Loading...
2011, 06-06 Permit App: 11001610 Storage, PC) F- arm Z�- �✓'a v U czi0 S �Q�. I 9cf,--� z (6 D-e--ck-f- cSr,w p f r\,,,,)adcx, V4e- /�_Z_ -/-D e ct�� cc 9-e, froJ ee-i OL- 1\S1�E' �Ubm�ita\ # Spokane ,,;ow*Val ley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane V,r;lley, WA, 99206 Tel: (509) 688-0036 �r Fax: (509) 688-0037 (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTIOWPERMIT APPLICATION ❑ NEW CONSTRUCTION ❑ ADDITION/ REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS: (? GZ yr S '\ c( ASSESSORS PARCEL NO.: LEGAL DESCR PTION: BUILDING OWNER NAME: NAME: 1; C— n ADDRESS: 3009 CITY: CS Loo e- STATE: ZIP: PHONE:E5-019� Ij • v-`3 5 FAX: 5 ,' S �f / CELL: cJC✓ ��' 7�J / CONTACT NAME: A / e- - x f.Q lip PHONE: FAX: CELL: CONTRACTOR NAME: cri�A hex &nv ko MAILING ADDRESS: CITY: STATE: Zip: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE H SCOPE OF WORK I DETAIL AND INDICATE USE & PROPOSED USE: C�- ****YOU MUST COMPLETE THE FOLLOWING**** MARK N /A TF lUnT ADDI Treat P Heig t Peak• Dimensions: a No. of Stories: Total Habitable -e' Z Z `< Z Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on a (S FT FT: Area: Property: No. of Bedro s: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature , �T �� Date: 6 -6 —2p�/, Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc 1 Zr "ST(OR09E PRoposEb PLA IN, D A)PRO E BY: ATE: Fsv RECEIVED PERMIT ERMiT CENTER JUN. 0 roi Name Submittalf �+ qtr 3004 S, bqvl REE N R� g3" sit Spokane ,,;W0Va11ey@,) For City Use9nl PLUS Project Number / Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised %target date. Your application review TARGET DATE is l r rrt I The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax; email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Site Address: 3009 S DAVIS RD Parcel Number: 45274.1203 x Project Transmittal City, of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, NX'A 99206 Phone: 509.688.0036 Neu -project E] Precious pre -app mee[ing 0 Plan revisions El Transmittal Date: _Xk,)nda.v,Junc 06, 2011 Project Number: 11001610 Zoning: R-3 Water District: VERA Fire District: I'D 01 Applicant: KRAVCHENKO, LILIYA & ALEX / NI Owner: KRAVCHENKO, LILIYA & ALEX / NI 3009 S DAVIS RD 3009 S DAVIS RD SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216 (509) 921-5957 e-mail: e-mail: Contact: KRAVCHENKO, LILIYA & ALEX / NI Occupant: 3009 S DAVIS RD e-mail: SPOKANE VALLEY, WA 99216 (509) 921-5957 e-mail: Contractor: OWNER Arch / Engineer: 0 �o ECHWE DD ti ' k.; e-mail: Project 22 X 12 STORAGE BLDG Description: I D) _"_a F.A0 C) J d�0�yt//�/Gi � /o/ 7' C7(O Please send all plan review and project comments via e-mail to the highlighted individuals. ECLIPSE ENGINEERING INC. Structural Calculations Floor and roof joists 3009 S. Davis Residence Spokane Valley, WA 421 W. RIVERSIDE AVE. STE 717. SPOKANE. WA 99201 PH: (509) 921-7731 FAX: (509) 921-5704 WWWECLIPSE- ENG