2012, 12-20 Permit: SW-12002629 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002629
Permit Issued Date:
12/19/2012
Expiration Date: 12/20/2012
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GRANDVIEW ACRES
SEWER
Primary Contact
Applicant'
Address:
Phone:
Email:
SUN SAND & GRAVEL INC
SUN SAND & GRAVEL INC
100 SHARON DRIVE
GREAT FALLS, MT 59405
406-264-5173
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
11904 E FREDERICK AVE
45091.0340
MIRABEAU RANCH
ADDITION
MIRABEAU RANCH L4 B3
Water District: Irvin
Water District #6
Owner:
Address:
Phone:
Email:
SECRETARY OF HOUSING & URBAN
4400 WILL ROGERS PKWY STE 300
OKLAHOMA CITY, OK 73108
Fire District: Spokane Valley Fire
Land Area. 12600 Square Feet
CONTRACTOR INFORMATION:
General Contractor
SUNSAI`0000KE
SUN SAND & GRAVEL INC
100 SHARON DRIVE
GREAT FALLS, MT 59405
406-264-5173
PETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL'
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed 12/19/2012 14:52 49
Printed by: 113 APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002629 12/19/2012
Expiration Date: 12/20/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/19/2012 14:52.49 Printed by: 115 APPPOOL\SmartGovProdApp