Loading...
2011, 04-20 Permit App: 11000980 DeckProject Number: 11000980 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/20/2011 Page 1 of 2 Project Information: Permit Use: REPLACE AND ADD ON TO EXISTING DECK Contact: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 922-7374 Group Name: Site In[ortnation: Project Name: Plat Key: 001641 Name: MIRABEAU RANCH ADD District: Nort Parcel Number: 45091.0108 Block: SiteAddress: 11919 E FREDERICK AVE Location:: CSV Zoning: R-3 SF Res District Lot: Owner: Name: BECHTOLD, SANDRA J & RICHA Address: 11919 E FREDERICK AVE SPOKANE VALLEY, WA 99212 Water District: 026 IRVIN Hold: ❑ Area: 10,500 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By: Originally Released: 4/19/2011 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 4/20/2011 By: tschmidt Permits: Operator: jmm Printed By: jmm Print Date: 4/20/2011 Project Number: 11000980 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/20/2011 Page 2 of 2 Contractor: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE SPOKANE VALLEY, WA 99212 Description Grp Type Notes DECK OPEN R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Firm: HANDYMAN CONNECTION Phone: (509) 922-7374 This Application: Total Project: Sq Ft Valuation Sci Ft Valuation 400 $6,000.00 400 $6,000.00 Totals: 400 $6,000.00 400 $6,000.00 Units Unit Desc SELECT SELECT SELECT Permit Total Fees: Fee Amount $125.25 $4.50 $50.10 $179.85 Notes: Payment Summary• Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $179.85 $179.85 $50.10 $129.75 $179.85 $179.85 $50.10 $129.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/20/2011 Spol�m� lley. Community Development DeparmentElV� Permit Center I revPFRMIT 0 11703 East Sprague Avenue, Suite B-3 Valley,Spokane Tel (509) 688-00361 APR 2 Fax: (509) 688-00371 project #_L(XO_ perm itcenter@sooka nevailey.orq (4._!Name i Submittal # RESIDENTIAL CONSTRUCTION PERMIT APPLICATION (St ff Use Only) LATER PERMIT NU BER: ?PERMIT FEE ❑3 NEW CONSTRUCTION 0 ADDITION/REMODEL❑ ACCESSORY BUILDING X DECK 0 OTHER SITE ADDRESS: //GJ/9 a', 1:152et(gCGK— ASSESSORS PARCEL NO.: etircoen , QI of LEGAL DESCRIPTION: Seer.' TAB, )s 4.q6 BUILDING OWNER NAME: ecHn0L-1 NAME: SA N'2 EtHioc-t ADDRESS: jig/ al FK -L UtLP— CITU: PHONE: � "cp. STATE: FAX: CELL: ZIP: CONTACT NAME: mC PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: C Hl AOlut mil -41 Go got) I t-3 P2tkau CITU: �\M(, LCW1 STATE: 14 -4(4 --ZIP:. ggal PHONE: q A 2- - / 3 �r//7 r FAX: CELL: Cg �q'-3062 a - }/ANS &.& tO// 1 )).�- /'t57i 3 CONTRACTOR LICENSE No.: (/ :!%PIRES: f ,7 CITY BUSINESS LICENSE NO.: DCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE US & PROPOSED USE: gEALA-C -A b ©-N TO k IS n .0 & aK- ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions; /b k) y is X 1// No. of Stories: /✓�� Total Habitable / Space: 4//4 Main Floor SQ FT:. /A iv //`- / Upper Floor FT: Unfinished Basement SQ FT: 4- Finished Basement SQ FT: ?/ //I - Garage SQ FT: /�— ered Patio SQ QOcp0p3Area: Impervious Swire drt/ / 30% Slopes on Property: /No. of Bedrooms: ,q///it onstruction Typ: Heat Source: d%//r Sewer or Septic: $awtr�L TOTAL COST OF PROJECT: $ SECO o> - DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted an subsequently approved before this application can be processed. }7ANAv/YIRRJ NA/eivclbate: <%/%4/i Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc Spokane do•OValley® • For City Use Only.a. y�) PLUS Project Number /f�!�V Project Address l /Q/ 7 - Yeail /0 11703 E Sprague Ave Suite B-3 4 Spokane Valley WA 99206 • 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org. • As part of our on-going .commitment'to customer service during' the 'review • process of yotit'=project' application, we are providing you with a TARGET DATE for the initial technical application review..If for' any reason we cannot meet this date, we will contact you with a revised target date. :. _' ' ` , Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application, will have' had its initial -.technical review. It is not the date for approval or permit issuance. • Tips for Smoother Project Application'Review' > Submit complete, accurate plans and documents.: Extra time may fi be required r re -submittals as project application'revieWei-s ivork,on'multiple,app1ications and it, may be several days before thev,can'ook at your new or revised information. > ', i Designate a specific contact person to communicate with the City. • • - i While the person designated as the applicant's contact person with the City:can:be'changeel"one individual with the . expertise for dealing with reviewer comments would be the best choice for the eh tire review process.- . . . ' - ➢ CaII staff regarding the status of your project only after the target date shown at the top of the page. " Although you should be contacted on or by the target date, please feel free to contact of f you haven't heard from us by your target date. Staff may contact you before the target date if the initial revietip is 'coinplete.'By following this • procedure, you will save time and allow the reviewers to complete the,work more expeditiously. Steps in the Permit Process. 1. Counter Complete. Your application has been accepted, as .counter complete. This .means all: of- the required documents, as indicated on your Pre -Application Checklist have been submitted or have . been approved; for. •deferred_ submittal. This does not prevent technical staff from requesting additional information as a 'result of.their technical review. . 2. Quality Check. The next step in the process is a quality check to make sure that the application is.reviewable and'free from substantive flaws that would prevent technical staff from completing the technical review once it is stalled. When this step is complete, your application will be routed to the appropriate 'staff and remain' in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You'should be contacted:by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.., 4. Permit Issuance. When,the.technical compliance review of -the application is complete; including ariy:subsequeht're- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all seetions of the application are received, a Permit Specialist will process the application and contact the.person specified 'on•your' application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 -9t s' 4 a s' �x >5 T I NI G, fouO 1 19 I R E, i-E� ERI cac PLANNING DEPT. APPROVED RErCEIVED CSV PE RMIT CENTER BYE^15;z AM I �l Proiect # I I t� _ 14 DATE: ������ -- - -- }_�-� ew I c -K ICU E,