INEE NING.COM N N N e\;PC _' % v s 7Ci r 0 Eclipse Engineering, Inc. 3009 S. Davis Residence 6/6/2011 Consulting Engineering fir joists Lee French, PE SIMPLE SPAN BEAM DESIGN IRlf ,:= lb - ft- >:= lb• ft 2 si := lb - in- 2 Design criteria: Allowable Stresses for - Fb := 900.1.15.1.1•psi Fb = 1138.5 -psi E := 1400000psi Grade DF #2 F,:= 180 -psi F, = 180 -psi Total Roof Dead Load - wr:= (10+ 0.0)•psf wr= 1o•psf Total Live Load - WP := (70)•psf wP = 70•psf Span - L,:= 12 -ft Roof Tributary Width - Wr:= 1.33 -ft Roof Distributed Load - Wf := Wr wr + Wr WP wf = 106.4•plf Additional Dist. Load - wa:= o•plf Total Distributed Load - W:= wa + wf w = 106.4 ft 1 lb Total Point Load - P:= 0.0 -lb P = 0 Dist From Point Load to End - a:= 6 -ft Dist From Pt. Load to opp end - b, := L - a b, = 6 ft Maximum Design Moment - M :_ w•L2 P•a•b, + M = 1915.2 ft•lb 8 L Maximum Design Shear - P -b' w=L + — V = 638.4 lb ^VM:= 2 L TRY: (1) 1.5" x 9.25" b := 1.5 -in d:= 9.25 -in b•d2 b d3 b • d I.-6 I _ 12 A = 13.9•in2 S = 21.4•in3 I = 98.9•in4 Actual Shear Stress - Actual Bending Stress - Total Load Deflection - fv 3 V L - 2•d f, = 60.1 -psi OK 2 A L fb := M fb = 1074.41 -psi OK S 5w -L4 P•a•bl•(a + 2•b1)3•a a + 2•b, 384•E•I 27•E•I•L 0 = 0.358•in I= = 401.8 OK O (1)1.5" x 9.25" DF#2 joists at 16" oc are Adequate. Eclipse Engineering, Inc. 3009 S. Davis Residence 6/6/2011 Consulting Engineering roof joists Lee French, PE SIMPLE SPAN BEAM DESIGN elf := lb -ft- 1 > := lb -ft- 2 Nsi:= Win 2 Design criteria: A Allowable Stresses for - Fb := 900.1.15.1.15.1.1 -psi Fb = 1309.3 -psi E:= 1400000psi Grade DF #2 F,:= 180.1.15•psi F, = 207 -psi Total Roof Dead Load - w,:= (12 + 0.0)•psf w7 = 12•psf Total Live Load - wp := (30)•psf WP = 30•psf Span - 1241 ML,�:= Roof Tributary Width - Wr:= 1.6 -ft Roof Distributed Load - Wf := WT Wr + Wr WP wf = 67.2•plf Additional Dist. Load - Wa:= o•plf Total Distributed Load - w:= Wa + Wf w = 67.2 ft 1 lb Total Point Load - P:= 0.0•1b P = 0 Dist From Point Load to End - a:= 6 -ft Dist From Pt. Load to opp end -b, := L - a b, = 6ft Maximum Design Moment - W*L2 P•a-bl M :_ + M = 1209.6ft- lb 8 L Maximum Design Shear - v := Ww—L + P•b V = 403.2 lb 2 L TRY: (1) 1.5" x 7.25" A := b•d A = 10.9•in2 Actual Shear Stress - Actual Bending Stress - Total Load Deflection - b := 1.5. in b•d2 S :_ IOA 6 S = 13.1 -in 3 d := 7.25 -in b d3 1 12 I = 47.6•in4 f, = 50 -psi OK fb = 1104.6 -psi OK 0 5w•L4 + P•a•b,•(a + 2•b1)3•a a + 2•b, 384•E•I 27•E•1•L 0 = 0.47 -in L = 306.3 OK 0 (1)1.5" x 7.25" DF#2 joists at 19.2" oc are Adequate. 3 V L - 2•d f _ � . 