 1010p0 I OMa A01~C M~a ir410b a sAr q0~ I ~ O ro O A~ Maparo~e sm e.. V ao~o~ ~n 0 r.r u ,1 -i aoa ame onw ~ an~roawer ~ t qyp q~, r D~' d • ww reda ro rr .rftu u■o aa i .on r I , ~1 •.rors = - = Lfif4S-- ~ I 6ro " ua am _ ~ c nniao wwo vf f~1~ j I ~ R ~ Q F M am~r I I ~-~r ~NIO BTORY 0~''FIL~ 11 Y ~0 ~ ~ io oa mareo t 1#r I p ~ 3r eimoaa Ha,aNr -iflACT 'M- TRACT 'C' ~ RECEIVED I ~ ~ SPOKANE COUM1i - ao ~ MIT DEC 18 200a ~~am %WAt a qI~ov~rI -7 o ~ur DIMON OF PLANNINO I . ~ - - SINTO Alf@IUE - - - - - - - - - - - - - - - ~ "yV~pS~ pn s MAMRMlMO~illtor~"°ir w M 00[O M 40A p~ ~ 'N_- PLAN I 0 20-.0- ~ I ~ C 1 ~ . • w ZE-53C-80 Comprehensive l.and Use Plan . I ~ ~ , CD ~ I cl , YQM - I I ~ J 7D ~ f Jill LW I ~ ~ IT- ~ ~ I r ET ~ ~ I I ~ ~ I I~ - , 1 I ~ I ' I ' I ~I UJ-l I I 17-1 Scale :1 inch - 833 ft (rounded) 11129100 Gompnehensive land Use Plan ......N....N. Subject Property wkhM IUOA. -i Subjeat Property within UTA Sublect Procertv within PS8A. Subjed Properhr within ASA. Z&53C=80 • Existing Zoning ~ 060 6-3 1 1 C 9Y 84 4 T 5 ~ UR-S.S 1 B-2 46 1 C~ ~ B-S 84 72C ( 79C ~ UR-2; 64 72 ' ~ ~ un- za nc - R- s 2 oe ~ 4 9 UR- .6y8 .1 ► ~ 07 B- 6 B-2 8d 4 ( B-S ~B & C 88C 78C I p. ~ c 01-S 4S ~ 8? o 584 48 U 22 7 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - ~ B-3 11 C ~ I~-S 96 s1C 8.6 32 R-3.6 8211 ~ 47 I e-s ata ssc ~ un4L 47 B-s 80J B-S 88 ' B~ 47 I i 8-188A 60C-r- I . A ~ r . ~ ~ - ` AP 1 ' 7 I 47 I ~ I Be r ~ ~R- 87 i 2 47 5 ' Z 13 87C ~ ~Z 87C u i . ~ • so ° I u ~ .~a° . 69 JM4J 240147 B B ~ 6j" ift N~ iMS 91$215d UR-8.8 3210 I~ TS 84C ~ U 1C .C ~ 2 8 l4C, ~ pn, AR-2246 68 t-I 7ec n- 55 ec ~ R7 2 1 1 Scale 1 kxh - 500 hOotmdecb 12t29/00 Extsdng Zorrmg . ,e ATTACHMENT B CONDITIONS OF APPROVAL. . , ~ RECOMMENDED CONDITIONS OF APPROVAL FOR ZE-53C-80 . . DIVISION OF PLANNING SPOKAbfi coul%uy I The proposal shall comply wdh the Neighborhood Business (B-1) zone, as amended 2 The applicant shall develop subject property in stnct accordance with the site development plan presented to the Hearmg Body Mmor vanations, when approved by the Planning Director/designee, may be permitted, including, but not limited to buildmg location, landscape plans and general al(owable uses of the peRnitted zone All vanations must conform to regulations set forth in the Spokane County Zoning Code, and the original intent of the development plans shall be mamtamed 3 A specific landscape pian, pianting schedule and provisions for mamtenance acceptable to Planning Director/designee shall be submitted with a sudable installation guarantee for the project pnor to release of building permds Landscaping shall be installed and maintamed so that sight distance at access points is not obscured or impaired 4. Approval is required by the Planning DirectoNdesignee of a specif c lighting and signing plan for the descnbed property prior to the release of any budding permds. Lightmg shall comply with Section 14 810 180 (Illumination) 5 The Planning Division shall prepare and record with the Spokane County Auditor a Title Notice notmg that the property in question is subject to a vanety of special conditions imposed as a resuft of approval of a land use acbon. This T'iOe Notice shall serve as public notice of the conditions of approval affecting the property m question The T'~tle Notice shouid be recorded wrthm the same time frame as allowed for an appeal and shall only be released, in full or in part, by the Dwision of Planning The Title Notice shall generally provide as follows "The parcel of property legally descnbed as (insert legal descnption from fiie number ZE-53C-80)) is tiie subject of a land use action heard on February 14, 2001 by the Spokane County Hearing Examiner, jmposing a vanety of special development conditions File No ZE-53C-80 is available for inspection and copymg in the Spokane County Division of Planning " 6 The Spokane County Division of Planning shali file with the Spokane County Auditor, wdhin the same time frame as allowed for an appeal from the final disposition, including lapsing of appeal penod, a Title Notice, which shall generally provide as follows • r . "Pnor to the issuance of any building permit for any building or any use on the property descnbed herem, the applicant shall be responsible for complying with the provisions of the Zonmg Code for Spokane County, Section 14 706 (Aquifer Sensitive Area Overlay Zone) The property which is the subject of this notice is more particulariy descnbed as follows "(msert legal description from Planning Division File number ZE-53C-80)" 7 All conditions imposed by the Heanng Examiner shall be bindmg on the "Applicant," which term shall mclude the owner or owners of the property, heirs, assigns and successors 8 A filed avigation easement satisfactory to the Manager of Felts Field shall be provided pnor to issuance of any building permits . ` r r u A7TACHMENT C AGENCY COMMENTS 1 Spokane County Public Work, . . Page 1 of 2 Falk, Jim From: Baldwin, Greg Sent: Friday, January 12, 20013 38 PM To: Faik, Jim Subject: Z-53C-80-TReview-01-11-01 doc OFFICE 4F THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)477-3600 Fax lawfi _ _ i ~ .L509)477-2243 ~ &O"Caumy "ENGINEER'S CONDITIONS OF APPROVAL" TR ZONE TO: Spokane County Buiiding and Planning Department FROM Division of Engineenng & Roads DATE. January 12, 2001 WAM tL.-.~ PROJECT: Mullan Centre - Office Building JAIN I i2pQ'1 FILE ZE-53C-80 Heanng Date PIUISIQN OF IPUWtVlNG - Review Date January 11, 2001 Sponsor/Applicant. Dan Cantu (Cantu Investments, LLC) Sectian Township Range. 17-25-44 Planner Jim Falk Technical/Review Date• January 11, 2001 @ 2• 15p The Spokane County Engineering Department has reviewed the above referenced appiication. The following "Conditions of Approval" are submitted to the Spokane County Planning Department for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved Prior to release of a building permit or use of properly as proposed: 1. Access permits for approaches to the County Road System shall be obtained from the County Engineer. 2 Applicant shall submd for approval by the Spokane County Engineer road, drainage and access plans. 3 A Professionat Engmeer, licensed in the State of Washington, shall submd final drainage plans, a drainage report and calculations that conform to the 1999 Spokane County Standards for Road and Sewer Construction, the current edition of the Spokane County Guidelines for Stormwater Management and all other standards and laws that are applicable Final drainage plans and a drainage report shall receive the County Engineers acceptance pnor to release of a construction or building permit 4 A parking plan and traffic circulafion plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance wdh standard engineenng practces Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehrcles 5 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer. O1/17/2001 Spokane County Public Work, Page 2 of 2 6 The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adjacent to the proposed development This will require the instaliation of asphalt equal to 20 feet from the centerline along the frontage of the development Curbing and sidewalk must also be constructed 7 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other appiicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 8 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 99-0265 as amended and are appiicable to this proposal 9 No construction worfc is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 10. All required construction wdhin the existing or proposed public nght of way is to be completed pnor to the refease of a buiiding permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed wdh the County Engineer. 11. The appiicant shouid be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adJustments or relocation regardmg these utilities. The applicant should check with the applicable uti(ities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work 12 The applicant shall grant applicabte border easements adjacent to Spokane County Right of Way per Spokane County Standards END O1/17/2001 SPOK:ANE REGIONAL HEALTH DISTRICT . ENVIRONMENTAL HEALTH DIVISION Inter-office Communication DATE January 30, 2041 TO• Jim Fallc, Associate Planner, Spokane County Plannmg Division FROM. Donald Copley - EHSII, SRHD SUBJECT: Proposed Zone Change• ZE-53C-80 (Cantu Investments, LLC) 1. References: a) Map of subject, scale 1" = 20', by Architectural Ventures, dated November l, 2000, received by this office Januaty 2, 2001. b) Reconnatssance Geologic Map of the West Half of the Spokane Quadrangle, WashuiQton and Idaho, Allan B. Griggs, 1966. c) Soil Survey, Spokane Countv, Washington, Soil Conservaton Service, U S D A., March, 1968 d) Spokane Cownty, Washington, Engineerulg Interpretations, Soil Conservation Service, U S D A, August, 1974. e) Spokane Couaty Rules and Regulahons for Sewage Disposal Svstems, January 19, 1995. fl Logs of water wells in Range 44E, Township 25N, Sections 8, 16, 17, 18, and 20. g) Map: Spokane N E. Quadrangle, U S.G S, 1973, and Spokane N E., U S G S.,1973 2 Find.ings• a) This project lies uiside the Spokane-Rathdrum Aquifer Sensihve Area, but not over the Spokane Rathdrum Aquifer. b) The project is within Critical Water Supply Service Area #3 and vvithui the service area of Modern Electric Water Company Water supply will be a public system. c) The project is inside the Spokane County Comprehensive Wastewater Management Area, uiside the General Sewer Service Area, and inside the Priority Sewer Service Area recommended in the '201' Study. The method of sewage disposal is subject to approval of the Director of Utilities, Spokane , . . County, pursuant to County Resvluhon 80.4418 adopted Ma,rch 24, 1980 The topography and soils .in. the area are generally suitable for use af individual on-site sewage disposal systems The tract is not of the proper dunensians to permit the use of both an individual well and sewage system d) The project lies in a relativel.y flat area east of Mullan Road atnd north of Sinto Avenue Local drainageways are uisignificant e} Surface soils aze classed by the U S Soil Conservation Service as Garrison graveily loam vvith Q% tv 5% slopes They have a septic tank filter field Imaitation of slight. There is al.so possible contamination of grvundwater. This sail vvould be classified as a Type IV fl Geologicaily, the sotls are giaciafluvlal deposits These geological structures generralllly yield moderate to very Iarge amounts of water Data from wells m the area referenced in sectian 1 f shows they are from 78' to 196' deep and have static water leveLs varymg from 40' to 136' below the surface The Modern Electnc Water Ca►mpany has indicated that zt can supply domestic use water far the project upon complehon af agreements vvith the proponent 3 Required (mandatary) Condhtions If Approved a} Sewage disposal method sha11 be as authonzed by the Directvr of Uti1ities, Spokane County. b) Water semce shatl be coordinated through the Darector of Utilities, Spokane County. c) Water service shall be by an existing public water supply when appraved by the Regional Enguieer (Spokane), Sta.te Department of Health d) A public sewer system vviu be made available fmr the groject and mdividual service will be pravided to the tract. Use of an intiividuai on-site sewage disposal syste3m sha11 not be authorized e) Use of pnvate wells snd water systems is prahibited c Drrector of Utihties, Spo.kaYie County c Spansor• Ran Mackate 9$02 E Mssxon Ave Spokane WA 99206 . JAN-16-01 09:42AM FROM-SCAPCA 5094776828 T-783 P 04/04 F-737 SPOKANE COUHTY ~ AlR POIlU110N s P O K A Na CONTAOLAIriHOR1TYY 1MEST 1101 COLLEGE, SUITE 403 • SP01cANB, WA 99201 •(509) 4774727 Fau (S09) 477-G828 pate Janu,mpl 1972001 To Jin4,FaikT Associate Planner Spokane CountM Dhrision ot Planninq 1026 W. BroadwsM AveM Spokane, WA 99260 From. Ron Edgar, Chief of Technieal Servioes RE SCAPCA REQUIREMENTS FOR File No ZE-S3040 Proponent / Project Name S 031 sq. R,. 