Loading...
2012, 04-02 Permit: SW-12001033 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-001033 Permit Issued Date: 04/02/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ACME EXCAVATING & SEWER BORING CO. Applicant: ACME EXCAVATING & SEWER BORING CO. Permit Type: SEWER Address: 6808 S LINDKE RD GREENACRES, WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: Parcel Number: 8018 E GRACE AVE 45072.4101 Subdivision: ORCHARD AVENUE, REPLAT OF BLKS 151- 154 Assessor's Description: ORCHARD AVE ADD REPLAT BLK 151 TO 154- 178-179&225 E1/2 OF E1/2 OF BLK 251 Inspection Area: Owner: FORSYTHE, CLIFFORD M Address: 8018 E GRACE AVE SPOKANE, WA 99212 Phone: Email: Water District: Orchard Fire District: Fire District 1 Avenue Irrigation District #6 Zoning: Land Area: 0.2632 acres / 11466 sgft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/02/2012 10:44:38 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001033 04/02/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/02/2012 10:44:38 Printed by: IIS APPPOOL\ASP.NET v4.0