Loading...
1999, 12-09 Permit App: 99011757 ResidenceProject Number: 99011757 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/09/19 Page 1 of 3 Proiect Information: Permit Use: NEW RESIDENCE/ATTACHED GARAGE - FA GAS Contact: HOMESTEAD CONSTRUCTI Address: 312 S FARR RD Setbacks: Front 26 Left: 41 Right: 30 Rear: 21 C - S - Z SPOKANE, WA 99206 Phone: (509) 892-0454 Site Information: Plat Key: 005751 Name: PARC CENTRE 1,.19`, District: Parcel Number: 45213.9284 SiteAddress: 10920 E 11TH LN SPOKANE, WA USA 99206 Location:: SPO Zoning: UR -3.5 Water District: Urban Residential 3.5 Owner: Name: HOMESTEAD CONSTRUCTIO Address: 312 S FARR RD SPOKANE, WA 99206 Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Department BUILDING BUILDING Comments: Comments: Review Site Plan Review Plan Review ENGINEER Approach / Drainage Comments: UTILITIES Comments: Permits: Sewer Review t\.1OA-A.5+ O -F Project Number: 99011757 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/09/19 Page 2 of 3 Contractor: HOMESTEAD BUILDERS Address: 3510 GREENWICH RD COEUR D ALENE ID 83815 Building Characteristics Const Category: Nbr Of Dwellings: Bldg W x D: 29 Req Parking: Description BASEMENT U DECK GARAGE RESIDENCE Building Permit Firm: HOMESTEAD BUILDERS Phone: (208) 640-3022 New Occupant Load: x 40 Building Sq Ft: Handicap Parking: Grp Type Notes R-3 VN R-3 VN U-1 VN R-3 VN Item Description RESIDENTIAL VALUATION STATE SURCHARGE RESIDENTIAL SURCHARGE Contractor: M & L MECHANICAL Address: PO BOX 10126 SPOKANE, WA 99205 Item Description DUCT SYSTEMS GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS CLOTHES DRYER HOOD -TYPE II Building Height: 21 Stories: 2 2048 Sprinklers: El Critical Materials: E This Application: Total Project: Sq Ft Valuation Su Ft Valuation 1,000 $11,560.00 1,000 $11,560.00 80 $588.80 80 $588.80 484 $5,808.00 484 $5,808.00 1,048 $64,976.00 1,048 $64,976.00 Totals: 2,612 $82,932.80 2,612 $82,932.80 Units Unit Desc 1 Y OR BLANK 1 Y OR BLANK 1 Y OR BLANK Permit Total Fees: Mechanical Permit Fee Amount $786.25 $4.50 $172.98 $963.73 Firm: M & L MECHANICAL Phone: (509) 326-2677 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 3 NUMBER OF 1 NUMBER OF 1 NUMBER OF Fee Amount $10.00 $10.00 $12.00 $2.00 $30.00 $10.00 $10.00 Permit Total Fees: $84.00 Project Number: 99011757 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/09/19 Page 3 of 3 Plumbing Permit Contractor: GOLD SEAL MECHANICAL INC Firm: GOLD SEAL MECHANICAL INC Address: 5524 E BOONE AVE Phone: (509) 535-5944 SPOKANE, WA 99212 Item Description TOILETS/BIDETS SINKS SHOWERS TUBS DISH WASHERS CLOTHES WASHER FLOOR DRAINS WATER USING DEVICES Payment Summary: Operator: DMD Permit Type Building Permit Mechanical Permit Plumbing Permit Units Unit Desc 3 NUMBER OF 4 NUMBER OF 1 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Printed By: DMD Fee Amount $963.73 $84.00 $96.00 Fee Amount $18.00 $24.00 $6.00 $12.00 $6.00 $6.00 $6.00 $18.00 Permit Total Fees: $96.00 Print Date: 12/09/1999 Invoice Amount $963.73 $84.00 $96.00 $1,143.73 $1,143.73 Notesw, OK TO ISSUE SEWER PERMITS PER BILLY 6/30/98 Amount Paid $0.00 $0.00 $0.00 Amount Owing $963.73 $84.00 $96.00 $0.00 $1,143.73 UTILITIES DIVISION • N. Bruce Rawls, P.E., Utilities Director A DIVISION OF THE PUBLIC WORKS DEPARTMENT GENERAL FACILITIES CHARGE (GFC) PAYMENT OPTION SELECTION RECORD Date: ���L �. \�� , Parcel No(s): Site Address(es): Builder Name: OR Owner Name: Payment Option Selected (Check One): 1. ( )FC payment received at issuance of Sewer Connection Permit by f Division c>: Utilities CI. To be. p0.% k oskn5 . 2. ( ) GFC payment in 24 equal monthly payments upon establishment of Sewer Billing Account. Complete one of the following statements. a. Owner's Statement: I, , understand that I will be billed for the applicable GFC amount in 24 monthly installments. The monthly GFC installments will be added to my monthly sewer service charges. Owner's Signature Date b. Builder's Statement: I, understand that because I am selecting this option for payment of the GFC, that the purchaser cf the home will be responsible for payment cf the applicable GFC in 24 equal monthly installments. I agree to formally disclose to potential buyers of the property that the GFC charges will be added to the monthly sewer service billings as soon as billing comments. Builder's Authorized Representative's Signature Spokane County, Division of Utilities 1026 W. Broadway • Spokane, WA 99260-01:i0 • (509) 477-3604 FAX: (509) 4774715 TDD: (509) 324-3166 Date GFC Payment Option Form Revised 1/26/99 1 This site plan is being submitted for the purpose of obtaining a building permit and is a true and correct representation of the proposal. All known property line/dimensions, curb lines, structures and easement: O\ Jba' been identified. Also indicated are wetlands, bodies of water, stee • slopes or other critical areas. L.. Signed: r ADDRESS: ZONE: ROAD WIDTH:_412...... FRONT: - , ANKING: COMMENTS: fir♦ RE /1F. BYO' EN 1....t � O Cs. 4? C