2-stoni otfiee blda. & oaNcina anea. an Mackey D General Comments an eruarv 14. ?A09 A 8:00 aAL The following is a list of concems/'rssues rihat may need t,o be addressed for thm project as determined Nom information reveived by this offioe The fist is pnovided as a bnef summary of general requirements and does not relieve the proponent from meeting all locat, state, ancUor federal reguMons For additional mfomnanon or darifiaaon, oontact SCAPCA at (509) 477-4727 Copies of SCAPCA regulaVons are availabte for purchase in : .scaQc a~,1g. our ofFive or can be viewed and downloaded from hffg Cogemcftp related neq,uiremep_ts • Dust emissions dunng demolmon, consuvc.don and excavelon projeas must be controlled. This may require the use of water sprays, tarps, sprinklers, or suspension of acdvity during certain weather condfions • Measures must be taKen to avoid the deposMon of dirt and mud from unpaved surhaces onto paved surfaoes. tf tracking or spilis occur on paved surFams, mea9unes must be taken immedaeiy to clean these surfaoes. • Oebrrs generated as a resutt of thrs project must be disposed of by means other than bummg • SCAPCA stircngty recommends that all aaveled suftces (i.e. ingress, egress, parking areas, access roads, etc.) be paved and kept clean tio mmimwe dust emissions • If obJecdonable odofs result from dhis projeot, effiecqve oontrol apparaws end meaeures must be taken to reduce odors to a mirnmum Add o al requirements • A Nouoe of Consttuction and Application for Approval is tequired to be submitted and approved by SCAPCA prior to the construcdon, installalon, ar establishment of an air pollution sourc,e This mdudes emergency generators ratied at 500 hp (375 kV1) or higher, natural gas headng equipment urnts rawi at 4 MMBTU/hr or higher (input), and headng eqwpment units flreo with othet fuels (e g. diesel) rated at 1 MMBTU/hr (input) ot higher. Con#act SCAPCA f+or a Nohce of Construcdon appluatian • A Noace of Intent must be submcbd to SCAPGA prror to any denolipon project or asbestos project An aspestos sunrey muet be done by an AHERA accredited building inspemr pnor to the demolibon or renovetion of bwldings to detertnine if asbestos-vontaining material is present at the site Contact SCAPCA for a Nodc:e of Irrtent application /MEPA%GENERAL QOMMENTS FORM doc U WW 0AWee on Re&aM,e #WW \ ~ ~ . REC ~P RECEI~/M SPOKA[~~ IPKANE COUUW 02 2001 To: Jim Falk (Division of Planrnng) F~R ffB CC: A From: Jim Red (Division of Utilities) D1YlSlAIV &V?J1%NOF ~~~~NG ~tIWON Date: Thursday, January 25, 2001 Subject: ZE-0053-80 Stage: Heanng Exammer Phase: WAM Enterprises, AS to LB, CHANGE OF CONDlTIONS SS09 A wet (live) sewer connecbon to the area-wide Public Sewer System is to be constructed Sewer connection permit is required Commercial developments shall submit histoncal and or estmated water usage pnor to the issuance of the connection permd m order to establish sewer fees SS12A Applicant shall submit expressly to Spokane County Division of Ublities "under separate cover", oniy those plan sheets showmg sewer plans and specifications for the public sewer connections and facilities for review and approval Commerciai developments shall submit histoncal and or estimated water usage as part of the sewer pian submittal SS12F Sewer plans acceptable to the DNision of Utilities shail be submitted pnor to the issuance of the sewer connection permit SS15A Arrangements for payment of applicabte sewer charges must be made pnor to issuance of sewer connecbon permit Sewer charges may include special connection charges and general facilities charges Charges may be substantial depending upon the nature of the development WS01 Any water service for this proJect shall be provided m accordance with the Coordinated Water System Plan for Spokane County, as amended RECEIVEG SPOKANE Cott FEB v 19 !<< onnsroN OF PLANwiNr, L CP~T' P ~ ~~I~~ _ ~ ~ 4yterj . - ~ - ~ ~ . ~ ~ 7~ - ~ _ ~ - - _ --i . ~ ~ _ - t - - , ~ rj ~ 5 , 17 C~~!~~. 0~ ~ ~ CL c~ ~ "'v'`- _ ~ TI / 0 C,~+ / - _ _ - - ~ ;k ','i P 4 K A N E C C3 U N T Y UFFdCE OF THE HEARING EXAMINER MTCHAEL C DEMPSEY, CH1EF EXAMMR February 23, 2001 Ron R Mackie Donald Beres Architectural Ventures Dakotah Direct II, L L C 9802 East MxssrQn 9317 East Sinto Avenue Spokanea WA 7No ~ - Spokane, WA 99206 I RE Fil ZE-53C-80, Dnv ta Issue Dear Sirs I am in receipt of a letter dated February 22, 2001 from Donald Beres, on behalf of Dakota Duect, with an attached 11-mch by 17-uich srte plan. I am also in receipt of a lefiter dated February 22, 2001 from Ran Mack-ie, on behalf of Cantu Ynvestmen#s, Inc , with an attached 2-fo4t by 3-faat srte plan Copzes of the above letters and reduced srte plans are respectively being faxed to yvu alang with this letter The documents you submitted propose different solution.s to the dnveway access issue. The letter from Da►nald Beres does sta.te that Dakota Direct is wxlling to share the dnveway with Cantu Investaments, Inc, and would entertain shght vanatrvns to 1ts dnveway access propasal by Cantu Investments, Inc with the County's approval Such letter requests that Cantu Investrnents, Inc zncur all cost associated with the changes proposed by Dakota I)irect Based on your submittals, it is not elear to me that there has been ameeting of the mulds between the parties Qn resolubon af the dnveway issue Could you please 1et me know ul wntuig what you agree and dtsagree on? If there is a disagreement on certain items, how do you recammend that such disa,greement be resolved? I will give you each until next VsJ'ednesday to revYew the other's submittal, talk to each other, and submit further wntten comments Please be advised that any changes to ihe dnveway access will need to be reviewed by County Engineenng, at least pnor to issuance of a building pernut Smcerely, ,,i j~ lc,~!' ~ •--y~ ~ Michael C Dempsey Hearing Examiner Enclosure c Dan Cantu, 15504 North Chraructe Court, Mead, WA 99021 Scott ]Engelhard, Division of Engineenng Tammy Jones, Diviston of P'Ianning TI-iMD FIAOR PUBt,IC WQRIC5 iUILUM 1026 WFST BRC7ADWAY AVBNUB, SPt?KANE, WASHrVGTQAT 99260-0245 PHOrE (509) 477-7490 0 Fax (509) 471-7478 • TDD (5M) 477-9133 ~ • RECEIVED . SPOKAIVE COUlVYY' ARCNITECTURAL YENTURES FEB 2 3 2001 9802 E Missfon ♦ Spokane, WA 99206 Phone 922-5287 # Fax 922-5287 DIVi~~~~ ~~~~IN-t- 2-22-01 Spokane County Office of the Hearing Examiner ATTN Michael C Dempsey RE Mullan Centre Office Building, 1410 N Mullan Rd, Spokane, WA 99206, File #ZE- 53-80 Dear Michael, Please see the enclosed revised Site P{an for Mullan Centre Office Buiiding showing changes made to address the concems of the adjacent property owner, Dakotah Direct, that were brought up at last week's hearing on February 14, 2001 Dakotah Direet's concerns with the previous plan were that their traffic coufd pose a safety issue with the penmeter parking we had shown between the existing driveway and the Dakotah Direct property We addressed this concern by eliminating these rnne stalls and leaving the existing driveway and easement access in it's present location and by only removing a portion af the northem curb-line to allow access to our property and parking areas This plan has been sent to and reviewed by Don Beres of Dakotah Direct He informed us that this would be a more acceptable so{ution to his concems We would probably replace the section of removed curb with a painted speed bump to direct their traffic out through the existing dnveway The existing landscape strip to the south of this existing driveway access would remain intact This is not quite 5' wide, however, after discussions vnth Micki Hamois at the Planning Department, this wouid still be acceptable This changes the provided parking stalls from 76 to 66, still meeting the requirements of the Zone We are only required to have 38 stalis if you have any further questions, please call me at 922-5287 Sincerely, eRaexlz e Ron R Mackie Architectural Ventures , , i ~ rnxt,c4 ~.uMU~n. , ' i ~ . PARCEL ~C` 4F BINDING S1Tft PLAN, 95N-59-97. EXISTING H~TEL 471 W ERAI~ NpT~S . ~ ra~nr+c: e-, ~xisriNC, ~orasFa s~ME iRxCTC}R TL vER1~Y 10CATIOH 4f AL~ E%~ST1NC UTILIifES ' ugE ZpNfS OF AOJACEf~T L0T5: v d 4 iR FD CONSTRUCT(ON. , ~TRACTOR TO PR4V[pE A~+' P.V.C. SLEEVE TO ~tl LANDSCaPE~ I NORTM: 8-~ _ N AS AS SM6Wk OH DRAWfNGS FOR SFR[NKLER SYSTEµ. CKp k , ~ • - - ' - ~ ' - - SQUTti: B-1 ~ . ~ . - . - - • - • ~ ` ^ ^ ~ f!c EN~S. CGORATNaTE LOGATION WIT11 SPR1iVNLER CONTR EAST, B 1 OvIpE 2'-8" ~~N. RAOlUS OH Al L CUR$$, TYPICA~ U.N O. WEST: B-I ' R NAT W1TH TFIE CQUNfY ENCENEER5 OFF CE K ]~1}; I I ; STREETVfORK Tp BE C40 DI E~ ~ I . $ETBAC S REOU a ,~p p~AK NC SiALI uDUNZEO ~ . ~RUNT YaRD: 65' F~i{3~1 CENFERLiNE STREET OR 35' FROM LOT L1NE I OVIOf SIC~+~GE 0 EA H NDIC ` N, AP WELDED lU TOP I . ' FLANKING 5iREE~: 65~ FRON CENTERLINE STREET OR 35~ Fft6MA LAT LINE • ~ ~ ~ 2 SQU~+RE Si~ F[PE w/ 1/ E D C ~LV. aF`TEA FnBRICATION. SiCN TO $E 12" ~ b8' Wf ~HE ~ SIDE YARQ: 9'+9'' I ~ ~ ACCE55 YIHITE On BLUE BACKCROUNII) I R YAR ~ I-tl TERNATIONAL 5YAIBOI 0 C , REA D 'S I Tt~E woRDS ~RE5CRVCD PaRK(nc' d~"STnTE DISA&~E PaRKINC P~FMIT iCQU1RE0". !/N )t}Mi SICN r4P 0 A8. PFfOYID~E Af}DIffONA~ `VAN RARItIfVG~ 5lGN 0~ I • .CN P05i, W~ERE N(}7E~ : SET9ACKS PRDYIDED. I a[ a I T YARO: 9&'-$Y." WEST TD PROPERTY LIN£ Ai I~ULLAN , rEflNATIONAL SYU~Bttl 4F ACCESS PAINTE4 "TRAF~`IC WH$TE~ ' . ~ F~Q~ I ,~pINTEp 'BLUE' BACKGRqUND ON PAVING. fLANKING STREET: 77'-61~" Tp PROPER7Y LINE AT $~NT4 ~ ao Z ~ O , ~^(p~ WALKwAY STRIPES 0 2'-0' OC PAINTEQ ON PAY[NG. } S1D€ YARp: 12'-q NORThl I ° ~ Li I ~SMT 'TRAFFfC wHf1E". I REAR YARO: 79~-4' EAST ~ [ I ~ FLl15H WIfH CONC. WALK 0 HEAD ~ ~ ;PNA~~ TO BE I I 5(TE kREA; ~9~778 5.F.i 4R I.1~ ACRfS , LLI ~ ACCE5SIBl.E SSaLlS - SLOPE A1A%. 1 a$. I r~ . DING C44'ERAGE: 8,DS~ S.F. DA a6X _ 'f "TRAFFIC WHITi . y ~ aRKINC ~OF STRIPING 1~ 9E 4" wIDE STqIPES PA[N E0 ~ N : A ARE~: NEW 23,4f1B S.F. I C ~ i RApING PLAN FON CURB CU'fS ANp COMCRET€ OU~~AIL L6CA ]fl 5 AS~ALF SURF CE 4 B C ,£E SI E G ~ I ~ ~ ~[KE RaCK 2'r M 30' NIGH SfiL, P3PE 1NVERTED U-SHA~ED E46EROED 3" N1N. ; ~ EXIST[NG 3,944 5.~. ~ ARCHITEGT ~ Q .~TO G4NCREiE- CnNFIA1A LOCASION W/ ~ u- o , CO~iCRfTE SURFACE AR~A: 1,672 S.F. I ;1TE LIGHIING DN BU14.D[NG AN(1 ON L[GHT SIANOAR[}5 TO ~ SHIfLOEO TO ~lA1~tTAW , CT PROPfRTY. WAINTAIN f FOOTCANf}LE f0 AlL ARE 5. I tNNDSCAPE AREA; 13,72} 5.F. QR 27,5~ * l- J~k71~G ON SUBJE ~M I F N R TE C A8. I PARKENC REQUIRfo- OF€ICE USE; ~3,d34 S.F. TENANT ~REA + 350 - 38.3 SgACES LL IISAENS10N5 5HOWN ARf T4 FACE 0 CO C E U , • (UNI~TERAI[NEa UNTIL LEASED) ~ * I , A T R ~ :4NCRETE SIPEWALK RANP DN. E:12 TU fLUSM W~ ASPHAlI pA R 1R tR' WIOE M 30~ LOHG z H'-6 HISH ~~,~'1~ 1 1J • TA E WaRNiMC STAIJPEa FUII ~EPTii OF RAMP. ~ UFF STRE~r LQAUINC: 1 5 CE ~OU EU ~ ~ROVI~E DETEC 9L ~ -~J 13,D0~ BCRpER -AS€IA~NT I ~ ~ S'-0" WI~c ~ET~C7A~.E WARNING S1AitPED [NT6 ASPHALT PAYINC I PARKING PROYIOEEI: , 1!/ N ESS TMAN 4i pQ' UTURE ACQUiSId[OH XREA ~ wHEaE TRANS]TiaN ~RO►1 Sl[)EW~LN TO PAVC C f5 L ~ ~ , P F wHICN 3 ARE H.C. ACCESSlBIE ~ Y0_~ I , PASSENGER CAR SPACES: 6fi S ACES D , ~ 2'-0' WI~E x t0'-0' ~EEP ~ 4' TwK. CONC. SLAB FOR auuPSTER ~ O HIGH CHA1N-LINF( fENCE k 5LAT5 ANA PR. 6~-0' GATES , 10.00~'--UTILiTY E~15E~IENT . I ~r WITH 6" 0 ~1 I li 0 ~ wlrH Car+~-BCr~f E~. tEpF. OE~a~~+stOn5 IIS~ED hRE C~E~R Di~ENSIM+. , ~ INSIbE ENCLOSURE. 