2014, 04-23 Permit: SW-14000457 Sewer Project #12-4-V
'30vi d���
RECEIVED #
SPOKANE COUNTY UTILOIES
PERMIT ( APR 2 8 2014
Application Number: SW-14000457 Permit Issued Date:04/23/2014
Expiration Date: 04/23/2015 —,
__ I SII 1
Project Description: SEWER CONNECTION — J
Project Name: CENTENIAL PLACE
Primary Contact: MARKHAM HOMES,INC Applicant: MARKHAM HOMES,INC
Phone: Address: PO BOX 14130
SPOKANE VALLEY,WA 99214
Phone:
Email:
SITE INFORMATION;
Site Address: 16918 E DESCHUTES LN Owner: KDGRA LLC
Parcel Number: 45124.0509 Address: 504 E FAIRHAVEN AVE
BURLINGTON,WA 98233
Phone:
Assessor's Description: CENTENNIAL PLACE PHASE 1 LT 9 BLK 2 Email:
(AFN#6254933)
Inspection Area: :(509)-477-3675
Water District:Consolidated Irrigation Fire District:Spokane Valley Fire
District#19
Zoning: Land Area:9991 Square Feet
CONTRACTOR INFORMATION:
MARKHHI971DK,Exp.03/12/2015
MARKHAM HOMES INC
PO BOX 14130 SPOKANE VALLEY,WA 99214
509-927-1437
info@markhamhomesinc.com
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $125.00
Total Fee: $151.64
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:04/23/2014 07:41:06 Project Coordinator:Dawn Dompier