2 A L J / _M fb S d := 7.25 -in b d3 1 12 I = 47.6•in4 f, = 50 -psi OK fb = 1104.6 -psi OK 0 5w•L4 + P•a•b,•(a + 2•b1)3•a a + 2•b, 384•E•I 27•E•1•L 0 = 0.47 -in L = 306.3 OK 0 (1)1.5" x 7.25" DF#2 joists at 19.2" oc are Adequate. Eclipse Engineering, Inc. 3009 S. Davis Residence 6/6/2011 Consulting Engineering roof joists Lee French, PE SIMPLE SPAN BEAM DESIGN luf := lb -ft - 1 sS:= lb -ft 2as := lb -in- 2 Design criteria: Allowable Stresses for - Fb := 900.1.15.1.15.1.1 -psi Fb = 1309.3•psi E:= 1400000psi Grade DF #2 F,:= 180.1.15•psi F, = 207•psi Total Roof Dead Load - wr:= (12 + 0.0)•psf wr = 12•psf Total Live Load - wp :_ (30)-psf wp = 30•psf Span - L := 12. ft Roof Tributary Width - Wr:= 2 -ft Roof Distributed Load - wf := Wr wr + Wr wp wf = 84•plf Additional Dist. Load - wa := 0•plf Total Distributed Load - W:= wa + wf w = 84 ft- l lb Total Point Load - P:= 0.0•lb P = 0 Dist From Point Load to End - a:= 6 -ft Dist From Pt. Load to opp end - b, := L - a b, = 6 ft Maximum Design Moment - M :_ w•L2 P•a•b, + M = 1512ft- lb 8 L Maximum Design Shear - P -b' W* + — V = 5041b �V,:= 2 L TRY: (1) 1.5" x 9.25" b:= 1.5 -in d:= 9.25 -in 2 b•d 3 b•d A:= b•d S .- I :- 6 12 A = 13.9•in2 S = 21.4•in3 I = 98.9•in4 Actual Shear Stress - f� 3 v CL - 2•dl 2 A L J fv = 47.5 psi OK Actual Bending Stress - fb := M fb = 848.22 -psi OK S Total Load Deflection - o Sw•L4 + Ra•bl•(a + 2•b,)3•a a + 2•b, :_ 384•E•I 27•E•1•L 0 = 0.283•in L = 508.9 OK 0 (1)1.5" x 9.25" DF#2 joists at 24" oc are Adequate. Tom Melbourn From: Lee French [LFrench@eeimt.com] Sent: Tuesday, June 07, 2011 4:43 PM To: Tom Melbourn Subject: Re: Kravenko Residence thanks tom I will look at the questions and get back to you on them. the home owners originally just wanted me to size the roof joists Sent from my Verizon Wireless Phone ----- Reply message ----- From: "Tom Melbourn" <tmelbourn@spokanevalley.org> To: "Lee French" <LFrench@eeimt.com> Subject: Kravenko Residence Date: Tue, Jun 7, 20114:22 pm Lee Thanks for the timely response. There are some other questions related to the structure. 1. Size and location of pier footings. A building less than 600 sf can meet frost depth at 12 inches. 2. The floorjoists appear to be cantilevered, but the joists are running parallel to beams which are not sized. 3. The distance between the earth and joists or beams is not provided. Are the joists and beams pressure treated? 4. The brace wall requirement could be met by continuous sheathing if the openings are a minimum of 24 inches from the corners. 5. The size of the roof, floor and wall sheathing is not given. 6. The roof felt size and covering is not provided. 7. The siding is not mentioned either. If you have any questions contact me directly. Tom (509)720-5315 From: Lee French [mailto:LFrench@eeimt.com] Sent: Tuesday, June 07, 20113:22 PM To: Tom Melbourn Subject: Kravenko Residence Hello Tom, I received your call regarding the Kravenko Residence at 3009 S. Davis. The wall sketch and floor layout was all I was given, so I checked the floor joists for a max allowable live load and then gave them options for the roof framing size and spacing. Attached you'll find a max (2)2x6 header opening calc. If they want to span farther then that I can