35.00' ~BUILD{NG SETBACK ~ _ _ • p,p, I , , 79.33' SETBACK ~ a THK. CbNCRETE SIOEYYF1K W~ CONTRO~ JO]NTS 0 5~-0~ f}.C. 4 ~ 3T4.D~ { i ~ I '98.72't SET9A K ~4 ~ CR O S S Sl{? P E T O B f 4 A X 1: 1 8 ~ ~ ~ ' ~ ~ C. +'AULT~ NDTE IB ~ ~ A V I N G S E C T I O N T O B E T" A S P H A L T P A V N G O Y E R w:~~~ _N 8~~~9,,4- ~ a 4' GRAVEI. 9ASE. y . ~ ~ _ • . - . ~ " - - . - ~ ~ - ~ ~ ` T N PARfi N ~ s ~ ~ CL _ ~ --~I------ `u __-w~ ~ _ - ~AA55SWAL£~ ( E%IS 1 G I G ~ ~ s ~A MfEU ~TRAFF3C N'HITE~. _ , ~ _ _ ~ ~ ~ I AlNTEO "VISIiOR" SIGNAGE UN pAY1NG [ , ~ GRASS SMfAI ~ ~ , 12.O~SEIBAClL _ ~ _ ~ l ~ . NOTE SI - I ~ T T S fpR TRE~CH[kG Q~ GAS l!NE TO ~ ~ f ~ ~ ~ } I COOR~INATE W/ AYI5TA l1 1'~I IE . ~ I h - "_A'' ~ CT CAN I . ~ -~I 9r' P' .:+r: ~ PROPOSED GAS IAETEfC l(7CATI0~l. < - ~t kETER ~ ~r,, . s w~, ~ I [C iu { I' ~ ^ _ n I ~ ~ ~~s' ~ 1 ~ ~ m' - - G .1 _ NT . r~ OI25 I i - PAD R Y 1G_3. :;'.60 • 1~~ ~ ~ ~ ~ , ~ ~ ~ ~ ~W~ ST~RY 4FFfCE . , , ~ _ , i - ~ O W - 1 - 8,D31 S.F. / F'LR. : , .w ~ - W NEW 4RIYCWAY "r ~ 3 ~ \ }E ?`'-~',?'<~i'iG . D JR f W ~ - - ~ ~ di tn ~r~: . :1 j ' ~.o' ~ 32' BUILDING HEICHT . ~.~a ~ :.°-~:'rr-; ~ ~ ~ ~~1~VT A f'ER SP9K. G0. S NOARDS ~ - i ~ Y5 ~i'~ i,. r,. ~n• • ~ ~ I ~ i ~ , ~ :;,.r~ PRDPC3SED CAS uETER s rr ~ ~r[~ •A w N I ~ ° '"y,- N / LOCA?ION ~.a. r~ ;Ni{ . ~ ~ _ ,~r 1 ~ - a ~ I ~ f~ N ¢ ! ~ - o ~ _ ` a' ; HtGI~ ~ . . a e-`~' "k~ HQTE 17 J f z i C ~~I I li , 'j1 _ - r.~., a i~;- / f YYP. -R- ~~-'S. l t l~ - f r • e R ~ # ,-Y::`~ + -r . . ' , . ~ ~ - O ~ . 'hr, . . . . ` h .i~{iuNn ti i - TRACT C ~ ~ ~ . d • . , ~ ~ ~ r 4 ~ ~ ~ j ' ~ k ~ ~ . i ~ r . ` 2_ ~ _ , ` ~ ~orE ~ : ; , u• , • : r N , . _ , . ~ s NDTE 5 N6TE I7 , . p I 4 ~ ~r,, I ; ; . _ : . - . ~ ,'~y' '1 , t' - - / NOdE 1 NDTE S _ 4? i i '"I ~ 4„ ! ~ o ° l a 3 ~ I ~ -.1~a , ~::-s~ 12' 'x" ~;G ~ ~J ~ ~e. ~ ~ ~ •I. ! ~ ~ , . . i . . ~ ti . A bQ - I ~ ~+I 7. Y I Z S j~ / ~ . ~ Q pq ~ I ~ -v S t~ 5 r r~ 1 ~ d' ~ ~ i I a 3 I = a , N f 1 T F r 2 w L A N D 5~ A P I N G _ t;-;~• I° a I, 7 ~ a ~l < . ~ e~i / , . u ~ , - T-,-,- rs a' ~h -W , , 1 . ~ r ~ . ~ r. ~ ~ ~ i~ - Q x ~r W ~ N f , f . 7.~ r---~ ' j~~ . ~ ~ I ._.r--.,.~1~ ± ~ `k~ . • r I N ~ - - Z ~I ~ K1. . .j . . . „ ' ; - _ C~ .-y° _ ~ r ` 7,~':~.2~.. ~L \ _ ~ ~ 4 ~ v~ Z ~ C FQft 5] N r. - , r. ~:s~ , tS, 4x l i z , . 4 - - t ~ . . . 1 i i I i . ~ ~ ~::TG~EL~€~ R ~ ~t- ~ _ ~Y J ,e ~ _ - i~~ L ;c;; rf ~ ,r~ Y '~~!"iAa ~ ~ - ~ ~ c7 EL r' , In ^ I i l ~ i~-'^ r~ I ~ 5y ~4 v k~^' ~ ~ ~ry ~ `~^'ir. _ W tFL;',~~n,~ - t `:f. a7~ .Ni~:. -i i . if •--r~ ~r:.El: ~„1 Y ~i "l . I _ _ .f J I~ , , , ~ ,z j ~ o F . ~ x ~ , l, . • r , , ' ~,K s .,j ; - ~i f.' ~ °0 W ; / e~ cn W W I. ~ ~~P.~ ~ ~ I 'rf!!la{ rrifi~ rA,lw ~~1t,.4 r7:1+~' " / . ` a 1 ~ i Y,~4 iY137 ^P9~.1..'. . ~ . . ~ . . ~ ' ' ~ a wmce ~tosp~ I nu~ u~ rt'~i?r~t y t 4~ J i f.~.~ ~ _ ` I _ _ .I r ~ { , ~ a t7 ~ ~ ~ ! . ~ ' ~ ~ z / . ~ ~ , . . . . , h~~'N~~4 F s _ ~ ,.4~. a. , t ~ rr ~`1 _ . . . ~ • . . .`(t ~ ' I { f ~ ~ .qJ ~ ~ , ~ _ . • ' . ..y. ~ ! . ~ ~ ~ ~ ~~^,v• z2.o- _ ~ ` - W I I Yl d _ . . ; a~'_ T . _ ~'T°"°FA`... ! i , W _ , i 7 ;'7.~.'~ Y N , ~ • . , ~ y P, v :r Y _ c , I T r' l~) 4 C~ ~ 'Y L.~~ r• a~- tit. L i i I!f . Q . ~ „ kl NU €N . , ~'~i y _ : f'~,~~r~. , . S1GN ~ ~ `~1=' / •-~.TO ELEC R~i::: u:,'. ~ .ti, ' s~t~,~ 2_•`~ n~ r.;.,~~•~,.. „ " ra 9 ~ ~ W -M ; a 0 I ' FEl H ~ ~ . r , I ~ ~ , ~ . ' . -~..;~,~..rl ~(}la' . ,,,.rt , 1t"~~~'; a c$:a:..:` r~ - - - ~I _.r-_~.-~~°`~y ~ . ' :,r.:- . . . t .5-.. . ~ t~ ~ . , , . ~ ` _ . ..~+faa ! L,: .r_a~ 4 J ~ ...-r.r~-:,, ,7,_~_ . . if . ,..,aY 4~~. .r., . . .,W . ~ f ~ ,,.e ~ ~ „r i - ~ I ` i - ~ N~~~ t . ~n ~ ~ ~ Ex15~[NG CURB r0 ~ ° p ~ I d . l : w ! ~Y y;aJ~ ~ flE REU0VE4 - 5r~DwN dn5HEC7 . . m - • ~ , • E%ISTIN ~ FIRE I ; ~ . ~ ~ ` ~ ; .4, . ~ROY#CFN~RAISftIS~~~UFir , - a ~ gll ~ 1~YpRAN / _ ~ I F~1NT 'TRAFiIG YELLC1W' $ ° ' ~ 1 ~ I - - - - - ~ - - p - „ - ~ ~ f-- "_o i~ _ _ ukA• 10 , 1 ~ . ' , • ~ 1 1 !r'_ . . Ek15TTFiG 6 EzIST[N. POW€R ~ ~f- . . ~ _ E f. _ _ - ~ - - - - - - - ~ _ r - _ ~ _ ~ - - - - ~ - - - ~ I _ - - - T 14 ~R~IAA~N POLE / 5 TYPE CT[ LANDSCA~ING _ _ ~ ~ ~ i r %prNr ~ „ ~ .r. ~xisTir+s e~~e. v,~u~T N 89'JB IB" E 349.10 '4_ . ' . _ ~ . ~ X[SFIMG LAHOSC . , . T _ • - ~ . ~ - _ ~ . . ^'k.~,~,, _ - ~ ~ .....r ~ r _ir~+~4: .Jf ~ .^'1'.., 4 .~,r• ~ . a E%.IST[NG 5~~.lQEWALK - - . _ _ _ _ . _ ~ - s Qa~~s E . s . . - - - ~ - . _ ~ a t;,y, ~ ~ I ~ NEW PAVSNG TO WAiCH ~ 5.51~ ~,~[t~7FN('ir i~l:`'RfSER . 1 - , " r ~ ~ o ~ E%[STCNG GRAU[S N ~ ~ ~ r>'' ",r ~_s - E%TST~NC DRIYEWAY Z i o ~ HY NT „ - -`-----'----_1.a~~:_r -~r_~j__.. _ . ` T4 REkYAiN ~ o i EMS$Tl%C FIRC DRA NEw C4NCRETE CU~9 d 5[DEwAIK N ry ~ 't ! I~fft CCIUNTY STAHDKRDS - - - - ~ - -d^ ~ _ ° _ _ _ - - - - - ~ - - - - - - , - - - ~ JGY INiIM/E1F: 30f30 ~ - - - - ~ KEw r,S~A~T PxvING iNTO AVENUE a aER CDtmTr 5TaNtiaRDS S ~ vE~trr ExrEars DA1E: . ~ LEGAL DFSCRIPTION: ~ 0 ~ ~ t TrsE SOU7H I 2 OF TRACT 7Q Or DPP~RfUr+17r AS PER P~a1 1HEREOF /~r . ~ , _ , r. .r . ~ ~ u - - - - - • - - • - ` ' - ` - ~ ~ - ~ ~ ~ t A . W ~i r R~Cd~i~EO lN V~pLUµF ~K~ O~ PLA~$. PACE ~Q ~YINC ~AST D~ ~ULLAN ~ ~ , ~ ~ ~ ~ r ANa N4FTH OF SINTO hVENUE; E%C~PT THE $OllTH S.QQ FEET TNEREOF ~EEDCO `4A RQAp RIGHT 4i' W.+1': ~ x w RECENI aEcEnrEO S$TUATEP lN 7H~ COUNTY QF $PpkANE, 5'~AIE OF WASNlNC70N. ~ I ~ I $pQN,pl~IE C~ NMY t/a pF TFiE NW I/4 0~ SECTTON ~7T.23N., R. a E ~N.~1. I , ~ ~ sPoK,ar►e couNm BIHpING SITE PLA~+, BSP-54-97 , ' a ~ = ZU~`V ~ FEB 23 ~ x FEB 23 2091 N pM510N oF P pM51QN OF PLANNIHC ~ ~ DA ok i4 7, DIRECT 11, L.L.C E C E O V E ~ ~ FE8 2 3 2001 J--1 + y sPOxaNE couNnr HEARING EXAMINER , Michael Dempsey Cluef Exatruner Spokane County Public Works 1026 West Broadway Ave Spokane, WA 99260-0245 February 22, 2001 Dear, Mr Dempsey Tlus letter and accompaayuig plans are to address the problems associated with the Buildmg Site Plan submitted by Cantu Investrnents and the proposed resolve to those issue by Dakotah Du-ect, as specified by the Cluef Examiner at the pubhc hearing on February 13, 2001 The followwg informahon supports the plan subnutted by Dakotah Duect and theu landowner MetropoLtan Investment Dakotah Duect is the lessee of Tract A, parcel No 45172 0731 and has legal easement to the South 30 feet for the full length of Tract C, Parcel No 45172-0752 per the BSP, for the purpose of a dnveway access to our facility We would agree to a shared dnveway with the developer of Tract "C" Cantu Investments Cantu Investment shall mcur all cost associated wrth the changes descnbed below and as reflected on attachment "A" Our concern of the exishng and revised BSP, by Cantu Inveshneats, is the mcomuig and outgomg traffic, in respects to flow and volume for both faalihes into a confined 28' space We currently have great difficulty enteruig and exihng the dnveway, specifically traffic heading West on Smto Ave Removing the curbing, per the Cantu proposed BSP, would not, m our opuuon alleviate many of the problems Even though we do not lnow the tenants' occupancy at the proposed site, we strongly believe that rt will only create more congeshon Our recommendahon is to wnden the dnveway access (at the curbing) to 43' wrth a laadscape style divider 21 5' O C dus will help alleviate any mcomuig/outgouig traffic confusion for both sites We agree that the North curbing of the dnveway easement should be removed The landscapmg at the Northeast end of the dnveway easement (at the property line) should be moved 5' to the North making the dnveway at the pomt of the property lme 30' (between Tract "A" and Tract "C" ) A center divider wnth standards at each end for signage would be uistalled in the dnveway at 15' O C from the pedesftan walkway to the property line to East to assist traffic flow for incomuig/outgoing velucles to Dakotah Duect Dakotah Direct would entertain sught vanahon to this proposal by Cantu Investinents with the Counties approval (See Dakotah Duect Srte Plan attached) If there are any other matters that need to be addressed in regards to this matter, I wil] make myself available to help in anyway It is not the intent of Dakotah Duect and Metropolitan Investment to m anyway stop the development of the Cantu Investement propErty, to the contrary the facility would only enhance tlus area . P /Donald B Beres Facility Manager (Attached Dakotah Direct Proposal) Dakotah Direct II, L L C 9317 East Sinto Avenue ' Spokane. WA 99206 TEL 509-789-4500 ` FAX 509-789-4703 ~ ~ _ . 1 ~ r ~~,.e , , ~ I ~ ! ~ ti ,~~1'~ :~1+ ':r,~.rl,t I^~~~~i^~'~r ~.6~i(t~ ~S 1~ ~rz~,.;,~,,~ ~ ~ 7n r~ j'~ 1 , ~i,~(~ Ir ~ t ~ ` ~.-~.-v ~ .~s.~.f~a ~ 3~ M , r {I NG H~IGHT _ Y~.~, ~~4t ~[`1 , ,,~~ti ~ 1 , 32 BUILD~ ~:t,-~~ .Y.VF:J ?V~T~ ~ y i Y yl I Y~ ~f4f(.,1.. J ~ Y~Si 4r) . ..~n{ , . "1.~ f,~.. .`,.~,W~~ ~ ~~-~A`...~,~y ~"`9 ~ . t/ ~ .l v Il . '7 ~i~ . . f . f r r f ~{41.: y''~ . ~..--:.;5,'~- ' `~C; ~,~~.a .'Y4~~odr..fi ~~~Sy~.~~~rlti~~tt"C~~ .~'w ru,a,' :'7 ~~'"Y''~'~ (J~ ? "~7'"rw ~ . R,.n'~i rr'~ ..,~r a ACAW F E B 2 3 2001 . ~ ~ 41 .~7.~..~ x^~ t ~ i ~~n~ t ~w ~.r~~r k wx sx ~t" . ~'j . ' 9 .M`" • ~ !M r~ro ~ ~ ~ ~,l ~ ~ tJ6 P~a r ~ ~ '~.,rJA. f `r`-5 1.~ , y ~ kI e°-~~: w ~ ~ ~~~~f~-~x}~1i• ~ ~ ~ .r~:~ r"~ , ( ' ~7 ~r°`~ x F4a~ kG,~ ~'"}~~",t,~~ ~x', ~,~,.-ws~~ s--,Y-~~ - yi PR~POS£D GAS ~ET~R 'tr, ` ~ l ~i.,~,:~I - ~.'X; ..f~r- C ~....r~r..,'.~w--_!"f ~ ~ti°31j;'~.~` Y ~ { f v a'~Y i~R"+S `}z r F ~ ~r, x t~1l~ ~~~SC ~s~-u;^~, n.+.,a,. Y,., ~ ry( k~ti~ s..e,.i 1'F ~ n rn n ~~1 ar4 z c4 r ~'Y 'ri-~' r ~ v ~I y ~ 4+4 'y ~l ~~,+y a~ ~ y$~.a v~,~~ca,~er`~ lI! } ~-.r r4t,1,~ L v~~j.~~~.~ ~ E nl 1nI 11]Y1 n] ti ~~;.=Y t+- ~S'~~ Y a.~'.~~ S. Y~~'~~g~^ r i,. ~~^~.d`1'Y;{ti~ ~~`j ,+5"w L 3 f.~ , c c~'.a,:5utr. I L.1fVl11 ~LJiY ."'!f+[ }T.:.~~ ia } ~ 3 { Y' kf.: ~[[f~ ~ ~.4 r r .r!.L-.~ mc';i ' t' ,k}~-... ~ ~^M.'4. ~ Yi.~' i~- 1~.r. f . .'`C^.~ ;-~{,u ~ ~ c~ i , ~ s + ,y'~ ~ ~ ' d _q , ,,,...~~zy,,, „ r~' . t ~ u,y~~.`~a ~,~~r., `~F~,Wy'`w'~ ' / . ~ s5 7 5~.i'~-a7e l~ii'`3i~k,~ e~'~. a,irs~ ~,~i ~na ~ [~~y. ~~t 'S'~'?°7}1'~''(~~/.~.,3 ~ i ~ ~ P ~4'' iY. ~ t• rit-34 (Y°q~~ d~S~.%`. ~ ~.t.ryaq~ ~ { Q ~y~f . ~ T trv~ `.`~,-.~'~'s"..~,~."x~ ~ }rt -~tif s`~~4~~:.g_'~'" ~~"7'~m~~, ~~'~5~. f ~~~~~~~!r ^~i'~Pks~w ~w . . ' . . . ^ . Lz~t.x r.,~~c~:.z~r x. 3 c„ur _ir ~ . i't~ , V f~' ~ 7.-t#~rti d, Y~' 1 'n d ~'~~.~a~! _ ~i1 ~ ~ ~ ~~~`l ~f ~ ...firnl` ~.`~s, Y.,,:iy~''t .~q~~ xq aw::'j'~'i ~7+n 5 i.,~ 2' y w.~ t r ~ T y:~-~ ~'h5'•~ N ~ T~ ~ 7 ~ l,r~~~.:.::~ ~~3^.. F q c ti~'^-~ k -~`t~~+. -"~'i„'.~i.{~.. l~y1rF/5(~ f5 ~;n~«t y.._a.^~ 4k~~~ . ~ 1 .~s-.'6 Y:.tr . rt~4 Yt~;, ~ . .s u ~ II 1. x r ir { .,L.~~ 1~• • ~ 'Y ~`-5C'u~ l r+"4, ytf' 1,liPYMI.+zYh1L~YU'i..(~r13TY`1I,` y..~~ ~I Vfr~IiL VV~ ~t~ ~X..;~ 5.'r+. a ~r `z~ r. ' ti ~ . . 3t i~" ~ ~ ~ "d ~ ~ ~a ~L.a.. . ' ~ ~ ~i ~ y i"4" ~ x~~r~,: C" r ~ ~ . : .k . ~s .ta~ ~F3. x = .f ~ . ' _ fn.~+3 . ~ ~ Il ~ l. r ,1 ~ ~ ~ ~ r~,s: _ ~c~H 1 La ~a.,. v7~.`~ ~ i s _ ~I~i J ~AA~ s~"~:`:.~..°`~ - _ ~ i ~ , ~ i1 ~ ~ a... F;:6.,1,.~ ~ 't^ r:. . .~1r ,s~...'.,~". SPOKANE CQUNTY ~ 4E'iRiNG EXAMINER ~ ~ -i~ i i~{ J ~ ~ ~ .~g ~7'"~'' '~1' ...s, .a •rF,,~` r. ~ e 4;~i` y... h'~'~~e~-~.-.:..µ~..~.~ .r~,, , , \ ,r , ~ .,rv s~^ 3,. . ,,,.~,»f~.+~~..,~~' .es..~r.~~: t r 1 ,a:"~ ~ • h `Y.~.t r ~ ~i t: ?~~5.~ , c x ' wn"~ii r+ ~ ~'~~7~~,,.,}~,.r~- ~ .r n. ~ ~ 2,. ~ ~~1` ~t'g"' s . x ,~s~n. . a ~t~, ' ;a*~~.~ ~h`~v~' ~''SJ~y~n~.. , ~ ` i+ ~ a*';y~:~. ry„~~. x„'~j~,.{~ ~~c~ !&S4',`~"',-. w'~.~~i`rk,.'