Loading...
2010, 10-01 Permit App: 10003177 Finish BasementProject Number: 10003177 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/1/2010 Page 1 of 2 Project Information: Permit Use: FINISH BASEMENT - 1 ROOM, 1 EGRESS WINDOW Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Parcel Number: 45072.3907 Block: SiteAddress: 7921 E GRACE AVE Location:: CSV Contact: ELITE EMPIRE CONSTRUCTION INC Address: 4333 W LENNOX LOOP C - S - Z: COEUR D'ALENE ID 83815 Phone: (208) 930-4720 Group Name: Project Name: District: Nort Zoning: R-4 SF Res Urban District Water District: 002 ORCHARD AVENUE Area: 11,090 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Permits: Lot: Owner: Name: INGRAM, THOMAS W Address: 7921 E GRACE AVE SPOKANE VALLEY, WA 99212 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 10/1/2010 By: tmelbourn Building Permit Contractor: ELITE EMPIRE CONSTRUCTION Firm: ELITE EMPIRE CONSTRUCTION I Address: 4333 W LENNOX LOOP COEUR D'ALENE ID 83815 Phone: (208) 930-4720 This Application: Total Project: Descriation Grp Tvpe Notes Sq Ft Valuation Su Ft Valuation BASEMENT R R-3 VB 565 SQFT 0 $7,189.31 0 $7,189.31 BASEMENT REMODEL Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $7,189.31 0 $7,189.31 Units Unit Desc Fee Amount 1 SELECT $153.25 1 SELECT $4.50 1 SELECT $61.30 Permit Total Fees: $219.05 Operator: jmm Printed By: JD Print Date: 10/1/2010 Project Number: 10003177 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/1/2010 Page 2 of 2 Plumbing Permit Contractor: ELITE EMPIRE CONSTRUCTION Firm: ELITE EMPIRE CONSTRUCTION I Address: 4333 W LENNOX LOOP COEUR D'ALENE ID 83815 Phone: (208) 930-4720 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 1 NUMBER OF $6.00 SINKS 1 NUMBER OF $6.00 SHOWERS 1 NUMBER OF $6.00 Notes: Payment Summary: Permit Type Building Permit Plumbing Permit Permit Total Fees: $18.00 Fee Amount Invoice Amount $219.05 $18.00 $219.05 $18.00 $237.05 $237.05 Amount Paid $33.30 $0.00 $33.30 Amount Owing $185.75 $18.00 $203.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 10/1/2010 Spokane . Valley Community Development Residential Construction Permit Application 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: PERMIT FEE: New Construction Addition/Remodel SITE ADDRESS: I92f 6 -Grace Accessory Bldg Deck Other:riestl (D.tete'-F ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: t -4. f)„, bd„l,//i,, (roNsfit,ctio vi .2fAc Name: 1-641 .. l o fa M City: CoeAr 6 A/c' I e State: 16 Zip: F3.36- Address: J��? t G a j et Contractor Lic No:4JLI7-t-LcC MP Date: 6-._...1._701-1 I /5 City: S�KAne I/�if'r'e y State: wA Zip: 9672/2 Phone:/_. \ ep-3 _.06I4/Fax: GARAGE SQ. FTG: Contact Person Name: 1411'Ke J otai Phone:('ZO$) 6S/-6Ss S Describe the scope of work in detail: Contractor: Name: t -4. f)„, bd„l,//i,, (roNsfit,ctio vi .2fAc Address: if 3 3.- / z...c.Nn OX GDS City: CoeAr 6 A/c' I e State: 16 Zip: F3.36- Phone(2 /L2 )? o---',,720Fax: Contractor Lic No:4JLI7-t-LcC MP Date: 6-._...1._701-1 City Business Lic. No: ya 7c'( Cost of Project: $ 71V3( ®K Kidd ;ne 1 &a)/00131 / ,d i ,-00m -y/asS dau> Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG_ : I IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: j osz- GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for co'. dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit it signatory is the property owner or has permission to represent the property owner in this transacti in full compliance with the City of Spokane Valley Development Code. Referenced codes are ave Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval local laws, codes or ordinances. 6) Plans or additional information may be required to be submit this application can be processed. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2115/07 ❑ Check DATE: el— ❑ Mastercard 0 VISA Expires: VIN#: MLCt•f,4((4 FAIJ L AA( r u(RE ire Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter@spokanevalley.org Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: Commercial F Residential SITE ADDRESS: Building Owner Name: Phone: Fax: Loot in foi(i'' Address: 792 ( _ (.,/,de City: � cf 4e 1/0/le y / /ley State: /meq Zip: C/9?/2 Contractor Name: Phone( -Z08) g30_4/720 Fax: ��� Ei+�pl.^e Vons f�hc'i� cam► 2,10 Address: 17/333 !f,, 400,0 City: dpch/.6i(l01,_ State: Zip: ,,3g/ ...z-4 License No:�ctr�6ii �j G7 City Business Lic: •/„.70.,7FL Contact/Project Manager: Name: /vl,Iece C o 7 Gt! Phone:(z0�� '�- 'S- # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 1 URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat 1 DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler ,)(WATER PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# SIGNATURE: EXPIRES: VIN: CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule. http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/PlumbingPecmitApplication040309.doc ns Valley° Community Development Mechanical Permit Application Spokee Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter@spokanevalley.org PERMIT NUMBER: PERMIT FEE: Commercial Residential SITE ADDRESS: Building Owner Name: 70 Address: 'J2 ( t Phone: Fax: Contractor Name: g-C,'•te y �? Co4 ffactibb ..Lr1C Address: 4,/.3.33 2/ ZA/10A `Qv� License No: 6~ZZr^ ecgiga i City: 5P0ae State: 4l/Q Zrp: /-q 2 / 2 Phone{2O gac_Lf720 Fax: 60;4Itnci) State: / Zj) Zip:�3g — City Business Lic: Contact/Project Manager: Name: Phone: ['CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: http://wwwspokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts • AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ['CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: http://wwwspokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc For City Use nly, PLUS Project Number /U - Project -Project Address / 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. • Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07