2010, 10-01 Permit App: 10003177 Finish BasementProject Number: 10003177 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/1/2010 Page 1 of 2
Project Information:
Permit Use: FINISH BASEMENT - 1 ROOM, 1 EGRESS
WINDOW
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Name: Range
Parcel Number: 45072.3907 Block:
SiteAddress: 7921 E GRACE AVE
Location:: CSV
Contact: ELITE EMPIRE CONSTRUCTION INC
Address: 4333 W LENNOX LOOP
C - S - Z: COEUR D'ALENE ID 83815
Phone: (208) 930-4720
Group Name:
Project Name:
District: Nort
Zoning: R-4 SF Res Urban District
Water District: 002 ORCHARD AVENUE
Area: 11,090 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Permits:
Lot:
Owner: Name: INGRAM, THOMAS W
Address: 7921 E GRACE AVE
SPOKANE VALLEY, WA 99212
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Released By:
Originally Released: 10/1/2010 By: tmelbourn
Building Permit
Contractor: ELITE EMPIRE CONSTRUCTION Firm: ELITE EMPIRE CONSTRUCTION I
Address: 4333 W LENNOX LOOP
COEUR D'ALENE ID 83815
Phone: (208) 930-4720
This Application: Total Project:
Descriation Grp Tvpe Notes Sq Ft Valuation Su Ft Valuation
BASEMENT R R-3 VB 565 SQFT 0 $7,189.31 0 $7,189.31
BASEMENT
REMODEL
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $7,189.31 0 $7,189.31
Units Unit Desc Fee Amount
1 SELECT $153.25
1 SELECT $4.50
1 SELECT $61.30
Permit Total Fees: $219.05
Operator: jmm Printed By: JD Print Date: 10/1/2010
Project Number: 10003177 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/1/2010 Page 2 of 2
Plumbing Permit
Contractor: ELITE EMPIRE CONSTRUCTION Firm: ELITE EMPIRE CONSTRUCTION I
Address: 4333 W LENNOX LOOP
COEUR D'ALENE ID 83815
Phone: (208) 930-4720
Item Description Units Unit Desc Fee Amount
TOILETSBIDETS 1 NUMBER OF $6.00
SINKS 1 NUMBER OF $6.00
SHOWERS 1 NUMBER OF $6.00
Notes:
Payment Summary:
Permit Type
Building Permit
Plumbing Permit
Permit Total Fees: $18.00
Fee Amount Invoice Amount
$219.05
$18.00
$219.05
$18.00
$237.05 $237.05
Amount Paid
$33.30
$0.00
$33.30
Amount Owing
$185.75
$18.00
$203.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 10/1/2010
Spokane
. Valley
Community Development
Residential Construction
Permit Application
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction
Addition/Remodel
SITE ADDRESS:
I92f 6 -Grace
Accessory Bldg
Deck
Other:riestl (D.tete'-F
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: t -4. f)„, bd„l,//i,, (roNsfit,ctio vi .2fAc
Name: 1-641 .. l o fa M
City: CoeAr 6 A/c' I e State: 16 Zip: F3.36-
Address: J��? t G a j et
Contractor Lic No:4JLI7-t-LcC MP Date: 6-._...1._701-1
I /5
City: S�KAne I/�if'r'e y State: wA
Zip: 9672/2
Phone:/_. \ ep-3 _.06I4/Fax:
GARAGE SQ. FTG:
Contact Person
Name: 1411'Ke J otai
Phone:('ZO$) 6S/-6Ss S
Describe the scope of work in detail:
Contractor:
Name: t -4. f)„, bd„l,//i,, (roNsfit,ctio vi .2fAc
Address: if 3 3.- / z...c.Nn OX GDS
City: CoeAr 6 A/c' I e State: 16 Zip: F3.36-
Phone(2 /L2 )? o---',,720Fax:
Contractor Lic No:4JLI7-t-LcC MP Date: 6-._...1._701-1
City Business Lic. No: ya 7c'(
Cost of Project: $ 71V3( ®K
Kidd ;ne 1 &a)/00131 / ,d i ,-00m -y/asS
dau>
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2ND FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG_ :
I
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: j osz-
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for co'.
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit it
signatory is the property owner or has permission to represent the property owner in this transacti
in full compliance with the City of Spokane Valley Development Code. Referenced codes are ave
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval
local laws, codes or ordinances. 6) Plans or additional information may be required to be submit
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2115/07
❑ Check
DATE: el—
❑ Mastercard 0 VISA
Expires: VIN#:
MLCt•f,4((4
FAIJ
L
AA( r u(RE
ire
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application
PERMIT NUMBER:
PERMIT FEE:
Commercial F
Residential
SITE ADDRESS:
Building Owner
Name: Phone: Fax:
Loot in foi(i''
Address: 792 ( _ (.,/,de City: � cf 4e 1/0/le y
/ /ley State: /meq Zip: C/9?/2
Contractor
Name: Phone( -Z08) g30_4/720 Fax:
��� Ei+�pl.^e Vons f�hc'i� cam► 2,10
Address: 17/333 !f,, 400,0 City: dpch/.6i(l01,_ State: Zip: ,,3g/
...z-4
License No:�ctr�6ii �j G7 City Business Lic: •/„.70.,7FL
Contact/Project Manager:
Name: /vl,Iece C o 7 Gt! Phone:(z0�� '�- 'S-
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
1
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
1
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
,)(WATER
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK ❑ VISA ❑ MC
Card#
SIGNATURE:
EXPIRES:
VIN:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/PlumbingPecmitApplication040309.doc
ns
Valley°
Community Development
Mechanical Permit Application
Spokee
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
Commercial
Residential
SITE ADDRESS:
Building Owner
Name: 70
Address: 'J2 ( t
Phone:
Fax:
Contractor
Name: g-C,'•te y �? Co4 ffactibb ..Lr1C
Address: 4,/.3.33 2/ ZA/10A `Qv�
License No: 6~ZZr^ ecgiga i
City: 5P0ae
State: 4l/Q Zrp: /-q 2 / 2
Phone{2O gac_Lf720 Fax:
60;4Itnci)
State: / Zj)
Zip:�3g —
City Business Lic:
Contact/Project Manager:
Name:
Phone:
['CASH ❑ CHECK ❑ VISA ❑ MC
CARD #:
EXPIRES:
SIGNATURE
VIN:
http://wwwspokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM (each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp -100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp — 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp — 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp — over 1,750,000 BTU
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
•
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
['CASH ❑ CHECK ❑ VISA ❑ MC
CARD #:
EXPIRES:
SIGNATURE
VIN:
http://wwwspokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc
For City Use nly,
PLUS Project Number /U -
Project
-Project Address /
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
• Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07