~i.:~ . _ ~ . . -r . ~ 44..' . . t ~ ~ ~ ~ h ~ M Ys h f s} ' ~ ,1+- .~~~T~3,•-. ~',a,~.- l.~}.~~# 4!'~ { . , ~r t a.i. k-U~cYV~~~3rv G.%L'"'L ^T . y~~`f:4 ] "!S'I:, TT ~ 1 ! ' ~ ~ ~ :1x Lr'r: st'~ ~.t=~ ~ _ '1 { f ~,.r . t ~7 ~ ~+;~vb ~ ~~~~i~ ~:~r-.,`zXf.~'~ ~ `~~}TC ~I`x.T ~r1,y ``^.,~.r:~t 1~3.. 4~-~..-^~'xSha~,.~~ ~'4~', 1, IV V I L ! t} ~ l I~,L+ .r . ' :°2 "~'4 ~.~:`.~r~~P E ~`•f~,.~^r°`~ ~~,'i~'T~..sr.'~,t l, . ~ ` 1 ii`"`' ~ i~i'h~.'`~.~a~i~~.k`.b+~+.~v~;.- ~,r~tir4+s+r~n.n,~~'~~~~.~~i s~, ~r r ~ Ifi r~ 4~ .a }4~.~~ ~~t ~h ~.5~ ~r~?n , 4~ er~2e.: ~ r co. ~f~,~-~ i F p ~~5.' . - - ~s r x .~`'a~ ~ r 3 e ~ 4 ~ ~y,.i'"` h1n^ - b'1~1~-`~~'~?~? ~ y~ s+~,,;;~x~ ~..a~a,-4 ut . 1~ h..r^.,~.~-r „x~:~.,~,A~ .~tg~~~~~.~w . . ~ar~ ~ ~aor~ r . ~ r ','r;y- i~r. ~.~2.~""~' ~ ~ s ~F'~ `1;. ~.~~,~~s~.tyi ~.~~'z,~, ~,;i;~~~~~,~,i~~~~~ ~'~iSY~~ k'~ :}ir`~Y'~ ~ .,~,~1~.~'~~'-L~''r'~~j^-:~.. ~i ~ ,c~+`•c'~.ks~~~,~ _~J~4.,~~~~;~i~_" Yt'rs~, au:~ -``'~x `~1"'Wi-~`~i~f ,'t,r~~' " ~0~~ ~ ,~,'..F•~::;r a. ..d.. ~7 .rJ~,~s,'~=,r - ~ ,'~3~ 'G~»J':=~" °",4~'+4'„sv~~a-.~?~{~y~ ~ ' V I L., ~ L ~,a,.,;.~ r~ a ~ .r,~ ~~4',~ ~~n ~ .a .iiP 1 r~"3'` . 3',,~~ q . I k ~ G. ~ -s^~ ~.I ~ I,~ ~ ( i . . ~J..%~~ F G` ~ ~~i~ t f~l.k. 4a~~"'1 ~ T7 .Y ; o .z7 ~,yi ~ ~~t'~"t~~wr,~lcr^ j 4 ~.-Fr„ ~ : - rJ,.'~r .~k~).`,.,-; ~t~.:'~•:u= '-'+i~s&~~s...k~'ti~s~.~ .,,a- k.j~. ~'''f `,~k~.. w a. - "es.~l~ke .~~,sc v~; ~ +.ct~ ' 3,LL. k ..,.-~"~~-~c'. ~~'t~+''~ r ' ~ 1 ' " +y+~ A`.'°.~4'"''~}fr'~$~l~.'arin r'+i,..~i ~.~-r~es ~~.v~s~-?y ~~Yr.t Cw r~ .,1~..:si kl.o-u~ ~:r,.. :s i~ ~ ~ ~ p 9},sy3.~:...~. ~y .~ti. . ~f~~~ fw .~,~1' ,,'9~~c1 . t.i y" , : ?'t~+ ~ ~ ~ ffr ~.'di,. § ~I ~ n;. r~,~r~t~„~^1d~"'s ~ r-G,,..~~"" Y,iS'~~~'-h.rz rt r~,~..,.-„ ' 1 ~~7'~.~~h~i~ +r ~ 1 ~ ' ~ ~s ; . :v; ~ ~ / ~ y"~"`.y. ~.,.ret n -~sa ~~Gy+r~garrwy^'µ{,~r,,, nrvac 5. d-,~-~_d'.~.~~.. , ~ i.~,k ~z q.~m. .1 t , h . . . ".S~ t ~ 1' ~`i 4 v `t ~'4'T = ~-]i ~ ~ irCi.tR i.a ~i S G'rs... x~'~~ . , 1 +~.y~4~r t;.,.n. ~ • k y` s c- •c ~ 1 h 7~° 4.: ~ r atr - u^' ~ 5 t x a S~E~.~~~.~t«.c.-~`'`~'fJ~aTi ~~ti• ~TIE:.~~~s; rtt~r..r~P '~*a ~.5~,~.~}~ ret~ ~ z Y~}i it ~ ~h ^~v,•y'ca' '1 / il ~ F ~ F f Y~ ~ -4 [ ~ ~ ~ a ~ LAN~SCAPZ~G ~ r~~'~~~'Y;~:3~.~ ¢ ~ k r`~~.~ ~y -~~'$.~~k ~,,f-,,~~,, ¢ ~ ~ i Y~r~~~in"Y'~i: ~~L~~d Y . j.:~~'_ Jy~l ~a~., 7+.~:-.#~,i,+{~1 1;,..{~.~3-,.;~„? ~ y- ~ ~~r ~ ~ ~ i.C.~9liN1lFE~~rM~}~„}:'^1 y.ai_.: * + ~ A ~J . ~,~i # ~~.~~.K" + I 4~ ~ 1 ~i u'l~';~'•~~'~~°'_~ L~`'i.r-~W.:~~ ~.~,~~,ti j'~,Y` m,'rk~,~3r w~ .~-~'~--s 1~ r~..°Y"i ~ fi~t~'~k~~l~~ss~jx=^~.ik,~~l~., W ~C~ ~^-~r~ i . ( ..'.i~, ~ ~SFY ~r r r'x ~ ~ ~ 5 f~ r ~ ~M ~ ~r.~ C ti'- < ` t ~ ~k `i4~ ~ti, ~ ~ : ~i" G~~z ia~ }s nr ~~i~.. s ~~.9 ~ 4 ,~,~,r. ~i1f _ ' x\ . . ~ ~ 4 ~\~:p 1ti ~ ~ 'A ~ ~ t'~; ~\MM ' ~ . ~ + . r ~i •y~~ ~ ~ a N5 1 1' d 1 ~ I ~ t~ ~ ~ 4 ~t ` \ ~ . rY~.:.,; rxr~~ ~7.:r;t~ ~ ~1 ~r~- t~... .y~.,Pr ~ ~ t....;~ ~ , i ~:~"..x.~~y ~y~;-~yr~r!`Y~ v~ i MFi r~ li~ , 1~+'_.•~,h ~~A ~S++~r r~~~~~ I. i I~le~~~, ,a„. e ..i~.., ~ ~ f~ ti4 • a~~ ~ wt 1 ~ r. ~ ~ .k. ~ i , Y'~rwpyfl.~ " r w.'~, ...,~"~~~i ~r x • ~a p ~ ~ ~I+~ .,i ~ 1"~~l' ~t ~ , ~5 ~ ~ `f ~ i},r" i M Ei ~ 1 i 7}, ~ r.r'~ '~~~t Y s ~ ~~~~-1 ~~+~Gw , i-s ^~'~'',h~ a~,.p1_~ ~~s.~~ i . ~~y ..1,~ i v~ a ~ i~ ~ . i ~ ti~~.. ~ ,t . k` M l t~ ~ ,~*f~~r~~,y. .,~Y.~ rh ,s,~ ~,s.`~,W.=~~.i L~aw ~'+:s. ~ , ~ ' ~ X. - - ~^r ~.]'s.it;'*~,a~ srlwb t~ a,. ~ R~ 1 ,.a.~.4.-.~ et~s': 'r.~v -r,~9,sK.^,~-. ~74 e ~ ~ a ry , , , : t,. , ~ ~ L ,.rv.w` .,a,- t♦ ~5ti ~1 ~f...~ ',y.`f° s r. ~ 'r---~ ~ ,r,, ~du iz, ,,,.~~'i ~ SE re~3 ,p 't 1.. I „ ~ ~ . ~ t'-. ,4't, ,7 S ar. ar . iw .1~:~,,,., ~h~~,5. Y ~ ~ ~ ~ 'N .r~tii~t~` • . . ~ ~i . "~uF$~-~-'a..ie~':~ .~+u.. ~ if ~ , ~„~.,w: , I -.~..,.1:'iCF'+~'w li T> t tk }y .i. 7'r~. ':.s,. ~r '~r~i. t r''.,~;i` .!yS. -.k.,5.,~. ~ ~'4f h T+l F ~ %4~P . .1,...,~-- p 'P' d - .£§,3. ~r~ ~ - ~ ' F t'z,; . rt., '~,.-r_ ~,~„a l,}v. Y~ ~ J r~;,+~. <h'.wik?; ;C rSA4':z, k ~h . t at ~ ) r~.r. . "r'' ~ ~ ~ F'~ ~ . 1 ~ . ' ~r-r .=u'~~~% ~ • a 7. .•iS~ S:?~~z~.~..,~.,, ~T". . Y;~.7a ~ 1~ ~4r ~ ~ . ~ .~.~~F~~v .i.~.w. . t ,,,1:~'ij~ ~ ~:,.u....::~v~ ~,q :i~ rc ,1. ~ti:~ti ~ ~..:~:.r_ r~~ r. r~~< :...i r~ ~ u,.,^._ .nw~.~. ~~y .`t ,.~tti c .~a`t': ,_r~ti~, r ~ ~~y Y . -u ;r. " K. 'f! ;.i~ ' , _ ~~.:i, , t • . i4. w.a , . a 1-.-~~ F i . , aaa~-~. ~ ~d`?!~~' y,~ "y W ~'~~e~ / ~,t,~. -;~~.,t:a .~~-.9~'?~s' '`5.;1/ ,.~?~S~t +v. N ,~t ~°~.u~ , r~ 's~~k. ~ _,.k r7~.-4J, G. .,,.,a~~~" ~:.~1.,~,.,.. . ..L~A~-,e.,~f-A~.rnk z ~1 -s~~ '~'.3 .'$~k....., y ~ ,e- . :z~.Cvr ~ar~.u,t. 1F . .r. :~~~v- ~w ~ . ..7~ 4~a;F~' ~ ,~s"`~.t~ . . , ~s, . x ~ zw,~ ;`^.rg~: ~A"~.,. . ~ ~k.1,~.-.. . w.. .~~R., W ~ , o..~ . ~I .r~.r .~1~~ ~t~~ .x r~ 7''".',--~ .,ts .y #.,4~.~ I tJ .~i,w~ .~~d x. . d ~ ~ i5a i • t . . yv;. -'~'~e~ ,1rv • ; at ~ . ~_..,Q~a. . - _ ~'c ~ , ~ c.w 'R~.~:=..+u? ~l ~ y~' h. - ~~i. . r+~.. s' ~i!* R~. ~ i"*' ~ ~ .3. .~.~,"r'J. ~;-'4~.. .~k~ .'S .~es~~a;. r:9 ,..*rY.~ .~i~ Y~, ~w~,.;~ir ~a,.~' h ~...ur s=' F~ ...1,. ~;~r,t`~~ _E„ro~~m~ Y+-4,:;4,.:;.r~,?1 ,rj ~i`.~ ~ ~.f2~ x . t!~ • .w , l+. 1 e ~nrnti~ "k'~. , , ~'C+ -z~~ ~..r.,, m.,. ~ u l ~ ~ ' ~,.+.h^--r +.M~ . i'. ~u'~. .G..-, 5?' ,x - *s>, 5: n!~,~M ~ ;-V "k 4k e~ i ~+x t^., : t . , r a^,.,~ f 4 4 i., _ ~ F'~iF.~•~L.~'.~n'~6~;, ~ia'r' ...~~x, .R,}, , .~c:• r. `i!~.~..'~t.. ,v _4rS,~~ ~w. ~r;~ x :i''.d'~ ~ _..c~,.i ••~t~ .t... m; o~r'=,'~z ~ t. 4~ . , ~i ~h ~ r .r~ ~ ~ ~y.. a ~ a~yf~ ,~1iic* r,R- < r „ -s ~ ; ~s 4~ t°f tt .y+~ . +v~~r . • _ .a ~ ~ !~?*n~'f ~ 2.~. ~'fiat . y , ~ 9raa ~~~,.a~s. 'ry . ~ r .-~,~1 Ssr ~ . EC`` ~ "V -2 e~. . a.~~ ~ ~l,azw~A-r, ~ t. ~ ~L,.~., . v., r :'~.~.i~ , ~ a .~F'.. ..,w~ .i 1~ .i.,`~,U~~..1. tl't rs.. ~w*~ !i ...~rc~. ..x"'T'°~ ,~w, y~o-.~,~iF #i ...,i... .).~~~.r.ir.tr.. .~-j. 1 p;. W;.~u.~~`'l < M'.. r.,, .~~IC,~ ":L... i .a.~. . ~..s. . MryY+'M kk,~...i 1, i. ,a .....n, Y' V?..,~ n 'p~•r.d,L.,,n,f ~ ..Y. ~""~fx xYt.~.x^f~V j ~ : ^ ~~4 ~T" r !rol ...i'.Xt -~Si ~m#J aV~..3( .,,r~.Y 3 ~a ~a . I ~.~s ~ ~ ~ Y.. .~i~ ' "'S ~ .~n- , C , . ~r ~ 1 ~ti5~ 1 ''r+:;:' . .l~ „y . . . ..,;~~,.ti ~.«~z..~.7.....;~-4w,:R~i~ ~ ±`~,'.r;r I ~.t~.. "1. t ~~.r _.us.~{a~,~.,.rq di Y ~1'-~.~ir~ ~ . X . ~ ir . ~i.. ~'J ~ w. .~n. yl i ~L"- t. 4 . yr. Y"Wbi~~... ~:r'~~ Ye~'~"e ` 1 . ~ S. J~..... ~ Fr ? H~"r . . J7' ~ ~ . . ~ i t p ~ 1a . ~.~,~1~ w, . , g~~ _.!a` ~ ~~L ~ ~~,~'~`~'~,m" ;j° ~ 7c5.~''a2:: a 1 .~P°~°0.~ rtu~? ~"'s~.,:{51~` . ~li~rd4w v„ . • , ~.~r.;.~,m,x t .ai ,,..~...r_.~•~-S^u+~...,.v~ {'_Ak•~,.,...w i.~:~. ,.*h? M ...4,~'{',,.~c. ..w f.w t .r. ~`.1'~...r.,..,5.,.~,~, ~..},r _r.,_>w ,~1 ~ *>+n., l hw.. „ "f , , ~ ~ :`;~l d ...w . , I~ . __.,i~" , L. .,Nr i, _ n n, ~a-'°t.c.~-; ,--r.:y~. f. :~C ..~x«. x, i ~ ~ ~ ~ a ~ I _ , .rvr~. . , . rw {n : i;, r{ r~,~r~ ~ -,7 ~ . < "4~A,. .41~:..~~~ : ~e~:r~.,. .S, d. ~E+.. C ..f ~ ~ . ✓x r+"'._.."' . .rx.i :".,rR*a-~r~ ,~R. .~~r.~, ~i .7,~..rC~ . .~,..5 k~.. ,~:,w T,y,,. ~.~'~,~:w . ~Wt lu'", 7 i., ,E ~ u,~~~~.~x y . r~.<,~^. r:m~ ~ k. 3^n V .r. ~ ~ ~F~ .~.w1 ~ ir I 3. t~:.r:, -.Y-.,-»...,;.J~,h4 1~-.y~,..o-~ `i~- f-, :...:,r..~. f:... ..~ry ~ ~-i..t ~~Y, r, J~,K~+ ~b, ~~r~'..~„' . ~.'F~~~~s i~.. r`.( -."'1, ~ `~n~...k=; ~ ~ .l"~'~ . / ,~.r'~~.~" -~t~, M ~ > ~ ~.w.,s'". .~#S, . . „w..~,~ . . ~4-..+.. ~.ls.. , v. k gJ .tr~.~!k_.. M;t-~v.- iy ~ f`4t~ .~~.n w~...r ~s,.~. .,...r~ ,..,.-4 . ~ ~~.3_4=si .~~.?~~F ~ r':F. ~ ~ aj,~i ~ :.'s~.~T - - ,..~-.I ~ k r Ma vi rt, ~i ~ ~ .h-,..r. « t . .-r. i;° , _ r . „1 . , ~.s~ a.- t;.~t ~4~..r. ~ ...ad ~ . .i_ ~ , S~_.~. ,J'7n'„p'~ . ,.t,. - " ~ .`~ry, . ~t,.. i , . ._..}y~ !.ot.i ~.~Jn-b...r.... a ~Y .....:-y.-: . F ~ y ~ . 't ~ . .','r" ~ ..~.I:'"° - ~;.,i~~.tid , ~ i ~ S.c .,i.~;;~„ L'S i~ ~ ~ L,~~-~'y`~E~°' ~ ~ / `:t~ i'~' ~x,. . t ? y. , . ,.w w. ;x . , '~~y ~ M ~~,Y~,•l , , I. ,~y-s q~"?'~~o- ~ ~ ~ .e~.a ~ .w.'-'A": C pr..:~..T; F~e' -i x~ . .'`~,r. ,V aa.~ I . 1~ ,~1r✓.v. . .~7~N` '3. . - ~ n ~ ,~..4.z.+'' ~ . z , ~.,.5-, ~ C~~ a er~ F ~7: . t":l. .,,.n., i..R.~ ~ ,M1 ~ ~ ~1 , `--,phr,a, , ,d..~. O / h r~"~. x . ~w+`V.y~ .f. .:Tx.. Y_.~tJ.i .Sd~ ~ M ~ .w'~Mq1{~ rd sY~!...f,..r.,~ f` Y. i~ ..y.. ,.Ya~ `5n.$~ .A.' :#1. 1.~ '3~ . ..~a ~t ~g a V ~ n. , 7 ~ a~ t Y» ~ -n w 7- ~ _ ~ ~,.y . , . . ~ }l . w ~k. a« a~`%", Ld _ J, vo rk`` 1. ~ ~ , 1.~, . , 1~ ~s. al . . y 9.f , ._~4 i;~ rf. . ~ ~~~M.~ yx~~ 4..t.... ~ ....a:_ - f,ri . . ~ . e wf~~:~ ~ . '~:w~, d~„., r ,,.fi U ~ ~ R 't , wl~'i.~ . ~ . . d~ „ .FS .,F~. ~ ~ 1ti. - . `V . . }J'. . ,...._~1:. C~~ ' NS. . 4 ~J ~.~:~_...IF \ , . :'F F '1~ ` ~~n _ ~~~y:It4, ia:~.~Y[.'~a','.Y~"~4., k ~ ~W,.i,~ i... ~:a.,lh. i`2 ~:z .W.~. M~ r, _t,.t~.. ,'-r i^. C~,~.4f... ~Je..,.rh.+!~wT .~~r~'"' J Z : oY , ~ y, s , ~ 1 ~ ~5 4 •..w _ Sf f . ~ ~ 7 r ~3 :t . / 71 ' a.,.l. : ~ ~ ' 4~.' 'ii .-..t, ~ n - ~Y~~ . ~-t _ :~i. ~ ~1 .Y r.. ~k~i ?~F-~k J".. n~ ~S~r .~M `~7 ~Jr~~ "~:i'- 3~7. d4:.. ;~1:..d..n . a ','~-,5 vL.~ ::CrF~ t Y - ~=y . 1 y~'i?'31 a r .t^~ . , f • ,.i.~ii t f: . J?~. a ~.ri,M e , S~.. < ; ~r~Y~ ''l~.~s yY ~J n, , i,.`~ '°a ` : ~ s / .-.......v..o-,~~,a.. 0...~ , . ~.7.. ,._v 3.!,._ . s wn ~ °+~i, , ..1,.,~.rrv ~ .7~ ~a ~fi S ~ ,s.w . t.,rti4' Wn. . ,.rd..~;4. 4.. - t y.y ~ ra~,;' u~~.: .L- , . _ r . ...v*u.«. . I , . ,e .,.....~_4 ~ ~l . w 1 ,4 , ...e- c~., i ..,t_.....,.~,. . r : .r,.?, W W . a - . . .-t i i S:~?-.,.: n ..A,,,-L . ~ x . . }'.;m , ,,,...f~.~~ , - t. . , 1.a r. ~ , n~~y . y_ . « w"~m.w^.+~. ~~~'~k,:.M1 ~ ~N ~ J.~~ ~J <a~~ .1 r s~'"`: ~A . a. I.. A v-.'r .4~'1 1~~.. ,+5' t . f. °f~. / ; ~ rc4w ~'r.. ' ~ .7~t.'~~ 3 , ~ . ~ a r.. „.i'~.~^t ,~r . ~ , 2'"1. . f5 ~e~- K-.w,,. , i~S,~~u l. I ~4.rwa I ~4 . q. ..a~`%. . i~Y. .t . . - iY ~•m~'' ....,a a~ . r . ~11r.~ - ~ ..,.a..,~~,. . ,..i .:r;.n~ ~$h , ~ ,;..r e.-r . ~ ~ - ..t . ~ . r.. 'E✓". 9 ~u.,. r.. ~ . . . ~ . +1r. ,:.~i`k, ~ r:d . ~ ~ , ~ i_ . I. ,iJ ~.-.e....7~: ; ? .~§A.~ ..I :~'~tn.. i.. ~ ...1. - ..z Y "Xx 11¢f.,~•,.. .7 ~ , •,,.1. M1.'f ~ .4~k. ~ ~sp 7.~~.t . . ~ ~ , .,~,;,f7~e, . .'~s ?_..,r r~ ~~~~-::'~T~kn1;..~~ r~L.;~S'..~ w~: a~... . .4 ~ i~ ~i.y. 'b~r~ ~ ~,'9 .n ,€~..:f~~.~ . . .,ri' :.F~ ~ i~ ! ~ rrr ~M . s .~....x.s, f7; __J . , t . r , tt . `1r . , w .r,~~ -r .~t-.. 'F} ~ . J~.~ . ~ ~ ~ , a ~ " ~ ~...F~.~ ~ ,~~r!, b . s~ ~ : a a e~ + ..~1 . - ~ ....X - - .A~, J~~ ~z~ t ui, t~-r~,. i~.~ 1.. ~.v - . ,y . . ~ -s~ : . ~ ~ ~rr'~ . a ..aS~fli-~ ~,e,.~~u~ ~.4+'rd" ~ . ~ d".,p~ I !fi~..: . ~ t't'r . ~ Y' ;;V l ~ a~ b •.vA. W. , k . ~ . , . w . - wx~i*.. ,r „ . ,?rt ~ ~ . , . ~ r~e S ~ i . . t _ , , w t , { t ~ . . , . ~ . . ;..,~-ey+....y_...., v.,m~ . ~T t1.~ t~ m. k., i~..,~~~. . ~v.~ :r- .....:'~,~,.,~wr...~`~, . ..~.y N :~1.. i~.~ .w a=- ~ ,i,. ,~t..~:'b~, .r.`?a~„fi..-~ . . . ~K4• . '2.;. a~.: ~`?`,'n ~ ~ "J ,.I.. i~.~.., ,...w?c .r~ '4✓,~~~n~", 'J`u~. .~~a . rs n., r',1 r P-. -t nt e,,, .,.,~~'~4 r. .,1... Y' i , ..J..a~.1• ~ 1 Y-f . a k.. .!k:^.N . ~ .w ~ i ~ ; ~ ~ n a . ~ ~ ~:rt~?r" . . a.. ~ . a? ~ ~ ~ , . , , S . ~ i 4 ~ ~ ~ `?'1.,Y ~s '3" ^~.1'ti,n4 ~ Mx ~ . 7.- , r„ ~n ~ 3~+r,. k r.~ a ~ ..ti' `f-'~, 'tr' , ! . h W ~ it~~"~~ s..,.. ~~3li~~u° i~r.M.,.~ ~ .,r. ~ .,.~.F., .'"Y... a~? .,w .,.yw,?~,.... V. . i,k i" ~ :;,e ?~r.~~ .~Y" wS ~ ~!t` . i~ a. ,'Y,,a..« ,s~ s~. ~ , . a . _ r~ . .a1 i "7 .'4 "'t., ~P...~,,ri ,~r r ti r ~ , . , "IV„r~.~,r"- ii... I. ,n .A..,..,~t s .,~w, .a..,,t~..,~ , ~,.,~1 ~:,.'F+,wz.. ..fi~. .~,~w. 7- . C 6.:. m . ~.s^a , ~ . . d ,w ~so.r~l .-a...~.~• +.r ~a >:.~v . ~.~>.s,~dr ~ ~ r, 1.~ .te..~ J ~ r~ ~ . .a"a l '~i~~ J~^ ~Yv,', .....t~. X'.]e e'~ V~ w.,L~adk. =o-.+* .'i r- +'d<:. , ~ , . , ~ . t r .~n, -~-r 7. ~9 . , . ~ , f"~" . ~ „ . : ..ti „ ~ . ~ ~ ~ . : S ~ . ~y 4+~ ~?a~ . , , , „ . ~n 4 , ~ ,e"'?~' «'~:.+,F ~,r-, .c~ i.rt « rs,,t h..~+ r .