Loading...
2010, 02-11 Permit App: 10000307 Pole BldgProject Number: 10000307 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/11/2010 Page 1 of 2 Project Information: Permit Use: POLE BLDG 24 X 24 Contact: STEEL STRUCTURES OF AMERICA Address: PO BOX 895 C - S - Z: POST FALLS ID 83877 Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 45134.2603 Block: SiteAddress: 207 N GALLWAY LN Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Area: 14,449 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: FINSTER, GEORGE L & MARY C Address: 207 N GALLOWAY LN SPOKANE VALLEY, WA 99016 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions Permits • 2/5/2010 By: tmelbourn Released By: Originally Released: 2/11/2010 By: cjjanssen Operator: jmm Printed By: jmm Print Date: 2/11/2010 Project Number: 10000307 Inv: 1 Application Date: 2/11/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor. STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I Address: PO BOX 895 POST FALLS, ID 83854 Phone: (800) 833-9997 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB PLAN 576 $10,944.00 576 $10,944.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Payment Summary: Totals: 576 $10,944.00 576 $10,944.00 Units Unit Desc 1 SELECT I SELECT 1 SELECT Fee Amount $195.25 $48.81 $4.50 Permit Total Fees: $248.56 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $248.56 $248.56 $48.81 $199.75 $248.56 $248.56 $48.81 $199.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/11/2010 Spol�an�a� iioValleyr CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@sookanevalley.orq RESIDENTIAL CONSTRUCTION -PERMIT -APPLICATION PERMIT NUMBER: PERMIT FEE: (Staff Use Only) 0a)-7 RECEIVED CSV PERMIT CENTEri ,lProject7 FES L�—I_ gl NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK 1 0 OTHER SITE ADDRESS:7 /v , ( 1/ ( ASSESSORS PARCEL NO.: -f5/ `' , 3i Q3 EGAL DESCRIPTION: BUILDING OWNER NAME: e -I ,nS�er NAME: C ADDRESS: L J-., 111U VOA CITY: s 1 e PHONE: /Q ' 5335 CONTACT NAME:' t .' 1 74 -0% -kV-, - S-ee, .,S4-1/1) 01e -e -c% FAX (eV)' -f 6 7'-6 `f ! eL: STATE: cit. FAX: CELL: ZIP: aar037 PHONE: CONTRACTOR NAME: S •�\ Nre [moire COU "re -Lc . MAILING ADDRESS: Pt. 89S CITY: Pcs-k-- "c&1 Sj� PHONE:(�7 "7� ! -1/9-9C) CONTRACTOR LICENSE NO.: S,�y STATE.') Q,[ / fes, ZIP: �, FAX: � -46 7Y�LL: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN TAI D INDICAATTE USE:S 9L-Ixa-c-1kip pnlsz b . r -req gm„��yQ, 1/43----oray_ PR SED USE: U > Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc /O— 307 ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /4-/r—CO" Dimensions: a-CiYa-C-rc/r� No. of Stories: / Total Habitable Space: tkiff4- Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: 5'7(D 0 K\ Deck/Covered Patio SQ FT: AU /44' Impervious Surface Area: N I 30% Slopes on, i - Property: lel /A No. of ,,( Bedrooms: $ Constructio Type: vS Heat Source: `�1 /�/� Sewer or Septic: Secoesr TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to'T�.ubmitted and subsequently approved before this application can be processed. `fir Signature Method of payment: ❑ Cash 0 Check Bankcard #: Date: 0 Visa 0 Mastercard EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc Spokane 4.0°_Valley° For City Use Only PLUS Project Number /0-0 30_1 Project Address .)O ./% (IAA" 1 11703 E Sprague Ave Suite B-3 • Spokane Vattey WA 99206 ` • • 509.688.0036 • Fax: 509.688:0037 • permitcenter®pokanevatley.org,' As part of our on-going commitment to • customer service during the 'review. process of your project application, we are providing you with a TARGET DATE for the initial technical application'review: If for any reason -we cannot meet this date, We will contact you with a �•evised target date. Your application review .TARGET DATE is The TARGET DATE is .the date we estimate your project application will have had its initial technical revicw..It is not the date for approval or permit issuance. ' ' Tips for a Smoother Project Application Review i Submit complete, accurate -plans and documents. Erma time may be t•egun•ed,for re -submittals as project application reniewers.work on multiple 'appHaitians and it Mery he several days be fore then can look at your new or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's -confab' person with the Citv can. he changed, one individual with the: expertise for dealing with reviewer comments wouhl be thebest choice jgr the entire reviewprocess. • i Call staff regarding the status of your project only after the target date shown -at the,top of the page. Alt/tough you should be contacted on or by the target date, please lee/ free id contact us `f roti haven't heardfrom om us by your target dale. Staff may contact you before the target date if the initial t•eriewiis cotitplete: Bv, following this procedure, you will save time and allow the reviewers to complete the Work more et'peditiously: Steps in the Permit Process • 1. Counter Complete. Your application has been accepted as counter. complete. 'This: means all .ofi the required documents, as indicated on your Pre -Application Checklist have been submitted ,or have been approved, for deferred submittal. This.does not prevent technical staff from requesting additional information as a result of their technical review. • 2, Quality Check. The next step in the process is a quality check to make. sure that the application is reviewable and free, from substantive flaws that would prevent technical [stall from completing. the' technical, review once it is started. When this step is complete: your application will be routed. to the 'appropriate staff and remain in their revieswqueue until it comes up for review. • 3. Technical Compliance. Once an application is administratively complete, it is routed to technical' staff for compliance review. Depending on the type of project, technical staff may, include multiple reviewers: .You should be contacted by phone, fax, email, or mail by your TARGET, DATE once the initial technical compliance review is complete, 4. Permit issuance. When the technical coiitpliance review of the application is cotitplete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Penn. it Center: When all sections of the application are received, a Permit Specialist will process the application and:contact the -person specified on your application for permit pick-up. Information regarding fees and pre-construction,meetings (if required) will be provided by the Permit Specialist at that time. , WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 STEEL STRUCTURE) AMERICA, INC. 1-800-833-9997 Name CO cot2- 4 Mucci F:-/._3 ii tis Mailing Address 1 City Vi3/4cttAL Job Address 44, State \A/& Zip 7-7a37 City County State C�-��� Zip r / Telephone Home Work &S3 Building Size _!_ x Z y x I U Appnme Date ' —��— - Sidewall Gable 10' 20' 30' 40' 10' 20' 30' 40' 50' 60' 70' 60' 70' 80' 90' 5 PLANNING DEPT. APPROVED Bl1�l IA (2)(14/1 c t DATE: V/It II° s 1 c I 80' 1%-- 90' ` 90' Customer Signature Sales Signature Scale: 3/4 = 10'