2009, 06-17 Permit App: 09001743 DeckProject Number: 09001743 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/17/2009 Page 1 of 2
Project Information:
Permit Use: ATT OPEN DECK Contact: BENCHMARK CUSTOM CONSTRUCTI
Address: 12311 E BIG MEADOWS
C - S - Z: CHATTEROY, WA 99003
Setbacks: Front Left: Right: Rear: Phone: (509) 995-5934
Group Name:
Project Name:
Site Information:
Plat Key: 000767 Name: FAIRACRES District: Nort
Parcel Number: 45092.0769 Block: Lot:
SiteAddress: 10817 E GRACE AVE Owner: Name: CARLSON, D K & L
Address: 10817 E GRACE AVE
Location:: CSV SPOKANE, WA 99206-2604
Zoning: UR -3.5 Urban Residential 3.5
Water District: 026 IRVIN Hold: r]
Area: 21,232 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 6/17/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 6/16/2009 By: tschmidt
Operator: JD Printed By: jmm
Print Date: 6/17/2009
Project Number: 09001743 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/17/2009 Page 2 of 2
Building Permit
Contractor: BENCHMARK CUSTOM Firm: BENCHMARK CUSTOM CONSTR
Address: 12311 E BIG MEADOWS Phone: (509) 995-5934
CHATTEROY, WA 99003
This Application: Total Project:
Description Type Notes So Ft Valuation Su Ft Valuation
DECK OPEN R-3 VB 85 SQFT 0 $3,200.00 0 $3,200.00
OPEN
DECK
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $3,200.00 0 $3,200.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Payment Summary: 1,;��.
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $140.65 $140.65 $38.90 $101.75
Fee Amount
$97.25
$4.50
$38.90
$140.65
$140.65 $140.65
$38.90 $101.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 6/17/2009
Sc ol�ane ''
.Valley
Community Development
rermit Lerner
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: I -1(43
PERMIT FEE:
Residential Construction New Construction Accessory Bldg
Permit Application nAddition/Remodel IRDeck
n Other:
SITE ADDRESS: /O b'(7 E (s r0. ac
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: L
�J&nG1+n10-/sL Cc, 37(04" �.o..,�'rwTrrti, 4 -CC --
Name:
/JaVC c,✓1S on
Phone:Fax:
509-Z 95- -593y 2.3 - G4r11
Address:
10 p 1 7 6. r+i- c a
IMPERVIOUS SURFACE
AREA: ^//;,
City:
5Q.1c.v.. V. 1/.17.State:
Zip:
Phone:
9 Z p- 19 Yo Fax:
CONSTRUCTION TYPE:
02 ..�4-; -/
Contact Person
Name: Ke„ da
Phone: 4 S - 5-13 <<
Describe the scope of work in detail:
Contractor:
Name: L
�J&nG1+n10-/sL Cc, 37(04" �.o..,�'rwTrrti, 4 -CC --
Address:
12 3 r( E /3� yt c...otow.$
City: C 1,.+-1-, -.7 State:4 'tIrl ova
Phone:Fax:
509-Z 95- -593y 2.3 - G4r11
Contractor Lic No: Exp Date: at z zoo
13e4 chGG430 cto
City Business Lic. No: 0 Z G ? 3 RGs.'
Cost of Project: $ �, z
I�p.v►o •t� a r� s f.^..� C - e.. e 4e / rJ o -,-c 1. 4- s 4-
L..t..dd C7G'ct� .,t Si rr�
Proposed Use: 1
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
Af A-/�-
DIMENSIONS:/v'
# OF STORIES:
(V R
TOTAL HABITABLE SPACE:
M1'
MAIN FLOOR TO SQ.
FTG: N4,
2Nu FLOOR SQ. FTG:
14
UNFIN BASEMENT SQ. FTG:
-- N'/a- -
IMPERVIOUS SURFACE
AREA: ^//;,
FINISHED BASEMENT
SQ. FTG: M/I
GARAGE SQ. FTG: a7
MO
DECK/COV. PATIO SQ�FTG:
- fifes .83" SF
30% SLOPES ON
PROPERTY: '(1"
# OF BEDROOMS:
Ark
CONSTRUCTION TYPE:
02 ..�4-; -/
HEA' SOURCE:
A14
SEWER OR SEPTIC?
sem,,-•4"--
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
Mastercard
xpires:
DATE: 4/e,3 -70..E
❑ VISA
VIN#:
RECEIVED BY
CITY nc QnrwANIF VAI LEY
Spokane
jUalley
Site Address: 10817 E GRACE AVE
Parcel Number: 45092.0769
Zoning: UR -3.5
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
PP
Prezious pre -app meeting 0
Plan revisions 0
Transmittal Date:
Monday, June 15, 2009
Water District: IRVIN
Project Number: 09001743
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
BENCHMARK CUSTOM CONSTRU
12311 E BIG MEADOWS
CHATTEROY, WA 99003
(509) 995-5934
BENCHMARK CUSTOM CONSTRU
12311 E BIG MEADOWS
CHATTEROY, WA 99003
(509) 995-5934
Owner: CARLSON, D K & L
10817 E GRACE AVE
SPOKANE, WA 99206-2604
e-mail:
Occupant:
e-mail:
BENCHMARK CUSTOM CONSTRU Arch / Engineer:
12311 E BIG MEADOWS
CHATTEROY, WA 99003
(509) 995-5934
e-mail:
Project
Description: ATT OPEN DECK
11 HI
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLN
A
PLAN
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Sioliane
_.. Valley w
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
1 \ CA
Your application review TARGET DATE is '
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information. •
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE REV 9/07
PLANW itW.);k
• • 01
• • 1 :0
or
7a
41-
t
3 4:
Iasi? c
ir..c.e
71
26
k
S 4,3,4 6c
r re t er et .,-eveo.4.e.<
rkye (1)C‘
741
>
RECHVFD BY.
(-ITV OF SPOKANE VALLEY
LK
BY: -