~,#'~'7''' [J] k %~Y .r. v^.~` h 4f.': ~.4 j h4r m5t. Y . . .~~f 1r+~(~e1, !M , d!.h h. t~~x. „~f~ ' !e'Y~. ;:r lt . r. .,`.s~1~. .F : ' ~ ~ ..rf"E . # rF'.,~''x+i.c:,rrn}A^.~. ~r.r~>.~, . ~~r~.. ~ ~,a • W ~ ;...F h~ wbF..,.m~.t ~ ..S`' F ~3 . y~~l''? ~+G.- x ~ cf 1 m , m. ,3 ~,.z~ ~ l,Tn . Y' ~ _ . ,r r.. ...W _ k7 ,c4,r,~ r~ : :dc ^t'~. $ , ,~„t~',C ~1 A6~ y;~~ Z ~ ~ Frt.. ee ~ . ~ . y~. ~1 . u wt ~ 6 . ~ .y,. .x ^5~.[11... ...u1 5 . V,S. ( '.;h. ~5 -t 9 . . 1 , . . ' . ~ a s.e; ' ~ ,...h«..s7.., 5. ~w{ v f ! .~nrt r. ~..j . , . . ~ r, .c.y..w., . ~ . , ~ . w.. l, 4 t~ b.~... _ . v,.~ f ''~v . ..-.~~i.4.~~S~L-- , i r~,v-.;,rr«... t, ~ : +'Mn -±^Y"" ~ . ~ }"l.t,.. n!'~ ~r'f.~xyrN..,~.T 'h~. . r:. i r. rr . . . W ~ . .~r~+ i . ~ .,f 6 Y dc... . . i 9,. t i t, i.,~ . ~ . . ~ .x- . e r s t ~ ir,.. , k.Y~q., t +~S ,~,'~1 ~ Ra«. . y F• - . tcJ9 =:~C~ ~ f -0 ~ .r-t4•.... ~ a ~.~~,,.r~ 4+~.~. .~~t. , ~~«.t*~ ~4 r~~~~ ~i u. .t~5' ~ i~. ..S t f ..~~r , ~.j x+• , au ~..s..: ,^..•'~.I 54+ . ',.~4: .p ,n."~a...~ t . k. ~t lL~ . tw:. y , v ~ ~..?la ~,L.. w.:~ '1 .};'~5. .h.. w ; ~ . f,. . Ar ~,k s ,T;`„~-~.~ . , y.~,'° . . „i, , r.~ {~s' ~ Y _r ;;t,~ ~ r,x i m:: .a a !3 _ . - 4 . ...s . ,...n . . a ~ ~ r . ~ ,.Y z.ter~.t.~~,zF .As a,~~1 ,ry..,~ ~P. .1 ,n r,W ~ ~ ~ ~ ~1~... z w-_ ~ - a ~ ~ S..:W .r,,, .x.>..~, .~.+5_ v+~t r~~..,, c .r . ~s. ~ ~.w~ ~7...r~ a. a, . RE..~. , r,~., n . ~ ~ t"V ~ ..~1 :f.~..;il. .~-!.'S-. 1, t d_ . :~'.7i M~~_ „ r~ _ . r~i41 ~ .h~.. 4>4 ~ t•`~ r~+.':~, ~ , :S??'.~.~~(~~.. ~Y ~ ~ ( ~ ,~a ~ . ,s~ • ~A.., ~~,,.b~" e,l~~t~ . . ~ ..:4, h ~ ,r_^._ ~r+ 1 tAn .~P , ..t a. x. ,•-pi„ .'''S.,•. . ~ . ~kea~. ,~r ~r , ..:.,f. . , l~,~~,. - < . T,N. 7 .~Y„. * ~ n..jf .mr . , ~i'. ~ . i?~ .xqL_ ~.~xa~' ._,,.-!+.v ..1 ..L_ '7_ '~'r`-,. . ~r-.. . , , ~ . ~an.s.`~?Y ~~'la, . ~,~'!16.t~r ...ts._?x!~^~eaY,Vlrr7s.~ ('F`~a~.~`,:°r ,.,,,y--~ 1 .w~t;!;~,...,it§'• RI... ,K v~c . r S1%~S. ..,.cr~' ,.~..+A, , r. ..:,~r +~"4a~..u::. .~,.~~.p.. ~,-..~A; 9~.....v~r~ ~.:a:::„f ' ^ ~1~~~:..._..,_,_,.. .Y.,. . . lW,. ,..x ~y ' '~C ~ _ . , _ ,;,,w. . , ..rr , . is~ ^ a . ,~~s.a.,U x ~ ...a~ „ ~-:1,,, )s1 U: a~'u.,44.~~+.h'~r~.. s..... a -..,..~F._::C_'^. , . . . ~ ~a~t.=.' r4 ' . ..yaz~.o t , M+, ~ ' i ~ .e- . , ~ "~-i %i".r. . , . i_.1. 4,~,M . . ,dr,.!„ ~..~_....~R` :'k.~~ 1. k ~ . ,r . . . ,r ~ * , r,' . ,~U ~ . ' . ,,~..,1 fx ;c W : ~?'~r +~.~,ac~ ~e~`r _ . - , . _~w_. <~,.~rr ~ . ~ . . .,.1 ~.y ~,t'.'N~n, ,~'~@~1;.~} , ~t~r ir~~.~~~nK . ~ `.a..~..,. ~ ~r.r~ ..~".~-1...r -:•a'~- ar,~w,- ,.~w~...~.~.eF: . . r.~:~.,.-...3 ~r` 1;i~a '.i ~ . . ~ y, ~ .k+§~ . . ld~v~v.a .lw.» ~'the '`Ar`,.w'-M s . ~.-..~iw..~t.iF..~]5~=~ , :n! 1 tx rk ~ ~ A L.4.1 :2 w • F. '~MAi^~-,_• J I'' - ..~N~riqiy~ ~ ~ . i~ - R~~..a.. ~r.~.~i ~i ".'*'~I ~ ' ' . x'' r u~ ..f.-.~~- -~~=~1 ~ ~l u . ' ""~Ma ~ !rM,~ .F . 7" ~ 9 ~~Y~`,~ ~ ~ a"+~~", . ,~j. . ~H cn ' ,F , ~ - ~ - y~ ~ X z ' r 4; 4~~', ~ , ~ ~ ~t ~ Ex~sT~~a~ cu~~ ~rv . ~ ~ . W ,~ry. ~ - ~ ~ d't`' ~°~e ~~$~tSA,~~,'~7 r a, •~5 ~ij ti , ,sw ~ ~ . Mr'~'°'~ .w _ ! ~r . ' w ~ ~ ~ ~.E B~ REM4VEa ~ t~ ~ u i ~ . ~ r ~ ~ ADD LANSCf~P'~ STY c~ ~s = °~;r- M,~~ LL ~ } . W . Ld ~ ~ ~ . . , . o~vi~~R ro co~TRO~ , ~ . . , ~ a , , . . . , , ' . C~ r~ ~ ~ ~ ~'RAFFIC FLdW 21.5 O~,G. ~r~ ~ ~ , ~~~~r~~ •'.?j~`i~ F' ~ . . , c~ ~~ki~.W ~;~u~~~~ ' ~u ~ . ' ~ ~ m ~ '~~a~ ~ .W S~ . ~:..,7~i~~~; ~ _ra~u~,,~'~ ' 1 Y.1 a ~ ; ~ , i~ ~ °~`t~' , ~ ~ ~ ~x z~ %aC'~ ~es ~„L~, . ~d , Aa~ e~v~a~R cuRSiNC ~ o,c. ~ ~ . y~~, ~ i b y,~~ ~~u h r~t~!$~~~ ~i~- ~`hkt~"~! ; ~ ~ s~ f.w~~r.~+fr~.y'~i ~ ~rP.p : .-:M i~ . i~ 4 Y1,V11. • , w . ~.l~.d~t.u5.,~Y~r~3~~~~.~i,~ .J~Y~ G ~JI..~y,ck~dl t ~i ~C~r~ ti~ ~~:~Y' ~ ' a. N L ~a '~"rb ~ ~ . ~ . ~p~,; h~~.....aV~~,.,.y~,.~,w ~r~.~~~r~~~~ ~r^~~` ,di ~ , ' , ~4..+ • , , . w~ a Q ~ ~ Y= f ~ r ~ . o . . . ~ ~ , ~ . . . . a - - p , _ . ' . ~ ~ ~ , _ , ~ ~ ~ ~ a ~ ~ o _ _ ~ " - . ~~R~AIN . ~ ' ~ ~ 1~ o ci ?`I ~r ~ C r f ~ . rry • ~~~G ~1~ l~~l'I~~~~~~ilY~ r' 1 ' ~ ~?~IS]"ING LAN~SG P N i ~ i ~ ~ p ~ . # f i ~ ~ ~ ~ ~ ~ . ~ + ~ i ~ 8 D O~ . ~ 9 ~8 , , , _t , A~, • : ~ ~ ~ , . . , , ~ . + E?~~~TING SID~WALK ' ~}1+~~ M ~y! 1 ~T"1 4~'~~r~ ~ w ~ y.1 Y~ ~ ~ ~ Z" 1' ' 1 ~ r ^ . 'ti ~ , ~ t+ ~ 1 ~ ' ~ i t' yl ~ l i 1~ 0~4 T h r V r. ~ ~ r ~ ~ ~ ~ ~~~t~P+i*~4 ~4'., ~'+T`~4 4~ i. % ~~11i'~i:a C j ~ a~ i~ f ` ~a>~ •4.:~~ a~ti~~'i~~a., V~~ .~.L+^. r..~ , , .,.t~ ~ ~ 1~ ~ ."~'-*-.~~-,,.r" . ~'vi~. ~ 3 7~y~i r~ r ~IJ';~ {.t" ~ ~""6..~"l~ ~ i~.. 1 [ ~ ~ ~ _ ~ . M~~ 'h~,(~~ ' Iv~ s ' r . 44y,n~ r . ~ ~ ~EW I EX157 r'~~•x~~'.sN .,n.N . W ~e%~.. i- S khn~k~.~# f~~v~t`,~~. V~~ Y ~ $~1~~ ~ ~ WID~~I DRIV~WAYT iih~~,A ~i7 ~.`i~!i;h~~ 77 P ~u. ~ ~zs~tiw~%n r ?'S'` r S~, ~s:,~W.A ~ ~ . p fi ~ p F~ s~,.~t•~wu,~ F a~ ~y+J~~ + i v `f 1~+ T ~Y~yl'n ~+~II ,~r~n.4,'f L~ k?'.4...~ ~~,~F~...~: ~n . . .,~,~{NxL~ ~1~i~~~'~.a~ ~ ~X~sriNG O~iV~WAY ~ I ~ h Y1 C 1 {1U1. 11 .~4~R~ fi,~~Y,~,.,~<<6. .hf 3,!r~✓~.~a1~a~P,."S 1'. ~J~~,~.,~...~.~.~~~~w~.~"-,- . 'I' i l.IliN 1 il'Y i!! ~'~`4`~.~,...:~+ "a.~...o-.~~ w. - W ~ . ~ 'i . ~4 ~~~A~N ~ ST IhiG FIRE HYDRAN7 ' CUR~ ~C ~3'~EI~ALK ~ ~ w ~ ~I~w ,C4NC~~~'~ . ~ , N - ~ ~ cauNr~ srA~~ARa~ ~ ~ s ~ ~ ~ ~ - ~ , n ' a • . ~ ~ , - ~ ~ W . ~ ~ ~ , ~ . ~ I ~ . N~W AS~HA~.T PAVING d ~ . . ' , ~ .r. ~~U~~Y ~r~~~A~~ ~ _ ~ xr~~,~ ~ _ , V~R1~'Y ~ S . . 3 • ~ ~ ~ 0 ~ ~ ~ ' '7 , . , ~ ~ ~ ~ ~ " ' ~ ~ ~ c~ • i"' ~ ~ • ~ i i. ~ 1 ► i 1 ~ I ~ r ~ 1 - • ~n V~ ~ ~ , ' 1 . ~ , ' , ~ ~ ~ . ' ~ ~ ~ ~ ~ ! ( ~ ~ ~ A ~N\ ~ i ~ , , 1 r r , p• . County Public Works, w f o ■ ' on Eng • Section, Divisio • ounty Eng • = BROADWAY _ 99260.(509) . .ri Memo Ta: Spnkane Counfiy Planning Pianner. Jim Falk From: Scott Engelhard, ~a ct (t ~ Suhjecfi: 2E-0053C-80 Applicant: Dan Cantu Date: January 26, 2041 RE: Comments for 02-14-2001 Hearing There are no changes ta the January 11, 2001, comments submitted for this application. CC: Applicant DAN CANTU EngineerlSurveyor RON MACKIE Planner .7IM FALK ti . • . ~ 1D ~ 3AN 1$ ,JAOIN71AV01 ER SE> c)o K"k r-4 F~ C7 c) u rv ~ ~c- _ E7IVISIC7N OF P1,.ANNING A DNISIQN (?F THE PUBL[C WORKS DEPARTMENT MICHAEi_ U. NEEDHAM, DIRFCT(7R GARY OfiERG, QfREC'I'[_R ~~~ORANDUM TO: Spokane County Diwisron of Engineering & Roads; Scott Engelliarci, cIQ Sandy Kiznball 5pnkane Caunfiy Divisian of Engitieering & Raads; Bill Hemmings Spokane CQUnty Dirrision of Utilities; ]im lied Spokane Cotinty Stormwater Utility; BrCetlda StIIlS Spokaiie Regional Health District; Steve Hopderby Spokaiie County Divisiora af Building & Gade Enforceinent; Jeff Forry Spakane Cvunty Air Pollution Control Authority, Chuck Studer Spokaiie Transit Authority Spokaiie County Fire Protectivn District No. l Madern Electric Water Campany Washing#vn State Department of Transpartation, Greg Figg FROM: Jim Falk, Associate Planner DATE: January 18, 2041 SUBJECT: Review and comments fvr the hearing of February 14, 2001 at 9:00 a.m. FILE NO: zE-53c-80 BRiEF DESCRIPTIQN: The applicatian groposes a specific site develapment plan for review by the County Hearing Examiner as required by thc canditions of apprvval of rezane ZE-53--80. The plan proposes the develQpment of an $,031 square foot, 2,sfiory office building and assQCiated parking area. S-T-R: 17-25-44 PARCEL NQ.: 45172.0752 APPLICANT: Ran Mackey Nate that the applica#ian aild maps were previouslv circulated to your agency. Please review atid return any comnients ta me by January 31, 2001. wc Attaclzments: Notice of Public Hearing 1026 W. BR0AL7WAY • SPplCANE, WASHINGTON 99260-0220 PH+QY'VE: (5(}9) 477-7200 • FAX: (509) 477-2243 • TDD: (504) 477-7133 ♦ • • ° • NOTICE OF PUBLIC HEARING SPOKANE COUNTY HEARING EXAMINER ^ TO: All interested persons, and owners/taxpayers within 400 feet YOU ARE HEREBY NOTIFIED THAT A PUBLIC HEARING WILL BE HELD ON THE LAND USE APPLICATION LISTED BELOW, AS FOLLOWS: Application: File No ZE-53C-80, The application proposes a specific srte developmeat plan for review by the County Hearing Examiner as requu-ed by the conditions of approval of rezone ZE-53-80 The plan proposes the development of an 8,031 square foot, 2-story office building and associated parking area. Parcel No.: 45172 0752 Hearing Date and Time: February 14, 2001 @ 9 00 a.m Place: Commissioners Assembly Room, Lower Level, Spokane County Pubhc Works Btuldmg, 1026 West Broadway, Spokane, Washuigton. Owner: Cantu Investments, LLC, 15504 N Chrorucle Ct, Mead, WA 99021; 509/755-7559 Applicant: Ron Mackey, 9802 E. Mission Ave, Spokane, WA 99206, 509/922-5287 Location: Generally located at the northeast corner of the mtersection of Mullan Road and Sinto in the NW '/a of Section 17, Township 25 N., Range 44 EWM, Spokane County, Washuzgton Comprehensive Pl$n: Urban (tJ) Existing Zoning: Neighborhood Commercial (B-1) Environmental Determination: A Determination of Nonsignificance (DNS) was issued by the County Division of Builduig and Code Enforcement, as the lead agency on December 29, 2000 There was no comment period for this DNS. Related Permits: Building Pernut Division of Planning Staff: Jun Falk, Associate Planner, (509) 477-7228 HEARING EXANIINER PROCEDURES Hearing Process and Appeals: The hearmg vrnll be conducted under the rules of procedure adopted in Spokane County Resolution No. 96-0294. All interested persons may testify at the pubhc hearing, and may submrt wntten comments and documents before or at the heanng The Hearing Examiner may limit the time given to speakers. A speaker representing each side of the issue is encouraged Any appeal of the Heazing Examiner's decision will be based on the record established before the Hearuig Examiner, pursuant to County Resolution Nos. 96-0171. Environmental appeals will follow the same procedural route as the underlying achon. All hearings wnll be conducted in facilihes which are accessible to persons wnth physical disabilrties Inspection of File, Copies of Documents: A Staff Report will generally be available for inspecrion seven days before the heanng. The Staff Report and apphcarion file may be inspected at the Spokane County Division of PlaiuYing, V Floor Permit Center, Pubhc Works Building, 1026 W Broadway, Spokane, WA 99260-0220, between 8.30 a m and 5 00 p m., weekdays, M-F, except holidays. Copies of documents will be made available for the cost of reproduction. If you have any questions or special needs, please call the Division at (509) 477-7200. Send written comments to the Spokane County Division of Planning, 1026 W Broadway, Spokane, WA 99260, Attn: Jim Falk, File No. ZE-53C-80. Motions must be made in writing and submitted to the Spokane County Hearing Examiner, 3"dFloor, Public Works Builcluig, 1026 W. Broadway, Spokane, WA 99260-0245 ~ OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)477-3600 Fax (509)477-2243 ~ X" "ENGINEER'S CONDITIONS OF APPROVAL" TR ZONE TO• Spokane County Building and Planning Departm nt / FROM• Division of En9ineenn9 & Roads 441 a~ri DATE January 12, 2001 PROJECT: Mullan Centre - Office Building FILE ZEr53C-80 Heanng Date. Review Date January 11, 2001 Sponsor/Applicant Dan Cantu (Cantu investments, LLC) Section Township Range. 17-25-44 Planner. Jim Falk TechnicaUReview Date January 11, 2001 @ 2.15p The Spokane County Engineenng Department has reviewed the above referenced application. The following "Conditions of Approval" are submitted to the Spokane County Planning Department for inciusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved. Prior to release of a building permit or use of property as proposed: 1 Access permits for approaches to the County Road System shall be obtained from the County Engineer. 2. Applicant shall submit for approval by the Spokane County Engineer road, drainage and access plans. 