2012, 04-19 Permit: SW-12001149 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001149
Permit Issued Date:
04/19/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GRANDVIEW ACRES
SEWER
Primary Contact
Applicant:
Address:
Phone:
Email:
NORM'S EXCAVATING INC
NORM'S EXCAVATING INC
PO BOX 574
VERADALE, WA 99037
509-928-0580
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
11923 E FREDERICK AVE
45091.0107
MIRABEAU RANCH
ADDITION
MIRABEAU RANCH L6 B1
Water District: Irvin
Water District #6
Owner:
Address:
Phone:
Email:
NOACK, AARON
11923 E FREDERICK AVE
SPOKANE, WA 99206-2616
Fire District: Fire District 1
Land Area: 0.241 acres / 10500 sgft
CONTRACTOR INFORMATION:
General Contractor
NORMSEI972BM
NORM'S EXCAVATING INC
PO BOX 574
VERADALE, WA 99037
509-928-0580
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 04/19/2012 11:19:34
Printed by: IIS APPPOOL\ASP NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001149 04/19/2012
Expiration Date
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/19/2012 11:1934
Printed by: IIS APPPOOLWSP.NET v4.0