definitely let them know what they need. As for the lateral calculations, I think it fits under the IRC. From the sketch they gave me it only has a standard door and window across the front which meets the requirements of R602.10. Let me know if you need anything else, Lee Lee French, P.E. Eclipse Engineering 421 W. Riverside Ave, Ste 717 Spokane, WA 99201 PH/509-921-7731*Cell/509-768-4574 www.eclipse-engineering.com l6;� FRONS w(4Lt. Z 2. C -4 - w(4LL e 2 ,ZI --� S 16, I I�LL- WOOD HiQt�17ifhJi's rRot4T w4Lt- -2- 2 �r— Er-Ez LF,J6�t4CP)= 3S ps 0 t2 �� IZ P5)F S-3op�r WALL 5 rE-'G'-l'" NEERING INC. 421 WEST RIVERSIDE AVE. SPOKANE. WA 99201 Q� SUITE 717 PH: (509) 921-7731 WWW.ECLIPSE-ENGINFERING.COM PROJFC7 # P-RWFCZ ❑ Sl.N BY i -GEA VILr -6 LGt%G= Cr'� 1•��'�� �� ��� Atee17-2. J T�' z x_ �-4l 2.�- p ab 57 P5F . . . . . . . . . . 07 t ,1. . . . . . . . . . . . . . . . .�5�,. . . b,:'L ® �aF5Fi . . . . . . . . -7-7 7-7 - . . . . . . . . . . . . i t`ECLIPSE �ENGINEERING INC. 421 WEST RIVERSIDE AVE. SPOKANL, WA 99201 ae"-),ao SUITE 717 PH! (509) 921-7731 WYMICLIPSE-ENGINEERING.COM fB-QSIEO--#- (9 .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . To NO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t17- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TRY: (3) 1.511 x 9.25" W:= b -d A = 41.6•in2 Actual Shear Stress - Actual Bending Stress - Total Load Deflection - b:= 4.5 -in b•d2 6 S = 64.2•in3 3 V L - 2•d 2 A L _M fb S 0 d := 9.25 -in b•d3 I :_ — 12 I = 296.8•in4 f,. = 74.9 -psi OK fb = 1101.2 -psi OK 5w.1,4 + P•a•bl•(a + 2•b,)• 3•a a + 2•b 384•E•I 27•E•I•L 0 = 0.23 -in L = 495.2 OK O (3)1.5" x 9.25" DF#2 joists are Adequate. Eclipse Engineering, Inc. 3009 S. Davis Residence 6/8/2011 Consulting Engineering Fir edge beam Lee French, PE SIMPLE SPAN BEAM DESIGN 4f,:= Ib•ft 1 psf�:= lb. ft- 2 psi := lb-in2 Design criteria: Allowable Stresses for - Fb := 900.1.15.1.15.1.1 -psi Fb = 1309.3 -psi E:= 1400000psi Grade DF #2 F,.:= 180.1.15•psi F,. = 207 -psi Total Roof Dead Load - w,:= (12 + 10)•psf w,= 22•psf Total Live Load - WP := (35 + 30)•psf wp = 65•psf Span - Lam:= 9.5 -ft Roof Tributary Width - w,:= 6•ft Roof Distributed Load - w,• := w,•w, + w,•wn wr = 522•plf Additional Dist. Load - W':= 0•plf Total Distributed Load - W:= wa + wr w = 522 ft 1.16 Total Point Load - P:= 0.0.lb P = 0 Dist From Point Load to End - a := 6 -ft Dist From Pt. Load to opp end - b, := L -a b, = 3.5 ft Maximum Design Moment - g M := + �`L2 P a b� M = 5888.8 ft. lb 8 L Maximum Design Shear - v:= b' w•L PP h + _ 2479.5 lb 2 L TRY: (3) 1.511 x 9.25" W:= b -d A = 41.6•in2 Actual Shear Stress - Actual Bending Stress - Total Load Deflection - b:= 4.5 -in b•d2 6 S = 64.2•in3 3 V L - 2•d 2 A L _M fb S 0 d := 9.25 -in b•d3 I :_ — 12 I = 296.8•in4 f,. = 74.9 -psi OK fb = 1101.2 -psi OK 5w.1,4 + P•a•bl•(a + 2•b,)• 3•a a + 2•b 384•E•I 27•E•I•L 0 = 0.23 -in L = 495.2 OK O (3)1.5" x 