3 A Professional Engineer, licensed in the State of Washington, shall submit final drainage plans, a drainage report and calculatrons that conform to the 1999 Spokane County Standards for Road and Sewer Construction, the current edition of the Spokane County Guidelines for Stormwater Management and all other standards and laws that are applicable Final drainage plans and a drainage report shall receive the County Engineer's acceptance prior to release of a construction or building permit 4 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineenng practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles 5 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer CC Applicant Dan Cantu, Cantu Investments, LLC Engineer/Surveyor Ron Mackie, Architectural ventures Planner Jim Falk Page 2 & . 01-11-01 Review ZE-0053-80 6. The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adjacent to the proposed development. This wiil require the installation of asphalt equal to 20 feet from the centerline along the frontage of the development. Curbing and sidewalk must also be constructed 7. All required improvements shali conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 8 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 99-0265 as amended and are applrcable to this proposal 9 No construction work is to be performed withm the exis#ing or proposed right of way until a permit has been issued by the County Engineer All work within the public road nght of way is subject to inspection and approval by the County Engineer 10 All required constructcon within the existing or proposed public right of way is to be completed prior to the release of a building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. 11. The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisdion Spokane County will assume no financial obligation for adJustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. 12 The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards END - - ~ : r :Kimball, Sandy ~ From• Hemmings;, Bill Sent. Tue'sday. January 02, 2001 1111 AM ToFalk, Jim 4 Cc: En'g elhar,d, Scott, Kimbail,, Sandy, Parryj, Ed;'Sims, Brenda, Baldwina, Greg, Hohman, John, Little;'Colleen Subject• ZE-53C-80 - Dan Cantu 1=2=01 No concepf dramage pian is required for this submittal The applicafion is,techrncally compiete tl recommend the standard'condition for toads} and dramage ,Bdl Hemmings, PE , , ^ 1 s - t • , • ,P S P O K A N E O U N T Y DNISION OF PLANNING A DNISION OF THE PUBLIC WORKS DEPARTMENT MICHAEL V. NEEDHAM, DIRECTOR GARY OBERG, DIRECPOR MEMORANDUM TO: Spokane County Division of Engineering - Roads; Scott Engelhard, c/o Sandy Kimball Spokane County Division of Utilities; Jim Red Spokane Regional Health District; Steve Holderby Stormwater Utility; Brenda Sims Development Engineering Services; Bill Hemmings Department of Transportation, Greg Figg Spokane Transit Authority; Christine Fueston Boundary Review Board; Susan Winchell West Valley School District No. 363 Fire District No. 1 Modern Electric Water Company ' FROM: Jim Falk, Associate Planner DATE: December 29, 2000 RE: Change of Conditions to ZE-53C-80 TECHNICAL REVIEW MEETING JANUARUY 11. 2001, 2:15 PM DIVISION OF PLANNING 1" FLOOR CONFERENCE ROOM PUBLIC WORKS BUILDING.1026 W. BROADWAY SPOKANE WASHINGTON Please review the above application and use the attached rEcHNicAL REVIEw MEEriNG FoRM for your comments. The Division of Planning encourages you to attend this meeting. The sponsor and representative have also been invited to attend this meeting. If you cannot attend, please forward your review comments on the attached form to me for the meeting. The attached TEcHNicAL REnEw FowNS will be given to the sponsor at the meeting and included in the Division of Building and Planning file. Thanks for your cooperation. If you have any questions about the application, please contact me at 456-3675. NOTE: The Division of Bullding and Code Enforcement reviewed the SEPA checklist on this project and, as the Lead Agency, issued a DNS as a part of the building permit review process. The Division of Planning is circulating the SEPA DNS at this time. The Division will likely accept the SEPA checklist and DNS for this project and incorporate them within the project file. c: Dan Cantu, Cantu Investments LLC, N. 15504 N. Chronicle Court, Mead, WA. 99021 Ron Mackey, Architectural Ventures, E 9802 Mission, Spokane, WA. 99206 Attachments: Technical Review Form, Project Application, Site Plan, SEPA DNS 1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0220 PHONP: (509) 477-7200 • FAX: (509) 477-2241 • TDD: (5(19) 477-711.1 1 [ Technical Review for January 11, 2001 at 2:15 p.m. Change of Conditions for ZE-53C-80 Generally located at the Southwest Corner of the property Sinto Avenue, approximately 300 feet east of Mullan Road in the NW % of Section 17, Township 25 North, Range 44 EWM, Spokane County, Washington. COMPREHENSIVE PLAN: Urban and Major Commercial PROJECT DESCRIPTION: Change of Conditions Requesting the Hearing Examiner Review and Approve a site development plan for a 2 story office building ► PARCEL NUMBERS: 45172.0752 SITE SIZE: Approximately 1.14acres. APPLICANT: Cantu Investments, LLC, 15504 N. Chronicte Ct., Mead, WA. 99021 ASSIGNED PLANNER: Jim Falk ` ♦ • f SPOKANE COUNTY PLANNING RECEIVED SPOKANE COUNTI CHANGE OF CONDITIUNS FOR A , PREVIOUSLY APPROVED ~ZONE CHANGE DE~ Dn►IS10N OF PL.ANNtNG Date: Application No. "53'gd Name Of Applicant/Representative: Caw~U _-Tn04-4 Ov„r%+s LLC ~ Mailing Address: C4. City: MP--,d State: Cc>4. Zip: 9?0z I Phone: ~5 S - -7559 (Work) (Home) Existing Zone Classification: -B" I Date Existing Zone Classification Established: f 9g4 Legal Descriptio of Property: ~,~c n+~r 5~y I ~'~~~tir' S r 4Z Section L-7 Township N Range Source of Legal: 5u-_Ilf_l Parcel No.: -45 17 2- 0_75Z ~ PROPOSED CHANGE OF CONDITIONS Reference specific "Condition(s)" of original approval. (Cite the applicable condition from the Findings and Order of the Hearing Examiner Committee's public hearing). 07~,r 11 F- 'S.~ "3O t: D -rL, 2' s.a~►: _XXJP Tcr L-ie_ c' nej .F-Ac~ ' • . . -f ~ Give detailed explanation of request for change in status of the proposal. AJ3~~'+ lbJa, ac-Q. nu~ wii TT~ i'&OG, ~ If development of the site will be changed substantially by this request, or the property has boundaries different than originally proposed, a revised development plan must be submitted. , ~~.r-t ~ d f~~ S ~ t~~►-~ ~ Signature of Applicant or Agent Address if different than Applicant nc~2 . GtJ{a , Rev. 8/93; sam ' : . DETERM.tNA rION OF NON-SIGN11, ICANCE SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT RESPONSIBLE OFFICIAL, JAMES L. MANSON, DIRECTOR WAC l 97-1 1-970 and Section 11.10.230(3) Spokane Environmental Ordinance PROJECT 00008440 PROPOSAL: 2 STORY OFFICE BLDG - MULLAN CENTRE OFFICE BLD OWNER: CANTU, DAN PHONE: (509) 755-7559 CONTACT: RON MACKIE/ARCHITECT VENTURES PHONE: (509) 922-5287 9802 E MISSION SPOKANE WA 99206 SITE ADDRESS: 1410 N MULLAN R.D GENERAL LOCATION: Sec 17 Twn 25 Range 44 , LEAD AGENCY: SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT DETERMINATION: A review of existing development regulations, zoning, and typical recomrnended conditions and or mitigating measures indicates that the State Envirnmental Policy Act Detemunation will be a Determination of Nonsignificance (DNS). A final deternunation (wi}}iR/was) made on i ZI 2a (6 v , after review of a completed environmental checklist and other information on file with the lead agency. This is available to the public on request. ❑ This DNS is issued pursuant to WAC 197-11-340 (2). There is no comment period for this DNS. REVIEW AUTHORITY: .Jeff Fprry SEPA Coordinator DDompier Project Coordinator James L. Manson, Director Spokane County Division of Building and Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260-0050 (509) 477-3675 Date Issued: -1 '2 Signature: v a✓~~ Z~ APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the Spokane County of Division of Building and Code Enforcement, l st Floor, West 1026 Broadway, Spokane, WA. 99260-0050. The appeal deadline is ten (l0) calendar days after the signing of the decision to approve or disapprove the project. This appeal must be written and the appellant should be prepared to make specific factual objections. . . . . I` tice of Applicatlon The Spokane County Division of Building and Code Enforcement (Review Authority) has published this Notice of Application to provide the opportunity to comment on the described proposal. The comment period ends 14 calendar days from the date issued. During this period written comments may be submitted to the Review Authority. The file may be examined between the hours of 8:30 a.m. and 5:00 p.m. Monday through Friday (except holidays) at the Division of Building and Code Enforcement offices in the Public Works Building, 1026 W. Broadway, Spokane, Washington. Questions may be directed to the Project Coordinator listed below. PROJkT 00008440 OWNER: CANTU, DAN PHONE: (509) 755-7559 CONTACT: RON MACKIE/ARCHITECT VENTURES PHONE: (509) 922-5287 APPLICATION DATE: 20-Sep-00 DETERMINATION OF COMPLETENESS: 11/1/00 SITE ADDRESS: 1410 N MULLAN R.D GENERAL LOCATION: Sec 17 Twn 25 Range 44 PARCEL 45172.0752 PROJECT: 2 STORY OFFICE BLDG - MULLAN CENTRE OFFICE BLD ZONING: B-1 OTHER PERMITS: NA FURTHER STUDIES: NA ENVTRONMENTAL REVIEW: The Division of Building and Code Enforcement has reviewed the proposed project for probable adverse environmental impacts and expects to issue a determination of nonsignificance (DNS) for chis project. The optional DNS process in WAC 197-11-355 is being used. This may be the only opportunity to comment on the environmental impacts of the proposed project. Any SEPA appeal is governed by the Spokane Environmental Ordinance and such appeal shall be filed within fourteen (14) days after the notice that the determination has been made. EXISTING ENVIRONEMNTAL DOCUMENTS: SEPA checklist w/ ZE-53-80A WRITTEN COMMENTS: Agencies, tribes and the public are encouraged to review and provide written commencs on the proposed project and its probable environmental impacts. All comments received within 14 calendar days of the date issued below will be considered prior to making a decision on this application. DEVELOPMENT REGULATIONS: Spokane County Zoning Code, Spokane County Subdivision Ordinance, Spokane County Standards for Roads and Sewer Construction, Spokane County Guidelines for Stormwater Manageinent and the regulations of the Spokane Regional Health District are the primary regulations applicable to the site. CONSISTANCY: In consideration of the above referenced development regulations and typical conditions and/or mitigating measures, the proposal is found to be consistent with the "type of land use", " level of development", "infrastructure", and "character of development". PUBLIC HEARING: This action is not subject to a future public hearing. REVIEW AUTHORITY: Jeff Forry Project Coordinator James L. Manson, Director Spokane County Division of Building and Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260-0050 (509)477-3675 Date Issued: 0 Signature: The comment period closes at 4:00 p.m. on . • ~ ~ , P1iE NO.: 00008440 PROjECT ADDRFSS: 1410 Nonh Mullza APFIDAVTT OF POSTING ~ AND INSTRUC'I'YONS . I STATE OF WASHIIVGTON ) ~ ) ss: ~ covrtTY oF sPOxAvE ) ~ MA~ , persoaallp assumed che On the -3 day of 2000,1, SkeflC~l rcsponsibiliry Lo cnsure that the Public notice sign waa- posLed as per ~structions and in accordance with the Spokar►e Envuonmentnl Ordiaance at the following locacion(s) in Spokane Counry: Please note location: ~ S W a rn~ -4~ e~ e-_`, ~r ec..