Loading...
2014, 04-23 Permit: SW-14000457 Sewer Project #12-4-V '30vi d��� RECEIVED # SPOKANE COUNTY UTILOIES PERMIT ( APR 2 8 2014 Application Number: SW-14000457 Permit Issued Date:04/23/2014 Expiration Date: 04/23/2015 —, __ I SII 1 Project Description: SEWER CONNECTION — J Project Name: CENTENIAL PLACE Primary Contact: MARKHAM HOMES,INC Applicant: MARKHAM HOMES,INC Phone: Address: PO BOX 14130 SPOKANE VALLEY,WA 99214 Phone: Email: SITE INFORMATION; Site Address: 16918 E DESCHUTES LN Owner: KDGRA LLC Parcel Number: 45124.0509 Address: 504 E FAIRHAVEN AVE BURLINGTON,WA 98233 Phone: Assessor's Description: CENTENNIAL PLACE PHASE 1 LT 9 BLK 2 Email: (AFN#6254933) Inspection Area: :(509)-477-3675 Water District:Consolidated Irrigation Fire District:Spokane Valley Fire District#19 Zoning: Land Area:9991 Square Feet CONTRACTOR INFORMATION: MARKHHI971DK,Exp.03/12/2015 MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY,WA 99214 509-927-1437 info@markhamhomesinc.com DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed:04/23/2014 07:41:06 Project Coordinator:Dawn Dompier