9.25" DF#2 joists are Adequate. Title: 214tie�'q tC, Job # ECLIPSE ejPro Proect Desc.: ENGINEERING INC. Project Notes: Description: Main Beam;T� Service loads entered. Load Factors will be applied for calculations. Loadforor Span Number 1 Material Properties Calculations per NDS 2005, IBC 2009, CBC 2010, ASCE 7-05 Analysis Method: Load Combination Allowable Stress Design 2006 IBC & ASCE 7-05 Fb - Tension 900.0 psi E: Modulus of Elasticity Point Load: D=1.250, L=20, S = 1.70 k (d� 0.0 ft Fb - Compr 900.0 psi Ebend- xx 1,600.Oksi Wood Species : Douglas Fir - Larch Fe - Prll Fc - Perp 1,350.0 psi 625.0 psi Eminbend - xx 580.0 ksi Wood Grade : No.2 Fv 180.0 psi Load for Span Number 3 Beam Bracing Beam is Fully Braced against lateral -torsion Ft buckling 575'0 psi Density 32.210pcf D(1.2�(�� 3-2x10 Span = 1.50 It 3-2x10 Span = 19.0 ft r3 -2x10 Span = 1.50 ft • w . Applied Loads Service loads entered. Load Factors will be applied for calculations. Loadforor Span Number 1 ---- ----- - Uniform Lead. D = 0.010, L = 0.050, Tributary Width = 1.0 ft Point Load: D=1.250, L=20, S = 1.70 k (d� 0.0 ft Load for Span Number 2 Uniform Load : D = 0.010, L = 0.050 , Tributary Width = 1.0 ft Load for Span Number 3 Uniform Load : D = 0.010, L = 0.050 , Tributary Width = 1.0 ft Point Load: D = 1.250, L = 2.0, S = 1.70 k (a, 1.50 ft DESIGN SUMMARY Maximum Bending Stress Ratio = -0;; 1 Maximum Shear Stress Ratio - Section used for this span 3-2x10 Section used for this span 0.713: 1 fb :Actual = FB: 1,138.99 psi fv : Actual - 3-2x10 147.61 psi Allowable = 1,138.50psi Fv : Allowable 207.00 psi Load Combination +D+0.750L+0.750S+H Location of maximum on span = Load Combination +D+0.750L+0.750S+H Span # where maximum occurs = 19 COOft Span # 2 Location of maximum on span = 1.500 ft Span #where maximum occurs = Span # 1 Maximum Deflection Max Downward L+Lr+S Deflection 0.228 in Ratio= Max Upward L+Lr+S Deflection -0.629 in Ratio= Max Downward Total Deflection 0.316 in Ratio = Max Upward Total Deflection -0.884 in Ratio = Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios - -- Summary of Moment Values - - - - ---- Summary of Shear Values Segment Length Span # M e9 9 V C d --- --- - C F1V C r C m - - - - C MactuaI fb-des n Fb-allow t +9 - - --- Vactual Iv -design Fv-allow +0 -- - _ Length =1.50 ft 1 0.356 0.253 1.000 Length =19.0 ft 2 0.356 0.253 1.100 1.000 1.000 1.000 -1.89 352.72 990.00 1.27 45.59 180.00 1.000 Length -1.50 ft 3 0.356 0.253 1.000 1.100 1.000 1.100 1.000 1.000 1.000 1.000 -1.89 352.72 990.00 1.26 45.59 180.00 +D+L+H 1.000 -1.89 352.72 990.00 1.26 45.59 180.00 Length =1.50 t 1 0.934 0.669 1.000 Length =19.0 ft 2 1.100 1.000 1.100 1.000 1.000 1.000 1.000 1.000 494 924.24 990.00 3.34 120.36 180.00 0.934 0.669 1.000 Length = 1.50 ft 3 0.934 0.669 1.100 1.000 1.000 1.000 -4.94 924.24 990.00 3.29 120.36 180.00 1.000 1.100 1.000 1.000 1.000 -4.94 924.24 990.00 3.29 120.36 180.00