2010, 10-28 Permit App: 10003513 AdditionProject Number: 10003513 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/28/2010
Page 1 of 2
Project Information:
Permit Use: RESIDENTIAL ADDITION OF 745 SF Contact: BG CONSTRUCTION
Address: PO BOX 1894
C - S - Z: KETCHUM, ID 83340
Setbacks: Front Left: Right: Rear: Phone: (208) 720-1116
Group Name:
Site Information: Project Name:
B
Plat Key: 005799 Name: SP -0777-92 District: East
Parcel Number: 45134.2604
Block: Lot: D
SiteAddress: 206 N GALLWAY LN
Location:: CSV
Zoning: R-3
SF Res District
Owner: Name: GOLTIANI, GLORIA J
Address: 16411 E MAIN
SPOKANE VALLEY, WA 99037
Water District: 010 VERA Hold: ❑
Area: 14,451 Sq Ft
Nbr of Bldgs: 1
Width: 97 Depth: 148 Right Of Way (ft): 30
Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By: -
Other Reviews
• Originally Released: 10/28/2010 By: tmelbourn
Released By:. - -'
NEED PROOF OF CITY BUSINESS LICENSE - BROUGHT IN 10/26/10
Originally Released: 10/26/2010 By: jdavis
Landuse/Zoning/HE Conditions
Released By:" - —
Originally Released: 10/27/2010 By: TSCHMIDT
Permits:
Operator: jmm Printed By: jmm
Print Date: 10/28/2010
Project Number: 10003513 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/28/2010 Page 2 of 2
Building Permit
Contractor: BG CONSTRUCTION Firm: BG CONSTRUCTION
Address: PO BOX 1894 Phone: (208) 720-1116
KETCHUM ID 83340
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
RES ADD R-3 VB PLAN 732 $72,431.40 732 $72,431.40
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 732 $72,431.40 732 $72,431.40
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$804.75
$4.50
$321.90
Permit Total Fees: $1,131.15
Notes:
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,131.15 $1,131.15 $324.70 $806.45
$1,131.15 $1,131.15 $324.70 $806.45
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 10/28/2010
**me 11703 E Sprague Av Suite-
.ne ar
Vaflley° (509)68 -FQ JFt1; r �Oi
wwts8 aete tlhcl-egEN
Permit Center
Community Development i
Residential Construction -
Permit Applicat o #- � ddition/Remodel U Deck
�Name — ther:
067 /0 a/IL/AJA/ .PD/ -MDQ 04u£/, u>A-
PERMIT NUMBER:
PERMIT FEE:
onstruction n Accessory Bldg
SITE ADDRESS:
ASSESSORS PARCEL NO:
LEGAL DESCRIPTION:
Building'Owner: _
Contractor: ' lJ_/r •
r3
Name: (r4 Login— %fl-/li r
Name: `0,0
Cmc �f )?c?S
5/4t,k_
Address�� ,� ) /�4L�o y / v j
L+vZiptY10.5
Address:�O_x /8(�.�
City�lt..kAtuic./f,94 tcv Stater 7
7`1 T
/7
State: -Q Zro;K'�i
City: /l/''76p10Uw J��'1`
Phone: (5, 24 Fax:
PhoneYl+�e 740 /1/ yo Fax: —
/
DECK/COV. PATIO SQ. FTG:_
�
ContraclorR PNOu?°sKg07P.~PDate: /////�v
rY
Contact Person
CONSTRUCTION TYPE:
COI-OTI0/3 L—
City Business Lic. No:
60305-7333
SEWER OR SEPTIC?
Name: itg a[J4p/NS
Phone: 8 700 (/((p
Describe the scope of work in detail:
Cost of Project: DDD
l of 7(-/67<e Ffin
Proposed Use: BCD R o 109
**************The followinzr MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
APRs C / r{
DIMENS9NS:
3&rY '90=
# OF STORIES:
TOTAL HABITABLE SPACE:
7s�S
MAIN FLOOR TO SQ.