#-I Posting of Public Noticc sigAs for Environmental Rcview/SEPA must be on or in the imanediate vic.inof the propeny in such z mwner so thu ic is visible.from a public right•of-way and thzc no information on the sign u obscurt om public view by . vegetatiou, and/or sLruct'ures. The sign shaU be perpa.ndiculal to, t6e right of w~ay. In no czst vvill the be zttached w a uciliry ~ pole. The sign u io remain up during the 15 day comment period. This affidavit of poscing shall be r ned to the Division of f Building and Code Enforcement. r f . ~~.~~'C- /4241.~ ~ Priut Name of Applicant or Agent '~%~~o-t ~ (L ~ G1~~ Signature of Applic.znt or Agtnc ~ Address: ~ o v~ G• 1 cS ` . ~ kAlyl~ Phone Number: {R,ETURN TO THE DMSION OP BUILDING & CODE ENFORCE;MEN1~ Jeffrey E_ Forry, Scnior Building Technicizn ~ 1026 ~'Jest Brozdway Avenuc Spokzne Washingtun 99260 Phone Nurriber 477-3675 ~ ~ Spokanc Counry Codc 11.10.130 (b) (i) 4 RECEIVEG SPOKp►NE CQUNYY , pEC pMS10N OF PLkNtqlNk. Spokane County IJivision of Plarming 1026 w. Broadway Spokane. WA 99260 RE: File No. ZE-53-90 Ta V✓hom it May Concern, 1 Dan Cantu berby authorize Ron Nlackie of Architxtural Ventures to act as my agent and provide signatures on my behalt for the project known as Mullan Centre, 1410 N. Mullan Road, Spokane, WA 99206_ ~ Sincercly,~ . . , ~ ~ Dan Cantu ;~)0 d filO~ 80 603:131 OOQDYH 31W31A 0:0.1 AMi00.~:?- ;;30 v ~ SPOKANE COUNTY Dl v ISION OIV BUIi.I~ING AND ~;S~DE ENFORCEMENT ~ I . 1026 WEST BROADWAY AVENUE • SPOKA1vE, WA 99260-0050 ~ (509) 477-3675 ~ ~ STI'E INFORMATION PROJECT INFOIiMATION ~ Site Address: 1410 N MLJLLAN RD Project Number: 00010908 Inv: 1 Issue Date: SPOKANE, WA 00000 permit Use: CTIANGE OF CONDITIONS Parcel Number. 45172.0752 Snbdivision: UNKNOWN Applicant: ('AN1IJ INVES'I`N4ENTS LLC Block: Lot: 15504 N CHRONICLE CT Zoning: B-1 Neighborhood Business 1VIEAD, WA 99021 Phone: (509) 755-7559 Contact: Owner: CANTU INVESTNiENTS LLC Address: 15504 N CHROIJICLE CT Phone: MEAD, WA 99021 Inspector: DAN HOWARD Setbacks - Front: Left: Right: Rear: Water Dist: UNKNOWN Group Name: uuil:nown Project Name: C PExMT(s) Zone Change Contractor: Ltcense ENGINEERS MLSC REVIEW S50.00 CHANGE Or CUNDITTONS 1E+05 $1,496.00 PRE-APP CONF CHG OF COND 537.00 'I'otal Pertnit Fee: $1,583.00 ~ PAYMENT SI:IMMARY Page 1 of 1 NOTFS ) PERMIT Processed By: WRIGHT, RAE Printed By: WENDEL, GLORIA Tran Date Receip.0- Pavment Amt 12122/00 10652 $1,583.00 Total Fees AmountPaid AmonntOwing $1,583.00 $1,583.00 $0.00 oR' . ~ tiIL~ Spokane Co unty Public Works Department Divison of Building & Code Enforcement Receipt Receipt Number: 10652 Customer Number Projects Fu1C Project Nbr Inv Nbr Fee Amt Inv Amt Owinp, PAID Pnrt 00010908 1 $1,583.00 $1,583.00 $1,583.00 $1,583.00 Total: $1,583.00 $1,583.00 $1,583.00 $1,583.00 Miscellaneous Items Total PAID: $1, 583. 00 Teader 7ie Check Acct Balance CC Nbr E.~n Dale TENDERED Checkl 1898 1,583.00 Total TENDERED: 1,583.00 Over / (Short) $0.00 Clrange $0.00 Notes: TranDate/Tin:e: 12/22/00 3:41:59 PM By: GWendel Logon User: gwendel Statlon: GWENDEL Override By: Printed: 12112100 3: 42: 00 PM Page 1 oj 1 ~ v'iCIr11ty map ~ ~ w Mp o , y $en ~ ~OX w ~ ~ . ' 7 d ~ 3 Y~ ~ ~ ]avmc 0 ~ Z E1ania Art ~s . ~ ; 0 s' ' p 1? ► - ~ ~ ksAe ~ 3 ~ N o ~ 2a ~w Av~~~►ay ~ 1 N _ s~t~►Y . _ i ` ~ ! 'OAM MAGM 451n.QM2 HOLIDAY INN EXPRE88 ar1~R~fS: ruiai t• a awuw sitt R.&, w-59-97 • pi `oaa ro iain'°' ,"w~c:`oufa. d.u nnr~ v,knK, I ~ w«~ cus,~c. ~m ww EXI8TINa HOTEL ~ s oarunn roPw+a ~ r ►.vc rurt ro~u i+wfeuco , • d~~r to~ ~ +nu n ro a ouw rtan rao wMUte tnttr w~ Mafk 9-3 wR oa. aoar"rt Launa mw s+Paw eart taurw, 8-1 in i ovrt r-r wi. uoat a Au wr, rmw uxo [ASf: Y- 1 T -t - M[st 0.i I ~~~TIPM f0 N GOOMIMAID WIM M LpMTI (o0t1([II{ 0/I+CL. I I ~LIYOD 0iO11KR ~ Q ~ wc 0 ta wiqw nMUNo Srw,L ■ouno i r~r r,uO u' rRor «rt[wIK sTKn a x' r~w Lor uK a. u+owi sn rr~ i~r ib w.unco ~o ~a ~ wr ,ci.c srRt[r: u' rRar awrcKiK sTItn a a' rRa wr Lu[ - rror.na ~m w r.'~wiva oruna ua ~cats ro Iw K ntt ~r ~ a w Ru •i +K n waaan ~ ua ruia C-o' a M~O~G7 1K~[~ ►~Mp' ~ yt~r[ Ot1Ni[ ►wIMfi ~tMOSI01 ~ •1 ~~p W ' MCAA TAllp IS~-0' ~ j ~10[ ~OOI110M/ VY /MI I I I ~ 7 I POIT, wQ tiotco ~ FnOrtqar trr0. O K43i MMrto'nurit wttt' ~ . a K1NOti MOYMR ~ Or NWU tiK' MOOn0110 0n MvUO. ~ lM0111 Y/JQ W-W' RST IO MpP[IIIY LIK Al yLlNl 1. WMXMT IrH'11 Mpt[D bm MVNp I rLANtIMC 51R(T: T7'•fM' TO M01(IITT LIK AI SIMTO MIrt 'tynk MrC. I I ~ SlOE rARD i7-(r MOIITN • A1NLL) f0 < /IYW RIM LpuL WAu 0 NU • , M[All tAp 11~-4' [ASI I//1' af OIN4s - tp[ wL I:N ~ I . NTi AGgft ~4"M f~.. OI i.rO qpKS I Q~p~ a' rArre ur tmrme Ta r Ir Wmt mnwZ r.rno'Manlt wMTI'. I 1LMM 07VCWAt aON S.F. p1 IN ~ us ~ltl . lU YR MAOM RM IOI GA W1{ MO [Oi[KR pMKI IO" tOl rl. OW w n- 3s aa a.. rvc rwirno wSKrm aAKoaa r •wYai RwaR ~[Y Q t7~W7 N. ~ rro cmtn• oarar wuita r/ •wimcr. ~ czunw ~ v. . Ii aa iM wn a oa a ~acss w a uam u.wM~n lo r ro ■un~y nc~tn rraa rrr I,ru v. u ~ O \ ~ I on tu Yt1 V. rUrus I roorwat ro Au iutq1. ~ tY~iMt ~ i1J~0 V. a rPa t3 OoUf10m MOw uf To rKt a Cata[tl GN. ~ Mr4~1 IOI~~iU arrl(t u4: 1~H V. mw+ MtA. lfo. 7W wRS } M Oa?I11 i~/~lM W1 dl 41! f0 tIYM ~W41 ' ({/p[RI1114[0 II~R Il4l0~ a ~ xna,u .~o :T+w n.L «.TM o~ w► I JI OW ttrm*a[ uAa" SnaT LaorQ I v.a aowco ir .ia . w taw a K~ wa TRACT 'B' ~ I ~~q+ou wu[e I I ~ re irwm rro uMwr Mvw ; we ~ MQ h~ItlOr I~ql fO[W" TO MYiO If ttA Twm C. I m' ' .cowurw. McA ~ ~ V-I il-f OQ►. P Oa. d7L tM t0N AYltp }-~-'L- I ~ ~cm cr wcw ~ wAa~ a.aa 3 ~ Kc..oaSsaX M"rc t~.nai uw ow oi ~ w~ m.~ i o aion' ~a I ~ur-uran, ar snul Laama I wa wovmto K Wmt . xa' ur . N•-' wG. ~ W O I m ~ IU0. n. r na cataa fla[Nws s/ Jowrs o f•o' uc eMC ftt4d aoM 11.010[ ro r wa uy r. ~y tr~p, t Q a ►arro sttaE io r r &ww, ►Ano o", I K•:atc. "wT - _ - - - w - - - - - - - - - • - - - ' - c ~ L w M71ti~• l~20i', -•orc-r_ I ~ ,,y t f I. .(auu s~Ki J iu~ r~wa_ crnn~.waw ~ z I ~ C CN11 _ __A A ■ ■ ~n11 f ~ II ~ O ~ ~1 I 00,K..~ E X A I ~co.,,~ 8TORY OFFIC ~ t o s i s.►. / r ~ a. O W ,sr euaoiNc HcIcHr -TflACT ''L ~ ~ I tA. < • ' ~ :TRACT 'C' l ~ r ~•5~ ~oa~ r ~ i.on o ~+I rOt[ i I 4~ . li i I I~ ~ • I ''I ~ ~ ZI. ~ ' r _ I Ta to, 0 _ ; _ i ~ ~ f 3 .7 . . . • j;r , ~ i;3 i01Xa Ct 1A tttC ~ ' CAR PAMCS . {a.v~ ' rr uW ~:~k~~ ADDITIONAI q RECEIVED ~ . 8POKANE COUNTY 2 . ~ 6 / III IANk.CM~up 1 100r~ ~ «II N ~b~r E .~1a DEC , ~ ~ ~ SI~~~~ ~ .7F.~1('~bt~~•;T'~+ ~n "w~ s:.l 7,7"t DMSION OF PLANNING ooM..l K. cacxR cur & six.KK roanw. cmvuo,m W+v..T ~ i R~ c0u~rr 11VpyAt ♦ ~ ( rhtprtrltANDAM SINTO AVENUE I 0 I 0 5-RIPiIONi +~r "mMS I i rr mrtw t/Ir d rra w a.. Mn. As ru wAr TKIKv Ao Matr ar luTo arouy OKwro0 rawcraiuu►.ac20 LYwacu~arru..{~w~ \ cCgn x[ iout■ ►ao r[n naKa atmm rai w~o noni a■~„ ~ ~ urwm r n~ oowir a srauc, tuTC a W.woVoa i r i a ~K w V~ a t[crwM in»i, t«t,■r u,~ tiK C-1 ' ( 1" = 20'-0' ~ i I I ~ INN SITE PIAN ~ Of RECORD I PApCEL NUI~BFR: 45172-0752 1,/L.~ ry ~ x►~R ~ E~~ ~ . PARCEL "C' OF BIt~D1NG SiTE P~,AN. 85~-~9-97. rn W _ c~/ ING H4T OT'~~~ 1 71151fNG PR SAME S~ E~ N RAL N , I IW+tNC: P E , OP05ED G/\I E ~t ae )NfRACTOA T6 V€R1FY IOC~T10~+ bF ~~L ExI511NC UT1~ifi~S I lOR iD COt~SI~uC~iQN. ~ USE TQNES ~F AaJACENT LOTS; O CL ~ ~1~iRFCTGA Tp I'ROYIaE A~' R.V.C. s~EEvE IO atl LANpSCAP~p I N4RTH: E3-3 RF,AS AS SHO~'N ON GPARI~tCS FOR SPRINKLER SYSTEM. CAP k SOUTN: 9-1 ~ • „ ~ , ~ . ! ~ • ~ - - ~ ARK f1J~5 CGQRGI~+ATE LOCAT90N WITH SP~1NKLfR CONTR - • T ~ ~ - - - EAST' B-~ " ~ ~ ~ ~ 'ROVfOE 2'-8"+AIN RAOfUS Da~ ~LL CU~BS, TYPI~~L U.Nfl WESf: B-1 ~ - - r~ ~ STREEfWORK ~ti BE COOApIMATED W~7H THE COUkTY EnCIMCERS 6FF~CE. ~ K REOIiiRED: I S~~ au I S€TBAC S t1AGE 0 EA HbHDICAP PARKtMC STA~,L uQUNIEC FRONT YARp: 65~ FROU CENTERLINE STR~ET q~ 35 FROM LOT L[NE I ~ ~RQvlpf 51G Ohr A P' SQUA~E STL PIPE w~ 1/e' EnrD CAP wE~DE~ T6 TOP ~ ~ FLANK[NG STREET 65 FROA1 CENTERLINE SiREET fl~ ~R~~ LOT LINE • ~ ~ALV. AFT:R FABRSCA+30k SIGµ Tfl BE 12' ~ t8" wf IHE 516E YARp: 0~-04 I I~T~RNAfIOMAti SrM80~ {1F ACCE55 (W+tiTf 4N BLUE BACKGFOtt~VD) I E FdEqR YARp• 15'-b' a W O & TMf WORDS "RESERVEQ P,aftKINC~ k`51x1E DfSABIE PARx1NG PERr~1T tEqU]REU ' ~ I 40UNi SSCN i'OP 0 AB~. PROVIUE a0D1110NAL `VAN PARNIN6' SIGN 0 3 I : I , SIGN POST, WHERE ~101ED SETBACKS Pft0Y1DED: I I fNrERNA7E0NAl SY~kB[1! ~F ACCESS Pa1NiE~ 'TRAFFiC WhYlif' ~ , FR4NT YAR~: 98~-$~i° WES7 7Q PROPERTY L1hiE AT AIULLAN N OC ~ 0[U ?N PA]NfED ~BIUE' BACKCROUNp aN pAV1NG. ~ ~ ~ I fLANKING S~REET. 77'-61h" TO PRpPERTY L1N~ A1 SIMTQ , I Z ~ n" wIDE w~LKwaY STR(Pf's ~ 2~°0~ O C PAINTFp QN PAYINC $~d~ YARp: 11'-q~ NORTM I ~ a n[ r~ r " r a a, F~ t e w r+ I r E" ~ R R~ r a R 7'- 4" E A T , E A D 4 ~ C~ A 5 P H A L T T O 9 E F L U S M ' M I f H C O N C. W A I. K ~ H E A ~ ~ i o I _ O F A C C E S S I B L C S~ A L t S - 5 L O P E ~ 4 l( r a 9 ~ , SfTE AREA: 49,778 S.F.t OA ~,14 ACRES , W W -F ~ BUILDINC C~YERAGE: 9~63~ S.F. O~t ~6% _ ~ a,~ R K 1 N G t U i 5 7 R I R f r~ G T 4 B[ 4' w J p E S F R I P E S P* i r+ r C p' T a H~ C w r i l i ' I ~ I • ~ U SEE SSSE GRA~[NG PIAN FOR C~RB CUTS AND CONCREiE AUTFAII LOC+~ IONS ASPHALT 5URFACE AREA: NEw 22,408 SF ~ ~ I ~ - ° x' h' H'1' . P NVERTED U-SHAFEO fNBEt1~fD 3''~1N EXISTSHG 3,944 S,F LL BIKE R►CK 2 a 3tl 1G 5 l [F'E 1 i - u~ I LL ~tiT6 COhCRCiE- CDNFERp ~OCAfION W/ ARCHI~EG1 , I I I 7 ~ , i CONCRETE SuRfACE AREA: ,6 2 S.F. I 0 ~ J 513E LIGHTItvG DN 6UltO1NG AMp Otl l,1Gs~t STAN~,lARpS TO E3E SHIELOE~ TO ~AfNTA~v ` LIGHTING ON SUpJELT AROPERiY. MAINTAfN I FQpTCAMOLE CO ALL ARE~}5. I ~ LANi}SCAPE AREA: 13,723 S.F. OR 27.55 • q ~ QI4fENSiQNS SHOWN ARE T~ FAC£ OF CONCRETE ClIR9. ~ PARIl1NC REQUIRED: OFFICE USE: 15.43d S.F. fEKANT AREA ~ 35D ~ 39.3 SPACES I ~ WALH ftA1tP OH. 1:12 TO FLl95M W A5pHA~T ~ (UNdETERAlINE6 UN7ll LEASEp} s ~ I CQkCRETE SSDE / Q ~ p p, I pFF STREEf ~OAp(NG: 1 SPACE REpU1RED 1T' W1DE x 3p' LONG k 14'-6" N[GH TRACT ~ • PROVIDE DETECrABIf WARNING 53A11PfD fULL EJEPTH U R M ~ ~ ~ --I 130D' ~BCRDER "ASfM~t~T I L y'-p° Wgfi~ pETECTAALf W~4RMlNC STAIAPfp IHTO ASPHALi PAYlNG p,r~pK~~ p~y~p(p; f fiE P ~ WHERE TflANS{1ION FRCJuY S10EwALK TO PAVl~G IS GE55 ThAh K' dp' ~ ~TURE ACWdS[I~10N AREA f ~ ~ ~p'_p" ; PASSfNGER CAR SPACES: 6S SPAGES OF WNICH 3 ARE H.C. ACCESSIBIE ~ r2'-0' wl4E ~ 14'-0" OECP ~ 4' TNH. CC1NC. SLA9 F"aR Dll1lPSTFR j I ' 1p.Op'-~-UTIL!rtY E~45E~AENi _ ~ L./ ~ WITH 6'-0~ M1CK CNAiN-L3Fi1t FENGE h SLAiS AM~7 PR. 6~-0' CATE5 ~ I , ~ W1TN CANE-9~7L~ EA 1E+~F pl~+Et~SfOHs ~[SFED r~RE CIE.~R 4t~uE~+Siix~S ~ ~ [N5I[]E ENCLDSURE ~5.pp` ~BlfIL01HG SETBACK I ~ , 25'-0" R a: . I ; . K ~ ~ ~ i TNK. CONCREtE SIDE'NAllf W/ CONTROI JOINTS 0 5'-U' 0 C. d ~ 99,7y't SETBA K ,fl' 124,i3' , 14.37' SEIBAC ` CRQSS SLOPE F4 9f uA%. I 4~. ~r , " " I r~ PAVING 5fCTI0r~ i~ BE T' ASPF+~Li PAUNC OvER NEW;ELEC 'AULT~ NO'E€ ~8 ~ f , = V V ~a ♦"GRtivELBaSE ~ _.~,-N 8~~3954 E ,312.06 Q ~r - r -'~q^ , _ _.--v.., - i . . , r _-e ~ ~ r . ~ E%15T1HG PARKING ~ J PAINTEO ~V1SIlOR' SIGKAGE 0H PAVIMG ° RAlMTfO ~TRl4FFIC wr+ltE". -y- - F- - - - - - - % GRti55 Swa ~ - 5 IBdC+i_ - ~ - _ _ _ - _ ~ ~ - - ~ CRA55 SWAlE ~ ; ~ ~ I ' - - I ~ - 12~E I _ l i~" ~1 j NOTE ~1 - ~ . ~ COQR~[NATE W AYISTA UTI~ITlES F'OR TRfNCtilNG Oi GAS L[HE ~4 a ~ ~ - , - I , O z 0~ ~ E- J 'r ~ -~k' ~ CT CAH "y . ~ ~~t r ~ 1~ V/ PRUPt75E0 GAS IAETER IOCATIQbI. H . 1 r' ~ YETER v,~°. I I ~ 't• , . _ ~ I - ''r' ~ ~ , j , C~ ~L ~ I r.;:. ~k`,~;~ - - PAQ~ITO. y tc~ ~_.-.~4~ ifr~'.._`u, ~ ~ ~ ~ . . ~ FIE ~ Q X - ~VYO ST4RY OF C ~ y , , , _ W ~ BQ31 5,F. FLR. ' , : W~~ ~ W Nfw DRIVEwar ~ ~ _ , ~ .LL; j a~, 3 - , ~ x .~k • ~ i .