2010, 02-11 Permit App: 10000307 Pole BldgProject Number: 10000307 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/11/2010 Page 1 of 2
Project Information:
Permit Use: POLE BLDG 24 X 24 Contact: STEEL STRUCTURES OF AMERICA
Address: PO BOX 895
C - S - Z: POST FALLS ID 83877
Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 45134.2603 Block:
SiteAddress: 207 N GALLWAY LN
Location:: CSV
Zoning: R-3 SF Res District
Water District: 010 VERA
Area: 14,449 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Lot:
Owner: Name: FINSTER, GEORGE L & MARY C
Address: 207 N GALLOWAY LN
SPOKANE VALLEY, WA 99016
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
Permits •
2/5/2010 By: tmelbourn
Released By:
Originally Released: 2/11/2010 By: cjjanssen
Operator: jmm Printed By: jmm
Print Date: 2/11/2010
Project Number: 10000307 Inv: 1
Application
Date: 2/11/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor. STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I
Address: PO BOX 895
POST FALLS, ID 83854
Phone: (800) 833-9997
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB PLAN 576 $10,944.00 576 $10,944.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Payment Summary:
Totals: 576 $10,944.00 576 $10,944.00
Units Unit Desc
1 SELECT
I SELECT
1 SELECT
Fee Amount
$195.25
$48.81
$4.50
Permit Total Fees: $248.56
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $248.56 $248.56 $48.81 $199.75
$248.56 $248.56
$48.81 $199.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 2/11/2010
Spol�an�a�
iioValleyr
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@sookanevalley.orq
RESIDENTIAL CONSTRUCTION -PERMIT -APPLICATION
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
0a)-7
RECEIVED
CSV PERMIT CENTEri
,lProject7 FES
L�—I_
gl NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING
0 DECK 1 0 OTHER
SITE ADDRESS:7 /v , ( 1/ (
ASSESSORS PARCEL NO.: -f5/ `' , 3i Q3 EGAL DESCRIPTION:
BUILDING OWNER NAME:
e
-I ,nS�er
NAME: C
ADDRESS: L J-.,
111U VOA
CITY:
s 1 e
PHONE: /Q ' 5335
CONTACT NAME:' t .' 1 74 -0% -kV-, - S-ee, .,S4-1/1) 01e -e -c%
FAX (eV)' -f 6 7'-6 `f ! eL:
STATE: cit.
FAX: CELL:
ZIP: aar037
PHONE:
CONTRACTOR NAME: S •�\ Nre [moire COU "re -Lc .
MAILING ADDRESS:
Pt. 89S
CITY: Pcs-k-- "c&1 Sj�
PHONE:(�7 "7� ! -1/9-9C)
CONTRACTOR LICENSE NO.:
S,�y
STATE.') Q,[ / fes, ZIP:
�,
FAX: � -46 7Y�LL:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN TAI D INDICAATTE USE:S
9L-Ixa-c-1kip pnlsz b . r -req
gm„��yQ, 1/43----oray_
PR SED USE:
U >
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
/O— 307
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
/4-/r—CO"
Dimensions:
a-CiYa-C-rc/r�
No. of Stories:
/
Total Habitable
Space: tkiff4-
Main Floor SQ
FT:
Upper Floor SQ
FT:
Unfinished Basement
SQ FT:
Finished Basement
SQ FT:
Garage SQ FT:
5'7(D 0 K\
Deck/Covered Patio
SQ FT: AU /44'
Impervious Surface
Area: N I
30% Slopes on, i
-
Property: lel /A
No. of ,,(
Bedrooms: $
Constructio
Type: vS
Heat Source: `�1
/�/�
Sewer or
Septic: Secoesr
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to'T�.ubmitted and subsequently approved before this application can be processed.
`fir
Signature
Method of payment: ❑ Cash 0 Check
Bankcard #:
Date:
0 Visa 0 Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
Spokane
4.0°_Valley°
For City Use Only
PLUS Project Number /0-0 30_1
Project Address .)O ./% (IAA"
1
11703 E Sprague Ave Suite B-3 • Spokane Vattey WA 99206 ` • •
509.688.0036 • Fax: 509.688:0037 • permitcenter®pokanevatley.org,'
As part of our on-going commitment to • customer service during the 'review. process of your project
application, we are providing you with a TARGET DATE for the initial technical application'review: If for
any reason -we cannot meet this date, We will contact you with a �•evised target date.
Your application review .TARGET DATE is
The TARGET DATE is .the date we estimate your project application will have had its initial technical
revicw..It is not the date for approval or permit issuance. '
' Tips for a Smoother Project Application Review
i Submit complete, accurate -plans and documents.
Erma time may be t•egun•ed,for re -submittals as project application reniewers.work on multiple 'appHaitians and it
Mery he several days be fore then can look at your new or revised information.
i Designate a specific contact person to communicate with the City.
While the person designated as the applicant's -confab' person with the Citv can. he changed, one individual with the:
expertise for dealing with reviewer comments wouhl be thebest choice jgr the entire reviewprocess.
•
i Call staff regarding the status of your project only after the target date shown -at the,top of the page.
Alt/tough you should be contacted on or by the target date, please lee/ free id contact us `f roti haven't heardfrom
om us
by your target dale. Staff may contact you before the target date if the initial t•eriewiis cotitplete: Bv, following this
procedure, you will save time and allow the reviewers to complete the Work more et'peditiously:
Steps in the Permit Process
•
1. Counter Complete. Your application has been accepted as counter. complete. 'This: means all .ofi the required
documents, as indicated on your Pre -Application Checklist have been submitted ,or have been approved, for deferred
submittal. This.does not prevent technical staff from requesting additional information as a result of their technical review.
•
2, Quality Check. The next step in the process is a quality check to make. sure that the application is reviewable and free,
from substantive flaws that would prevent technical [stall from completing. the' technical, review once it is started. When
this step is complete: your application will be routed. to the 'appropriate staff and remain in their revieswqueue until it
comes up for review.
•
3. Technical Compliance. Once an application is administratively complete, it is routed to technical' staff for compliance
review. Depending on the type of project, technical staff may, include multiple reviewers: .You should be contacted by
phone, fax, email, or mail by your TARGET, DATE once the initial technical compliance review is complete,
4. Permit issuance. When the technical coiitpliance review of the application is cotitplete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Penn. it Center: When all sections
of the application are received, a Permit Specialist will process the application and:contact the -person specified on your
application for permit pick-up. Information regarding fees and pre-construction,meetings (if required) will be provided by
the Permit Specialist at that time. ,
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
STEEL STRUCTURE) AMERICA, INC.
1-800-833-9997
Name CO cot2- 4 Mucci F:-/._3
ii tis
Mailing Address 1
City Vi3/4cttAL
Job Address
44,
State \A/& Zip 7-7a37
City
County
State
C�-��� Zip
r /
Telephone Home Work
&S3 Building Size _!_ x Z y x I U
Appnme
Date '
—��— -
Sidewall Gable
10' 20' 30' 40'
10'
20'
30'
40'
50'
60'
70'
60'
70' 80' 90'
5
PLANNING DEPT. APPROVED
Bl1�l IA (2)(14/1 c t
DATE: V/It II°
s 1
c I
80' 1%--
90'
`
90'
Customer Signature
Sales Signature
Scale: 3/4 = 10'