FTG: 7
73Lga�rr�/u
N
2 F OR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
n 4. -
/
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENTGARAGE
SQ. FTG: �—
SQ. FT
DECK/COV. PATIO SQ. FTG:_
�
30% SLOPES ON
PROPERTY: /fid
# OF BEDROOMS:
/
CONSTRUCTION TYPE:
COI-OTI0/3 L—
HEAT SOURCE:
F:( ,Ees-r-
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can pfo ;.s
/G
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/0]
0 Check
❑ Mastercard
Expires:
DATE: /O “46/70
❑ VISA
VIN#:
Spokane
Valley®
For.City Use Only
PLUS'Project Number e o �S
Project Address -2010 /1?'`76-
11703 E Sprague Ave Suite 13-3 is SpokaneValtey SA/A(99206
. 509.688.0036 ♦.Fax: 509.(?88.0037 ♦ permitcenter@spokanevattey,org
As part. of our on-going commitment to customer service during the, `review pr'o'cess .of•:yotir project;
application, we are, providing you with a TARGET DATE for the initial technical applicationireview' for
any reason we cannot meet this date, we will contact you with a revised target date': _
•
Your application review TARGET. DATE is'•
The TARGET DATE is the date we estimate your project' application:will have had its initial •technical
review. It. is not the date for approval or permit issuance.'
This fora Smoother Project Application Review
i Submit complete, accurate plans:aiiddocuments.. .
Extra time ntay be reyuirecl for re -submittals as' project application revicners; wark ini'niir/iiple.appllcalioiis and it
may be several dans be/bre they can look at Your nein or 'revised infortiutiianT.•
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can' be changed, one individual with the
expertise for dealing with reviewer co'?ments would be the best choice for tie'entire rei,iew process: . • - •
•
• Call staff regarding the status of your project only after the target date.showmat the top of the page.
Although you should he 'contacted on or hy.the target date. please feel free to fontaet us -if you haven't heardfroom us_
by rncrr Puget date. Stmt may. contact you before the target alate, if the initial review is -complete. Bi fol/owingthis
procechte e, you ,Will save time and allciw the renewers io complete the work mot-eerpeditiously.'•
Steps in the Permit Process.
1, Counter Complete, Your application has. been, accepted I as.'counte'r- complete: tThis means all-:of,'the.required.
documents, as indicated on your Pre -Application Checklist have been submitted- or have. been ; approved for': deterred
submittal. This does not prevent technical staff from requesting additional information asa result of their technical, review.
2, Quality Check. The next step in the process, inti quality check to make sure that the application isreviesgable and free ,
from substantive Claws that would prevent technical sta11liom'completing the technical review once itis started ;When
this step is complete, your application will be routed to 'the tippropriate staff` and remain in'•their'review-queue until it
comes up for review:
3. Technical Compliance. Once an application is administratively complete, it is routed to technical' staff for compliance •
review. Depending on' the type of project, technical stat' may include multiple reviewers..You'should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance'reviesv is complete.
4. Permit Issuance. When the technical compliance review of the'application is complete; including any. subsequent re-:
subinittals. each reviewer will approve their section of the application. and route it fo:the Permit Center: When all sections
•
of the application are received,'a Permit Specialist will 'process the applicatidn and`contact the person specified on your
application for permit pick-up. Information 'regarding fees and pre -construction inceting's'(if required) will bc•provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE, '
REV 9/07
•
o
/3V yz
1/6.81--T
X11.39
PLANNING DEPT APPROVED
BY.
__�
DATE: , /Gy2"7//7),
X7,73
?2of0560
DD ox_D
oT D
/a ICoq li inp & AiE
APER
11-6115/ s'r
I 61-1
sous
2X0 c7q Lw4/1,-
F. I(D4i/ ,n,4;ti /40E
-L-31, oo
3r—
U
RECEIVED
CSV PERMIT CENTER
OCT 2 6 2010
Project
0
q7,3V/
Submittal #--�- -