~.1 Y i - '.:f ~ ~ < . I ~(I PER SPOK. C0. STANDARLIS ~ ~ ~ - .:~2.5~,p: ; • - - . ° ~o' . 3?' B~IL[}ING liEIGHT , ~:4, r ~ 4 ~RA~~ ~ 'cs l ( ' _ r ~A . I NI• : G m E ~ ~ ` ~ ~ ~ ~ - ~ i r~aaos~a cAs ~,ea ; . ~ f iI. ~,f-. ~ . N LOCATION r I4I ~ N E:_F ~ ~ / ~ s ~ .i)'s~.:cx tF . ~ . ~6`"HSGhI . . f ~k f ` ' { , , , . NOTE 17 ! / • r " i~ _ _ / , ~y.. ! ~ Q _ - ■ ■ + J , ~ i YF^ ~ G • f ~i a , .,,a,: / ~ _ - _ I ~.1,~ ,,r~ - TRAGT C ~ . z..~~, t . ~ ~ - . _ , y+ ~ i' ` 0j ~ I ^ t3, r T - a ~ 0~ .",;~W _ / NOE7 _ I - . N~TE 6 N07E 17 . _ I I I ~ Q Q _ e ' , d ~ " : ' ~ . . ~ N07E 2 - N{7TE S ~ AI.'. a - ~ '1 - : - f / , ° , ~ ~ Y. ~ jH~ i! l : yt . . t;: J . tT . _ ~ . I.J 3 u ~ ~ ~ (5 ~ L ~2 I~ _ = ~Q.~~. . - I ~ y ~ ai ~ ? ~ - n ~ ~ ~ . ~ , i~~-~"1 ~ ~ . . a . . e a ~I a NDT ~2 ° . ~ I LAF1DSCAPING ~ ' , ~ ~ m I~ : ; W Z ~ ~ o H ~y , ~ . 4,~" y~. ~ ,w ~ , . . . . ~ : . _ 14~.Q4 ,~i ~ ~ : k . . . W . . . ` ; ~ , ' . . . . ~ . . ~ _ ' . ~ ~ _ ..,~~1. ~ ~ . . ~ . Z W Q' Vi I ~ ~ ~ f~,. I~... . ~ : 3 Y~ ; , I. Vi ~ . . . ~ . ~ _ _ ~ ~ p . ~a~:~i . , ; . . , . ,_.'x ~ ..F . : a ~ ~ ' - „s: ' ~...~,~t ~ --i': : `f ~ r ~ Q ~ ~ z = , ~;t ~ ~ v~ ~sr ~ ~ - _ ~ _ n s ~ ~r ~ ~ a I ` : , • ~ { J, : ~ ~ . I . / I J ~v ~.~,G. R. ~ E ' , ~ , r: I 3 , ~ E., ~ ~ ~ ~ t . I , { _s. ~ ^ ~ , o / ~ I I F" I '~`I ~ . r ~'.1 `I i € ;raE r 4..i. ~C dP ~r L.~r, ~ x:.~'.b-, ~ _ .s it ' J CL ;v J ~ ~ wA ~ ~ i. ~ ~r ~ ~~,~i "r ~ ~:~1 3 I ~ r - X~ , ~ _ . p . I~ . ~ • J' c.~1 N1~?TE~ t~5` ] ~ . ~ m ~ ~ _ , I i _ f w ~ s. ~ - ~ 1 f P ~ ~ r , • W.i Y:S~.+i uYim~?'sf n N.Y~1, " W i 'v.. ~ , a . .~_.~t S ~~~f inre~-nv~w ~ui.,, ~~,t~ ~~JS~"ti~r31ip1Mf.i.aY~a`eM1~w...~,..... ~..~~f... ! ~ . . ~ . ! . , , . , E#G. u~ , . . , _ ~ p`. l ~ ~ r ~ I . . _ . , F ; ; , c~.~"+! ~ d , F I - ~ ,f ~ . ~ I~ ~p, m ~ I #~YF~ m t~ t K x~ '~.w, r ~r, Z ~ ~ i _ . , } ~72 ~ s., _ ~ . , ~ . . . _ ~ ..~,~_~_~„E~~.p - ~ i . , ~ - . _ - _ - . _t _ ~ u . ~ ~ ~ - L i`:r; : ~ , , tiC''f r r~n R ' . u 4uaCNr - t~.:~. f~)`~4 i a~; ~.,M~~" ~ - ~.~~,:r hU~ (~.r•;~ , e .~~,.,Tts ^ _ ~ " , . ,~'f, ~:~R.` ~ ~ < . • ~ M a } ! 5lGN . ~ , Til ELEG HhS.-. ~ i,f " ~ , ~1 , 6 ~ ~ W / ~ . , t MICn • - . . a : . , _ , 1 r l . ; , , l -~f , , , , } ~ ~ - ~ 1 , ,:1, .w: :s ~ / ~ ~~~5: . 5 r _ , , ' . , ' - - - ~ ~ a ~ ~ / . ~ ~ , ~ . ,.,z- i i - i ° ~x{ ..~i~, n...n.;~e>- ~..~.:7a~t~ws~~sa~-~.,.1~rw'~ o a ~ ~ - - ~ ~ ~ O ~ l . I I 1~a ~ i: ~ ~ ~y,d' ~ EX25T[NU CURB iQ I ~ p~ ~ ~ _ ~ ~ i . ~ / a ; ~ ~ a~ ~ 6 . , I HE REI~QVED - SNOwN DASHEp , - . , ~ _ _ - EXISfIH; F1Rf r'" 5 ~ . _ . . , f , ;'..~.."~:r~~. t ~Qy~p~-~t~--~At~"9~r , - p HY~iAN~~ ~ r:. :~i~,- - ~ tl ~ ! :x x,' I FF Y I ~ r ~ ~ ~ , p ~ ~r. ' n: PAINT 'TRA 1C ELLOW' ~ . _ _ , ~...,i ~ _ I ~i , ~ . . _ f. . ERIS~[N ~ POWfF : . , e' ~ " " ~ tf(~$~IRZB,1~- - - - -t'~- - a _ ~ - ~ - - ~ . . . _ . ROtE ~ ~ ~ f - - - - _ :~~-~-r ~ T ~ ~ _e - ~ - ~ . T 14 ~R~Ar ~ ~ ~ q~ $ T1~PE I!I LaN~Sr_aFlraC s ~ NO E . - l7 n `~--~xisTrNC E~~c. w~u~r ~ 8g'~8`18" E 309.tD ~ ~ _ . . . • - 1, . . " J , ~ _ . ~ , ~ r • ~ . . i ~-~k. _ . .i _ . ~ _ ~ ~ . - - - , ' - I ~ . . r-.~ '~r ~ EXIST[NG SIOEYIALK -~y . S 31Y?0"35' E _ : - - - ~ ~ _ ~ - - - _ . ~ , I i 581~ ~ . - f NEw a~v1r~G rp u~TCM y 4. ~?.y^~.'w,.na..r I Y.,~v _ _ iQC . EO ~ ~IISTiNG `I~L:~,RI5E~7 : w EJI1STiNC GRAftES sl•: i ~ ~ _ _ - T ` ~ sr~,~r ExCSf1NG ONtv~whr z w ° ~ EXISSING F[RE HTpRAMT ~ N W T LIR ~ lQEWaLIt 76 REuA1N ~ "es ' E CONCRE E C B 5 W ~v in PtR COUNT`Y STANQARD$ ~ N i / _ _ _ _ - - - s - ~ - - ~ - - ~ - - - - - - - - _ _ _ ` ~ - NEW ASP4IALT PAVING ~ XGp..y~ NUMKllt. 208M ~ {NiLi ~R rd~Nx~ $rA~oA~os SlNTO AVENUE a V€R1FY fxTENTS ~ ~ ~ . ~ ~EGAL dESCRIPTION:. - - - ~ - - o _ , O TN~. $OUTH 1 j2 OF TRkCf 7p (}F OPPORiUN1TY ~S RER P~AT TnEREO~ /Y + _ , ~ - • ~ - - • ° - . - ~ • cor + 2-1~7ro1 RECORDEO 1N VGLUkE 'N' t?~ pLAT$, PACE ~P L~'ING EAST OC AfULLAW ~OAQ. . ~ . _ • . _ _ . ~ _ - r. ~ - • - - - , r• ~ ~ ~ ANp t~0{tTH pF $Ih7p AVENUE, / N ~xCEPT TIiE $pUTra 3pp FEET THEREOF C7EE6L{~ F~R R6A~ fltlGM! ~F W IY: i W R~GEM S1T~ATEfl [N 7KE CQl1HrY OF SP~~iAHE, 5?AEE OF WASHCNCTON. I ~~~~~E~ kw f/a ~F 1Fi~ Nw ~J; pF 5ECSION »T.ZSN., R a4 E.w.M ~ I ' ! _ I „ w B[NOING i! ~ E• LAN, BSP-5g-97 , . ~ _~y n+, n ~ L ll U c 4-.RECEIVED SFOifAhlE C4UNTY ° a FEB 2~ Z FEB 23 2647 ' rn DIV'ISION QF F DNllSIO~} OF PiANNI1~G ;Z016:~63OWSe ~ I II 1 1 ~ f~.IILQiNG INF4RYlli[(}N: ' . a~ ev ra ~ , ~ P411~4 M~R; 4517Z07S2 ~~`~~~x ~AP ~ L ~ ~ ~ PARCEL "C' OF BIPIDINC S1Tf PLAta~ 85P-59-D7. ~ a: GEAlERAL Nt?tES: ~ ~ ~ ~ tard~w e-r cxtsrn+c, ~r~oaos~a s~ure ~~~~~H~ ~Q~~ E L G. CCa~rr~~Crar ro vea+t€r ~oc+►riaN oF ~u~ ErasrruG u~rr.lrtE9 ~ao~ ra co~r~wcrsa►~ ~ u~[ toM[s a~o[Nr ~~T~: . 2. Ca►r~Cioe r0 a~br60E a.v.C, S~[EvE ra ~u~(~SC+~aED I NORi'ti: B-3 A11fA$ AS S~t(!N'M Qq pRAl1MGS ~pR SPRJMtiER SYSiEM, f;AP ~ r~ ~ ~ YAf~( ENOS. CilpiQlNATf lOI~ATIOM 1fIS8 5~"RIIrClC~1 C4MTR ~y i ~ ~UTH: B-1 ~r ~ ~ • ~ ~ ~ ~ ~ r. ~ ~ _ ^ ,i s. aAOvrar r~s' ww. Rwctrs oN c~, rr~tcu uxo, ~~sr. 8-i " ~r€s~~: s-, . - I u~ s7e~trra~oc ro ~ caormu~,~sm ~~rH rr~ c,a~rr ~c~as r~F~c~. ~ ~r~ +~~u~+~o~ . ~ Q~ ~l+ S. PRC~Y]Of 318~IACE tEA. 1~A1~ICAP W►RNl#~C STAtL u0lqiiEO FRQFIi YAiiQ 65' FR01i CEHTERLiNE STREET 0~ 35' FR4i~i LOT ~If~ I QN A Y SCU~RE STL PiPC w/ ! j~" EID CAP REEfJEQ Tp fOP ~ , ' - , ~~u~nciuc sTr~~r: ss' F~OAi CENTER~[NE SiREET QR 35• ~ai . r OALY. A~fT~A FIS~tICATIIMI, S~GN T(1 ~ T2~ e I~` 11/ Tf1E ' y IMTERN+ITI(f~+Al SYI~DL {l~ ACCESS (11FqiE OM 8LI1E BACKCROI~1J y f S1UE YARtk 0'-0~ I ~ THE 11UIiGS 'RESERYEO FFRlCIMG" !`S~ATE DISAILE PAflKIMG pER111T ~QJIREO . ' R€AR YARp; 1~'-D" ' ~Oil~+s SICw 10P ~~~f"'. ~i0Yt0E ~GOCilOws4 lrut R~c1~C' S1t~ ~ t I . ~ ~ S1~i1E POSi. '~F+ERE MOTEA • ~ ~ , • ~C'ti~x3 ~r1a0~ 6. [NTERNA7]DNAL SY1RlpL (iF ACU55 PAlNiE➢ "►RAIFIC tNITE' , , ~ o~► a~~r~co ~u• e~c~c~u~ a~ a,~v~~. ~ vec~t r~so- ~a'-s~' wESi TO PROPERIY LfDE AT hRALAN ~ FLAh~(1PIC STf~ET: 77'-6Y~' iQ pROPER7Y !.{NE AT 51Nf0 ~ 7. fA4~1YAY $IRIPES PA~liT'~0 0~ pAY[MC. ' ~ P1tip'ii "TR/~i~IC /IiITE". I ~ '3IDE YARI}. 12"-0" NQRTH ~ REAR TAPoD; 79'-~' EAS~ ~ E ASPl~+Ali TO ~ flt15H ~IYN C~NC. iAIK R►EAp f ` , ~ i~ NC. ~ ~ p II LrT ~ GF A~CCESSdBI.E STtiLi.B - Si,aPE MfiX~ ktE. ' . ~ItL ~K~k ~,I7d 3.E.t OR E.~~ Al~Ei ~ . ~ 0. PA~Ik[hID l01 STRiPING TQ BE 1' !'Ipi STRIPCS PAUIiED'YNArfIC NHI ~ ~011~ q~(; ED31 Sf, qt 16X r~ . ~ V 40. SLE S31C GNXOiMC PIAM FU~ LtAt& CllTS AND CO~ACTC OUTFALt IOCA i0M5. . ~ r ~ ~ ~Ef iiAKL A~k IiE~f 23,017 9.~. ~ ~ W II. !IM[ RAdC 2'~ ~ 3p"' Nlpi STI. PIPE WyEItT[0 U-SNAPCD CI~OQED 3 M1N. = E%ISiING ~,01$ S.F. • i trna c~~- a~'i~ ~oc~rtoN r/ +~wa+tr~cr. ~ , ' ~L • a~cn sur~cc +~~u►: ~ ~x s.~. ~ ~ ~ Q 12, $1YE L1i~71T111~ t1N ~JILpdNC Alq ON L[GNi 6iAipA~ iD 9E SN10.0EC_10 11AfNTAM ~ I ~ ~ L1GHYpi('i OM Si~l,~CT lROMpkTY, W1MIACM I~DOfCA1~,ILE TQ ALL AR[~5. I (,Ai~'A}~ II~~C 1].6~'Q SF. 4R 17.AX ~ , ' .d ~ 13, Qd~[ItSi0l~5 9tK~1+RM 1WE T4 fACE l'~' CQNCl~E1E f~. ~ , , ~MIti~R ~[4W~# O~F!(~ U4f= 13.43~ S.F. rEI~N1 ~Jt[A * 3SG • 3b.J 3PACE5 ~ ~r Ia lf R 1~1 f F T * ~ ~ I1NDEiEF11E{IEQ UIITII tf~ISED ii . ca~~ smc~r~. +u~ o~. . z o tus~ r/ ~sp+~~ , 7 t R ~ lx PR01fIQE ~E1E~FA8.E ~ANMIMC 9T+AIpED FLII ~fRT~I bF RAif?. I (1~'F STRE[T lOADING: i SRACE kEOUCaED 12` ~10E a 30' LGNG ~ 1~'-6" Mlf~Y1 . L/ ~ fiRACT 8 r~. ~'-a'rr~ oetecr~c ~r,~~tNa sr~rto taro xsr+c~r a,~vt+re ° ~loo' ~ec~w ,►s~ew~~r ~ 0 . ~~wc ~a~.~ + , 1M~liE 7RAi151TI0~'~ ~i1QM S1DE~AI.K Tp PAMnNG 15 1ESS fMAk ~ OD~ ~ URE ACRP151~IflF Ai1CA ~ ~ ~ 16, f- f ~ 1' P e 1' TFe4. F p ~ PASSfI~,ER CAR $PACES: ~6 SrACE3 OF' 11111G~1 3 ANE H,C. ACCES51Bl.E ~ ~ Z' 0" IOE 0-0' OCE (~AwG ~~B ~ buYPStF a ■IfN 6'-D' N1G11 C~i11-LIMt F}~E k 5LAT5 Alq Pft. ~'-0' GATES ~ kQOQ' ---U1[L1TY E44SEI~MT pF'f SiREET LOApIMG: 1 SPl~~ AltQY1DEE1 f1"'~IUE x"-(Y OIM z 14'- M ~ I ~ JO t t RG ~ ~ lflt►+ CI~E-NQI~ E~s. Lf~4i, DIrEM510n5 1I57E0 ~RE CtE~R a1wEM510~ , , f 0 lNSi~E f~CIDS~tf. ~ I ~ !►S~OtY ---~tlILG1M4 SETB+~CJ~ ~ ~ 1T. N'' THt. COi1CN[TC SIGEwIIK ~f/ COU,FROC JQ1NT5 * 5-0' 0.G. r tS-Q" R.O. , , ~ ~ ~ CN055 StOPE r0 BE ~x, t;+b, ~ I l~7I`3 3ET 1?~.0~ 4 6~~ TQ'lY~ SETBAOt ~ ~ . I~ P~YEMG SfCf10[! 10 9E 2" A4P1M~.T PAYMC pYtR ' NEY;EIEC. Aulr NQTE 16 ~ 4` CRAiIfI BASE. I N~"f~`E4` E~l$.~' ~V .~1~. .~.r+ ~ - ~ Z - - - ~ 'n i 1t4' SET~c ~~~5 Swµ£ ' Ex1STING ~PMR~cp~G ~ WA~ sRUt .Z ~ ~ b . I IT 4 , ~~itEtr~-- ,~--ti ~ ~ ~y , I ~ l ~ p~ ~ ' ~ i ' i t ~ ' ~ it 1ETER ~ V ~M1 ~ ~ 9 ~ ~ . ~ ~ ~ .I, , „ _ _ po~rEr~ . ~ 1 - ~iir ~ IE11 QRfYE11A1' ~ ( • - xfyrF~7 ~ s:16.4` t6d'"~ ~ F I ! t _ i8i PfA SPOR. C4, STAIpAqpS ~ - ,1. ~ , X , ~ ~ ~ 8,031 S,F. / FLR. , ~ ~ . ..x~ . ~ f. \ a . . ~ I ';I I ~?_v ; 6 r8.,5' ~ H HT ~ ~l ti . . 3~ 8U(LQING EIG ~ ~ ~ ~ . ; ~ s° s±~us~...~'"I I C ~ : ) . i s. . ,l~ i 1..~:,.,~'"~ ~ ~ ~ 1 I ~ . ; ~ i ~ ` q ~ ~ ;E ~ _ 1qTE t7 / t ; v i N ~ I Q ~E r r ~ « ' i` • * II j ~ TRA T ~ ~ C C ~ ~ ~ j ~ ~ ~ , ~ ~ ~ , , _ ~ ~ r~ort r `1.b I - -4-'-~ 4, ' HarE a +aie » ~ ~ s~. ~ ~ I i ~ ~+o~E S 4.` ~ q i ~ y, ~ f i v ...:ii~ ~ , . ~ II I ~ ~ . { , ~ ~ ~ I ) t I d . ~ . , . . ~ < L ~I € ~ , . ~ ~.!y - ~ . = P ~ • ~ ~dfi. ~ . ~OS~,] ~ L~5CAFING ~ ~ ~ i , ~ Z . ~ ~,~~.e i : ~ . t. ~ . ~ A ' ~ ~ ~ ~ • ~ ' - ~ ~ a ~ ~'~ti .i ..~~:..U~~r'~ a 5~ a., _1 ;an'~ 5~,; :y.. f ~ ~ ~c,~ si ~ ~ , ' ~ ~f 4 ~ ~ . f . , , • ~ . ~ 1rr ; , ~ 9 > ~ ~ ~ ~ s~.~ , . ~ J ~'4'c.vr ; [ e} ~ ~ i .1 . , ! - ~ . . I ~ ~ f ~ ~ . . ~;s ~ _ ; : " ns-^ ~ ~1, S ~ ~ .~crasnvn~:e~a - 9 . / ~ ! ~ . ~ . #'i " ~ ~ J ~ ~ 76 ~ .~._~.u~ . ~ I .~~a~ ~ ~ f i,.f;e.....s.~~~~P~ ~~'.7 :.s. iG J ~Q f ~u L C C3 V% s ~ ~ ~ : ~ ; r' TY~. i - ; ~ i ~ ' ` k[ ' I ~ vw . s ~ ~ . a _ ~ ; _ ~ . # i. 9 ~ ~ . ! f. . i . ~ i,r~ . . r . ~ 1 !F s~ ~ ~ ^ , ! I . r ~~:~r~~ ~ 3 a, ~ . ~ . r!61€ 2 ~ ~ ~ % ~ ~ , ? .ft ~ 8' b~~,17 ~'~.e" , s fl . . , , ~ _ . . . . . . ~ . . ~ - - - - . y•„ • ~ ~ T a' f'4~ TFI. ~ _ - ~ ~ ~ ~ - ~ ~ s p+ { , , I , ~ M ~CAR PARKS . ~ , I so ettc. _ . ' . . . : l , ~ , , r, ' , M1 . ~ , ~ 3 . y t~' A~4D1T10NAL . #~.5' t33.43' S~'t fl' 3 , 8 .b . . , .:a= q' / . . A ' - ~"7;.x±,~ . ~ ~.e,..:'ii3:+rir _ ..'.w~ 5 ~ : ~ ~ ,y,a_..-.. ~ ~ I ~ ~ - j - ~ ~ ~ ~ ~ ~ s ~ ~ ` i a...~ . w , ~ ~~~~I~~iJ ~ ~ ~ . . 3 . a ~ F ! ~4 I 1~ ~ I ~i . xai, ~ I ~ 1 , ~ li e d~ c $ .g €z~s r . . ` ~ ~ ir~ ~ I ~ ~ ~ ,~'oR r ~ ..~.~..rt_ 4 ~ ~ ; . _ _ , ~ . . - - ~ ~ x 1 ~ ' SP+~KA~IE CO~tN'i~ ~ ~ _ : ~ ~ _ ~ ~ ~ ~T ~ $ ~ - I 1 ~ I ~ ; I , I . . _ E E i ~ I - E~tS f~ ~irER ~ ~ - - i ~ '1 ~ ~ r • - r _ _ PdIE~ ~ ' _ ~ . . _ _ _ - 5' frPE IIl LAM6tiSCAP~NC m ••••uu TYPf~ill LAN05ZAPIM6 _ y,,~s'`~ ~ ~ ~xiSi~~ e~€c. vx~.r - ~=--..,~,4.---r-_---• _ ~ ~ ~ ~Q~rP, H 3~~d"f 3C~.tQ' . . ► _.~.....r -._~.r.~.,~_ • . ~ . ~ ~ r. ~ - - S 3~~35 f ~`''~r rr~ ~'ye ~.'~=•e ~ ER~~1iM~ $~E~ALK , ~ , ' * - -I .4 ~ ~ ~ ry+~y y~' , ~ ~ i~~SIQN lr~Nll' t9 'W..---•--.. . fXIS7UYC OR~VEMAY ~ f~Cw CONCREiE ClAtB R SI~RALK Y4 REWIN r €~I$TING FI11E tiY0qAN7 . ~ PEp C01lN~Y 5TAM011Rt15 - - - ~ - - ^ - - - - - - - - - - - - _ _ _ _ _ _ _ _ 1ICN ASPFIAL~ DAYING r~ ta~+rv fr,u~o~aos s~~ ,A~E~ YERIFY E1IT~N15 l.EGAL D~SCRI~?TIbN: . ~ , ~ ~ il-1-~10 ~~c sanr a/~ o~ r~rAct ~o a ar~osnau~r ,~s a~a Pr.~r rr~~c~ IiECOR~O~t) [M YOLIlI~E 'IC` 6F PlATS, PAGE 20 l7l}PG ~~15i OF MlA.LAN 11D. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 4 ~ r ~ ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ` ~ ~ ~ + ~ . ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ a ~ i ~ ~ ~ AI~D MORihI 8F SINTO AY[tN~; j ExCEpT lr~ SayiH S,Op fEET TNERE(NF qEEDED f~R f14A0 RiGtii pP 11 Y; 517l~ATEp 1N 1'ME C6UeNTY ~ SPpcAHE, STATE G~ w~3NlN6T0~ ~ ~ t{~ 4/i pf fHE k~ I/4 IjF ~{C710~ 177.ZSN„ R. N E,XJ1, au~o~~c sn~ a~~~ es~-~a-a~ I ! ~ I . . ~ • 1,~ T 2fl~_~„ a C14 ~ r ~