1999, 09-16 Permit App: 99008696 ResidenceProject Number: 99008696
Inv: 1 'Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: RESIDENCE W/GARAGE - GAS
Setbacks: Front 36 Left: 16 Right: 20 Rear: 71
Site Information:
Plat Key: 005999 Name: MEADOWLAND
Page 1 of 3
Contact: CHRIS SWANSON/HOMESTE
Address: 312 S FARR RD
C - S - Z SPOKANE WA 99206
Phone: (509) 926-0755
District:
Parcel Number: 45213.3009
SiteAddress: 1409 S GLENN RD Owner: Name: HOMESTEAD CONSTRUCTIO
Spokane, WA USA 99206 Address: 312 S FARR RD
Location:: SPO SPOKANE WA 99206
Zoning: UNKN Unknown
Water District: 007 MODEL
Hold: 0
Area: 13,251 Sq Ft Width: 80 Depth: 141 Right Of Way (ft): 38
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: mmicomonmemap,,s3
Department
BUILDING
Comments:
Review
Site Plan Review
BUILDING Plan Review
Comments:
NGINEER
Comments:
d - -17
2.-.. -r.� s �:.2 51- / 7- F
Approach / Drainage
!-li-91-Fii/t4811)440,15k
UTILITIES Sewer Review/0_2x)
Comments:
Permits:
Project Number: 99008696 Inv: 1
t\�
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/16/99 Page 2 of 3
Contractor: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Building Permit
Firm: HOMESTEAD CONSTRUCTION
Phone: (509) 926-0755
Building Characteristics
Const Category: New
Nbr Of Dwellings: 1 Occupant Load:
Bldg W x D: x Building Sq Ft:
Req Parking: Handicap Parking:
Description Tvpe Notes
BASEMENT U R-3 VN
DECK R-3 VN
GARAGE U-1 VN
RESIDENCE R-3 VN
Item Description
RESIDENTIAL VALUATION
STATE SURCHARGE
RESIDENTIAL SURCHARGE
Building Height:
1873 Sprinklers: 0
Critical Materials: 0
This Application:
Sq Ft Valuation
632 $7,305.92
80 $588.80
650 $7,800.00
1,241 $76,942.00
Totals: 2,603 $92,636.72
Units Unit Desc
1 Y OR BLANK
1 Y OR BLANK
1 Y OR BLANK
Contractor: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS
CLOTHES DRYER
Permit Total Fees:
Mechanical Permit
Stories: 1
Total Project:
Su Ft Valuation
632 $7,305.92
80 $588.80
650 $7,800.00
1,241 $76,942.00
2,603 $92,636.72
Fee Amount
$848.75
$4.50
$186.73
$1,039.98
Firm: HOMESTEAD CONSTRUCTION
Phone:
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
2 # OF UNITS
4 NUMBER OF
1 NUMBER OF
Permit Total Fees:
(509) 926-0755
Fee Amount
$10.00
$12.00
$2.00
$40.00
$10.00
$74.00
Project Number: 99008696 Inv: 1
" Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Date: 9/16/99 Page 3 of 3
Contractor: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
TUBS
DISH WASHERS
CLOTHES WASHER
FLOOR DRAINS
WATER USING DEVICES
Payment Summary:: • • •,wo .
Operator: JAS
Permit Tvpe
Building Permit
Mechanical Permit
Plumbing Permit
Notes:
Units
3
4
1
2
1
1
1
3
Printed By: JAS
Firm: HOMESTEAD CONSTRUCTION
Phone: (509) 926-0755
Unit Desc
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Print Date:
Fee Amount
$18.00
$24.00
$6.00
$12.00
$6.00
$6.00
$6.00
$18.00
Fee Amount Invoice Amount Amount Paid
$1,039.98 $1,039.98 $0.00
$74.00 $74.00 $0.00
$96.00 $96.00 $0.00
$1,209.98 $1,209.98
$96.00
9/16/99
Amount Owing
$1,039.98
$74.00
$96.00
$0.00 $1,209.98
Date:
Site Address(es):
Builder Name: OR Owner Name:
Payment Option Selected (Check One):
1. ( ) G C payment received at issuance of Sewer Connection Permit by
a - To be pa(15 .
Division, of Utilities
UTILrrIEs DIVISION •
N. Bruce Rawls, P.E., Utilities Director
A DIVISION OF THE PUBLIC WORKS DEPARTMENT
GENERAL FACILITIES CHARGE (GFC)
PAYMENT OPTION SELECTION RECORD
Parcel No(s):
2. ( ) GFC payment in 24 equal monthly payments upon establishment of Sewer Billing Account.
Complete one of the following statements.
a. Owner's Statement: I, , understand that I will
be billed for the applicable GFC amount in 24 monthly installments. The monthly GFC
installments will be added to my monthly sewer service charges.
Owners Signature Date
b. Builder's Statement: I, understand that
because I am selecting this option for payment of the GFC, that the purchaser cf the hcme will
be responsible for payment cf the applicable GFC in 24 equal monthly installments. I agree to
for ally disclose to potential buyers of the property that the GFC charges will ce added to the
monthly sewer service billings as soon as billing comments.
Builder's Authorized Representative's Signature Date
Spokane County,
Division of Utilities
1026 W. Broadway • Spokane, WA 99260-0190 • (509) 477-3604 FAX: (509) 4774715 TDD: (509) 324-3166
GFC Payment Option Form
Revised 1/26/99