Loading...
2010, 05-18 Permit App: 10001390 Egress WindowProject Number: 10001390 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/18/2010 Project Information: Page 1 of 2 Permit Use: 1 EGRESS WINDOW Contact: EVERTS, RICKEY L & THERESA M Address: 11610 E GRACE AVE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 924-1547 Group Name: Site Information: Project Name: Plat Key: 001641 Name: MIRABEAU RANCH ADD District: Nor Parcel Number: 45091.1222 Block: Lot: SiteAddress: 11610 E GRACE AVE Location:: CSV Zoning: R-3 SF Res District Water District: 026 IRVIN Area: 12,600 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Owner: Name: EVERTS, RICKEY L & THERESA Address: 11610 E GRACE AVE SPOKANE, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 50 Review Building Plan Review Permits: Released By: Originally Released: 5/18/2010 By: tmelbourn Building Permit Contractor: HOREY CONTRACTING Firm: RICK HOREY CONTRACTING Address: 12201 E MOFFAT RD Phone: (509) 926-4163 MEAD, WA 99021 This Application: Total Project: Description Grp Tv ps Notes Su Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB EGRESS 0 $1,900.00 0 $1,900.00 WINDOW Totals: 0 $1,900.00 0 $1,900.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW <7999 SQ FT 1 SELECT $27.70 Operator: JD Printed By: JD Permit Total Fees: $101.45 Print Date: 5/18/2010 Project Number: 10001390 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/18/2010 Page 2 of 2 Issued Affadavit of Exemption 8/28/2007 - Guardian Senior Care Management (mjp) Issued affidavit of exemption, Rickey L and Theresa Everts, Guardian Senior Care Management, geriatric care management Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $101.45 $10L45 Amount Paid $27.70 Amount Owing $73.75 $101.45 $101.45 $27.70 $73.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 5/18/2010 an rp®ne ' Valley' CITY OF SPOKANE VALLEY Community Development Department Perm11703 Centerst 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterespokanevalley.orq RESIDENTIAL CONSTRUCTION (Staff Use Only) PERMIT NUMBER: PERMIT FEE: _. .: 1r D CSV PERMIT CENTER MAYs 14 2Q10 ,Project# 9 e.�� + l I Nome --,I._ _ ISubmittal #_____ PERMIT APPLICATION NEW CONSTRUCTION ►1 ADDITION/REMODEL ACCESSORY BUILDING ® DECK • OTHER SITE ADDRESS:11610 E GRACE ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME:RICK EVERTS ADDRESS:11610 E GRACE CITY:SPOKANE VALLEY STATE:WA ZIP: PHONE:509-994-9250 FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAM E:HOREY CONTRACTING MAILING ADDRESS:12201 MOFFAT RD CIrY: M EAD STATE:WA Zip:99021 PH0NE:509-926-4163 FAX:509-926-4163 CELL:50S-710- 8938 CONTRACTOR LICENSE No.:HOREYC*994MC EXPIRES: CITY BUSINESS LICENSE No.:L0935475 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: INSTALATION OF 4X4 VINAL SLIDING WINDOW IN BASEMENT OF HOME FOR EXTRA VENTILATION AND LIGHT. Dina 1 nS 3 Effective October 28, 2007 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construc ion Permit App.1.doc c7 ****YOU MUST COMPLETE THE FOLLOWING**** MHKI% 1\//A II- Ivy. .+rr.-+..r.---- Height to Peak: Dimensions:4X4 No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 300/0 Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $1900.00 Q The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will /— DISCLAIMER be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is t e property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Deve..ment code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley perm s not a permit or approve or any violation of federal, state or local laws, codes or ordinances. 6) Plans o additional information may be r sired to be�lsubmitted and/ bsequently approved before this application can be processed. NOO ;nature Method of payment: 0 Cash Bankcard #: /h ❑ Visa ❑ Mastercard EXP: VIN#: Authorized Signature: Effective October 26, 2007Page 3 of 3 http://www.spokanevalley.org/uploads/Community_DeveloPP dent//Documents/Forms/Building/Residential Construgtion Permit o Spokane Valley® For City Use Only PLUS`ProjectNumber, in()(1 Project Address 11703 E Sprague Ave Suite B73_♦ Spokane Valley WA 99206 ' 509.688.0036 • Fax: 509.688.0037 • permitcenter®spoklanevaltey.org_- As part of .our •on-going commitment to customer -service during., the review:process' of yojtin project: application, we areproviding: you with a TARGET. DATE for the initial technical application rev ew: if• for any reason we cannot meet.this,date; we will contactyou'With a revised target date. • Your application review TARGET,DATE'-is' The TARGET DATE' is the .date' We estimate' your. project application -Will have :had ;its review. Itis not the date for approval or permit issuance. '.' - • " Tips fora Smoother Project Application Review 'I:- .Submit complete, accurate plans and'documentsr-,, Elba lime min' be requi:cd for re -.submittals 05'pr1oj£ applicatio2 i•ei;ieirerc irin_/c,di/. (huhlple,:applications,ci/id it 1710.11 be several days be fo, Ihev cari.hiok at rotir, rtensor revised infoi•niatloiti •', Designate a'specific contact, person to communicate with the City.' Whit thelierson de.signcited-as:the applicant's coittachpenon sritli the,Citi- can: be changed,,one inlivi nal "with, the . .expertise for dealing with reviewer ctiminents Would be the best choice `for. Clic entire review /irocess, i Call staftregarding the status your project onlv'after,the target date shownlat'the top of the page: - Although you should he contacted on _or- bi' the.target'deile; please feel free to contact us if rout have// "1 h ard,fi-nn us hr vonr target, date Staff /ium contact yoir before. die target. date if the ;init/0/ / eview,is complete, By") lloiring this procedure, you wilLsare time and a/low the reviewers t� co inplete'tlte.work /tire es»tediihonslv.' Steps in the Permit Process • 1.• Counter Complete. Your application,has;,been 'accepted_as;'counter.'-complete. This means all of. the required', • • documents, as indicated on your Prc Application Cheeklist,has'e heensirbrnitted or have, been liaPpildved oc.: deferred • submittal. This does' not prevent technical staff fromt requesting additional as a result of their technical review,: ' 2. Quality. Check, The next step'in'the process is a duality check to make, sure that the'application is "reg iec ble and tree tiom substantive Claws that would prevent technical staft;trom completing the technical' review' onceit'is'st rted.j, When this step is "complete, Your application will be -routed to the'approp'riate staff and remain in their review' ueue until it ' comes up for review.:.. 3. Technical Compliance.; Once an application is administratively complete; it is routed. to'technicat,staff for;coinpliance review. Depending 011 the type of, project, technical staff may include multiplereviewers:, You should be'bontacted by , phone, fax, email, or mail by your TARGET DATE once the initial technical coinpliance review is complete - . 4. Permit Issuance.` When the technical compliance review of the application is complete,: including,anyis`t,bsequent re- • submittals, each reviewer Will approve then- section of the application and route it to the Perm it Center: When all ections of the application are received, a' Permit -Specialist skill process th'eapplication and contact the person:spec fied OP ,your application for permitpick-up. Information regarding fees and pre -construction meetings`(if required) will be provided by : the Permit Specialist at that tine. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07