1999, 12-09 Permit App: 99011757 ResidenceProject Number: 99011757 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/09/19 Page 1 of 3
Proiect Information:
Permit Use: NEW RESIDENCE/ATTACHED GARAGE - FA GAS Contact: HOMESTEAD CONSTRUCTI
Address: 312 S FARR RD
Setbacks: Front 26 Left: 41 Right: 30 Rear: 21 C - S - Z SPOKANE, WA 99206
Phone: (509) 892-0454
Site Information:
Plat Key: 005751 Name: PARC CENTRE 1,.19`,
District:
Parcel Number: 45213.9284
SiteAddress: 10920 E 11TH LN
SPOKANE, WA USA 99206
Location:: SPO
Zoning: UR -3.5
Water District:
Urban Residential 3.5
Owner: Name: HOMESTEAD CONSTRUCTIO
Address: 312 S FARR RD
SPOKANE, WA 99206
Hold: ❑
Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Department
BUILDING
BUILDING
Comments:
Comments:
Review
Site Plan Review
Plan Review
ENGINEER Approach / Drainage
Comments:
UTILITIES
Comments:
Permits:
Sewer Review t\.1OA-A.5+ O -F
Project Number: 99011757
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/09/19 Page 2 of 3
Contractor: HOMESTEAD BUILDERS
Address: 3510 GREENWICH RD
COEUR D ALENE ID 83815
Building Characteristics
Const Category:
Nbr Of Dwellings:
Bldg W x D: 29
Req Parking:
Description
BASEMENT U
DECK
GARAGE
RESIDENCE
Building Permit
Firm: HOMESTEAD BUILDERS
Phone: (208) 640-3022
New
Occupant Load:
x 40 Building Sq Ft:
Handicap Parking:
Grp Type Notes
R-3 VN
R-3 VN
U-1 VN
R-3 VN
Item Description
RESIDENTIAL VALUATION
STATE SURCHARGE
RESIDENTIAL SURCHARGE
Contractor: M & L MECHANICAL
Address: PO BOX 10126
SPOKANE, WA 99205
Item Description
DUCT SYSTEMS
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS
CLOTHES DRYER
HOOD -TYPE II
Building Height: 21 Stories: 2
2048 Sprinklers: El
Critical Materials: E
This Application: Total Project:
Sq Ft Valuation Su Ft Valuation
1,000 $11,560.00 1,000 $11,560.00
80 $588.80 80 $588.80
484 $5,808.00 484 $5,808.00
1,048 $64,976.00 1,048 $64,976.00
Totals: 2,612 $82,932.80 2,612 $82,932.80
Units Unit Desc
1 Y OR BLANK
1 Y OR BLANK
1 Y OR BLANK
Permit Total Fees:
Mechanical Permit
Fee Amount
$786.25
$4.50
$172.98
$963.73
Firm: M & L MECHANICAL
Phone: (509) 326-2677
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
2 # OF UNITS
3 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Fee Amount
$10.00
$10.00
$12.00
$2.00
$30.00
$10.00
$10.00
Permit Total Fees: $84.00
Project Number: 99011757 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/09/19 Page 3 of 3
Plumbing Permit
Contractor: GOLD SEAL MECHANICAL INC Firm: GOLD SEAL MECHANICAL INC
Address: 5524 E BOONE AVE Phone: (509) 535-5944
SPOKANE, WA 99212
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
TUBS
DISH WASHERS
CLOTHES WASHER
FLOOR DRAINS
WATER USING DEVICES
Payment Summary:
Operator: DMD
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Units Unit Desc
3 NUMBER OF
4 NUMBER OF
1 NUMBER OF
2 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
3 NUMBER OF
Printed By: DMD
Fee Amount
$963.73
$84.00
$96.00
Fee Amount
$18.00
$24.00
$6.00
$12.00
$6.00
$6.00
$6.00
$18.00
Permit Total Fees: $96.00
Print Date: 12/09/1999
Invoice Amount
$963.73
$84.00
$96.00
$1,143.73 $1,143.73
Notesw,
OK TO ISSUE SEWER PERMITS PER BILLY 6/30/98
Amount Paid
$0.00
$0.00
$0.00
Amount Owing
$963.73
$84.00
$96.00
$0.00 $1,143.73
UTILITIES DIVISION •
N. Bruce Rawls, P.E., Utilities Director
A DIVISION OF THE PUBLIC WORKS DEPARTMENT
GENERAL FACILITIES CHARGE (GFC)
PAYMENT OPTION SELECTION RECORD
Date: ���L �. \�� , Parcel No(s):
Site Address(es):
Builder Name:
OR Owner Name:
Payment Option Selected (Check One):
1. ( )FC payment received at issuance of Sewer Connection Permit by
f
Division c>: Utilities
CI. To be. p0.% k oskn5 .
2. ( ) GFC payment in 24 equal monthly payments upon establishment of Sewer Billing Account.
Complete one of the following statements.
a. Owner's Statement: I, , understand that I will
be billed for the applicable GFC amount in 24 monthly installments. The monthly GFC
installments will be added to my monthly sewer service charges.
Owner's Signature Date
b. Builder's Statement: I, understand that
because I am selecting this option for payment of the GFC, that the purchaser cf the home will
be responsible for payment cf the applicable GFC in 24 equal monthly installments. I agree to
formally disclose to potential buyers of the property that the GFC charges will be added to the
monthly sewer service billings as soon as billing comments.
Builder's Authorized Representative's Signature
Spokane County,
Division of Utilities
1026 W. Broadway • Spokane, WA 99260-01:i0 • (509) 477-3604 FAX: (509) 4774715 TDD: (509) 324-3166
Date
GFC Payment Option Form
Revised 1/26/99
1
This site plan is being submitted for the purpose of
obtaining a building permit and is a true and correct
representation of the proposal. All known property
line/dimensions, curb lines, structures and easement:
O\ Jba' been identified. Also indicated are wetlands,
bodies of water, stee • slopes or other critical areas.
L.. Signed:
r
ADDRESS:
ZONE:
ROAD WIDTH:_412......
FRONT: - , ANKING:
COMMENTS: fir♦
RE /1F. BYO' EN 1....t
� O Cs. 4?
C